Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “hydro electric power”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

Options for Resilient and Flexible Power Systems in Select South American Economies

This presentation provides highlights from the published report TP-6A50-75431, which summarizes opportunities for Argentina, Brazil, Chile and Colombia to adapt to the new forces buffeting electricity sectors around the globe to ensure reliable, affordable, sustainable and resilient power systems. Special attention is placed on the potential role for natural gas to help ensure flexible and resilient power systems in those countries.

ENERGY PLANNING, POLICY, AND ECONOMY,HYDRO ENERGY,↗

Effects of carbon/graphite fiber contamination on high voltage electrical insulation

The contamination mechanics and resulting failure modes of high voltage electrical insulation due to carbon/graphite fibers were examined. The high voltage insulation vulnerability to carbon/graphite fiber induced failure was evaluated using a contamination system which consisted of a fiber chopper, dispersal chamber, a contamination chamber, and air ducts and suction blower. Tests were conducted to evaluate the effects of fiber length, weathering, and wetness on the insulator's resistance to carbon/graphite fibers. The ability of nuclear, fossil, and hydro power generating stations to maintain normal power generation when the surrounding environment is contaminated by an accidental carbon fiber release was investigated. The vulnerability assessment included only the power plant generating equipment and its associated controls, instrumentation, and auxiliary and support systems.

Garrity, T.↗

Long-run Marginal Emission Rates for Electricity - Workbooks for 2022 Cambium Data

These workbooks contain modeled estimates of long-run marginal emission rates (LRMER) for the contiguous United States. A LRMER is an estimate of the rate of emissions that would be either induced or avoided by a change in electric demand, taking into account how the change could influence both the operation as well as the structure of the grid (i.e., the building and retiring of capital assets, such as generators and transmission lines). It is therefore distinct from the more-commonly-known short-run marginal, which treat grid assets as fixed. Long-run marginal emissions rates are generally appropriate to use when trying to comprehensively estimate the impact of a long-lived (i.e., more than several years) intervention. There are two workbooks that supply the data at two different geographic resolutions: states and GEA regions (20 regions that are similar to, but not exactly the same as, the US EPA's eGRID regions). For more data underlying these emissions factors, see the Cambium 2022 project at https://scenarioviewer.nrel.gov/. For more details on input assumptions and methodology see the associated report (Cambium 2022 Scenario Descriptions and Documentation, https://www.nrel.gov/docs/fy23osti/84916.pdf). This data is planned to be updated annually. Information on the latest versions can be found at https://www.nrel.gov/analysis/cambium.html.

01 COAL, LIGNITE, AND PEAT↗

Modeling a Bulb-Style Kaplan Unit Hydrogovernor and Turbine in Mathworks-Simulink and RTDS-RSCAD

Some run-of-river (ROR) hydropower plants use a horizontal bulb-style Kaplan turbine. This turbine and the corresponding governor are not represented well in standard high-fidelity power-system modeling platforms. This paper presents the characterization, development, and modeling of bulb-style Kaplan turbine and associated hydrogovernor equipment in two platforms: Simulink from the MathWorks, Inc., and RSCAD from RTDS Technologies, Inc. The developed models enable accurate assessment of the response of a bulb-style Kaplan hydropower unit to changes in electrical loading and water conditions. The resulting models enable accurate digital real-time simulation with hardware-in-the-loop testing of this class of turbine, which was not previously possible. This, in turn, improves the ability to innovate these technologies and hybridize them in a lab setting, accelerating the potential for innovation in this type of ROR hydropower plant.

13 HYDRO ENERGY↗

A Comparison of Battery Charge Controller Technologies for Wave Energy Converters

Wave energy is a uniquely challenging field for electrical system designers. High peak and low average power potential with a constantly varying energy input is difficult to harness and control through conventional means. To power the blue economy, low-powered wave energy converters (WECs) need batteries for energy storage. Safely and effectively charging batteries from waves requires a charge controller to properly monitor and control voltage and current going to the battery. Currently, off-the-shelf charge controllers exist for other renewable generation such as wind, hydro, and solar. Two topologies were validated: a buck converter and a pulse width modulation (PWM) charge controller. Using an in-lab dry testbed, wave energy power inputs were simulated to properly validate the effectiveness of existing charge controller technologies, identifying the shortcomings and improvements needed to effectively harness wave energy.

battery storage↗

A Comparison of Battery Charge Controller Technologies for Wave Energy Converters: Preprint

