Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “groundwater pumping”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

Guidance for Monitoring Passive Groundwater Remedies Over Extended Time Scales

Passive remediation can be appropriate where natural processes and actions such as institutional controls mitigate exposure to contaminated groundwater, achieving remedial action objectives and protectiveness of human health and the environment. Monitored natural attenuation (MNA) is a prevalent passive remediation strategy supported by a regulatory framework and monitoring design guidance. MNA can also be used after active remediation has been completed (e.g., pump-and-treat) as a polishing step to reach ultimate remedial action objectives. However, MNA and existing monitoring guidance primarily target situations where the remedial action objectives are met within a few decades. When timescales for passive remediation extend to many decades, a corresponding change in monitoring strategy is needed to adapt to the extended time scale. This document provides guidance for implementing an extended-scale monitoring (ESM) approach appropriate for long-duration passive remediation. Extended-scale is defined in this document with respect to time (i.e., a long duration of remediation) and a large enough physical scale such that receptors will not be impacted within the remediation timeframe.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Wilson Corners SWMU 001 2019-2020 Annual Long-Term Monitoring Report Kennedy Space Center, Florida

This report presents a summary of the long-term monitoring (LTM) activities that occurred in 2019 and 2020 at Wilson Corners, Solid Waste Management Unit 001, at the John F. Kennedy Space Center (KSC), Florida. The site is monitored under KSC’s Resource Conservation and Recovery Act Corrective Action Program. Adaptive site management is being utilized through ongoing assessment, design, and interim measures. This approach also meets the requirements of Chapter 62-780, Florida Administrative Code. The goal of LTM at this site is threefold: to determine groundwater flow characteristics, monitor the downgradient concentration trends, and monitor select locations internal to the groundwater plume. Every 5 years, upgradient and side-gradient monitoring wells are sampled to verify delineation. The last time this was performed was in 2015. Sampling of these wells in 2020 was replaced with the direct push technology investigations in October 2020 and April 2021. The activities presented in this report include three field events: (1) December 2019 -groundwater gauging of 38 monitoring wells and sampling of 36 monitoring wells; (2) May 2020 - groundwater sampling of 7 monitoring wells; and (3) December 2020 - groundwater gauging of 49 monitoring wells and sampling of 43 monitoring wells. During the December 2019 and May 2020 events, monitoring wells were sampled using passive diffusion bags and were analyzed for a “full list” of volatile organic compounds (VOCs), including Freon 113. During the December 2020 event, the low flow sampling method was used, and samples were analyzed for a “select list” of VOCs, including Freon 113. The following conclusions can be made based on the 2019 and 2020 LTM results: •In December 2019 and December 2020, groundwater flow for the site was generally to the west with the individual zones only varying by occasional northerly and southerly components. This is generally consistent with historical observations at the site. •The GCTL plume continues to extend both horizontally and vertically beyond our current monitoring well network. •The vertical extent of VOCs was historically generally delineated by monitoring wells screened greater than 48 feet bls. The results from the two vertical extent monitoring wells WILC-MW0078 and WILC-MW0130 that were sampled during the 2019 and 2020 LTM indicate that groundwater VOC concentrations in both wells were greater than the GCTL. •Freon 113 was not detected above GCTLs during the 2019 and 2020 LTM events. Based on groundwater sampling activities performed during this reporting period, including recent DPT groundwater sampling conducted for the implementation of an air sparge system, the following recommendations are provided: •Install 10 new monitoring wells, which will be sampled along with 49 existing monitoring wells, to assist with delineation of the low concentration plume. The wells are listed inTable 4-1, and the proposed locations are presented on Figures4 -1 through 4-5. (Figures 4-1, 4-2, 4-3, and 4-5 also show updated plumes and proposed performance monitoring well locations. This information will be discussed and presented under a separate cover.) •Modify the annual LTM sampling plan as presented inTable 4-1. •Sampling for future events at the site will be conducted using low flow pumping methods. The next annual LTM sampling event is currently planned for December 2021. Please note the 10 new monitoring wells will not be installed before this event but will be installed as part of the upcoming IM construction and will be sampled during baseline sampling, along with the 49 existing monitoring wells. Following this sampling event, it is recommended that the Annual LTM be combined with the performance monitoring under the IM implementation, and LTM be temporarily discontinued. Objectives of the 2021 LTM are to: (i) evaluate groundwater gradient and flow direction by collecting depth to water measurements from LTM wells; (ii) continue monitoring the peripheral VOC trends in the northern, southern, and western portions of the site by monitoring existing wells and installing and monitoring new wells as recommended; and (iii) monitor select internal plume wells.

