Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “drilling analysis”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

Percussive Augmenter of Rotary Drills (PARoD)

Increasingly, NASA exploration mission objectives include sample acquisition tasks for in-situ analysis or for potential sample return to Earth. To address the requirements for samplers that could be operated at the conditions of the various bodies in the solar system, a piezoelectric actuated percussive sampling device was developed that requires low preload (as low as 10N) which is important for operation at low gravity. This device can be made as light as 400g, can be operated using low average power, and can drill rocks as hard as basalt. Significant improvement of the penetration rate was achieved by augmenting the hammering action by rotation and use of a fluted bit to provide effective cuttings removal. Generally, hammering is effective in fracturing drilled media while rotation of fluted bits is effective in cuttings removal. To benefit from these two actions, a novel configuration of a percussive mechanism was developed to produce an augmenter of rotary drills. The device was called Percussive Augmenter of Rotary Drills (PARoD). A breadboard PARoD was developed with a 6.4 mm (0.25 in) diameter bit and was demonstrated to increase the drilling rate of rotation alone by 1.5 to over 10 times. Further, a large PARoD breadboard with 50.8 mm diameter bit was developed and its tests are currently underway. This paper presents the design, analysis and preliminary test results of the percussive augmenter.

percussive augmenter↗

Percussive Augmenter of Rotary Drills (PARoD)

Increasingly, NASA exploration mission objectives include sample acquisition tasks for in-situ analysis or for potential sample return to Earth. To address the requirements for samplers that could be operated at the conditions of the various bodies in the solar system, a piezoelectric actuated percussive sampling device was developed that requires low preload (as low as 10 N) which is important for operation at low gravity. This device can be made as light as 400 g, can be operated using low average power, and can drill rocks as hard as basalt. Significant improvement of the penetration rate was achieved by augmenting the hammering action by rotation and use of a fluted bit to provide effective cuttings removal. Generally, hammering is effective in fracturing drilled media while rotation of fluted bits is effective in cuttings removal. To benefit from these two actions, a novel configuration of a percussive mechanism was developed to produce an augmenter of rotary drills. The device was called Percussive Augmenter of Rotary Drills (PARoD). A breadboard PARoD was developed with a 6.4 mm (0.25 in) diameter bit and was demonstrated to increase the drilling rate of rotation alone by 1.5 to over 10 times. The test results of this configuration were published in a previous publication. Further, a larger PARoD breadboard with a 50.8 mm (2.0 in) diameter bit was developed and tested. This paper presents the design, analysis and test results of the large diameter bit percussive augmenter.

piezoelectric actuation↗

Physics-Based Limiter Redesign and Bit Performance Analysis at The Geysers

As part of a U.S. DOE Geothermal Technologies Office funding opportunity, Geysers Power Company, LLC (GPC), an indirect subsidiary of Calpine Corporation, partnered with Sandia National Labs, EGI at the University of Utah, and Texas A&M University to demonstrate increased drilling performance at The Geysers Geothermal Field. The performance target in the drilling demonstrations is at least a 25% improvement in rates of penetration, with increased footage on bottom for each bit coupled with increased bit life and time drilling. The project leverages advances in oil and gas drilling technologies including PDC bits, along with the physics-based limiter redesign techniques championed in drilling demonstrations conducted at the Utah FORGE geothermal site. The planned drilling demonstrations are being conducted as part of an existing drilling campaign intended to enhance reservoir utilization. The wells are typically drilled to the top of the reservoir with mud and then air-drilled to total depth (TD) through fractured zones at temperatures ≥ 450°F. A major goal of the project is to assess the effectiveness of implementing mechanical specific energy (MSE) and drilling dysfunction diagnosis and remediation in these challenging environments, as well as alternate rock reduction technologies. The first demonstration well has been completed, with 15 PDC bit runs in the 17.5”, 12.25” and 8.5” sections. Initial analysis shows ROP gains in all three sections, especially in the 17.5” and 12.25” sections, compared with conventional roller cone bit runs in the demonstration well and offset wells. However, in the 8.5” hole, wear and damage to the PDC bits resulted in relatively short bit runs. Analysis is underway to take advantage of the positive results and remediate the challenges. This paper provides updates on drilling activities conducted since the Phase 1 demonstration well at GDC-36 which was drilled from November 2023-January 2024. Additional analysis of the bit performance has been conducted. Furthermore, in subsequent wells drilled by GPC, PDC bits have been used extensively, building on the gains realized at GDC-36. GPC has continued to work with bit vendors to identify designs that last longer in the harsh, air-drilled 8.5” portions of the wells. Planning for the Phase 2 demonstration at Prati-44 is ongoing.