Wave energy is a uniquely challenging field for electrical system designers. High peak and low average power potential with a constantly varying energy input is difficult to harness and control through conventional means. To power the blue economy, low-powered wave energy converters (WECs) need batteries for energy storage. Safely and effectively charging batteries from waves requires a charge controller to properly monitor and control voltage and current going to the battery. Currently, off-the-shelf charge controllers exist for other renewable generation such as wind, hydro, and solar. Two topologies were validated: a buck converter and a pulse width modulation (PWM) charge controller. Using an in-lab dry testbed, wave energy power inputs were simulated to properly validate the effectiveness of existing charge controller technologies, identifying the shortcomings and improvements needed to effectively harness wave energy.

battery storage↗

Large Scale Pumped Storage to Support Renewable Deployment; PSH Resource Assessment and Complementary Analysis for Alaska

The State of Alaska has a rather unique electric power system, as it has two larger transmission grids (Railbelt and Southeast Alaska) and over 150 islanded stand-alone power systems that are serving remote rural communities. In 2010, the Alaska legislature enacted a non-binding goal for 50% of renewable electricity generation by 2025. With the expected increase in wind and solar generation in the future, the role of energy storage becomes increasingly important. Considering the specific power system characteristics in Alaska, energy storage technologies that can supply electricity over an extended period of time, such as pumped storage hydropower (PSH), may play a key role in enabling the reliability and resiliency of both integrated and rural power systems. The overarching objective of the subject study of this presentation is to investigate the prospects and opportunities for PSH in Alaska.

Alaska↗

Energy-Flow-Environment Linkage Map

Understanding how flexibility in environmental requirements can facilitate co-optimization of hydropower production outcomes and environmental outcomes is critical for future grid decision-making and operations as renewable energy resources increase. The environmental and power system outcomes connectivity linkage maps presented here provide a framework for conceptually and quantitatively linking power system outcomes to environmental outcomes through hydropower flow decisions. The Executive Summary Map serves as a starting for exploring the links between hydropower system performance outcomes and environmental outcomes. The centralized topic is “Flow from Hydropower System,” and connects the hydropower operations through “Flow through turbines” and “Non-turbine flows”, and to environmental outcomes through Reservoir elevation” and “Flow downstream of the hydropower system”. To the left of these central topics, “Hydro-mechanical operations” are linked through “Hydro-electrical operations” to “Hydropower performance outcomes” (“Reliability”, “Resilience”, “Revenue”, “Emissions”). On the right, environmental outcomes are grouped together by their physical location: “Upstream Outcomes” (“Upstream geomorphology”, “Upstream recreation”, “Upstream habitat”, “Upstream biota and biodiversity”, “Upstream water quality and greenhouse gas”), Outcomes relevant to both “Upstream/downstream or dam interface” (“Navigation”, “Dam safety and maintenance", “Human health”, “Water supply”, “Flood control”, ”Fish passage”), and “Downstream outcomes“ (e.g., “Downstream geomorphology”, “Downstream recreations”, “Downstream habitat”, “Downstream biota and biodiversity”, “Downstream water quality and greenhouse gas”). Each of these subtopics (e.g., “Hydro-mechanical operations”, “Hydro-electrical operations”, “Upstream geomorphology”, “Upstream recreation”) is further explored through their corresponding submaps. The “Read Me” file provides more detail information on map navigation. The “Models and tools database” file provides detailed information of models and tools presented in the maps.

13 HYDRO ENERGY↗

Validation of Numerical Models of the Offshore Wind Turbine From the Alpha Ventus Wind Farm Against Full-Scale Measurements Within OC5 Phase III

The main objective of the Offshore Code Comparison Collaboration Continuation, with Correlation (OC5) project is validation of aero-hydro-servo-elastic simulation tools for offshore wind turbines (OWTs) through comparison of simulated results to the response data of physical systems. Phase III of the OC5 project validates OWT models against the measurements recorded on a Senvion 5M wind turbine supported by the OWEC Quattropod from the alpha ventus offshore wind farm. The following operating conditions of the wind turbine were chosen for the validation: (1) idling below the cut-in wind speed, (2) rotor-nacelle assembly (RNA) rotation maneuver below the cut-in wind speed, (3) power production below and above the rated wind speed, and (4) shutdown. A number of validation load cases were defined based on these operating conditions. The following measurements were used for validation: (1) strains and accelerations recorded on the support structure and (2) pitch, yaw, and azimuth angles, generator speed, and electrical power recorded from the RNA. Strains were not directly available from the majority of the OWT simulation tools; therefore, strains were calculated based on out-of-plane bending moments, axial forces, and cross-sectional properties of the structural members. The simulation results and measurements were compared in terms of time series, discrete Fourier transforms, power spectral densities, and probability density functions of strains and accelerometers. A good match was achieved between the measurements and models setup by OC5 Phase III participants.

