Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “hardware-in-the-loop laboratory”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

FY 2021 Isolated Grids and Grid-Connected Turbine Reference Systems; Microgrids, Infrastructure Resilience, and Advanced Controls Launchpad (MIRACL)

For individuals, businesses, and communities focused on building resilient electrical grid infrastructure, wind energy can provide an affordable, accessible, and compatible distributed energy resource option that also enhances the capabilities of local grid operations. The Microgrids, Infrastructure Resilience, and Advanced Controls Launchpad (MIRACL) project is a multi-year distributed wind research effort, driven through a partnership between four Department of Energy National Laboratories and industry to develop and improve the planning, design, and operation of wind-centered microgrids to complement solar, energy storage, and other distributed energy resources for grid-tied and isolated operation (U.S. Department of Energy, 2021). This report documents the application of methods developed through the initial three years of the MIRACL project to two real-world distributed wind reference systems. Specifically, the methods demonstrated in this report include 1) a market valuation framework to comprehensively value the services distributed wind can provide and 2) a resilience framework that enables stakeholders to characterize distribution system resilience and compare grid investment decisions from a resilience perspective. Additional methods mentioned in this report include distributed hybrid system design methods for grid resilience, advanced control co-simulation platforms, and power hardware-in-the-loop (PHIL) models. Preliminary results from these additional methods are presented in this report and will be demonstrated and/or applied to the reference systems in the coming year. The purpose of applying these methods to reference systems is to drive technology transfer of the theories, methodologies, and technologies developed under the MIRACL project and increase the number of referenceable case studies available to stakeholders interested in additional value-added capabilities of wind systems beyond bulk energy supply (i.e. kilowatt-hours).

17 WIND ENERGY↗

Demonstration of a Novel Technology to Manage Electricity Demand in Grid-Independent Military Microgrids

This research was conducted by the National Renewable Energy Laboratory (NREL) in collaboration with the S&C Electric Inc. through funding provided by the ESTCP. The project demonstrates use of cybersecure Automated Demand Response (ADR) technology to effectively manage microgrid loads during grid-independent, also known as "islanded," operation. When military microgrids become isolated from the main electrical grid, they are required to balance electricity supply and demand locally. Given that local generation may be constrained, the prevailing strategy involves shedding all but the most critical loads by tripping smart circuit breakers, which then necessitate manual resetting. This approach is generally implemented at the building level, which means that the buildings with mission-critical activities are exempt from load management and remain fully powered, whereas those deemed non-critical can experience a complete loss of service. In this research we developed a method that allows building automation systems to selectively control their assets in response to load shedding request from a microgrid controller, avoiding total loss of service in contrast to the conventional control approach. A commercial OpenADR client server by GridFabric is used for communication between the microgrid controller and the building management system (BMS). The microgrid controller monitors both generation capacity and various assets within the microgrid and issues a demand reduction request when necessary. This request is communicated to the OpenADR server via Modbus. Upon receiving the request, the OpenADR server forwards it to the BMS utilizing the OpenADR protocol. The BMS is pre-configured with various levels of load reduction strategies based on the controllable assets available, allowing for a nuanced approach to demand reduction. Both lab and field tests were performed that considered load shedding needed to achieve closed transition into island mode and to accommodate changing loads and power source availability while islanded. A commercial microgrid controller was used for these tests with normal programming within the expected constraints of the system capabilities. That is, the solution did not require any specialized modification to the code base of the controller. Given the latency of the round-trip communication path between the microgrid controller and the various devices involved with the load shed processes, there are certain scenarios for which the demonstrated solution are appropriate and some which are not. The methods described in this report can be used for load shedding/restoration during transitions between islanded and grid-tied modes of operation, as well as accommodating normal variations in load and the need to remove a power source from operation for maintenance. These methods should not be used for scenarios that require load shedding within a second or two such as sudden and unanticipated significant load increases or loss of power sources through equipment faults.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Customized open source renewable energy models validated through PHIL lab experiments