Jennifer Lynn Joyal↗

In situ reductive dissolution to remove Iodine-129 from aquifer sediments

The use of an aqueous reductant (Na-dithionite) with pH buffer (K-carbonate, pH 12) was evaluated in this laboratory study as a potential remedial approach for removing Fe oxide associated iodine and enhancing pump-and-treat extraction from iodine-contaminated sediments in the unconfined aquifer in the 200 West Area of the Hanford site. X-ray fluorescence data of untreated sediment indicated that iodine was largely associated with Fe (i.e., incorporated into Fe oxides), however, XANES data was inconclusive as to valence state. During groundwater leaching, aqueous and adsorbed iodine was quickly released, then additional iodine was slowly released potentially from dissolution of one or more surface phases. The Na-dithionite treatment removed greater iodine mass (2.9x) at a faster rate (1 to 4 orders of magnitude) compared to leaching with groundwater alone. Iron extractions for untreated and treated sediments showed a decrease in Fe(III)-oxides, which likely released iodine to aqueous solution. Solid phase inorganic carbon and aqueous Ca and Mg analysis further confirmed that significant calcite dissolution did not occur in these experiments meaning these phases did not release significant iodine. Although it was expected that, after treatment, 127 I concentrations would eventually be lower than untreated sediments, leaching experiments showed continued, elevated iodine concentrations for treated samples over 750 hours. Stop flow events during 1-D column leaching suggested that some iodide precipitated within the first few pore volumes. In the survey of metals during leaching, some silver was detected which could have been solubilized by the elevated pH of initial Na-dithionite injection. Then, silver (or other metals) could have subsequently precipitated with iodide during the initial stop flow event forming a slowly dissolving source. Although significantly greater iodine is removed with treatment, the long-term leaching needs to be investigated further as it may limit dithionite treatment at the field scale.

54 ENVIRONMENTAL SCIENCES↗

Analysis of Microbial Communities as Indicators of Microbially Induced Corrosion Potential in Stainless Steel Piping

The 200 West Area Pump-and-Treat (200W P&T) facility is part of the final remedy decision for the 200 ZP-1 Operable Unit (OU) and is the interim remedial action for 200-UP-1 OU at the Hanford Site. The facility also treats water from other sources across the site, including 200-DV-1 OU perched water, groundwater from the 200-BP-5 OU, and leachate from the Environmental Restoration Disposal Facility. The facility originally operated a biological treatment process for nitrate that resulted in systemic biofouling and loss of injection well capacity, requiring frequent and costly well rehabilitation. Biofouling has also contributed to corrosion of welds and pitting of stainless-steel piping at the facility. The biological treatment for nitrate was suspended at the end of 2019 calendar year to eliminate negative impacts from biological treatments which improve facility operations and treatment of carbon tetrachloride. Evaluation of the 200W P&T facility’s response to operational improvements, specifically the suspension of the biological treatment, provides information on the potential for continued microbially induced corrosion (MIC). To this end, historical data sets (2015-2017) were compared with molecular biological analyses of 200W P&T water samples from 2018-2020 to quantify trends in total microbial biomass and specific microbial indicator species (iron, sulfate, nitrate, and manganese reducing bacteria) known to cause and enhance metal corrosion. Results showed unequivocal reductions (in excess of 90%) in all microbiological indicators measured following the suspension of the biological treatment. Although abundance measurements for all corrosive MIC populations initially declined after removal of the treatment system, nitrate-reducing bacteria (nirK) and sulfate-reducing bacteria remain highly abundant in the system, an order of magnitude higher than the number of cells present prior to the removal of the biological treatment system [5.14e (1.4) cells/L, vs. 1.14e (0.07) cells/L, reported as average (±SD) for n=3]. In addition, there was an unexpected inflection point in 2019 where all microbial indicators increased unexpectedly in abundance in 2020 by as much as two orders of magnitude compared to 2019 samples. Given the limited number of water samples available for this analysis, the cause of the increase in microbial indicators post-biological treatment has not yet been determined. Systematic sampling of the facility for continued monitoring is recommended so that the responses of MIC populations can be evaluated to ensure that further corrosion is avoided, allowing the 200W P&T facility to operate safely and efficiently at design capacity.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Seasonal to Decadal Variability in Focused Groundwater and Contaminant Discharge along a Channelized Stream