17 WIND ENERGY↗

Optimal scheduling for profit maximization of energy storage merchants considering market impact based on dynamic programming

This paper analyzes how electricity merchants' market impact affects merchants' profit. Energy storage has long been studied for its role in maximizing profit, and merchant decisions are assumed to have no impact on market prices. However, the trading decisions of large-scale energy storage merchants (e.g., pumped storage hydro) will affect the market prices. This paper employs dynamic programming theory to investigate merchants' optimal economic dispatch considering the market impact and physical characteristics of storage systems. Our findings show that the State-of-Charge (SOC) based analytical solution significantly facilitates energy storage merchants' decision-making. The SOC range is segmented into three regions by two optimal SOC reference points, which depend on the available energy in storage, given prices, and market impact. By comparing the current storage SOC with the reference points, the merchant can get the corresponding optimal actions. We analytically show that if the merchant neglects the market impact on the power market, she will exaggerate her expected profit when the price-taker and price-maker merchants have the same generating and pumping upper limits offered to Independent System Operators (ISOs). Furthermore, the profit-maximizing merchant must, therefore, assay to balance the trade-off correctly between the intensity of market impact and the dispatched power. Our findings are verified by numerical simulation, and results demonstrate the ramifications for electricity merchants in energy arbitrage decisions.

25 ENERGY STORAGE↗

Manufacturing and Hydro Testing of a 10 MWe sCO2 Axial Turbine

Abstract Supercritical CO2 (sCO2) power cycles designed for thermodynamic efficiencies above 50% push component designs into pressure and temperature combinations that approach the limits of American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code and ASME Piping Design Codes with Turbine inlet conditions near 250 bar and 715 °C. These design conditions which limit available materials to high nickel alloys are compounded by the high fluid densities of sCO2 at these conditions which result in very compact machinery at the 10 MWe class which are currently being developed for the DOE supercritical transformational electric power (STEP) program. Design of the STEP Turbine is complete with integrated lessons learned from a previous 1 MWth subscale demonstration of a high temperature 10 MWe Turbine designed under the DOE SunShot Program. Fabrication of the STEP Turbine is nearing completion with all housings and pressure containing components in hand. This paper provides a detailed look at design intentions and limitations for the pressurized sections of the main pressure casing and the fabrication of key turbine components. Additional discussion is provided regarding postfabrication inspection and acceptance of the casing for use after issues with casing welds were identified late in the fabrication process.

Engineering↗

Impact of Lost Generation at the Glen Canyon Powerplant due to the Environmental Requirements for the Years 2024 to 2027

This report was prepared by Argonne National Laboratory (Argonne) and the National Renewable Energy Laboratory (NREL) in support of an economic and financial analysis conducted for the U.S. Department of Energy’s Western Area Power Administration (WAPA) of the loss in Glen Canyon power generation due to the environmental requirements for the years 2024 to 2027. WAPA markets electricity produced at hydroelectric facilities operated by the Bureau of Reclamation (Reclamation). The facilities known collectively as the Salt Lake City Area Integrated Projects (SLCA/IP) include dams equipped for power generation on the Colorado, Green, Gunnison, and Rio Grande rivers and on Plateau Creek in the states of Arizona, Colorado, New Mexico, Utah, and Wyoming.

13 HYDRO ENERGY↗

Ice-Penetrating Robot for Scientific Exploration

The cryo-hydro integrated robotic penetrator system (CHIRPS) is a partially developed instrumentation system that includes a probe designed to deeply penetrate the European ice sheet in a search for signs of life. The CHIRPS could also be used on Earth for similar exploration of the polar ice caps especially at Lake Vostok in Antarctica. The CHIRPS probe advances downward by a combination of simple melting of ice (typically for upper, non-compacted layers of an ice sheet) or by a combination of melting of ice and pumping of meltwater (typically, for deeper, compacted layers). The heat and electric power for melting, pumping, and operating all of the onboard instrumentation and electronic circuitry are supplied by radioisotope power sources (RPSs) and thermoelectric converters energized by the RPSs. The instrumentation and electronic circuitry includes miniature guidance and control sensors and an advanced autonomous control system that has fault-management capabilities. The CHIRPS probe is about 1 m long and 15 cm in diameter. The RPSs generate a total thermal power of 1.8 kW. Initially, as this power melts the surrounding ice, a meltwater jacket about 1 mm thick forms around the probe. The center of gravity of the probe is well forward (down), so that the probe is vertically stabilized like a pendulum. Heat is circulated to the nose by means of miniature pumps and heat pipes. The probe melts ice to advance in a step-wise manner: Heat is applied to the nose to open up a melt void, then heat is applied to the side to allow the probe to slip down into the melt void. The melt void behind the probe is allowed to re-freeze. Four quadrant heaters on the nose and another four quadrant heaters on the rear (upper) surface of the probe are individually controllable for steering: Turning on two adjacent nose heaters on the nose and two adjacent heaters on the opposite side at the rear causes melt voids to form on opposing sides, such that the probe descends at an angle from vertical. This steering capability can be used to avoid debris trapped in the ice or to maneuver closer to a trapped object of scientific interest.