Energy models for power systems require ongoing updates to reflect advancements in equipment technology and the increasing complexity of power electronic devices. This study utilizes a Power Hardware-in-the-Loop (PHIL) experimental setup to validate custom photovoltaic (PV) inverter models, aiming to enhance and expedite the development of advanced renewable energy models. The research compares the performance of a physical inverter with generic Renewable Energy Source (RES) models recommended by the Western Electricity Coordinating Council (WECC). As inverter-based renewable energy sources become more prevalent in modern electrical grids, it is crucial that dynamic models accurately represent their real-world behavior. Accurate models improve our understanding of these energy resources and their interactions with the grid. The proposed model enhancements are designed to better reflect real inverter performance, based on insights from PHIL experiments. These models are developed using the open source Modelica language and the OpenIPSL Modelica Library, allowing integration across various simulation tools without re-implementation. The paper concludes with a thorough assessment, comparing the enhanced models with PHIL experiments on a real PV inverter in a controlled laboratory setting. As a result, the study provides the enhanced WECC RES models and validation data as open source resources, facilitating further research and development.

Modelica↗

Asynchronous Grid Connections Providing Fast-Frequency Response: System Integration Study

This paper presents an integration study for the recent power electronic-based fast-frequency response technology, "asynchronous grid connection" which operates as an aggregator for behind-the-meter resources and distributed generators. Both technical feasibility and techno-economic viability studies are presented. The fast-frequency response characteristics, validated against Power Hardware-in-the-Loop experiments, are integrated into an IEEE 9- bus system in DigSilent PowerFactory for system-level dynamic analysis. It demonstrates that droop-based control enhancements to local distributed generators allow their aggregation to provide grid-supporting functionalities and participate in the ancillary service markets. To this end, a long-term simulation embedding the system within the ancillary service market framework of PJM has been performed. The fast-frequency response regulation is subsequently used to calculate the potential revenue and project the results on a 15-year investment horizon. Finally, the techno-economic analysis provides recommendations for enhancements to access the full potential of distributed generators on a technical and regulatory level.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Assessment of the Electrical Substation-Grid Testbed with Inside/Outside Devices and Distributed Ledger Technology

The electrical substation-grid testbed was created to integrate the GOOSE and/or DNP (Distributed Network Protocol) messages with time synchronized sources and Distributed Ledger Technology (DLT). The objective was to study the impact of faults and cyber-events at an electrical substation with inside (protective relays) and outside (power meters) substation devices. The electrical substation-grid testbed was based on the design of a 34.5/ 12.47 kV electrical substation (sectionalized bus configuration) with two power transformers, connected to radial power lines and load feeders. The electrical substation-grid testbed was installed at 252 lab space (Advanced Power System Protection), Grid Research Integration and Deployment Center (GRID-C), Oak Ridge National Laboratory. This testbed was created for Task 5, DarkNet project. The electrical substation-grid testbed was created to simulate fault and/or cyber events that could potentially result in damage to the electrical infrastructure. In addition, tests were run that are usually not allowed to be performed in an operational electrical power grid, because these test scenarios could trip breakers and/or generate fault situations that could potentially damage equipment. The number of tests performed in the electrical substation-grid testbed were executed in a better way than in a real electrical substation and/or power grid, because multiple tests could be run in a short period of time, and complex permits, and safety/ schedule restrictions like in a real electrical substation environment were not needed. The electrical substation-grid testbed was created using real measurement, communication, and protection devices that are used by electrical utilities, to have same conditions that we could observe in a real power grid or electrical substation. The electrical substation-grid testbed was based on using a real time simulator and expansion box with amplifiers that were wired to electrical substation-grid devices. This hardware-in-the-loop (HIL) was provided by protective relays, power meters, ethernet switches, remote terminal units, synchronized timing network clock, DLT devices, workstations, and servers. This report includes the design, installation, and assessment of the electrical substation-grid testbed that was similar to an operational electrical substation, integrating the power system protection, communication, and control systems. The results for the electrical substation-grid testbed were based on:• verifying the analog signals for protective relays and power meters, • observing the synchronized time source frame at devices, • authenticating the GOOSE (IEC 61850) and DNP messages from power meters and protective relays, and • verifying the trip conditions of protective relays at fault tests with the power system fault event detection, using DLT devices. For future work, the electrical substation-grid testbed with protective relays and power meters, using DLT and synchronized time source from DarkNet, will be used to study the impact of cyber-events at inside and outside substation devices. Advanced algorithms for detecting cyber-events produced by non-desired protective relay settings will be studied, to improve the detection and reliability of protection, control, and communication systems at power grids.