Abstract Focused groundwater discharge to streams is problematic at contaminated sites because high fluxes can limit natural attenuation in the hyporheic zone. However, information on location, spatial evolution, and temporal persistence of springs in unlithified sediments over multiyear time scales is limited. We examine discharge at point (~1‐m) to reach (~300‐m) scales along a stream that intercepts trichloroethene and technetium‐99 plumes from a Superfund site. During 2011 to 2012, we seasonally monitored stream and spring flow and contaminant concentrations, along with probing streambed temperatures on a grid in winter and summer, building on prior monitoring during 1999 to 2002. Baseflow measured by both gauging and dye dilution generally increased with distance downstream, and stream and spring discharge varied seasonally, from minima in October to January to maxima in February to June. Thermal anomalies identified by probing occupied approximately 3% to 6% of the reach and typically coincided with visible springs or seeps. Locations of anomalies were similar to those identified in summer 2002, although some orifices disappeared and others emerged. Vertical groundwater fluxes calculated from probing tended to be less than net fluxes calculated from stream discharge, perhaps in part because the assumption of one‐dimensional, steady‐state flow in calculating point fluxes was simplistic. Maximum contaminant concentrations and fluxes decreased between 1999 to 2001 and 2011 to 2012 as a result of partial capture by an upgradient pump‐and‐treat system. Our findings confirm that springs in unlithified sediments can remain stationary within a few meters over decadal time scales, and seasonal variability in discharge can be greater than decadal variability.

Tripathi, Ganesh N.↗

Evaluating Remediation Options for a Perched-Water Unit at the Hanford Site - 20378

At the U.S. Department of Energy's Hanford Site, liquid-phase waste was discharged using surface disposal features such as ponds, trenches, and cribs. These practices distributed contaminants in the subsurface, some of which are currently in the vadose zone above the groundwater. At the 200-DV-1 operable unit (OU) at the Hanford Site, a key feature is a perched-water zone. This perched-water zone contains several million liters of water contaminated with high concentrations of uranium, technetium-99 (Tc-99), and nitrate that serves as a continuing source of contamination to the underlying aquifer. Currently, a pumping system is used to remove contaminant mass from the perched-water zone. However, water extraction will become more challenging as the perched unit dewaters. As a result, residual contaminants remaining after pumping is no longer effective needs to be addressed with post-extraction mitigation approaches, appropriate monitoring, and selection of suitable remediation endpoints. Thus, a remedy evaluation needs to include the unique conditions of this perched-water zone. As part of the initial evaluation, a set of technologies have been preliminarily identified as potentially applicable to the perched-water zone, including in situ remediation technologies to sequester uranium and Tc-99 and to degrade nitrate. While there is sufficient information available for direct consideration of some of the reviewed technologies in a feasibility study, five in situ remediation technologies were identified as needing additional information on their effectiveness under the geochemical and contaminant conditions of the perched-water zone. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Evaluation of a Potential Groundwater Tracer Test in the Ringold Upper Mud Aquifer at the 100-H Area of the Hanford Site

