Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “hazard avoidance”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

Orbital Deflection of Comets by Directed Energy

Cometary impacts pose a long-term hazard to life on Earth. Impact mitigation techniques have been studied extensively, but they tend to focus on asteroid diversion. Typical asteroid interdiction schemes involve spacecraft physically intercepting the target, a task feasible only for targets identified decades in advance and in a narrow range of orbits—criteria unlikely to be satisfied by a threatening comet. Comets, however, are naturally perturbed from purely gravitational trajectories via solar heating of their surfaces, which activates sublimation-driven jets. Artificial heating of a comet, such as by a laser, may supplement natural heating by the Sun to purposefully manipulate its path and thereby avoid an impact. Deflection effectiveness depends on the comet’s heating response, which varies dramatically depending on factors including nucleus size, orbit, and dynamical history. These factors are incorporated into a numerical orbital model to assess the effectiveness and feasibility of using high-powered laser arrays in Earth orbit and on the ground for comet deflection. Simulation results suggest that a diffraction-limited 500 m orbital or terrestrial laser array operating at 10 GW for 1% of each day over 1 yr is sufficient to fully avert the impact of a typical 500 m diameter comet with primary nongravitational parameter A {sub 1} = 2 × 10{sup −8} au day{sup −2}. Strategies to avoid comet fragmentation during deflection are also discussed.

79 ASTRONOMY AND ASTROPHYSICS↗

An information diffusion technique to assess integrated hazard risks

An integrated risk is a scene in the future associated with some adverse incident caused by multiple hazards. An integrated probability risk is the expected value of disaster. Due to the difficulty of assessing an integrated probability risk with a small sample, weighting methods and copulas are employed to avoid this obstacle. To resolve the problem, in this paper, we develop the information diffusion technique to construct a joint probability distribution and a vulnerability surface. Then, an integrated risk can be directly assessed by using a small sample. A case of an integrated risk caused by flood and earthquake is given to show how the suggested technique is used to assess the integrated risk of annual property loss.

58 GEOSCIENCES↗

Heterogeneity, pore pressure, and injectate chemistry: Control measures for geologic carbon storage

Desirable outcomes for geologic carbon storage include maximizing storage efficiency, preserving injectivity, and avoiding unwanted consequences such as caprock or wellbore leakage or induced seismicity during and post injection. Here, to achieve these outcomes, three control measures are evident including pore pressure, injectate chemistry, and knowledge and prudent use of geologic heterogeneity. Field, experimental, and modeling examples are presented that demonstrate controllable GCS via these three measures. Observed changes in reservoir response accompanying CO 2 injection at the Cranfield (Mississippi, USA) site, along with lab testing, show potential for use of injectate chemistry as a means to alter fracture permeability (with concomitant improvements for sweep and storage efficiency). Further control of reservoir sweep attends brine extraction from reservoirs, with benefit for pressure control, mitigation of reservoir and wellbore damage, and water use. State-of-the-art validated models predict the extent of damage and deformation associated with pore pressure hazards in reservoirs, timing and location of networks of fractures, and development of localized leakage pathways. Experimentally validated geomechanics models show where wellbore failure is likely to occur during injection, and efficiency of repair methods. Use of heterogeneity as a control measure includes where best to inject, and where to avoid attempts at storage. Lastly, an example is use of waste zones or leaky seals to both reduce pore pressure hazards and enhance residual CO 2 trapping.

58 GEOSCIENCES↗

Integrating the Safety Evaluation for a Molten Salt Reactor Operation and Fuel Cycle Facility Application

Molten salt reactor (MSR) sites may include additional elements of the nuclear fuel cycle beyond those of the existing fleet. In the existing fleet, the individual elements of the fuel cycle typically have been located on different sites and licensed separately. Providing robust separation between hazards remains a useful safety practice for MSRs. Although the different elements of the fuel cycle at a nuclear site that includes MSRs may transfer material between processes more frequently than prior practices, providing adequate separation between distinct facilities avoids the potential for adverse interactions. Additionally, some elements of the MSR fuel cycle, such as fuel salt preparation or waste stabilization, may be more efficient to share among multiple nearby reactors, and nuclear sites that include MSRs may also include other reactor classes. Hence, discrete MSR fuel cycle facilities located at a common site could be physically separated with robust barriers—albeit potentially connected by piping—and licensed individually. This report describes the hazards of individual elements of representative MSR fuel cycle facilities, including their relationship to overall site level hazards. The report maps the regulatory compliance aspects of the individual MSR fuel cycle elements (e.g., fuel salt preparation, reactor, waste stabilization) to existing and developing regulations, as well as describes current and developing site-level regulations from an MSR perspective.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