24 POWER TRANSMISSION AND DISTRIBUTION↗

A Case Study in NREL DERMS Asset Management Implementation

The National Renewable Energy Laboratory (NREL) and Smarter Grid Solutions (SGS) plan to present a case study on their implementation of SGS' Strata Grid Distributed Energy Resource Management System at NREL's Energy Systems Integration Facility (ESIF). The ESIF is one of the nation's premier energy systems integration laboratory facilities focused on development and deployment of clean energy technologies and resilient delivery systems. NREL looked for a DERMS to install at the ESIF that is capable of replicating real world scenarios to control and monitor distributed devices from small residential scale to the grid substation level. The DERMS system demonstrates the use cases of beneficial operation and coordination of modern grid devices, leverage DERs for improved grid planning and operation, demand-side management and customer engagement through bidirectional communication with utilities and energy market operations. The presentation will cover the delivery strategy of NREL and SGS, how the use cases help NREL's research, and NREL and SGS plan to expand the system and use cases.

ARIES↗

New Developments and Capabilities Within WEC-Sim

WEC-Sim is an open-source software for simulating wave energy converters and has been actively developed and applied since its initial release in 2014 to simulate a wide variety of device archetypes. WEC-Sim is developed jointly by the National Renewable Energy Laboratory and Sandia National Laboratories within the MATLAB/SIMULINK environment. A general wave-to-wire model begins with a deployment site resource characterization, which is used to complete the hydrodynamic simulation of wave energy converters (WEC), with the power generation profile imported to a grid simulator to understand the influence on the local electrical network. While modeling the entire wave-to-wire is difficult and encompasses multiple time scales and physics, WEC-Sim is focused on the hydrodynamics simulation to predict, analyze, and optimize WEC dynamics and power performance. WEC-Sim simulations are performed in the time domain based on the radiation and diffraction method using hydrodynamics coefficients derived from boundary element method (BEM)-based frequency-domain potential flow solvers (e.g., WAMIT, NEMOH, Capytaine, or ANSYS-AQWA). With this level of modeling fidelity, WEC-Sim can handle floating body hydrodynamics, mechanical and electrical power generation methods, advanced control implementation, mooring systems, and other unique applications such as desalination. Additional WEC-Sim functionalities include pre-built Simulink blocks and MATLAB scripts that can simulate a wide range of floating systems and the corresponding auxiliary subsystems. The developers of WEC-Sim continue to release new versions of the software, at least annually, with the latest release in September 2022. These releases include bug fixes, updates to software documentation, as well as new features to expand WEC-Sim's capabilities to model a wide range of WEC concepts. This publication will highlight the new features added to WEC-Sim between versions 4.1.0 to 5.0.1, which spans a 2-year period from June 2020 to September 2022. New features described here include topics such as continuous integration checks, revised Morison Element and nonlinear hydro implementations, run directly from Simulink (required for hardware-in-the-loop execution), BEMIO updates to import Capytaine BEM hydrodynamics, addition of cable blocks, and new wave visualization features.