This document presents an evaluation of a potential groundwater tracer test in the uppermost RUM (Ringold Formation member of Wooded Island – upper mud unit) aquifer in the 100-H Area of the Hanford Site. The results from field electrical resistivity tomography (ERT) investigations, numerical flow and transport (F&T) modeling, coupled ERT-F&T model simulations, and laboratory resin experiments provide the technical basis for evaluating tracer test scenarios that minimize impacts to the 100-HX pump and treat (HX P&T) operations, and maximize hydrologic data acquisitions including the use of advanced surface geophysical techniques for monitoring tracer transport.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Aquifer Hydraulic Testing and Characterization Plan for the Ringold Formation Unit A in the Hanford 200-ZP-1 Groundwater Operable Unit and Vicinity

This document presents a plan for testing and characterizing the hydraulic properties of the Ringold Formation, member of Wooded Island – unit A (Rwia) in the 200-ZP groundwater operable unit. The testing approach includes multiple field methods and associated analyses designed to investigate and understand aquifer hydraulic properties over a range of scales. Testing was designed to achieve specific testing objectives identified previously in the 200 ZP-1 Groundwater Operable Unit Ringold Formation Unit A Characterization Sampling and Analysis Plan (Ringold A SAP). The test plan provides necessary technical and operational detail for writing subsequent field test instruction documents specific to each testing location. Hydraulic characterization activities will proceed in a phased manner focusing on areas identified to have knowledge gaps and also critical for remedy modifications and/or selection. These activities are designed to minimize impact to pump-and-treat (P&T) operations and to use existing P&T injection and extraction wells as stress wells, and include use of the new Rwia monitoring wells installed for Ringold A SAP activities. ZP-1 hydraulic testing will include slug testing in new Rwia wells, shutdown-recovery tests in multiple Rwia and composite Ringold Formation member of Wooded Island – unit E (Rwie)-Rwia aquifer test locations, installation of new Automated Water Level Network stations in Rwia monitoring wells, characterization of P&T and barometric responses, identifying the vertical distribution of hydraulic conductivity in the Rwia and Rwie units using electromagnetic borehole flowmeter tests, and single-well tracer testing in select Rwia monitoring wells. Slug testing to be conducted during drilling is described under the Ringold A SAP. The remaining testing activities are to be conducted after well drilling and completion and are described in this test plan.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Pump-and-Treat Impacts on Aquifer Conditions and the Development of System-Wide Performance Strategies - 20377

The pump-and-treat (P and T) system on the Hanford Site's Central Plateau currently treats multiple contaminants within the 200-ZP-1 operable unit, including nitrate through its biological treatment processes. Although it was initially designed to support the 200-ZP-1 Remedial Action Objectives, the P and T system has evolved in use to address contaminants from other regions of the aquifer as well. The P and T influents are biogeochemically distinct, treating groundwaters with elevated concentrations of cyanide, uranium, technetium-99, and nitrate. Given the varying geochemical signatures from current and potential future sources, operational conditions, and amendments considered for treatment processes, there is a need to identify the impacts that the P and T effluent has on the aquifer, and how the aquifer affects P and T performance. To this end, laboratory efforts have focused on characterizing P and T effluent and its biogeochemical effects on the sediments through a series repacked column experiments. The P and T effluent is rich in particulate matter. A systematic inspection of this particulate matter in the P and T effluent showed significant levels of manganese/iron oxides, calcite crystals, relatively large organic matter molecules, and biomass. Therefore, the column experiments were designed and conducted for four different treatment systems: artificial groundwater, filtered P and T effluent, non-filtered P and T effluent, and chlorinated P and T effluent. Different levels of microbiologically- and geochemically-induced changes in the columns occurred and modified the flow systems. For example, physical filtration occurred in the sediments where the particulate material had accumulated in the top portion of the column. Reactive transport modeling of the laboratory experiments is being carried out so that the reaction network can be extrapolated to the field scale. These simulations will provide predictive evaluations of system performance based on P and T operational changes and aquifer mass loading and capacity estimates. This information can be used to address combined subsurface and operational challenges, such as the need for frequent well redevelopment to maintain injection capacity. This information also provides the technical basis for decisions related to the P and T system operations that support remedy optimization efforts and short- and long-term remedy decisions related to multiple operable units on the Hanford Site Central Plateau. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A Comparative Metagenomic Analysis of Specified Microorganisms in Groundwater for Non-Sterilized Pharmaceutical Products

