Grid Impact Analysis of Heavy-Duty Electric Vehicle Charging Stations

This paper presents a grid impact analysis of heavy-duty electric vehicle (EV) charging stations. In this work, heavy-duty EVs have battery capacities high enough to provide a range of 250-500 miles on a single charge, such as long-haul trucks. Heavy-duty EVs will require extremely fast charging rates to reduce charging time and will induce very high charging loads (at the multiple-megawatt scale) if several vehicles charge at the same time. Therefore, analysis is needed to understand the impact of charging station loads on the electric power grid and set the baseline for developing mitigation plans and necessary system upgrades. We develop a systematic procedure to analyze the potential impact of the placement of charging stations on the grid. Charging load is modeled using a DC fast-charging station model. A voltage load sensitivity matrix approach is leveraged to investigate the challenges of placing charging stations on the feeder. Given the charging load profiles and suggested charging station locations, time-series simulations are performed on various connection points on the feeder to understand the impact. The analysis is performed on both the IEEE 34-bus system and a realistic feeder from California. Initial mitigation solutions are developed based on insights from this analysis.

47 OTHER INSTRUMENTATION↗

The Monotonic Lagrangian Grid for Rapid Air-Traffic Evaluation

The Air Traffic Monotonic Lagrangian Grid (ATMLG) is presented as a tool to evaluate new air traffic system concepts. The model, based on an algorithm called the Monotonic Lagrangian Grid (MLG), can quickly sort, track, and update positions of many aircraft, both on the ground (at airports) and in the air. The underlying data structure is based on the MLG, which is used for sorting and ordering positions and other data needed to describe N moving bodies and their interactions. Aircraft that are close to each other in physical space are always near neighbors in the MLG data arrays, resulting in a fast nearest-neighbor interaction algorithm that scales as N. Recent upgrades to ATMLG include adding blank place-holders within the MLG data structure, which makes it possible to dynamically change the MLG size and also improves the quality of the MLG grid. Additional upgrades include adding FAA flight plan data, such as way-points and arrival and departure times from the Enhanced Traffic Management System (ETMS), and combining the MLG with the state-of-the-art strategic and tactical conflict detection and resolution algorithms from the NASA-developed Stratway software. In this paper, we present results from our early efforts to couple ATMLG with the Stratway software, and we demonstrate that it can be used to quickly simulate air traffic flow for a very large ETMS dataset.

Kaplan, Carolyn↗

Use of Operating Agreements and Energy Storage to Reduce Photovoltaic Interconnection Costs: Conceptual Framework

This report explores one integrated technical and process concept designed to manage interconnection costs and streamline interconnection timelines to support near-term renewable energy deployment. We describe a new agreement between renewable energy developers and utilities, informed by the technical analysis. The agreement defines the operational parameters for a renewable energy system, with the goal of reducing risk and cost to all parties. This work provides a foundation upon which other states and utilities may build proof of concept. This report is supported by a technical analysis that is detailed in a companion report, "Use of Operating Agreements and Energy Storage to Reduce Photovoltaic Interconnection Costs: Technical and Economic Analysis" (McLaren et al. 2022).

14 SOLAR ENERGY↗

Depot-Based Vehicle Data for National Analysis of Medium- and Heavy-Duty Electric Vehicle Charging

Medium- and heavy-duty vehicles (MHDVs) are a major source of greenhouse gases and local criteria air pollutants. Electrifying MHDVs may reduce these harmful emissions, which disproportionately impact disadvantaged communities. Due to their relatively high per-vehicle energy needs, consistent fleet operations, and frequent colocation of multiple vehicles at depots, MHDVs may have more spatially and temporally concentrated charging demands than light-duty passenger electric vehicles. That charging concentration means their electrification may require careful advance planning and coordination to manage potential impacts to the electrical grid via charge management or infrastructure upgrades. However, MHDV duty cycles and parking schedules are highly variable across vocations of operation, and there is a shortage of nationally representative, vocationally diverse public data describing typical MHDV operations. This report summarizes the methodology - designed with national representativeness in mind - used to create a new set of data describing typical daily driving distances, dwell durations, and normalized electric vehicle depot charging load curves for MHDVs. The dataset reflects the subset of MHDV operating patterns that may originate from a consistent depot each day and rely on the same depot for charging. In addition to trucks with depot-centric vocational patterns, the data describes operations of transit buses and school buses, each with a depot-centric focus. The dataset is available to the public and suitable for national analysis. It can inform research, infrastructure planning, and policymaking regarding the electrification of MHDVs.