The Importance of Convective Stage on Out-of-Cloud Convectively Induced Turbulence from High-Resolution Simulations

Turbulence (clear-air, mountain wave, convectively induced) is an aviation hazard that is a challenge to forecast due to the coarse resolution ultilized in operational weather models. Turbulence indices are commonly used to aid pilots in avoiding turbulence, but these indices have been designed and calibrated for midlatitude clear-air turbulence prediction (e.g., the Ellrod index). A significant limitation with current convectively induced turbulence (CIT) prediction is the lack of storm stage dependency. In this study, six high-resolution simulations of tropical oceanic and midlatitude continental convection are performed to characterize the turbulent environment near various convective types during the developing and mature stages. Second-order structure functions, a diagnostic commonly used to identify turbulence in turbulence prediction systems, are used to characterize the probability of turbulence for various convective types. Turbulence likelihood was found to be independent of region (i.e., tropical vs midlatitude) but dependent on convective stage. The probability of turbulence increased near developing convection for the majority of cases. Additional analysis of static stability and vertical wind shear, indicators of turbulence potential, showed that the convective environment near developing convection was more favorable for turbulence production than mature convection. Near developing convection, static stability decreased and vertical wind shear increased. Vertical wind shear near mature and developing convection was found to be weakly correlated to turbulence intensity in both the tropics and the midlatitudes. Finally, this study emphasizes the need for turbulence avoidance guidelines for the aviation community that are dependent on convective stage.

54 ENVIRONMENTAL SCIENCES↗

Far-field Wireless Energy Harvesting for Increased Safeguards Equipment Battery Life.

Modern unattended safeguards equipment (e.g. seals) incorporates many low-power electronic circuits, which are typically powered by expensive and toxic lithium thionyl chloride (LiSOCL2) batteries. The limited life of these batteries necessitates their periodic replacement. This replacement must be performed before total battery discharge to avoid potential loss of continuity of knowledge. Thus, the effective battery capacity becomes significantly less than the actual usable capacity. Additionally, such maintenance is a radiological hazard to personnel, as well as a monetary burden to a safeguards inspectorate. Energy harvesting, a commercially available technology, could extend the operational life of batterypowered equipment to achieve significant efficiencies for safeguards deployments. Energy harvesting is the scavenging and storage of ambient energy sources, such as solar, thermal, and kinetic for use in lowpower electronic applications. While the amount of scavenged energy per unit time may be small, it most often comes from a source that will not be depleted throughout the deployment of the harvesting device. The best-known energy harvesters are solar panels and wind turbines. Recently, far-field wireless energy harvesting has become a commercially available option. Far-field wireless energy harvesting provides consistent, predictable, and un-tethered power over distances up to 50 feet. This process converts radio frequency (RF) energy, both intentionally emitted and ambient, into usable direct current (DC) power. Incorporating far-field wireless energy harvesting into safeguards equipment can significantly extend the equipment’s battery life and perhaps make it indefinite. Furthermore, additional functionality can be added to safeguards equipment without lowering its operational life expectancy. This paper explores the benefits and drawbacks of integrating far-field wireless energy harvesting into a chosen safeguards seal: the Remotely Monitored Sealing Array (RMSA). Specifically, it examines the performance of a commercially available RF harvesting system from Powercast, as well as commercial and custom antenna solutions.

