Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “forecast scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

Forecasting the demand potential for STOL air transportation

A process for predicting the potential demand for STOL aircraft was investigated to provide a conceptual framework, and an analytical methodology for estimating the STOL air transportation market. It was found that: (1) schedule frequency has the strongest effect on the traveler's choice among available routes, (2) work related business constitutes approximately 50% of total travel volume, and (3) air travel demand follows economic trends.

Fan, S.↗

Estimating the Need for Medical Intervention due to Sleep Disruption on the International Space Station

During ISS and shuttle missions, difficulties with sleep affect more than half of all US crews. Mitigation strategies to help astronauts cope with the challenges of disrupted sleep patterns can negatively impact both mission planning and vehicle design. The methods for addressing known detrimental impacts for some mission scenarios may have a substantial impact on vehicle specific consumable mass or volume or on the mission timeline. As part of the Integrated Medical Model (IMM) task, NASA Glenn Research Center is leading the development of a Monte Carlo based forecasting tool designed to determine the consumables required to address risks related to sleep disruption. The model currently focuses on the International Space Station and uses an algorithm that assembles representative mission schedules and feeds this into a well validated model that predicts relative levels of performance, and need for sleep (SAFTE Model, IBR Inc). Correlation of the resulting output to self-diagnosed needs for hypnotics, stimulants, and other pharmaceutical countermeasures, allows prediction of pharmaceutical use and the uncertainty of the specified prediction. This paper outlines a conceptual model for determining a rate of pharmaceutical utilization that can be used in the IMM model for comparison and optimization of mitigation methods with respect to all other significant medical needs and interventions.

Myers, Jerry G.↗

Applied Meteorology Unit (AMU)

This report summarizes the Applied Meteorology Unit (AMU) activities for the first quarter of Fiscal Year 2010 (October - December 2009). A detailed project schedule is included in the Appendix. Included tasks are: (1) Peak Wind Tool for User Launch Commit Criteria (LCC), (2) Objective Lightning Probability Tool, Phase III, (3) Peak Wind Tool for General Forecasting, Phase II, (4) Upgrade Summer Severe Weather Tool in Meteorological Interactive Data Display System (MIDDS), (5) Advanced Regional Prediction System (ARPS) Data Analysis System (ADAS) Update and Maintainability, (5) Verify 12-km resolution North American Model (MesoNAM) Performance, and (5) Hybrid Single-Particle Lagrangian Integrated Trajectory (HYSPLIT) Graphical User Interface.

Bauman, William↗

Solar Effects of Low-Earth Orbit objects in ORDEM 3.0

Variances in atmospheric density are directly related to the variances in solar flux intensity between 11- year solar cycles. The Orbital Debris Engineering Model (ORDEM 3.0) uses a solar flux table as input for calculating orbital lifetime of intact and debris objects in Low-Earth Orbit. Long term projections in solar flux activity developed by the NASA Orbital Debris Program Office (ODPO) extend the National Oceanic and Atmospheric Administration Space Environment Center (NOAA/SEC) daily historical flux values with a 5-year projection. For purposes of programmatic scheduling, the Q2 2009 solar flux table was chosen for ORDEM 3.0. Current solar flux activity shows that the current solar cycle has entered a period of lower solar flux intensity than previously forecasted in 2009. This results in a deviation of the true orbital debris environment propagation in ORDEM 3.0. In this paper, we present updated orbital debris populations in LEO using the latest solar flux values. We discuss the effects on recent breakup events such as the FY-1C anti-satellite test and the Iridium 33 / Cosmos 2251 accidental collision. Justifications for chosen solar flux tables are discussed.

Vavrin, A. B.↗

Short-range precipitation forecasts using assimilation of simulated satellite water vapor profiles and column cloud liquid water amounts