33 ADVANCED PROPULSION SYSTEMS↗

Generator Interconnection Costs to the Transmission System in non-ISO Balancing Authorities [Slides]

Electric transmission system operators—including Independent System Operators (ISOs), Regional Transmission Organizations (RTOs), and utilities—require proposed power plants to undergo a series of interconnection studies before connecting to the grid. These studies assess what transmission upgrades or new infrastructure may be necessary and assign the associated costs to the project. Lawrence Berkeley National Laboratory has compiled, aggregated, and cleaned interconnection cost data, originally for ISOs/RTOs, and now for five non-ISO Balancing Authorities: PacifiCorp, Bonneville Power Authority, Duke Energy Progress, Duke Energy Carolinas and Duke Energy Florida. Insufficient transparency in interconnection cost data may contribute to rapidly expanding interconnection queues, with active queue capacities tripling between 2020 and 2024 in the studied BAs. Most projects withdraw after receiving high interconnection cost estimates. Interconnection costs have increased since the early 2000s, with average costs for "complete" projects reaching $194/kW between 2018 and 2024. Active queue projects and withdrawn projects incur substantially higher costs, primarily due to rising network upgrade costs. Recent interconnection costs in non-ISO balancing authorities are higher than in ISO regions, potentially due to a greater willingness to pay among developers. Utility-scale solar, wind, and storage projects have interconnection costs that exceed those for natural gas. However, when focusing on projects that do not withdraw from the queue, the interconnection costs for these technologies are more similar to natural gas projects. Other key findings include: (1) Larger generation projects benefit from lower proportional interconnection costs, (2) capacity transmission service (NRIS) often requires additional network investments, and (3) projects with high network upgrade costs are often clustered geographically. The dataset includes results from 2,104 interconnection studies conducted between 2000 and 2024, covering projects that are operational, withdrawn, or still progressing through the study process. The Excel file contains (a) the complete project-level interconnection cost dataset, and (b) seven additional tabs summarizing cost metrics across dimensions such as time, market structure, cost category (point of interconnection vs. broader network upgrades), fuel type, service type (ERIS vs. NRIS), generator size, and geography.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Parallel Unsteady Turbopump Simulations for Liquid Rocket Engines

This paper reports the progress being made towards complete turbo-pump simulation capability for liquid rocket engines. Space Shuttle Main Engine (SSME) turbo-pump impeller is used as a test case for the performance evaluation of the MPI and hybrid MPI/Open-MP versions of the INS3D code. Then, a computational model of a turbo-pump has been developed for the shuttle upgrade program. Relative motion of the grid system for rotor-stator interaction was obtained by employing overset grid techniques. Time-accuracy of the scheme has been evaluated by using simple test cases. Unsteady computations for SSME turbo-pump, which contains 136 zones with 35 Million grid points, are currently underway on Origin 2000 systems at NASA Ames Research Center. Results from time-accurate simulations with moving boundary capability, and the performance of the parallel versions of the code will be presented in the final paper.

Kiris, Cetin C.↗

Seasonal Cost-Benefit Analysis of Automated Distribution Feeder Upgrades with Advanced Mitigation Technologies

The increasing deployment of distributed solar photovoltaics (DPV) to meet clean energy goals can trigger adverse grid operation issues, such as voltage excursions and the violation of thermal loading constraints of the power delivery elements (e.g., lines and transformers) on the evolving electricity infrastructure. Such integration issues would require distribution upgrades with associated costs to mitigate them and to maintain reliable and resilient grid operating conditions. Traditional distribution network upgrade approaches use a specific single snapshot analysis that is overly conservative. This study considers a multi-time point analysis to capture both moderate (probable bounds) and extreme grid operating conditions using time points such as minimum load with minimum photovoltaics (PV), maximum load with maximum PV, maximum load with minimum PV, and minimum load with maximum PV. Further, this study investigates seasonal variation impacts and associated distribution upgrade costs for a spring season case (March, representing a low load and high PV scenario) and a summer case (July, representing a high load and high PV scenario). Such seasonal analysis will allow system operators to characterize upgrade requirements and associated costs across various periods. Because the spatial distribution of DPV can impact upgrade and associated costs, this study investigates three common DPV deployment scenarios - randomly deployed, close to the substation, and far from the substation - at different penetration levels. Apart from spatial distribution impacts, this project evaluates the techno-economic impacts of the nodal photovoltaic penetration factor (NPPF) for generating the various DPV deployment scenarios at increasing penetration levels. This project investigates the impact of varying nodal PV-to-load ratios using conservative and extreme NPPF values of 3 and 10, respectively. This study investigates the deployment of traditional infrastructure upgrade strategies, such as installing new voltage regulating equipment, transformers and lines replacements, and the activation of advanced inverter functionality (e.g., autonomous volt/VAR) in expanding PV hosting capacity. Existing DPV systems are assumed to operate with the legacy unity power factor, and we considered the possibility of retrofitting such systems with the activation of volt/VAR control as integration standards and regulations continue to evolve to allow such functions. The cost-benefit analysis metrics used in study include distribution upgrade costs, average cost per watt of the upgrade cost, average marginal cost per watt of the upgrade cost, and power losses.