In pharmaceutical manufacturing, ensuring product safety involves the detection and identification of microorganisms with human pathogenic potential, including Burkholderia cepacia complex (BCC), Escherichia coli, Pseudomonas aeruginosa, Salmonella enterica, Staphylococcus aureus, Clostridium sporogenes, Candida albicans, and Mycoplasma spp., some of which may be missed or not identified by traditional culture-dependent methods. In this study, we employed a metagenomic approach to detect these taxa, avoiding the limitations of conventional cultivation methods. We assessed the groundwater microbiome’s taxonomic and functional features from samples collected at two locations in the spring and summer. All datasets comprised 436–557 genera with Proteobacteria, Bacteroidota, Firmicutes, Actinobacteria, and Cyanobacteria accounting for > 95% of microbial DNA sequences. The aforementioned species constituted less than 18.3% of relative abundance. Escherichia and Salmonella were mainly detected in Hot Springs, relative to Jefferson, while Clostridium and Pseudomonas were mainly found in Jefferson relative to Hot Springs. Multidrug resistance efflux pumps and BlaR1 family regulatory sensor-transducer disambiguation dominated in Hot Springs and in Jefferson. These initial results provide insight into the detection of specified microorganisms and could constitute a framework for the establishment of comprehensive metagenomic analysis for the microbiological evaluation of pharmaceutical-grade water and other non-sterile pharmaceutical products, ensuring public safety.

59 BASIC BIOLOGICAL SCIENCES↗

Responses of Florida Scrub Vegetation to Water Additions from a Groundwater Treatment Project and to Hurricane Disturbance

Florida scrub is a fire-maintained shrub vegetation of well-drained, sandy soils; dominant species include several species of Quercus and Serenoa repens. In a remediation project, treated groundwater was distributed through an exfiltration gallery into intact scrub. We established eight permanent line-intercept transects (15 m length) in the site in April 2002, four close to the exfiltration gallery and four more distant from it. We sampled vegetation, < 0.5 m and ≥ 0.5 m, along each transect and measured vegetation height at four points (0, 5, 10, 15 m) annually through 2019. The initial phase of the project operated from October 2002 to early March 2004 (494 days) and distributed 1.74 x 10^8 L of water. The final phase of the project occurred from March 2005 through August 2008 (1251 days) and distributed 1.90 x 10^8 L of water. Pumping raised the water table near the exfiltration gallery. Vegetation height did not differ between the near and far transects initially. Vegetation height increased in the near transects by 2004 with the greatest percent change in 2003 and 2004 as did total cover ≥ 0.5 m. Total cover < 0.5 m and bare ground were similar initially in the near and far transects and declined in the near transects by 2004. Scrub species, particularly the dominant scrub oaks, increased height and cover in response to water additions with no loss of dominant scrub species and no establishment of mesophytes. Hurricane Frances (September 2004) reduced cover ≥ 0.5 m the following year. Hurricane Matthew (October 2016) and Hurricane Irma (September 2017) caused greater damage including breaking limbs as reflected in reduced height and total cover ≥ 0.5 m probably because the older, taller scrub was more vulnerable to wind damage.

Florida scrub↗

Independent Review of Groundwater Remediation Strategy for Hexavalent Chromium and RDX Groundwater Plumes at Los Alamos National Laboratory (Rev. 1)