These observing system simulation experiments investigate the assimilation of satellite-observed water vapor and cloud liquid water data in the initialization of a limited-area primitive equations model with the goal of improving short-range precipitation forecasts. The assimilation procedure presented includes two aspects: specification of an initial cloud liquid water vertical distribution and diabatic initialization. The satellite data is simulated for the next generation of polar-orbiting satellite instruments, the Advanced Microwave Sounding Unit (AMSU) and the High-Resolution Infrared Sounder (HIRS), which are scheduled to be launched on the NOAA-K satellite in the mid-1990s. Based on cloud-top height and total column cloud liquid water amounts simulated for satellite data a diagnostic method is used to specify an initial cloud water vertical distribution and to modify the initial moisture distribution in cloudy areas. Using a diabatic initialization procedure, the associated latent heating profiles are directly assimilated into the numerical model. The initial heating is estimated by time averaging the latent heat release from convective and large-scale condensation during the early forecast stage after insertion of satellite-observed temperature, water vapor, and cloud water formation. The assimilation of satellite-observed moisture and cloud water, together withy three-mode diabatic initialization, significantly alleviates the model precipitation spinup problem, especially in the first 3 h of the forecast. Experimental forecasts indicate that the impact of satellite-observed temperature and water vapor profiles and cloud water alone in the initialization procedure shortens the spinup time for precipitation rates by 1-2 h and for regeneration of the areal coverage by 3 h. The diabatic initialization further reduces the precipitation spinup time (compared to adiabatic initialization) by 1 h.

Wu, Xiaohua↗

The First Seasat-A Industrial Users Workshop

The purpose of this workshop was to begin the process of definition and development of the SEASAT-A Demonstration Program, leading to the implementation of a set of experiments which would begin during the latter part of 1978 following the launch of SEASAT-A (now scheduled for May 1978). NASA through the SEASAT-A program, has encouraged the planning of cooperative experiments by industry and government agencies that operate in areas of ocean activity that could benefit from improved measurements and forecasts of weather and ocean conditions. The objectives of these experiments are to: (1) evaluate the significance of SEASAT-A data to commercial user organizations; (2) assist in identifying those characteristics of follow-on systems that are important to industrial users; (3) obtain experimental evidence that could be used to refine estimates of the economic potential of an operational system; and (4) begin the technology transfer process to the industrial users.

Hicks, K. W.↗

Continuously Improving Parametric Modeling with Historical Data on the ICESat-2 Mission

This paper delves into the details of the Joint Confidence Level (JCL) process performed for the Ice, Cloud, and Land Elevation Satellite (ICESat)-2 mission and how past performance was incorporated into subsequent JCL models to enable the project to continuously analyze potential slips to their launch readiness date (LRD). One year prior to the mission Preliminary Review (mPDR), the JCL model development process began. The first model was well received at the mPDR, held on October 10, 2012, and the input received by the Standing Review Board was incorporated into the model for the official data drop for key decision point (KDP)-C. The 70% JCL results of the October 2012 mPDR model forecast an LRD of February 2017 and associated cost of $830M. This result in 2012 immediately highlighted potential challenges with the project-planned LRD of July 2016. The year following the mPDR, the project had sustained a oneyear slip in the LRD due to problematic systems engineering requirement issues which impacted all project subsystems. This slip moved the project planned LRD from July 2016 to July 2017, an additional 5 months beyond the 2012 model’s 70% JCL result for the LRD of February 2017. As the project was quickly approaching the mission Critical Design Review (mCDR), the need for reliable JCL results increased significantly. The project held discussions on the JCL modeling process and focused on the input uncertainty distributions. Specifically, to identify the uncertainty distributions that the 2012 mPDR model would have needed to produce a 70% LRD result of July 2017. This led the project to compare multiple uncertainty distributions, and ultimately spurred the project to utilize uncertainty distributions that incorporated project past performance and historical data to forecast potential LRD slips. The revised results, created in 2014 and utilizing the new uncertainty distributions, showed that with 70% confidence, the ICESat-2 mission would launch in August 2018 with a cost of $1,044M. Today, ICESat-2 is scheduled to launch on September 15, 2018 with a project management (PM) agreement value of $1,056M. This illustrates how a JCL model can be continuously improved to produce valuable results for a project, even in cases of LRD delays. The primary reason for the ICESat-2 LRD delay is due to a laser failure on the primary instrument. Laser failure was one of the highest risk and uncertainty drivers within the JCL model. The project placed the most risk in this area of the model, and the model further identified the laser as the top risk driver and contributor to the LRD result. This further illustrates how a JCL can be used to predict and quantify possible issues on new technology missions.

Krygiel, Joseph↗

Remote sensing for urban planning

Utility companies are challenged to provide services to a highly dynamic customer base. With factory closures and shifts in employment becoming a routine occurrence, the utility industry must develop new techniques to maintain records and plan for expected growth. BellSouth Telecommunications, the largest of the Bell telephone companies, currently serves over 13 million residences and 2 million commercial customers. Tracking the movement of customers and scheduling the delivery of service are major tasks for BellSouth that require intensive manpower and sophisticated information management techniques. Through NASA's Commercial Remote Sensing Program Office, BellSouth is investigating the utility of remote sensing and geographic information system techniques to forecast residential development. This paper highlights the initial results of this project, which indicate a high correlation between the U.S. Bureau of Census block group statistics and statistics derived from remote sensing data.