14 SOLAR ENERGY↗

TECHNCIAL REPORT

The outcomes of these upgrades include an estimated savings to the City and the power grid of 720 kilowatts in peak energy load. This outcome includes the benefit of lower operating costs for the City, conservation of energy resources and increased availability of energy to the grid during peak times of energy use. The goals and objectives of the HVAC upgrades are to replace equipment as old as twenty-three (23) years in five different facilities. The project will upgrade some facilities from SEER ratings of 9 to SEER ratings of 14 at a savings of 556 kilowatt hours per ton (savings depends on specific size of the system). In addition to these objectives, the project will also install comprehensive HVAC control systems to maximize the efficiency of all HVAC upgrades. The expected outcomes of these upgrades emphasize savings capture; it is anticipated to save the City’s 42% in space heating and cooling costs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

3D Simulations of Ion Thruster Accelerator Grid Erosion Accounting for Charge Exchange Ion Space Charge

Accelerator (accel) grid sputtering by ions formed through charge-exchange (CEX) reactions between beam ions and residual neutral gas is a critical life-limiting mechanism for gridded ion thrusters. The three-dimensional ion optics code CEX3D is designed to simulate this grid erosion for a single beamlet, with a particular emphasis on non-axisymmetric features such as the "pits and grooves" erosion commonly observed on the accel grid downstream face in two-grid thrusters. The treatment of CEX ions in the code was recently upgraded with a new particle-in-cell (PIC) module to account for the influence of these ions' space charge on the electrostatic potential downstream of the grids. In order to achieve reasonable computation times while resolving the Debye length near the grids and avoiding gross violations of the Courant-Friedrichs-Lewy (CFL) condition, macroparticle velocities in the PIC calculation are limited through a rescaling procedure that preserves ion trajectories and space charge density. The code accounts for beam divergence, finite momentum transfer in CEX collisions, and radial losses of CEX ions from the beam; these effects are important for determining the CEX ion flux to the accel grid because the calculated potential downstream of the grids can become very flat. The upgraded code has been used to simulate operation of NASA's Evolutionary Xenon Thruster (NEXT) during the 51 kHr Long Duration Test - a selection of results is presented and compared with experimental data.

Chaplin, Vernon H.↗

Grid Strength Analysis for Integrating 30 GW of Offshore Wind Generation by 2030 in the U.S. Eastern Interconnection

Offshore wind is a key player in the transition to a decarbonized electric gird, and the United States has set ambitious goals of integrating 30 GW of offshore wind capacity by 2030 and 110 GW by 2050. To facilitate this integration, the National Renewable Energy Laboratory and the Pacific Northwest National Laboratory are conducting the Atlantic Offshore Wind Transmission Study to assess transmission solutions. To achieve the 110-GW target by 2050, meticulous planning for network expansion and resource allocation is essential; however, meeting the 2030 goals requires integrating offshore wind power with minimal system upgrades, thus necessitating a careful study of grid strength and stability. The study team developed the Automated System-wide Strength Evaluation Tool (ASSET) to assess system strength under various operating conditions and contingencies, focusing on the proposed integration of 30 GW of offshore wind power by 2030. In this paper, we provide a summary of key features of the ASSET software and results of the grid strength analysis for integrating 30 GW of offshore wind generation by 2030 in the U.S. Eastern Interconnection.