TIDAL AND WAVE POWER↗

New Developments and Capabilities Within WEC-Sim: Preprint

WEC-Sim is an open-source software for simulating wave energy converters, which has been actively developed and applied since its initial release in 2014 to simulate a wide variety of device archetypes. WEC-Sim is developed jointly by the National Renewable Energy Laboratory (NREL) and Sandia National Laboratories (Sandia) within the MATLAB/SIMULINK environment. A general wave-to-wire model begins with a deployment site resource characterization, which is used to complete the hydrodynamic simulation of wave energy converters (WEC), with the power generation profile imported to a grid simulator to understand the influence on the local electrical network. While modeling the entire wave-to-wire is difficult and encompasses multiple time scales and physics, WEC-Sim is focused on the hydrodynamics simulation to predict, analyze, and optimize WEC dynamics and power performance. WEC-Sim simulations are performed in the time domain based on the radiation and diffraction method using hydrodynamics coefficients derived from boundary element method (BEM)-based frequency-domain potential flow solvers (e.g., WAMIT, NEMOH, Capytaine, or ANSYS-AQWA). With this level of modeling fidelity, WEC-Sim can handle floating body hydrodynamics, mechanical and electrical power generation methods, advanced control implementation, mooring systems, and other unique applications such as desalination. Additional WEC-Sim functionalities include pre-built Simulink blocks and MATLAB scripts that can simulate a wide range of floating systems and the corresponding auxiliary subsystems. The developers of WEC-Sim continue to release new versions of the software, at least annually, with our latest release in September 2022. These releases include bug fixes, updates to software documentation, as well as new features to expand WEC-Sim's capabilities to model a wide range of WEC concepts. This publication will highlight the new features added to WEC-Sim between versions 4.1.0 to 5.0.1 which spans over a two year period from June 2020 to September 2022. New features to be described will include topics such as continuous integration checks, revised Morison Element and nonlinear hydro implementations, run directly from Simulink (required for hardware-in-the-loop execution), BEMIO updates to import Capytaine BEM hydrodynamics, addition of cable blocks, and new wave visualization features.

TIDAL AND WAVE POWER↗

Hydrogen Production System Scaling Using a High-Fidelity Simulation-Optimization Framework

Proton exchange membrane (PEM) electrolyzers are widely used for hydrogen production, yet few validated, high-fidelity tools can reliably guide scale-up. Using measured performance from a 50-hour hardware-in-the-loop pilot test, a physics-based, plant-level model of a 1.25 MW PEM electrolyzer and its balance-of-plant (BoP) subsystems is developed and validated. The model couples electrochemistry and thermal/flow submodels and is calibrated against pilot test data via a genetic algorithm (GA) workflow. Validation yields a mean absolute percentage error (APE) of 0.43% for cell voltage and stack power. Two scale-out strategies are then benchmarked under a common 7-day wind-and-photovoltaic (PV) profile: (i) linear duplication of 1.25 MW blocks and (ii) shared-BoP architectures. Sharing BoP between stacks reduces BoP energy by 27% at 10 MW and 34% at 100 MW (vs. linear duplication) and improves system specific energy consumption (SEC) to 52.9 and 52.6 kWh/kg, respectively (from 54.0 kWh/kg with linear duplication). Partial-load studies (25-100% set-point) show that cumulative hydrogen production remains nearly constant down to 50% load because all cases use the same weekly renewable-energy input. Below 50%, the power cap limits how much energy can be used within 168 h, which reduces hydrogen output. The model further indicates that the practical operating optimum lies between 50% and 85% load, where efficiency gains begin to appear without significant loss in hydrogen output. Moreover, the efficiency gains at lower loads are offset by reduced production. The validated framework supports scenario-based engineering trade-off studies for large configurations (10-100 MW) and for operating policies under variable renewables.

08 HYDROGEN↗

Oak Ridge National Laboratory Pilot Demonstration of an Attestation and Anomaly Detection Framework using Distributed Ledger Technology for Power Grid Infrastructure