Site operations at the Los Alamos National Laboratory (LANL) resulted in the release of oxidized chromium, Cr(VI), into Sandia Canyon from cooling tower effluent from 1956 until 1972. The chromium traveled with the surface water approximately 3 miles downstream before migrating below ground surface. Chromium concentrations exceed 50 μg/L in the upper portion of the aquifer. Another LANL groundwater plume of concern is associated with RDX (Royal Demolition Explosives, 1,3,5-trinitro-1,3,5-triazine). Between 1951 and 1996, RDX was released to the mesa-top facilities' process water outfall, adjacent and underlying soils, and alluvial sediments, along with surface water in Cañon de Valle. Between 2000 and 2010, two remedial actions were deployed, removing much of the near-surface RDX, however, recharge due to precipitation has transported RDX into the perched-intermediate zone and into the regional aquifer. The report documents an independent technical review by scientists from the Department of Energy (DOE) Network of National Laboratories for Environmental Management and Stewardship (NNLEMS) to provide recommendations for potential near term actions to address and optimize remediation for both the Cr(VI) and RDX plumes. The proposed near-term remedial actions include design of pump and treat systems for Cr(VI) and monitoring and study for natural attenuation for RDX. The review assesses existing data, conceptual and numerical modeling, and it recommends a technical integration process to support identifying and implementing strategic, effective and efficient remedies. The DOE Environmental Management Los Alamos Field Office (EM-LA) and their cleanup contractor Newport News Nuclear-BWTX, LLC Los Alamos (N3B) provided the information required for the review. Interviews were also conducted with regulators to obtain the full spectrum of technical, regulatory and scientific perspectives. The independent review team was impressed by the capabilities, experiences, innovativeness, and insightfulness of the technical representatives from both the regulator, the New Mexico Environment Department (NMED) and N3B. Incorporation of vadose zone flow pathways in the conceptual site model (CSM) and configuring the numerical modeling for the site was generally state-of-the-practice (or better). This could be considered state-of-the-art by addressing uncertainties related to spatial extent of hydraulic windows. The reviews from the regulators were thorough and often provided useful concepts for consideration and future/study resolutions. The overarching consensus recommendation of independent review team is that the LANL groundwater plumes should be addressed in context of the emerging "management of complex sites" paradigm.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Estimating irrigation water use from remotely sensed evapotranspiration data: Accuracy and uncertainties at field, water right, and regional scales

Irrigated agriculture is the dominant user of water globally, but most water withdrawals are not monitored or reported. As a result, it is largely unknown when, where, and how much water is used for irrigation. Here, we evaluated the ability of remotely sensed evapotranspiration (ET) data, integrated with other datasets, to calculate irrigation water withdrawals and applications in an intensively irrigated portion of the United States. We compared irrigation calculations based on an ensemble of satellite-driven ET models from OpenET with reported groundwater withdrawals from hundreds of farmer irrigation application records and a statewide flowmeter database at three spatial scales (field, water right group, and management area). At the field scale, we found that ET-based calculations of irrigation agreed best with reported irrigation when the OpenET ensemble mean was aggregated to the growing season timescale (bias = 1.6–4.9%, R 2 = 0.53–0.74), and agreement between calculated and reported irrigation was better for multi-year averages than for individual years. At the water right group scale, linking pumping wells to specific irrigated fields was the primary source of uncertainty. At the management area scale, calculated irrigation exhibited similar temporal patterns as flowmeter data but tended to be positively biased with more interannual variability. Disagreement between calculated and reported irrigation was strongly correlated with annual precipitation, and calculated and reported irrigation agreed more closely after statistically adjusting for annual precipitation. The selection of an ET model was also an important consideration, as variability across ET models was larger than the potential impacts of conservation measures employed in the region. From these results, we suggest key practices for working with ET-based irrigation data that include accurately accounting for changes in soil moisture, deep percolation, and runoff; careful verification of irrigated area and well-field linkages; and conducting application-specific evaluations of uncertainty.