Automated System-wide Strength Evaluation Tool (AS↗

Grid Strength Analysis for Integrating 30 GW of Offshore Wind Generation by 2030 in the U.S. Eastern Interconnection: Preprint

Offshore wind is a key player in the transition to a decarbonized electric gird, and the United States has set ambitious goals of integrating 30 GW of offshore wind capacity by 2030 and 110 GW by 2050. To facilitate this integration, the National Renewable Energy Laboratory and the Pacific Northwest National Laboratory are conducting the Atlantic Offshore Wind Transmission Study to assess transmission solutions. To achieve the 110-GW target by 2050, meticulous planning for network expansion and resource allocation is essential; however, meeting the 2030 goals requires integrating offshore wind power with minimal system upgrades, thus necessitating a careful study of grid strength and stability. The study team developed the Grid Strength Analysis Tool (GSAT) to assess system strength under various operating conditions and contingencies, focusing on the proposed integration of 30 GW of offshore wind power by 2030. In this paper, we provide a summary of key features of the GSAT software and results of the grid strength analysis for integrating 30 GW of offshore wind generation by 2030 in the U.S. Eastern Interconnection.

Automated System-wide Strength Evaluation Tool (AS↗

Further Improvement in 3DGRAPE

3DGRAPE/AL:V2 denotes version 2 of the Three-Dimensional Grids About Anything by Poisson's Equation with Upgrades from Ames and Langley computer program. The preceding version, 3DGRAPE/AL, was described in Improved 3DGRAPE (ARC-14069) NASA Tech Briefs, Vol. 21, No. 5 (May 1997), page 66. These programs are so named because they generate volume grids by iteratively solving Poisson's Equation in three dimensions. The grids generated by the various versions of 3DGRAPE have been used in computational fluid dynamics (CFD). The main novel feature of 3DGRAPE/AL:V2 is the incorporation of an optional scheme in which anisotropic Lagrange-based trans-finite interpolation (ALBTFI) is coupled with exponential decay functions to compute and blend interior source terms. In the input to 3DGRAPE/AL:V2 the user can specify whether or not to invoke ALBTFI in combination with exponential-decay controls, angles, and cell size for controlling the character of grid lines. Of the known programs that solve elliptic partial differential equations for generating grids, 3DGRAPE/AL:V2 is the only code that offers a combination of speed and versatility with most options for controlling the densities and other characteristics of grids for CFD.

Alter, Stephen↗

Experimental Test Bed to Enable Realistic Evaluations for Direct Transfer Trip Relaying via Private Wireless LTE Communications

Increasing penetration levels of inverter-based distributed energy resources (DERs) in distribution systems are creating challenges in system operation. Currently, wired or proprietary wireless communications are used by advanced distribution management systems (ADMS) to detect the state of the system and control the DERs for optimal operation. Wireless communications are an alternative solution that can enable connectivity between the dispersed assets used in distribution system applications. This paper demonstrates an experimental test bed to enable the realistic evaluation of communications system characteristics for direct transfer trip (DTT) relaying of a photovoltaic inverter system using a private 900-MHz spectrum wireless LTE network. Private LTE network communications can be deployed to many remote DERs and other grid-edge devices to prevent costly infrastructure upgrades across distribution systems. In addition, this paper provides a framework for evaluating the impact of signal strength and network traffic in communications systems. The results shown develop a better understanding of the best practices for using LTE communications systems across multiple utility applications, such as protective relaying, voltage regulation, and supervisory control and data acquisition system messages.

900-MHz LTE network↗

Experimental Test Bed to Enable Realistic Evaluations for Direct Transfer Trip Relaying via Private Wireless LTE Communications: Preprint

Increasing penetration levels of inverter-based distributed energy resources (DERs) in distribution systems are creating challenges in system operation. Currently, wired or proprietary wireless communications are used by advanced distribution management systems (ADMS) to detect the state of the system and control the DERs for optimal operation. Wireless communications are an alternative solution that can enable connectivity between the dispersed assets used in distribution system applications. This paper demonstrates an experimental test bed to enable the realistic evaluation of communications system characteristics for direct transfer trip (DTT) relaying of a photovoltaic inverter system using a private 900-MHz spectrum wireless LTE network. Private LTE network communications can be deployed to many remote DERs and other grid-edge devices to prevent costly infrastructure upgrades across distribution systems. In addition, this paper provides a framework for evaluating the impact of signal strength and network traffic in communications systems. The results shown develop a better understanding of the best practices for using LTE communications systems across multiple utility applications, such as protective relaying, voltage regulation, and supervisory control and data acquisition system messages.