25 ENERGY STORAGE↗

Major Achievements of the Springfields Decommissioning Program - 16512

Since the 1940's, Springfields has manufactured fuel products for the UK's nuclear power stations and for international customers. The early operations were in support of the atomic weapons program, closely followed by fuel manufacture for electricity generation via the Magnox power stations commencing in the late 1950's. In 2005, responsibility for the assets and liabilities of Springfields was transferred to the Nuclear Decommissioning Authority (NDA). A new company, Springfields Fuels Limited, was created to run the site, which was managed and operated by Westinghouse Electric UK Ltd on the NDA's behalf. On April 1, 2010, Westinghouse entered into an agreement with the NDA for a long-term lease of the Springfields site, which transferred responsibility for the commercial fuel manufacturing business and Springfields Fuels Limited to Westinghouse. Today, the main Springfields activities include: - Oxide fuels for Advanced Gas-cooled and Light Water Reactors, as well as intermediate fuel products, such as powders, granules and pellets, - Manufacture of Uranium Hexafluoride (now in Care and Maintenance), - Processing and recovery of Uranium residues, - Decommissioning and demolition of redundant plants and buildings. Some 120 plant buildings and support facilities have been successfully decommissioned and demolished in the period 1996 to date. These range from 1940's buildings, subsequently converted for nuclear fuel manufacture, together with some of the formerly sealed chemical agent manufacture and storage facilities. Decommissioning of the now redundant Magnox manufacturing facilities is ongoing at Springfields without compromising the other site operations. Westinghouse is managing all activities related to the whole lifecycle, planning, design, safety case, radiation protection, Post Operational Clean Out (POCO), service diversions, characterization, decommissioning all phases through to ground remediation, waste disposal and agreed end states. Decommissioning of process plants starts with the removal of the majority of radiological activity or hazard contained within the plant. This is known as Post Operational Clean Out. Once this is complete, the plant may be dismantled. Work is scoped and defined within packages (at plant or cell level) to aid control and commercial monitoring as the decommissioning is progressed. This package approach also enables clean or lightly contaminated items to be removed separately to aid potential re-cycling and minimize decontamination and waste disposal costs. Westinghouse is further optimising work package delivery by planning parallel POCO and Decommissioning work phases within plant at a cell level to systematically remove redundant plant and reduce hazard earlier, whilst optimising use of both internal and external resources to reduce total project cost. Waste and Residues from all phases are disposed of via authorized disposal routes and in accordance with our environmental authorizations. On completion of decommissioning and removal of plant and equipment the building is re-assessed radiologically, categorized and appropriate remediation work progressed to render it safe for conventional demolition. The major elements of the success achieved to date can be attributed to the following elements: - Overall programme management with extensive experience of planning, cost, and risk management. Integration of the programme within a major commercial site without compromising safety or operations. - Complete site EHS management working within a complex regulatory framework including the Nuclear Site Licenses, Environmental Authorisations and Security requirements. - Avoiding safety complacency by use of rigorous and systematic process to emphasise safety over competing goals. Including structured use of Human Performance and Corrective Action and Learning processes. - Unique safety experiences attained through complex hazard reduction across a broad range of uranium manufacturing and chemical hazard/agent facilities. - Project leadership and excellence utilizing a core site team to deploy repeatable processes and safe practices to deliver complex scope within budget and schedule. - Optimised use of internal and external resources, with extensive use of Operating Experience to drive continuous improvement and problem resolution. - Management of Contractors from initial selection, pre-qualification, tender assessment and Performance using varied contract forms across delivery phases. - Use of Westinghouse expertise for safety case, waste management, uranium recovery, health physics and design. - Implementation of a work package to ensure gated discreet manageable packages. Underpinned by package specific method statements, with appropriate hold points to maintain management and control of the works. - Continuous local safety focus via safety planning, induction, plant specific training, proactive risk assessment, and a defined approach to decoupling operating plant safety cases enabling focussed and usable documentation. This paper will provide an overview of the latest decommissioning activities achieved on the Springfields site and will focus on best practices that allowed Westinghouse to maintain the program on time and on budget. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

CBRN Situational Awareness Tools for the Modern Age

CBRN Situational awareness (SA) should be a key operational requirement in the CNI area of discussion, not only for the “boots-on-the-ground” warfighter, but at a strategic level. For example, maneuver plans will need to be developed for contamination avoidance and battlefield survivability. Large datasets from instruments dispersed across the battlefield will thus need to be collected and processed into a holistic assessment of the radiological hazard. From there, hazard maps then must be distributed at the tactical level, all while continuing to effectively engage a peer adversary. This vision represents a network of sensors, software tools, data processing algorithms, communications suites, and common operational picture (COP) platforms working in concert to inform warfighters and command echelons alike of evolving nuclear and radiological hazards. This complex system-of-systems and the ultimate goal of effective engagement in a nuclear or radiological-hazard battlefield can be achieved through pursuit of improvement in collaborative SA tools.

