High gradient experiments with X -band cryogenic copper accelerating cavities
Not Available
SEARCH · Engineering Papers
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Not Available
Not Available
Explore the source record for details and available documents.
The advanced superconducting test accelerator at Fermilab has accelerated electrons to 20 MeV and, separately, the International Linear Collider (ILC) style 8-cavity cryomodule has achieved the ILC performance milestone of 31.5 MV/m per cavity. When fully completed, the accelerator will consist of a photoinjector, one ILC-type cryomodule, multiple accelerator R&D beamlines, and a downstream beamline to inject 300 MeV electrons into the Integrable Optics Test Accelerator (IOTA). We report on the results of first beam, the achievement of our cryomodule to ILC gradient specifications, and near-term future plans for the facility.
The main goal for this project was to design, build, and evaluate a detuned-cavity, collinear, two-beam accelerator structure. Testing was to be at the Yale University Beam Physics Laboratory, under terms of a sub-grant from Omega-P to Yale. Facilities available at Yale for this project include a 6-MeV S-band RF gun and associated beam line for forming and transporting a ~1 A drive beam , a 300 kV beam source for use as a test beam, and a full panoply of laboratory infrastructure and test equipment. During the first year of this project, availability and functionality of the 6-MeV drive beam and 300 kV test beam were confirmed, and the beam line was restored to a layout to be used with the two-beam accelerator project. Major efforts during the first year were also focused on computational design and simulation of the accelerator structure itself, on beam dynamics, and on beam transport. Effort during the second year was focussed on building and preparing to test the structure, including extensive cold testing. Detailed results from work under this project have been published in twelve archival journal articles, listed in Section IV of the technical report.
The Los Alamos C-band Test stand (CERF-NM) is operational. We are about to start testing and fabricating cavities using various materials and various fabrication methods for both ours and collaborators’ cavities.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
We present the latest progress in developing Low-Surface-Field, or LSF shape SRF cavities and plans for future development.
This presentation discusses recent advances in R&D on 1.3 GHz and 650 MHz bulk niobium SRF cavities. These findings are related to potential applications in the first muon collider.
Over the course of nearly 2 years, the goal of this project has been to identify methods for the separation of uranium oxide particles from other geologic materials. The primary motivation is to assess methods for enhancing the extraction and throughput of actinide particles from environmental samples, enabling the evaluation of these trace actinides through more traditional methods such as thermal ionization mass spectrometry or secondary ion mass spectrometry.
Abstract not provided.
Final technical report on the work performed for Grant number DE‐SC0022057.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Abstract Not Provided