59 BASIC BIOLOGICAL SCIENCES↗

Pumped-Storage Hydropower using Abandoned Underground Mines (PSH-AUM) as an Innovative Energy Storage Technology for Fossil-Integrated Systems

Pumped-storage hydropower (PSH) provides around 95% of all utility-scale energy storage in the U.S. and globally. Additional deployment of PSH is hampered by excessively long permitting and commissioning requirements and is constrained to locations for which natural topography provides suitable elevation relief between the upper and lower reservoirs (the ΔH challenge). The purpose of this research was to evaluate Pumped-Storage Hydropower using Abandoned Underground Mines (PSH-AUM) as a means to solve the ΔH challenge and initiate the commercialization pathway for a promising new energy storage technology. Four primary tasks were conducted: Screening and ranking of candidate sites for project development; multiphase reservoir modeling to evaluate mine performance; techno-economic analysis and preliminary designs for PSH-AUM systems integrated with fossil-fuel power units; and stakeholder engagement to identify pathways to commercialization of this new technology. Key results were achieved in each of the four primary tasks. Candidate site screening determined that nearly 10,000 underground mines were spatially locatable, of which more than 100 sites appear suitable for integration with existing fossil power plants that are expected to remain in longer-term operation. Mine reservoir models were developed using PNNL’s STOMP simulator and parameterized using candidate site data to evaluate interactions with the surrounding groundwater system and confirm the potential for some mines to accommodate inflows and outflows on the order of 100 m3/s over 8-hour durations (1.6 GWh system) without excessive aqueous pressures. Techno-economic analysis resulted in a project cost optimization scheme to identify key sensitivities and the development of preliminary designs that can minimize overall costs of deployment. Finally, stakeholder engagement with industry, state government, and local economic development leaders confirmed the viability of PSH-AUM as a promising new technology. Our Phase I project results suggest that PSH-AUM technology has a domestic market potential on the order of $100+ Billion with ample space for technology development to commercialization within the next decade.

13 HYDRO ENERGY↗

Flow rate logging seepage meter

An apparatus for remotely measuring and logging the flow rate of groundwater seepage into surface water bodies. As groundwater seeps into a cavity created by a bottomless housing, it displaces water through an inlet and into a waterproof sealed upper compartment, at which point, the water is collected by a collection bag, which is contained in a bag chamber. A magnet on the collection bag approaches a proximity switch as the collection bag fills, and eventually enables the proximity switch to activate a control circuit. The control circuit then rotates a three-way valve from the collection path to a discharge path, enables a data logger to record the time, and enables a pump, which discharges the water from the collection bag, through the three-way valve and pump, and into the sea. As the collection bag empties, the magnet leaves the proximity of the proximity switch, and the control circuit turns off the pump, resets the valve to provide a collection path, and restarts the collection cycle.

Reay, William G.↗

Distributed Acoustic Sensing as a Distributed Hydraulic Sensor in Fractured Bedrock

Distributed acoustic sensing (DAS) was originally intended to measure oscillatory strain at frequencies of 1 Hz or more on a fiber optic cable. Recently, measurements at much lower frequencies have opened the possibility of using DAS as a dynamic strain sensor in boreholes. A fiber optic cable mechanically coupled to a geologic formation will strain in response to hydraulic stresses in pores and fractures. A DAS interrogator can measure dynamic strain in the borehole, which can be related to fluid pressure through the mechanical compliance properties of the formation. Because DAS makes distributed measurements, it is capable of both locating hydraulically active features and quantifying the fluid pressure in the formation. We present field experiments in which a fiber optic cable was mechanically coupled to two crystalline rock boreholes. The formation was stressed hydraulically at another well using alternating injection and pumping. The DAS instrument measured oscillating strain at the location of a fracture zone known to be hydraulically active. Rock displacements of less than 1 nm were measured. Laboratory experiments confirm that displacement is measured correctly. These results suggest that fiber optic cable embedded in geologic formations may be used to map hydraulic connections in three-dimensional fracture networks. A great advantage of this approach is that strain, an indirect measure of hydraulic stress, can be measured without beforehand knowledge of flowing fractures that intersect boreholes. The technology has obvious applications in water resources, geothermal energy, CO 2 sequestration, and remediation of groundwater in fractured bedrock.