This report summarizes the design and pilot demonstration of a framework called Grid Guard that was created to provide increased data and device trustworthiness to electric grid devices by leveraging distributed ledger technology (DLT), specifically blockchain. Grid Guard contains a combination of core cryptographic methods such as the secure hash algorithm (SHA), and asymmetric cryptography, private permissioned blockchain, baselining configuration data, consensus algorithm (Raft) and the Hyperledger Fabric (HLF) framework. The system implements a low energy, fast, and robust enhancement to system trustworthiness within and across electric grid systems such as substations, control centers and metering infrastructures. Blockchain is a distributed database structured that provides a practically unalterable (immutable) timeline of stored transactions. By relying on hashing and the Raft consensus algorithm, if an entity tries to illegitimately alter a record at one instance of the database the other ledger nodes are not altered. They work to cross-reference each other and easily locate any incorrectly added data and remove it. The bulk raw data is stored in an off-chain storage (outside of the blockchain ledger) and a hash of this baseline data is stored in the Blockchain ledger via hashing windows of time-series and configuration data, after aggregation and filtering. The bulk off-chain data repository is then considered to be trust-anchored using the hashes stored in the blockchain. To secure the electric grid testbed devices and data, device configuration baselines were compared to those baselines that had been previously stored in the ledger. Statistical baselines for device configurations, network communication patterns, and high-speed sensor data are calculated and then stored off-chain and hashes stored in the ledger. Measurements such as three-phase voltage and current, frequency, breaker status, protection scheme settings, network configuration settings (and other device configuration artifacts) and network traffic features (packet interarrival times) are compared every minute or other selected time windows. During phase 1 of the Grid Guard DLT project different DLT technologies were studies, and an assessment was performed on DLT technology vulnerabilities, uses, and key characteristics. DLT consensus protocols were studies (e.g., RAFT, named after Reliable, Replicated, Redundant, And Fault-Tolerant). Also, cryptography, public, private and permissioned or permissionless systems were assessed. Grid Guard implements a permissioned private DLT. Consensus algorithm selection and choice of DLT implementation depended heavily on the use-case. For this use-case, parameters were selected to measure performance and existing tools for assessment. Benchmarking was performed theoretically and practically. During phase 2 hashed transactions/blocks were inserted into the ledger every second. During phase 2 of the Grid Guard DLT project, a prototype framework was developed and demonstrated for attestation of critical substation devices and data using precision timing systems that use PTP and IRIG-B protocols) on a testbed of operational devices that emulated a distribution substation, control center, and power metering infrastructure using real Operational Technology (OT). The testbed includes OT devices such as protective relays, human machine interfaces (HMI), and power meters. To determine when to collect and compare system and network baselines, an initial examination of an anomaly detection capability to identify malicious manipulation of data streams was conducted. The resulting anomaly detection was demonstrated in a set of experiments and leveraged to trigger device artifact attestation checks. Attestation checks occur against device configuration baselines when compared with the immutable blockchain-stored baselines, which provided a cryptographically supported means by which to store baselines. The electrical substation-grid testbed was created to test the Grid Guard framework. The testbed emulates the operations of a portion of a power grid and SCADA systems as closely as possible. The testbed integrates real protocols, mainly IEC 61850 standard protocols, such as the Sampled Value (SV) and the GOOSE protocols. The testbed also supports DNP3 and other layer 2 and layer 3 protocols such as Telnet, SSH, SFTP/FTP and other proprietary protocols needed to connect to industrial control system equipment. The testbed emulates real power conditions using the OpalRT hardware-in-the-loop (HIL) device which can create fault situations that cannot be easily tested on real systems. The electrical substation-grid testbed was created using real measurement, communication, and protection devices that electrical utilities commonly use.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Balance of Plant Modeling and Real-Time Hardware-in-the-Loop Integration with the Microreactor Automated Control System

The advent of novel microreactor technology has driven a focused effort to explore safety and efficiency improvements that can be achieved through the use of automated system control. Development of control strategies, especially for initial demonstration, requires an adequate surrogate environment to safely research failure modes and control integration with realistic hardware delay. However, efficiency gains from control strategies are improved when the scope of controller action is expanded to include system-level dynamics such as downstream heat extraction and mass flow. For this reason, a balance-of-plant (BOP) model of a representative microreactor system has been developed using the TRANsient Simulation Framework of Reconfigurable Models library in Modelica. This model captures a reactor and primary NaK coolant loop that represent corresponding system components of the Microreactor Applications Research Validation and EvaLuation (MARVEL) design as well as a secondary coolant loop and heat extraction representative of the Microreactor Agile Non-Nuclear Experimental Test Bed (MAGNET). This model configuration allows for hardware-in-the-loop (HIL) integration with microreactor automated control system (MACS) hardware in real time through a Python-based gRPC client. Real-time simulation of model performance with emulated hardware and communication delay suggests that under independent proportional-integral-derivative control of BOP model drum dynamics and downstream heat extraction, stable power load following is achievable. A slight delay in load following, filtering of high-frequency dynamics, and localized temperature fluctation suggest room for improvement through the development of higher-level control strategies. The simulated coupling of the MAGNET facility lays the groundwork for future digital twin analysis with a coupled MACS-MAGNET HIL demonstration.