900 MHz LTE network↗

Experimental Test Bed to Enable Realistic Evaluations for Direct Transfer Trip Relaying via Private Wireless LTE Communications

Increasing penetration levels of inverter-based distributed energy resources (DERs) in distribution systems are creating challenges in system operation. Currently, wired or proprietary wireless communications are used by advanced distribution management systems (ADMS) to detect the state of the system and control the DERs for optimal operation. Wireless communications are an alternative solution that can enable connectivity between the dispersed assets used in distribution system applications. This paper demonstrates an experimental test bed to enable the realistic evaluation of communications system characteristics for direct transfer trip (DTT) relaying of a photovoltaic inverter system using a private 900-MHz spectrum wireless LTE network. Private LTE network communications can be deployed to many remote DERs and other grid-edge devices to prevent costly infrastructure upgrades across distribution systems. In addition, this paper provides a framework for evaluating the impact of signal strength and network traffic in communications systems. The results shown develop a better understanding of the best practices for using LTE communications systems across multiple utility applications, such as protective relaying, voltage regulation, and supervisory control and data acquisition system messages.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Characterizing electrical demand and load diversity of low-power water and space heating appliances in US homes

Home renovation and remodeling projects can involve costly and time consuming electrical infrastructure upgrades at the household level. From the grid perspective they also lead to costly replacement of local infrastructure, such as transformers, and can add stress to the grid at peak times. The emergence of innovative, power-efficient household appliances offers a way to minimize these problems. These appliances are designed for lower power consumption, simplifying installation through standard plug-in connections, reducing the need for new electric circuits/panels/service, and minimizing the peak power demand for the home. Key examples include low-power heat pump water heaters (HPWHs) and cold climate window heat pumps that operate on standard 120V outlets. To assess the real-world impact of these solutions, we compiled and analyzed power metering data from several US field studies. This data provides insights into the effects on peak power demand of selecting lower-power appliances. Our analysis focuses on several key metrics, including the maximum power demand of individual appliances, their operational runtime, continuous operation and load diversity. While individual low-power 120V space and water heating appliances offer significant peak demand reductions compared to 240V heat pump or resistance alternatives, their longer runtimes might increase the likelihood of operation during whole-dwelling peak events, albeit at lower power levels.

Less, Brennan↗

High-Frequency Density Oscillations from a Plasma Source Used for Simulating Low-Earth Orbit Plasma Environment

We present data from ground-based, vacuum-chamber tests demonstrating the ability to modulate the output of a plasma source capable of producing a low-Earth orbit (LEO) type plasma. We obtained plasma oscillations up to 2.5 kHz impingent on stationary test equipment, which corresponds to meter-level ionospheric structures in LEO. This plasma source is, therefore, suitable for developing scientific instruments that measure the LEO plasma environment, in situ, with meter-level spatial resolution. Measurements were made using a fixed-bias collector and an electrometer sampling at 40 kHz. A mechanical aperture was established at the output of the plasma source via two concentric grids. The outer grid was free to rotate in the azimuthal direction with respect to the fixed inner grid. An identical, alternating hole pattern in the two grids resulted in a variable aperture that cycles through 90 open/close cycles per revolution. The frequency of the plasma oscillations is limited by the mechanism used to spin the grids and the bearing assembly on which the grids rotate. Higher frequencies are obtainable by upgrading the drive mechanism, allowing the possibility of centimeter-level spatial resolution.

McTernan, Jesse K.↗

The multidimensional Self-Adaptive Grid code, SAGE, version 2

This new report on Version 2 of the SAGE code includes all the information in the original publication plus all upgrades and changes to the SAGE code since that time. The two most significant upgrades are the inclusion of a finite-volume option and the ability to adapt and manipulate zonal-matching multiple-grid files. In addition, the original SAGE code has been upgraded to Version 1.1 and includes all options mentioned in this report, with the exception of the multiple grid option and its associated features. Since Version 2 is a larger and more complex code, it is suggested (but not required) that Version 1.1 be used for single-grid applications. This document contains all the information required to run both versions of SAGE. The formulation of the adaption method is described in the first section of this document. The second section is presented in the form of a user guide that explains the input and execution of the code. The third section provides many examples. Successful application of the SAGE code in both two and three dimensions for the solution of various flow problems has proven the code to be robust, portable, and simple to use. Although the basic formulation follows the method of Nakahashi and Deiwert, many modifications have been made to facilitate the use of the self-adaptive grid method for complex grid structures. Modifications to the method and the simple but extensive input options make this a flexible and user-friendly code. The SAGE code can accommodate two-dimensional and three-dimensional, finite-difference and finite-volume, single grid, and zonal-matching multiple grid flow problems.

Davies, Carol B.↗