Davis, Bruce A.↗

Development of an OSSE Framework for a Global Atmospheric Data Assimilation System

Observing system simulation experiments (OSSEs) are powerful tools for estimating the usefulness of various configurations of envisioned observing systems and data assimilation techniques. Their utility stems from their being conducted in an entirely simulated context, utilizing simulated observations having simulated errors and drawn from a simulation of the earth's environment. Observations are generated by applying physically based algorithms to the simulated state, such as performed during data assimilation or using other appropriate algorithms. Adding realistic instrument plus representativeness errors, including their biases and correlations, can be critical for obtaining realistic assessments of the impact of a proposed observing system or analysis technique. If estimates of the expected accuracy of proposed observations are realistic, then the OSSE can be also used to learn how best to utilize the new information, accelerating its transition to operations once the real data are available. As with any inferences from simulations, however, it is first imperative that some baseline OSSEs are performed and well validated against corresponding results obtained with a real observing system. This talk provides an overview of, and highlights critical issues related to, the development of an OSSE framework for the tropospheric weather prediction component of the NASA GEOS-5 global atmospheric data assimilation system. The framework includes all existing observations having significant impact on short-term forecast skill. Its validity has been carefully assessed using a range of metrics that can be evaluated in both the OSSE and real contexts, including adjoint-based estimates of observation impact. A preliminary application to the Aeolus Doppler wind lidar mission, scheduled for launch by the European Space Agency in 2014, has also been investigated.

Gelaro, Ronald↗

Assimilation of SeaWinds Scatterometer Data in the GEOS Data Assimilation System

The first SeaWinds scatterometer was launched in to space aboard the Quikscat satellite on June 19, 1999 at 7:15 p.m. PDT. Flying in a near polar orbit 800 km above the earth's surface, SeaWinds uses an advanced scatterometer design to measure surface wind velocity over 90 percent of the ice free oceans ever 24 hours. This first SeaWinds mission is designed to replace the NASA Scatterometer (NSCAT) which ceased providing wind velocity data when the ADEOS I satellite failed. A second SeaWinds is scheduled to be launched late in 2000 aboard ADEOS II. Previous scatterometer assimilation experiments conducted by the NASA Data Assimilation Office, using both ERS and NSCAT wind observations, have demonstrated considerable potential for this type of data to improve both atmospheric analyses and forecasts, however much of the smaller scale information content of the scatterometer data could not be taken into account in the early coarse resolution versions of the Goddard (GEOS) Data Assimilation System (DAS) or in operational data assimilation systems. In this paper, we will describe data assimilation experiments in which the new higher resolution versions of the GOES DAS are used to assimilate SeaWinds scatterometer winds. Following a brief discussion of the SeaWinds design and the methodology used to assimilate scatterometer data in the GOES DAS, the quality of the SeaWinds data and the impact of SeaWinds on GOES analyses and forecasts at different resolutions will be presented.

Atlas, Robert↗

A Markov Decision Process Framework for Optimal Airport Reconfiguration

The airport runway configuration is defined as a combination set of runways for arrivals and departures used at a point during operation of the airport. An optimal configuration of these runways depends on a number of factors, including traffic demand, wind magnitude and direction, other adverse weather conditions, and noise restrictions, among others. Based on the current state of these factors and predictions of traffic demand and weather conditions, runway configuration changes are made and coordinated between tower controller, other air traffic control facilities, pilots, and ground personnel. Reconfigurations can be quite disruptive to airport operations; minimizing their frequency and scheduling them well in advance is essential for mitigating some of the added workload for controllers and pilots. Unfortunately, deciding on an appropriate time to change is challenging for human decision makers. Not only do multiple factors need to be evaluated, but the uncertainty in their forecasts must also be considered. Previous optimization methods, such as mixed linear integer programming, have been proposed. Although these methods can reason over a large set of variables, they do not systematically handle the uncertainty associated with weather movement, traffic demands, and other variables. In this work, we introduce a Markov Decision Process (MDP)-based decision making framework which can reason effectively over the inherent uncertainties and make optimal decisions on if/when to change the airport configuration. In a prototype implementation, we present a single runway with three aircraft and utilize knowledge of the forecasted wind speed and direction to determine whether to keep or change the current runway configuration. Our aim through this work is to present a framework for airport reconfiguration which can be scalable to additional aircraft, multiple runways, and various input parameters. This technique will optimize the airport reconfiguration procedure by providing a proactive approach, optimizing not just at the next optimal opportunity for a reconfiguration based on varying atmospheric and traffic conditions in the terminal airspace, but also anticipating future necessary reconfigurations. This will eliminate the inefficiencies of frequent changes currently associated with runway reconfiguration procedures.