15 GEOTHERMAL ENERGY↗

Visualization Component of Vehicle Health Decision Support System

The visualization front-end of a Decision Support System (DSS) also includes an analysis engine linked to vehicle telemetry, and a database of learned models for known behaviors. Because the display is graphical rather than text-based, the summarization it provides has a greater information density on one screen for evaluation by a flight controller.This tool provides a system-level visualization of the state of a vehicle, and drill-down capability for more details and interfaces to separate analysis algorithms and sensor data streams. The system-level view is a 3D rendering of the vehicle, with sensors represented as icons, tied to appropriate positions within the vehicle body and colored to indicate sensor state (e.g., normal, warning, anomalous state, etc.). The sensor data is received via an Information Sharing Protocol (ISP) client that connects to an external server for real-time telemetry. Users can interactively pan, zoom, and rotate this 3D view, as well as select sensors for a detail plot of the associated time series data. Subsets of the plotted data can be selected and sent to an external analysis engine to either search for a similar time series in an historical database, or to detect anomalous events. The system overview and plotting capabilities are completely general in that they can be applied to any vehicle instrumented with a collection of sensors. This visualization component can interface with the ISP for data streams used by NASA s Mission Control Center at Johnson Space Center. In addition, it can connect to, and display results from, separate analysis engine components that identify anomalies or that search for past instances of similar behavior. This software supports NASA's Software, Intelligent Systems, and Modeling element in the Exploration Systems Research and Technology Program by augmenting the capability of human flight controllers to make correct decisions, thus increasing safety and reliability. It was designed specifically as a tool for NASA's flight controllers to monitor the International Space Station and a future Crew Exploration Vehicle.

Jacob, Joseph↗

RESOLVE's Field Demonstration on Mauna Kea, Hawaii 2010

In cooperation with the Canadian Space Agency, and the Northern Centre for Advanced Technology, Inc., NASA has undertaken the In-Situ Resource Utilization (ISRU) project called RESOLVE (Regolith and Environment Science & Oxygen and Lunar Volatile Extraction). This project is an Earth-based lunar precursor demonstration of a system that could be sent to explore permanently shadowed polar lunar craters, where it would drill into regolith, quantify the volatiles that are present, and extract oxygen by hydrogen reduction of iron oxides. The resulting water could be electrolyzed into oxygen to support exploration and hydrogen, which would be recycled through the process. The RESOLVE chemical processing system was mounted on a Canadian Space Agency mobility chasis and successfully demonstrated on Hawaii's Mauna Kea volcano in February 2010. The RESOLVE unit is the initial prototype of a robotic prospecting mission to the Moon. RESOLVE is designed to go to the poles of the Moon to "ground truth" the form and concentration of the hydrogen/water/hydroxyl that has been seen from orbit (M3, Lunar Prospector and LRO) and to test technologies to extract oxygen from the lunar regolith. RESOLVE has the ability to capture a one-meter core sample of lunar regolith and heat it to determine the volatiles that may be released and then demonstrate the production of oxygen from minerals found in the regolith. The RESOLVE project, which is led by KSC, is a multi-center and multi-organizational effort that includes representatives from KSC, JSC, GRC, the Canadian Space Agency, and the Northern Center for Advanced Technology (NORCAT). This paper details the results obtained from four days of lunar analog testing that included gas chromatograph analysis for volatile components, remote control of chemistry and drilling operations via satalite communications, and real-time water quantification using a novel capacitance measurement technique.