McConnell, Jono [ORNL] (ORCID:0000000238984741)↗

Using Hardware-In-The-Loop Methodology to Develop Test Systems

Hardware in the Loop (HIL) testing methodologies have become widespread in industry. Typically, they focus on developing control algorithms for systems such as autonomous vehicles or aircraft. An oft overlooked aspect of product development is the design and fabrication of a test system for validating that the product meets requirements. Abstractly, a test system differs little from a control system—testers provide signals to the unit, monitor feedback, and base decisions on the results. While the time scales may differ, the functionalities are conceptually similar. Viewed in this light, it becomes natural to extend HIL approaches to tester development. By replacing a physical unit with a proxy model deployed to a real-time or pseudo real-time target, test systems can be developed in parallel with the design and fabrication of a first production unit. This saves considerable time in the life cycle from conceptual design to realized product. This manuscript demonstrates the process flow using a capacitive discharge unit as an exemplar.

42 ENGINEERING↗

A CHIL Validation of Machine Learning-Assisted Methods for Real-Time Controls of Solar PV for Grid Services

Recent research has highlighted the potential for solar to act as a zero-marginal-cost and zero-emission flexibility resource on the bulk power system when operated with advanced control systems. To increase the performance of these systems, leading technologies, including machine learning (ML) and hierarchical inverter set point allocation, have been proposed; however, these technologies lack comprehensive validation under real-world application scenarios. This paper addresses this gap by designing and developing a controller-hardware-in-the-loop framework to evaluate the performance of different flexible solar technologies in responding to automatic generation control signals in a closed-loop fashion. Simulation results indicate the superior performance of an ML-based approach compared to the conventional reference-control grouping-based approach, showcasing its potential to support grid stability and operational efficiency.

14 SOLAR ENERGY↗

Use of Power Hardware-in-the-Loop and Controller Hardware-in-the-Loop to De-Risk the Use Of Grid-Forming Fuel Cell Inverters in Microgrids

Microgrids continue to proliferate, particularly those that rely on inverter-based resources as the microgrid's voltage and frequency leader. Hardware-in-the-loop simulations can de-risk microgrid deployments, and therefore we need power-hardware-in-the-loop (PHIL) interfaces for grid-forming (GFM) inverters to enable simulations of seamless transitions between islanded and grid-connected operation. Such interfaces are particularly challenging when the inverters need to switch modes, i.e., between grid-following (GFL) and GFM as the microgrid transitions between grid-connected and islanded operation. This presentation shows the use of PHIL interfaces for such microgrids and the preliminary experimental results.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Real-Time Simulation of Ares I Launch Vehicle