runway reconfiguration↗

Simulations of the monthly mean atmosphere for February 1976 with the GISS model

Three monthly mean simulations of the global atmosphere were computed for February 1976 with the GISS model from observed initial conditions on the first day of the month. In a replication experiment, two of these computations generated slightly different monthly mean states, apparently due to the schedule of interruptions on the computer. The root-mean-square errors of replication over the Northern Hemisphere were found to be about 2 mb, 20 m and 1 K for sea level pressure, 500 mb height and 850 mb temperature, respectively. The monthly mean 500 mb forecast results for February 1976 over the Northern Hemisphere are consistent with those from earlier GISS model experiments and again indicate some predictive skill at that level. Use of the observed monthly mean sea surface temperature (SST) field for February 1976 in place of the climatological SST field for February resulted in slightly improved simulations over the globe and Northern Hemisphere,

Spar, J.↗

A measurement system for large, complex software programs

This paper describes measurement systems required to forecast, measure, and control activities for large, complex software development and support programs. Initial software cost and quality analysis provides the foundation for meaningful management decisions as a project evolves. In modeling the cost and quality of software systems, the relationship between the functionality, quality, cost, and schedule of the product must be considered. This explicit relationship is dictated by the criticality of the software being developed. This balance between cost and quality is a viable software engineering trade-off throughout the life cycle. Therefore, the ability to accurately estimate the cost and quality of software systems is essential to providing reliable software on time and within budget. Software cost models relate the product error rate to the percent of the project labor that is required for independent verification and validation. The criticality of the software determines which cost model is used to estimate the labor required to develop the software. Software quality models yield an expected error discovery rate based on the software size, criticality, software development environment, and the level of competence of the project and developers with respect to the processes being employed.

Rone, Kyle Y.↗

Delta XTE Press Briefing

Live coverage of the pre-launch Delta X-Ray Timing Explorer (XTE) press briefing is presented. George Diller, NASA Public Affairs, introduces the panel. The panel consists of Floyd Curington, NASA Launch Manager, Kennedy Space Center; David Mitchell, Launch Vehicle Manager, NASA Goddard Space Flight Center; Dale Schulz, Mission Director, XTE Project Manager Goddard Space Flight Center; Dr. Hale Bradt, XTE Principle Investigator, Massachusetts Institute of Technology (MIT); and Joel Tumbiolo, Launch Weather Officer, Department of the Air Force. The launch of the Delta XTE spacecraft atop the Delta 230 expendable launch vehicle is discussed. Once lofted into orbit, the XTE spacecraft will embark on a two-year mission to carry out an in-depth study of x-ray sources in the universe. Floyd Curington gives the lift-off schedule, fueling, and countdown of the spacecraft. David Mitchell discusses the launch sequence and spacecraft separation. Dale Schulz presents viewcharts of the instrument side of the XTE. Dr. Hale will be studying compact stars such as light dwarfs, neutron stars and quasars. Joel Tumbiolo presents the weather forecast for the December 10, 1995 launch. The press briefing ends with a question and answer period.

Source record↗

Simulations of the monthly mean atmosphere for February 1976 with the GISS model

Monthly mean simulations of the global atmosphere were computed for February 1976 with the GISS model from observed initial conditions. In a replication experiment, two of these computations generated slightly different monthly mean states, apparently due to the schedule of interruptions on the computer. The root-mean-square errors of replication over the Northern Hemisphere were found to be about 2 mb, 20 m, and 1 K for sea-level pressure, 500 mb height, and 850 mb temperature, respectively. The monthly mean 500 mb forecast results for February 1976 over the Northern Hemisphere were consistent with those from earlier GISS model experiments.