Becker, Eric M.↗

MH-1A Sturgis Decommissioning and Dismantlement - 20281

The U.S. Army Corps of Engineers (USACE) with its prime contractor, Aptim Federal Services, LLC (APTIM), recycled 5,260 metric tons (11.6 million pounds) of material from Sturgis Barge (Sturgis) during the Decommissioning and Dismantlement of the MH-1A nuclear power reactor. The overall objective of the project was to reduce residual radioactivity associated with MH-1A to levels that permitted release of Sturgis for dismantlement and termination of the Army Reactor Office permit. By effectively applying waste hierarchy's three Rs - reduce, reuse and recycle - the Sturgis project not only minimized the amount of waste that required disposal at landfills, but also reduced the potential for long-term environmental liability emanating from these landfills. The project team completed the physical decommissioning efforts in June 2018 in Galveston, TX. In September 2018, radiological surveys were completed to demonstrate the vessel could be released for shipbreaking. Sturgis was towed from Galveston, TX to Brownsville, TX in late September 2018. Shipbreaking, dismantlement and recycling efforts began in early October 2018 and were completed on 15 March 2019. As part of the decommissioning effort in Galveston, the team shipped 69 shipments (860 metric tons) of low-level radioactive waste and radioactive components to the Waste Control Specialist (WCS) facility in Andrews TX for disposal. Certain radioactive components had to be transferred to the Department of Energy prior to placing the materials into the Federal Waste Facility located within WCS. However, most of the radioactive waste was characterized, profiled, approved and managed under the WCS permitted radioactive waste exemption process authorized and implemented by the Texas Commission on Environmental Quality (TCEQ) and the Radioactive Materials Division. This allows LLRW and LLMW to be shipped as regulated waste and then upon receipt at WCS through satisfying the relevant waste acceptance criteria the waste is exempted and placed into the WCS RCRA permitted cell. An additional 35 shipments (544 metric ton) of contaminated hazardous waste water were transported to U.S. Ecology in Robstown, TX for treatment/disposal. An additional 36 shipments (500 metric tons) of non-hazardous wastewater was sent to Republic Waste Services' facility in Fresno, TX. The disposal of these materials required close coordination with State of Texas regulators. During decommissioning, the project team recycled approximately 270 metric tons (600,000 pounds) of lead and steel. As part of the dismantlement in Brownsville, TX the team recycled approximately 5,000 metric tons (11 million pounds) of ferrous and non-ferrous material, limiting our disposal requirements to about 180 metric tons (400,000 pounds) of material (<4% from entire shipbreaking activity). Although the primary hazard being mitigated by this project was radiological, recycling was always a priority for the project. The team strived to achieve sustainability goals as we implemented this one of a kind project. Scrap metal recycling has a large positive impact on the environment and can also favorably impact project disposal costs. Steel is among the most recycled material in the world. Nearly 40% of the world's steel production is made from scrap. Recycling steel also requires 75% less energy than producing it from raw materials. By using recycled steel rather than virgin materials, 2.33 kg of carbon emissions are eliminated per kg of steel [1]. The project recycled more than 4,500 metric tons (10 million pounds) of steel, which eliminated about 10,400 metric tons (23 million pounds) of CO{sub 2}. By implementing a recycling initiative for the Sturgis project, the team was able to realize cost avoidance for disposal of scrap, cost savings from the metals recycled, plus the project provided benefits to the environment through our recycling efforts. Once the dismantlement was complete, the team prepared a detailed decommissioning closure report, which allowed for the termination of the Army Reactor Decommissioning Permit. While it not only reduced any potential long-term environmental liability, this project to decommission and dismantle a floating nuclear power plant is truly unprecedented - it is a prime example of the USACE mission which is: 'Engineering solutions for the Nation's toughest challenges'. This unique, one of a kind, historical power plant was never designed to be taken apart, and the available information about its construction was lacking in many details. The hazards that required mitigation dictated a painstaking and deliberate process in order to avoid any release to the environment and the community, and to protect the health and safety of the workers involved while keeping the waste hierarchy's three R's - reduce, reuse and recycle at the forefront. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

2020 State of the Science Report, Chapter 8: Encounters of Marine Animals with Marine Renewable Energy Device Mooring Systems and Subsea Cables