Zimmerman, Wayne↗

NREL Helps Hydropower Projects Navigate Complex Regulatory Currents

Hydropower accounts for about 37% of U.S. renewable electricity generation. But before industry members can license and construct new projects or relicense existing projects, they must navigate complex approvals from federal, state, and tribal authorities. These regulations provide critical protections for water quality, species, cultural resources, and recreation, but they can also increase the costs, risks, and uncertainties to license or relicense projects.

HYDRO ENERGY↗

Financial Analysis of Experimental Releases Conducted at Glen Canyon Dam during Water Year 2019

This report was prepared by Argonne National Laboratory in support of a financial analysis of the Glen Canyon Dam high-flow experimental release that is intended to mobilize the sand in the Colorado River with high-volume water releases from the dam and redeposit it downstream as sandbars along the river. These sandbars serve, among other things, as habitat for wildlife. This experimental release was conducted during the period from November 5 to November 8, 2018. This analysis was funded by the Colorado River Storage Project (CRSP) Office of the U.S. Department of Energy Western Area Power Administration (WAPA). CRSP markets electricity produced by hydroelectric facilities collectively known as the Salt Lake City Area Integrated Projects including dams equipped for power generation on the Colorado, Green, Gunnison, and Rio Grande Rivers and on Plateau Creek in the states of Arizona, Colorado, New Mexico, Utah, and Wyoming. Staff members in Argonne’s Energy Systems Division prepared this technical report with assistance from the WAPA CRSP and Energy Marketing and Management Offices.

13 HYDRO ENERGY↗

Financial Analysis of the 2019 Glen Canyon Dam Bug Flow Experiment

This report was prepared by Argonne National Laboratory (Argonne) in support of a financial analysis of the Glen Canyon Dam (GCD) flow experiment that was intended to support downstream macroinvertebrate production that are a primary food supply for fishes in the Colorado River. Also known as “bug flow” experiments, these experimental water releases were conducted on the weekends and holidays from the beginnings of May 2019 through the end of August 2019. This analysis was funded by the Colorado River Storage Project (CRSP) Office of the U.S. Department of Energy’s Western Area Power Administration (WAPA). CRSP markets electricity produced by hydroelectric facilities collectively known as the Salt Lake City Area Integrated Projects including dams equipped for power generation on the Colorado, Green, Gunnison, and Rio Grande Rivers and on Plateau Creek in the states of Arizona, Colorado, New Mexico, Utah, and Wyoming. Staff members in Argonne’s Energy Systems Division prepared this technical memorandum with assistance from WAPA’s CRSP and Energy Marketing and Management Offices (EMMO).

13 HYDRO ENERGY↗

Financial Analysis of the 2020 Macroinvertebrate Production Flow Experiment at Glen Canyon Dam

This report was prepared by Argonne National Laboratory (Argonne) in support of a financial analysis of the Glen Canyon Dam (GCD) flow experiment that was intended to support downstream macroinvertebrate production that are a primary food supply for fishes in the Colorado River. Also known as “bug flow” experiments, these experimental water releases were conducted on the weekends and holidays from the beginnings of May 2020 through the end of August 2020. This analysis was funded by the Colorado River Storage Project (CRSP) Office of the U.S. Department of Energy’s Western Area Power Administration (WAPA). CRSP markets electricity produced by hydroelectric facilities collectively known as the Salt Lake City Area Integrated Projects including dams equipped for power generation on the Colorado, Green, Gunnison, and Rio Grande Rivers and on Plateau Creek in the states of Arizona, Colorado, New Mexico, Utah, and Wyoming. Staff members in Argonne’s Energy Systems Division prepared this technical memorandum with assistance from WAPA’s CRSP and Energy Marketing and Management Offices (EMMO).

13 HYDRO ENERGY↗

PSH Assessment and Site Identification [Slides]

NLR's Pumped Storage Hydropower (PSH) geospatial and cost model algorithms are applied to the Chemehuevi Reservation to assess the potential for PSH within the reservation. The algorithm identifies both "open-loop" PSH opportunities formed by constructing a new reservoir within the reservation paired with bordering Lake Havasu and "closed-loop" systems formed by two new reservoirs within the reservation. Options range from 28 to 538 MW of electrical generation power at maximum generation and 10 hours of storage. CAPEX is estimates as 4422 2022 $\$$/kW of generating power, which is meaningfully higher than the lowest cost systems identified in NLR's national scale assessments. Further economic analysis is needed to fully evaluate whether this would be an attractive option to meet the Chemehuevi Reservation's goals.

25 ENERGY STORAGE↗