The Ares Real-Time Environment for Modeling, Integration, and Simulation (ARTEMIS) has been developed for use by the Ares I launch vehicle System Integration Laboratory (SIL) at the Marshall Space Flight Center (MSFC). The primary purpose of the Ares SIL is to test the vehicle avionics hardware and software in a hardware-in-the-loop (HWIL) environment to certify that the integrated system is prepared for flight. ARTEMIS has been designed to be the real-time software backbone to stimulate all required Ares components through high-fidelity simulation. ARTEMIS has been designed to take full advantage of the advances in underlying computational power now available to support HWIL testing. A modular real-time design relying on a fully distributed computing architecture has been achieved. Two fundamental requirements drove ARTEMIS to pursue the use of high-fidelity simulation models in a real-time environment. First, ARTEMIS must be used to test a man-rated integrated avionics hardware and software system, thus requiring a wide variety of nominal and off-nominal simulation capabilities to certify system robustness. The second driving requirement - derived from a nationwide review of current state-of-the-art HWIL facilities - was that preserving digital model fidelity significantly reduced overall vehicle lifecycle cost by reducing testing time for certification runs and increasing flight tempo through an expanded operational envelope. These two driving requirements necessitated the use of high-fidelity models throughout the ARTEMIS simulation. The nature of the Ares mission profile imposed a variety of additional requirements on the ARTEMIS simulation. The Ares I vehicle is composed of multiple elements, including the First Stage Solid Rocket Booster (SRB), the Upper Stage powered by the J- 2X engine, the Orion Crew Exploration Vehicle (CEV) which houses the crew, the Launch Abort System (LAS), and various secondary elements that separate from the vehicle. At launch, the integrated vehicle stack is composed of these stages, and throughout the mission, various elements separate from the integrated stack and tumble back towards the earth. ARTEMIS must be capable of simulating the integrated stack through the flight as well as propagating each individual element after separation. In addition, abort sequences can lead to other unique configurations of the integrated stack as the timing and sequence of the stage separations are altered.

Tobbe, Patrick↗

Modeling and Simulation of Variable Mass, Flexible Structures

The advent of the new Ares I launch vehicle has highlighted the need for advanced dynamic analysis tools for variable mass, flexible structures. This system is composed of interconnected flexible stages or components undergoing rapid mass depletion through the consumption of solid or liquid propellant. In addition to large rigid body configuration changes, the system simultaneously experiences elastic deformations. In most applications, the elastic deformations are compatible with linear strain-displacement relationships and are typically modeled using the assumed modes technique. The deformation of the system is approximated through the linear combination of the products of spatial shape functions and generalized time coordinates. Spatial shape functions are traditionally composed of normal mode shapes of the system or even constraint modes and static deformations derived from finite element models of the system. Equations of motion for systems undergoing coupled large rigid body motion and elastic deformation have previously been derived through a number of techniques [1]. However, in these derivations, the mode shapes or spatial shape functions of the system components were considered constant. But with the Ares I vehicle, the structural characteristics of the system are changing with the mass of the system. Previous approaches to solving this problem involve periodic updates to the spatial shape functions or interpolation between shape functions based on system mass or elapsed mission time. These solutions often introduce misleading or even unstable numerical transients into the system. Plus, interpolation on a shape function is not intuitive. This paper presents an approach in which the shape functions are held constant and operate on the changing mass and stiffness matrices of the vehicle components. Each vehicle stage or component finite element model is broken into dry structure and propellant models. A library of propellant models is used to describe the distribution of mass in the fuel tank or Solid Rocket Booster (SRB) case for various propellant levels. Based on the mass consumed by the liquid engine or SRB, the appropriate propellant model is coupled with the dry structure model for the stage. Then using vehicle configuration data, the integrated vehicle model is assembled and operated on by the constant system shape functions. The system mode shapes and frequencies can then be computed from the resulting generalized mass and stiffness matrices for that mass configuration. The rigid body mass properties of the vehicle are derived from the integrated vehicle model. The coupling terms between the vehicle rigid body motion and elastic deformation are also updated from the constant system shape functions and the integrated vehicle model. This approach was first used to analyze variable mass spinning beams and then prototyped into a generic dynamics simulation engine. The resulting code was tested against Crew Launch Vehicle (CLV-)class problems worked in the TREETOPS simulation package and by Wilson [2]. The Ares I System Integration Laboratory (SIL) is currently being developed at the Marshall Space Flight Center (MSFC) to test vehicle avionics hardware and software in a hardware-in-the-loop (HWIL) environment and certify that the integrated system is prepared for flight. The Ares I SIL utilizes the Ares Real-Time Environment for Modeling, Integration, and Simulation (ARTEMIS) tool to simulate the launch vehicle and stimulate avionics hardware. Due to the presence of vehicle control system filters and the thrust oscillation suppression system, which are tuned to the structural characteristics of the vehicle, ARTEMIS must incorporate accurate structural models of the Ares I launch vehicle. The ARTEMIS core dynamics simulation models the highly coupled nature of the vehicle flexible body dynamics, propellant slosh, and vehicle nozzle inertia effects combined with mass and flexible body properties that vary significant with time during the flight. All forces that act on the vehicle during flight must be simulated, including deflected engine thrust force, spatially distributed aerodynamic forces, gravity, and reaction control jet thrust forces. These forces are used to excite an integrated flexible vehicle, slosh, and nozzle dynamics model for the vehicle stack that simulates large rigid body translations and rotations along with small elastic deformations. Highly effective matrix math operations on a distributed, threaded high-performance simulation node allow ARTEMIS to retain up to 30 modes of flex for real-time simulation. Stage elements that separate from the stack during flight are propagated as independent rigid six degrees of freedom (6DOF) bodies. This paper will present the formulation of the resulting equations of motion, solutions to example problems, and describe the resulting dynamics simulation engine within ARTEMIS.