54 ENVIRONMENTAL SCIENCES↗

Electrical Resistivity Tomography Monitoring of In Situ Soil Flushing at the Hanford 100-K East Area: 100KE Soil Flushing Monitoring

Former operations in the 100-KE Area at the Hanford Site resulted in vadose zone hexavalent chromium that provides a source of groundwater contamination. Previous efforts to remediate vadose zone chromium involved excavation and offsite treatment of contaminated soils. Although much of the chromium was removed, contamination still exists in native soil between the water table and the bottom of the pit, which has since been backfilled. In-situ soil flushing was tested at the 100-KE Area to accelerate the removal of the remaining hexavalent chromium in the vadose zone. Soil flushing works by applying clean flush water at the surface, which mobilizes and transports chromium as it migrates downward to the water table. Once the chromium reaches the water table, it is hydraulically contained, extracted, and treated through pump and treat operations. The efficacy of soil flushing is directly related to the volume of clean water that infiltrates through contaminated soils. Therefore, performance monitoring requires and understanding of flush water migration through the vadose zone. It is challenging to comprehensively assess soil flushing performance via borehole access due to the limited volume of investigation afforded by a given wellbore. As an alternative, 3D time-lapse electrical resistivity tomography (ERT) was tested as a method of monitoring the distribution of flush water over time within the vadose zone. ERT is a method of imaging the bulk electrical conductivity of the subsurface, which is highly dependent on water saturation levels in unconsolidated and unsaturated sediments. Thus, the timing and location of changes in bulk conductivity caused by soil flushing can be used to infer flush water migration pathways. In this report we present results of 3D time-lapse ERT imaging during two separate soil flushing campaigns conducted during the spring and summer months of 2022 and 2023. Results show generally that: 1) Pit backfill materials appear to nominally have larger permeability than native soils. Consequently, the boundary between pit backfill and native soil had a significant impact on flush water migration, causing some flush water to migrate along the pit boundary to the bottom of the pit. 2) Non-uniform flows, likely caused by variations in hydrogeologic properties, developed in the pit backfill materials, resulting in uneven flush water distribution on the southern margin of the soil flushing zone. 3) Redistribution of water at the interface between backfill materials and Hanford formation materials likely facilitated elevated and uniform distribution of flush water within native soils beneath the deeper parts of the pit boundary beneath the center of the flush zone, which presumably overlie soils with elevated chromium contamination. These areas appear to have been infiltrated by higher volumes of flush water than the northern and southern margins of the flush zone. 4) In comparison to 2022, high flush water application rates significantly improved flush water distribution throughout the target flushing zone. 5) Imaging resolution was limited to a depth of approximate 20 meters below the land surface, due primarily to limitations on the lateral extent of the surface ERT array. The ~10 m region of the vadose zone between approximately 130 meters elevation and the water table at approximately 120 meters elevation was unresolved.

100 Area↗

Bioremediation Retrospective: DOE Experiences and Lessons Learned – 26131

The U.S. Department of Energy (DOE) has implemented bioremediation strategies for chlorinated volatile organic compounds (cVOCs) for more than three decades across multiple contaminated groundwater sites. A retrospective analysis conducted by the Savannah River National Laboratory (SRNL) and collaborating field sites evaluated the design, performance, and outcomes of bioremediation projects at DOE’s Savannah River, Hanford, Idaho, Mound, and Pinellas sites. This retrospective was based on a series of case studies, leveraging historical documentation and site interviews. Technical approaches employed at the various sites were explored, including active bioremediation, enhanced attenuation (EA), and monitored natural attenuation, with specific sub-sections discussing anaerobic, aerobic, and combined anaerobic-aerobic strategies. Each case study includes detailed descriptions of the site-specific conditions, deployment strategies, regulatory considerations, metrics, and performance. Key findings include general cost savings compared to traditional remedies such as pump and treat (P&T), significant success in applying enhanced attenuation to transition remedies toward a passive site management strategy, and documentation of robust subsurface microbial communities at most sites limiting the need for bioaugmentation. Challenges highlighted in the study include underperformance due to poor amendment delivery in low-permeability zones and unfavorable biogeochemical conditions, emphasizing the importance of site-specific designs. Cost analysis across DOE sites suggests bioremediation may offer long-term economic benefits. The retrospective study underscores valuable lessons that can help inform current and future bioremediation efforts.

Newby, Deborah T. [Savannah River National Laborat↗