Many marine renewable energy (MRE) technologies, including floating or midwater wave and tidal devices, require mooring systems (i.e., mooring lines and anchors) to maintain their position within the water column or on the sea surface. In the case of some devices such as tidal kites, these lines and cables can be highly dynamic. An array of non-bottom-mounted devices may also include transmission cables within the water column interconnecting devices to one another, or to offshore substations or hubs on the seabed. The potential for these lines and cables to present hazards for marine animals that may become entangled or entrapped in them, or confused by their presence remains an issue of uncertainty. The degree to which mitigation to avoid or reduce entanglement risk might be required for future MRE installations is yet to be determined, pending greater understanding of the actual nature of the risk. In this chapter, the entanglement or entrapment of a marine animal is defined as the cause to become caught in a system without possibility of escaping. https://tethys.pnnl.gov/publications/state-of-the-science-2020-chapter-8-moorings

16 TIDAL AND WAVE POWER↗

Coordination and control – limits in standard representations of multi-reservoir operations in hydrological modeling

Abstract. Major multi-reservoir cascades represent a primary mechanism for dealing with hydrologic variability and extremes within institutionally complex river basins worldwide. These coordinated management processes fundamentally reshape water balance dynamics. Yet, multi-reservoir coordination processes have been largely ignored in the increasingly sophisticated representations of reservoir operations within large-scale hydrological models. The aim of this paper is twofold, namely (i) to provide evidence that the common modeling practice of parameterizing each reservoir in a cascade independently from the others is a significant approximation and (ii) to demonstrate potential unintended consequences of this independence approximation when simulating the dynamics of hydrological extremes in complex reservoir cascades. We explore these questions using the Water Balance Model, which features detailed representations of the human infrastructure coupled to the natural processes that shape water balance dynamics. It is applied to the Upper Snake River basin in the western US and its heavily regulated multi-reservoir cascade. We employ a time-varying sensitivity analysis that utilizes the method of Morris factor screening to explicitly track how the dominant release rule parameters evolve both along the cascade and in time according to seasonal high- and low-flow events. This enables us to address aim (i) by demonstrating how the progressive and cumulative dominance of upstream releases significantly dampens the ability of downstream reservoir rules' parameters to influence flow conditions. We address aim (ii) by comparing simulation results with observed reservoir operations during critical low-flow and high-flow events in the basin. Our time-varying parameter sensitivity analysis with the method of Morris clarifies how independent single-reservoir parameterizations and their tacit assumption of independence leads to reservoir release behaviors that generate artificial water shortages and flooding, whereas the observed coordinated cascade operations avoided these outcomes for the same events. To further explore the role of (non-)coordination in the large deviations from the observed operations, we use an offline multi-reservoir water balance model in which adding basic coordination mechanisms drawn from the observed emergency operations is sufficient to correct the deficiencies of the independently parameterized reservoir rules from the hydrological model. These results demonstrate the importance of understanding the state–space context in which reservoir releases occur and where operational coordination plays a crucial role in avoiding or mitigating water-related extremes. Understanding how major infrastructure is coordinated and controlled in major river basins is essential for properly assessing future flood and drought hazards in a changing world.

54 ENVIRONMENTAL SCIENCES↗

What Is the Optimal Treatment of Large Brain Metastases? An Argument for a Multidisciplinary Approach

Purpose: Single-modality treatment of large brain metastases (>2 cm) with whole-brain irradiation, stereotactic radiosurgery (SRS) alone, or surgery alone is not effective, with local failure (LF) rates of 50% to 90%. Our goal was to improve local control (LC) by using multimodality therapy of surgery and adjuvant SRS targeting the resection cavity. Patients and Methods: We retrospectively evaluated 97 patients with brain metastases >2 cm in diameter treated with surgery and cavity SRS. Local and distant brain failure (DF) rates were analyzed with competing risk analysis, with death as a competing risk. The overall survival rate was calculated by the Kaplain-Meier product-limit method. Results: The median imaging follow-up duration for all patients was 10 months (range, 1-80 months). The 12-month cumulative incidence rates of LF, with death as a competing risk, were 9.3% (95% confidence interval [CI], 4.5%-16.1%), and the median time to LF was 6 months (range, 3-17 months). The 12-month cumulative incidence rate of DF, with death as a competing risk, was 53% (95% CI, 43%-63%). The median survival time for all patients was 15.6 months. The median survival times for recursive partitioning analysis classes 1, 2, and 3 were 33.8, 13.7, and 9.0 months, respectively (p = 0.022). On multivariate analysis, Karnofsky Performance Status ({>=}80 vs. <80; hazard ratio 0.54; 95% CI 0.31-0.94; p = 0.029) and maximum preoperative tumor diameter (hazard ratio 1.41; 95% CI 1.08-1.85; p = 0.013) were associated with survival. Five patients (5%) required intervention for Common Terminology Criteria for Adverse Events v4.02 grade 2 and 3 toxicity. Conclusion: Surgery and adjuvant resection cavity SRS yields excellent LC of large brain metastases. Compared with other multimodality treatment options, this approach allows patients to avoid or delay whole-brain irradiation without compromising LC.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Brachytherapy and Local Excision for Sphincter Preservation in T1 and T2 Rectal Cancer