Spar, J.↗

Required Time of Arrival as a Control Mechanism to Mitigate Uncertainty in Arrival Traffic Demand Management

The objective of this study is to explore the use of Required Time of Arrival (RTA) capability on the flight deck as a control mechanism on arrival traffic management to improve traffic delivery accuracy by mitigating the effect of traffic demand uncertainty. The uncertainties are caused by various factors, such as departure error due to the difference between scheduled departure and the actual take-off time. A simulation study was conducted using the Multi Aircraft Control System (MACS) software, a comprehensive research platform developed in the Airspace Operations Laboratory (AOL) at NASA Ames Research Center. The Crossing Time (CT) performance (i.e. the difference between target crossing time and actual crossing time) of the RTA for uncertainty mitigation during cruise phase was evaluated under the influence of varying two main factors: wind severity (heavy wind vs. mild wind), and wind error (1 hour, 2 hours, and 5 hours wind forecast errors). To examine the CT performance improvement made by the RTA, the comparison to the CT of the aircraft that were not assigned with RTA (Non-RTA) under the influence of the selected factors was also made. The Newark Liberty International Airport (EWR) was chosen for this study. A total 66 inbound traffic to the EWR (34 of them were airborne when the simulation was initiated, 32 were pre-departures at that time) was simulated, where the pre-scripted departure error was assigned to each pre-departure (61 conform to their Expected Departure Clearance Time, which is +-300 seconds of their scheduled departure time). The results of the study show that the delivery accuracy improvement can be achieved by assigning RTA, regardless of the influence of the selected two factors (the wind severity and the wind information inaccuracy). Across all wind variances, 66.9 (265 out of 396) of the CT performance of the RTA assigned aircraft was within +- 60 seconds (i.e. target tolerance range) and 88.9 (352 out of 396) aircraft met +-300 seconds marginal tolerance range, while only 33.6 (133 out of 396) of the Non-RTA assigned aircrafts CT performance achieved the target tolerance range and 75.5 (299 out of 396) stayed within the marginal. Examination of the impact of different error sources i.e. departure error, wind severity, and wind error suggest that although large departure errors can significantly impact the CT performance, the impacts of wind severity and errors were modest relative the targeted +- 60 second conformance range.

required time of arrival (RTA)↗

Calculation of Flight Deck Interval Management Assigned Spacing Goals Subject to Multiple Scheduling Constraints

The Federal Aviation Administration's Next Generation Air Transportation System will combine advanced air traffic management technologies, performance-based procedures, and state-of-the-art avionics to maintain efficient operations throughout the entire arrival phase of flight. Flight deck Interval Management (FIM) operations are expected to use sophisticated airborne spacing capabilities to meet precise in-trail spacing from top-of-descent to touchdown. Recent human-in-the-loop simulations by the National Aeronautics and Space Administration have found that selection of the assigned spacing goal using the runway schedule can lead to premature interruptions of the FIM operation during periods of high traffic demand. This study compares three methods for calculating the assigned spacing goal for a FIM operation that is also subject to time-based metering constraints. The particular paradigms investigated include: one based upon the desired runway spacing interval, one based upon the desired meter fix spacing interval, and a composite method that combines both intervals. These three paradigms are evaluated for the primary arrival procedures to Phoenix Sky Harbor International Airport using the entire set of Rapid Update Cycle wind forecasts from 2011. For typical meter fix and runway spacing intervals, the runway- and meter fix-based paradigms exhibit moderate FIM interruption rates due to their inability to consider multiple metering constraints. The addition of larger separation buffers decreases the FIM interruption rate but also significantly reduces the achievable runway throughput. The composite paradigm causes no FIM interruptions, and maintains higher runway throughput more often than the other paradigms. A key implication of the results with respect to time-based metering is that FIM operations using a single assigned spacing goal will not allow reduction of the arrival schedule's excess spacing buffer. Alternative solutions for conducting the FIM operation in a manner more compatible with the arrival schedule are discussed in detail.

ATD-1↗

Future Air Traffic Growth and Schedule Model User's Guide

The Future Air Traffic Growth and Schedule Model was developed as an implementation of the Fratar algorithm to project future traffic flow between airports in a system and of then scheduling the additional flights to reflect current passenger time-of-travel preferences. The methodology produces an unconstrained future schedule from a current (or baseline) schedule and the airport operations growth rates. As an example of the use of the model, future schedules are projected for 2010 and 2022 for all flights arriving at, departing from, or flying between all continental United States airports that had commercial scheduled service for May 17, 2002. Inter-continental US traffic and airports are included and the traffic is also grown with the Fratar methodology to account for their arrivals and departures to the continental US airports. Input data sets derived from the Official Airline Guide (OAG) data and FAA Terminal Area Forecast (TAF) are included in the examples of the computer code execution.

Kimmel, William M.↗