Tobbe, Patrick A.↗

Mini AERCam: A Free-Flying Robot for Space Inspection

The NASA Johnson Space Center Engineering Directorate is developing the Autonomous Extravehicular Robotic Camera (AERCam), a free-flying camera system for remote viewing and inspection of human spacecraft. The AERCam project team is currently developing a miniaturized version of AERCam known as Mini AERCam, a spherical nanosatellite 7.5 inches in diameter. Mini AERCam development builds on the success of AERCam Sprint, a 1997 Space Shuttle flight experiment, by integrating new on-board sensing and processing capabilities while simultaneously reducing volume by 80%. Achieving these productivity-enhancing capabilities in a smaller package depends on aggressive component miniaturization. Technology innovations being incorporated include micro electromechanical system (MEMS) gyros, "camera-on-a-chip" CMOS imagers, rechargeable xenon gas propulsion, rechargeable lithium ion battery, custom avionics based on the PowerPC 740 microprocessor, GPS relative navigation, digital radio frequency communications and tracking, micropatch antennas, digital instrumentation, and dense mechanical packaging. The Mini AERCam free-flyer will initially be integrated into an approximate flight-like configuration for laboratory demonstration on an airbearing table. A pilot-in-the-loop and hardware-in-the-loop simulation to simulate on-orbit navigation and dynamics will complement the airbearing table demonstration. The Mini AERCam lab demonstration is intended to form the basis for future development of an AERCam flight system that provides on-orbit views of the Space Shuttle and International Space Station unobtainable from fixed cameras, cameras on robotic manipulators, or cameras carried by space-walking crewmembers.

Fredrickson, Steven↗

SEXTANT X-Ray Pulsar Navigation Demonstration: Flight System and Test Results

The Station Explorer for X-ray Timing and Navigation Technology (SEXTANT) is a technology demonstration enhancement to the Neutron-star Interior Composition Explorer (NICER) mission. NICER is a NASA Explorer Mission of Opportunity that will be hosted on the International Space Station (ISS). SEXTANT will, for the first time, demonstrate real-time, on-board X-ray Pulsar Navigation (XNAV), a significant milestone in the quest to establish a GPS-like navigation capability available throughout our Solar System and beyond. This paper gives an overview of the SEXTANT system architecture and describes progress prior to environmental testing of the NICER flight instrument. It provides descriptions and development status of the SEXTANT flight software and ground system, as well as detailed description and results from the flight software functional and performance testing within the highfidelity Goddard Space Flight Center (GSFC) X-ray Navigation Laboratory Testbed (GXLT) software and hardware simulation environment. Hardware-in-the-loop simulation results are presented, using the engineering model of the NICER timing electronics and the GXLT pulsar simulator-the GXLT precisely controls NASA GSFC's unique Modulated X-ray Source to produce X-rays that make the NICER detector electronics appear as if they were aboard the ISS viewing a sequence of millisecond pulsars.

SEXTANT↗