Purpose: To report long-term results of brachytherapy after local excision (LE) in the treatment of T1 and T2 rectal cancer at risk of recurrence due to residual subclinical disease. Methods and Materials: Between 1989 and 2007, 32 patients undergoing LE and brachytherapy were followed prospectively for a mean of 6.2 years. Estimates of local recurrence (LR), disease-specific survival (DSS), and overall survival (OS) were generated. Treatment-related toxicity and the effect of known prognostic factors were determined. Results: There were 8 LR (3 T1, 5 T2), of which 5 were salvaged surgically. Median time to the 8 LR was 14 months, and the 5-year rate of local control was 76%. Although there have been 9 deaths to date, only 5 were from disease. Five-year DSS and OS rates were 85% and 78%, respectively. There were 4 cases of Grade 2-3 radionecrosis and 1 case of mild stool incontinence. The sphincter was preserved in 27 of 32 patients. Conclusion: Local excision and adjuvant brachytherapy for T1 and T2 rectal cancer is an appealing treatment alternative to immediate radical resection, particularly in the frail and elderly who are unable to undergo major surgery, as well as for patients wanting to avoid a permanent colostomy.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Lessons From Love Canal: Considerations for the Effective Use of Institutional Controls

The purpose of this paper is to provide background on a well-known failure of an institutional control (IC), an overview of the types and potential shortcomings of individual ICs, provide some considerations for more effectively selecting and maintaining appropriate ICs in the context of a decommissioning project (including those that may be subject to various federal and state requirements). In light of these considerations, it should be clear that the potential liabilities arising from the failure to comply with ICs may be very significant, even if such failure is not directly caused by the party responsible for the pre-existing conditions. A number of options exist to help manage risk at sites where impacts will remain in place following the completion of active decommissioning efforts. It is important to involve all appropriate professionals early on and throughout the process and to consult with other relevant parties (e.g., regulatory agencies, the community, and potential site owners and occupants) to evaluate the most appropriate ICs available. This is particularly critical in the context of a long-term decommissioning project involving a large number of contractors, personnel turnover or departure, potential isolation of individuals with focused technical or regulatory expertise, or other factors that may affect more ideal communication. Mechanisms for ensuring long-term compliance with ICs, as well as reliable approaches for enforcing their terms, also warrant early and on-going attention. However, even with a detailed and thoughtful approach, it must be recognized under certain circumstances that a more realistic goal may be to continue to reasonably minimize potential risks rather than absolutely avoid all risks for all time.

99 GENERAL AND MISCELLANEOUS↗

Radioactive Waste Conditioning, Immobilisation, And Encapsulation Processes And Technologies: Overview And Advances (Chapter 7)

The main immobilization technologies that are available commercially and have been demonstrated to be viable are cementation, bituminization, and vitrification. Vitrification is currently the most widely used technology for the treatment of high level radioactive wastes (HLW) throughout the world. Most of the nations that have generated HLW are immobilizing in either alkali borosilicate glass or alkali aluminophosphate glass. The exact compositions of nuclear waste glasses are tailored for easy preparation and melting, avoidance of glass-in-glass phase separation, avoidance of uncontrolled crystallization, and acceptable chemical durability, e.g., leach resistance. Glass has also been used to stabilize a variety of low level wastes (LLW) and mixed (radioactive and hazardous) low level wastes (MLLW) from other sources such as fuel rod cladding/decladding processes, chemical separations, radioactive sources, radioactive mill tailings, contaminated soils, medical research applications, and other commercial processes. The sources of radioactive waste generation are captured in other chapters in this book regarding the individual practices in various countries (legacy wastes, currently generated wastes, and future waste generation). Future waste generation is primarily driven by interest in sources of clean energy and this has led to an increased interest in advanced nuclear power production. The development of advanced wasteforms is a necessary component of the new nuclear power plant (NPP) flowsheets. Therefore, advanced nuclear wasteforms are being designed for robust disposal strategies. A brief summary is given of existing and advanced wasteforms: glass, glass-ceramics, glass composite materials (GCM’s), and crystalline ceramic (mineral) wasteforms that chemically incorporate radionuclides and hazardous species atomically in their structure. Cementitious, geopolymer, bitumen, and other encapsulant wasteforms and composites that atomically bond and encapsulate wastes are also discussed. The various processing technologies are cross-referenced to the various types of wasteforms since often a particular type of wasteform can be made by a variety of different processing technologies.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Synthesis of ThN using a Carbothermic Reduction to Nitridation Process