Captain, Janine↗

Resource Prospector Instrumentation for Lunar Volatiles Prospecting, Sample Acquisition and Processing

Data gathered from lunar missions within the last two decades have significantly enhanced our understanding of the volatile resources available on the lunar surface, specifically focusing on the polar regions. Several orbiting missions such as Clementine and Lunar Prospector have suggested the presence of volatile ices and enhanced hydrogen concentrations in the permanently shadowed regions of the moon. The Lunar Crater Observation and Sensing Satellite (LCROSS) mission was the first to provide direct measurement of water ice in a permanently shadowed region. These missions with other orbiting assets have laid the groundwork for the next step in the exploration of the lunar surface; providing ground truth data of the volatiles by mapping the distribution and processing lunar regolith for resource extraction. This next step is the robotic mission Resource Prospector (RP). Resource Prospector is a lunar mission to investigate 'strategic knowledge gaps' (SKGs) for in-situ resource utilization (ISRU). The mission is proposed to land in the lunar south pole near a permanently shadowed crater. The landing site will be determined by the science team with input from broader international community as being near traversable landscape that has a high potential of containing elevated concentrations of volatiles such as water while maximizing mission duration. A rover will host the Regolith & Environment Science and Oxygen & Lunar Volatile Extraction (RESOLVE) payload for resource mapping and processing. The science instruments on the payload include a 1-meter drill, neutron spectrometer, a near infrared spectrometer, an operations camera, and a reactor with a gas chromatograph-mass spectrometer for volatile analysis. After the RP lander safely delivers the rover to the lunar surface, the science team will guide the rover team on the first traverse plan. The neutron spectrometer (NS) and near infrared (NIR) spectrometer instruments will be used as prospecting tools to guide the traverse path. The NS will map the water-equivalent hydrogen concentration as low as 0.5% by weight to an 80 centimeter depth as the rover traverses the lunar landscape. The NIR spectrometer will measure surficial H2O/OH as well as general mineralogy. When the prospecting instruments identify a potential volatile-rich area during the course of a traverse, the prospect is then mapped out and the most promising location identified. An augering drill capable of sampling to a depth of 100 centimeters will excavate regolith for analysis. A quick assay of the drill cuttings will be made using an operations camera and NIR spectrometer. With the water depth confirmed by this first auguring activity, a regolith sample may be extracted for processing. The drill will deliver the regolith sample to a crucible that will be sealed and heated. Evolved volatiles will be measured by a gas chromatograph-mass spectrometer and the water will be captured and photographed. RP is a solar powered mission, which given the polar location translates to a relatively short mission duration on the order of 4-15 days. This short mission duration drives the concept of operations, instrumentation, and data analysis towards critical real time analysis and decision support. Previous payload field tests have increased the fidelity of the hardware, software, and mission operations. Current activities include a mission level field test to optimize interfaces between the payload and rover as well as better understand the interaction of the science and rover teams during the mission timeline. This paper will include the current status of the science instruments on the payload as well as the integrated field test occurring in fall of 2015. The concept of operations will be discussed, including the real time science and engineering decision-making process based on the critical data from the instrumentation. The path to flight will be discussed with the approach to this ambitious low cost mission.

ISRU↗

Sensitivity analysis of design parameters in RowWise borehole layout for ground heat exchangers

Ground source heat pump systems offer a promising pathway toward energy-efficient building heating and cooling. The performance and cost-effectiveness of these systems heavily depend on the design of the ground heat exchanger (GHE), particularly the spatial placement of boreholes used in large commercial buildings. Among various borefield layout strategies, the RowWise approach generates and optimizes borehole configurations within irregular polygonal land boundaries, providing land-use efficiency and installation flexibility. While multiple geometric design parameters constrain the RowWise layout, their influence on the system thermal performance and total drilling requirements remains unclear. Thus, this study presents a sensitivity analysis of key design parameters influencing the RowWise layout of vertical borehole GHEs, including the perimeter spacing ratio, borehole spacing, borehole field rotation angle, and borehole length. GHEDesigner and Ray Tune are employed to generate and assess different RowWise configurations. A series of parametric simulations was conducted to quantify the impact of each parameter on geometric distribution, economic cost, and computational speed. The results provide critical insights into the sensitivity and relative importance of different design parameters of RowWise method, offering practical guidance for designers aiming to optimize GHE layouts by balancing thermal efficiency, land constraints, and economic feasibility.