The thorium fuel cycle has several advantages when compared to the uranium fuel cycle. Not only is thorium more abundant than uranium, it also avoids many of the disadvantages which are inherent to the uranium fuel cycle. For example, the thorium fuel cycle does not result in significant formation of long lived, highly toxic transuranics that are inevitably formed in the uranium fuel cycle. The fissile U-233 that is created through neutron capture of Th-232 is also more proliferation resistant than the Pu-239 created from the uranium fuel cycle, because of the buildup of U-232, a source of extremely hazardous gamma emitters. Additionally, thermal reactors which utilize the thorium fuel cycle may be used to destroy transuranics through transmutation as opposed to the fast reactors that are typically required for the uranium fuel cycle. The result is that not only does the thorium fuel cycle avoid the production of transuranic actinides, it may also be used to destroy the inventory of these isotopes within existing reactors. The work presented here investigates the fabrication of ThN so that its properties may be studied to determine its feasibility as a nuclear fuel within a thorium fuel cycle. While both ThO{sub 2} and ThN have melt points higher than the metal, one of the potential advantages of using ThN instead of ThO{sub 2} is that it has a 28% higher fertile density. Additionally, previous investigations have suggested that ThN has substantially higher thermal conductivity when compared to ThO{sub 2} fuel. This suggests that if a (Th,U)N solid solution can be shown to behave similarly to (U,Pu)N, the nitride fuel form would possess a significant advantage over (Th,U)O{sub 2} which has poor thermal conductivity. A carbothermic reduction to nitridation (CTR-N) process has been utilized extensively at LANL for the production and study of UN, but this type of process has not been used for the fabrication of high purity ThN. The work presented here describes the development of a similar process which will be used to fabricate bulk ThN for subsequent experimental study. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Conformal Avoidance of Normal Organs at Risk by Perfusion-Modulated Dose Sculpting in Tumor Single-Dose Radiation Therapy

Although 24 Gy single-dose radiation therapy (SDRT) renders >90% 5-year local relapse-free survival in human solid tumor lesions, SDRT delivery is not feasible in ∼50% of oligometastatic lesions owing to interference by dose/volume constraints of a serial organ at risk (OAR). Conformal OAR avoidance is based on a hypothetical model positing that the recently described SDRT biology specifically permits volumetric subdivision of the SDRT dose, such that high-intensity vascular drivers of SDRT lethality, generated within a major tumor subvolume exposed to a high 24 Gy dose (high-dose planning target volume [PTV{sub HD]}), would equilibrate SDRT signaling intensity throughout the tumor interstitial space, rendering bystander radiosensitization of a minor subvolume (perfusion-modulated dose sculpting PTV [PTV{sub PMDS}]), dose-sculpted to meet a serial OAR dose/volume constraint. An engineered PTV{sub PMDS} may thus yield tumor ablation despite PMDS dose reduction and conformally avoiding OAR exposure to a toxic dose.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Logical Approach to Tritium Vacuum Pump Selection

Introduction Vacuum pumps are essential to the operation of tritium purification and recovery processes. However, not all vacuum pumps sold meet the requirements for tritium service. Manufacturers routinely do not fully appreciate the hazards associated with tritium, or the complex materials interactions. Therefore, a decision tree was established detailing which pump types, and certain manufacturers, are either fully compatible, limited use, or to avoid at all costs to establish a more structured and uniform approach to tritium vacuum pumps.

ANGELETTE, LUCAS↗