Xu, Dikai [Purdue University]↗

Mars Science Laboratory Drill

This drill (see Figure 1) is the primary sample acquisition element of the Mars Science Laboratory (MSL) that collects powdered samples from various types of rock (from clays to massive basalts) at depths up to 50 mm below the surface. A rotary-percussive sample acquisition device was developed with an emphasis on toughness and robustness to handle the harsh environment on Mars. It is the first rover-based sample acquisition device to be flight-qualified (see Figure 2). This drill features an autonomous tool change-out on a mobile robot, and novel voice-coil-based percussion. The drill comprises seven subelements. Starting at the end of the drill, there is a bit assembly that cuts the rock and collects the sample. Supporting the bit is a subassembly comprising a chuck mechanism to engage and release the new and worn bits, respectively, and a spindle mechanism to rotate the bit. Just aft of that is a percussion mechanism, which generates hammer blows to break the rock and create the dynamic environment used to flow the powdered sample. These components are mounted to a translation mechanism, which provides linear motion and senses weight-on-bit with a force sensor. There is a passive-contact sensor/stabilizer mechanism that secures the drill fs position on the rock surface, and flex harness management hardware to provide the power and signals to the translating components. The drill housing serves as the primary structure of the turret, to which the additional tools and instruments are attached. The drill bit assembly (DBA) is a passive device that is rotated and hammered in order to cut rock (i.e. science targets) and collect the cuttings (powder) in a sample chamber until ready for transfer to the CHIMRA (Collection and Handling for Interior Martian Rock Analysis). The DBA consists of a 5/8-in. (.1.6- cm) commercial hammer drill bit whose shank has been turned down and machined with deep flutes designed for aggressive cutting removal. Surrounding the shank of the bit is a thick-walled maraging steel collection tube allowing the powdered sample to be augured up the hole into the sample chamber. For robustness, the wall thickness of the DBA was maximized while still ensuring effective sample collection. There are four recesses in the bit tube that are used to retain the fresh bits in their bit box. The rotating bit is supported by a back-to-back duplex bearing pair within a housing that is connected to the outer DBA housing by two titanium diaphragms. The only bearings on the drill in the sample flow are protected by a spring-energized seal, and an integrated shield that diverts the ingested powdered sample from the moving interface. The DBA diaphragms provide radial constraint of the rotating bit and form the sample chambers. Between the diaphragms there is a sample exit tube from which the sample is transferred to the CHIMRA. To ensure that the entire collected sample is retained, no matter the orientation of the drill with respect to gravity during sampling, the pass-through from the forward to the aft chamber resides opposite to the exit tube.

Okon, Avi B.↗

Mars sample return - Science

The possible scientific goals of a Mars sample return mission are reviewed, including the value of samples and the selection of sampling sites. The fundamental questions about Mars which could be studied using samples are examined, including planetary formation, differentiation, volcanism and petrogenesis, weathering, and erosion. Scenarios are presented for sample acquisition and analysis. Possible sampling methods and tools are discussed, including drilling techniques, types of rovers, and processing instruments. In addition, the possibility of aerocapture out of elliptical or circular orbit is considered.

Blanchard, Douglas P.↗

Analysis and simulation of the Ultrasonic/Sonic Driller/Corer (USDC)

The USDC was developed to address the challenges to the NASA objective of planetary in-situ rock sampling analysis. A computer program was developed to simulate the operation of the USDC and successfully predicted the characteristic behavior of the new device. This paper covers the theory, the analytical models and the algorithms that were developed and predicted the results.

piezoelectric↗

Borehole hydraulic coal mining system analysis

The borehole hydraulic coal mining system accesses the coal seam through a hole drilled in the overburden. The mining device is lowered through the hole into the coal seam where it fragments the coal with high pressure water jets which pump it to the surface as a slurry by a jet pump located in the center of the mining device. The coal slurry is then injected into a pipeline for transport to the preparation plant. The system was analyzed for performance in the thick, shallow coal seams of Wyoming, and the steeply pitching seams of western Colorado. Considered were all the aspects of the mining operation for a 20-year mine life, producing 2,640,000 tons/yr. Effects on the environment and the cost of restoration, as well as concern for health and safety, were studied. Assumptions for design of the mine, the analytical method, and results of the analysis are detailed.

Floyd, E. L.↗

Mars Hand Lens Imager (MAHLI) Efforts and Observations at the Rocknest Eolian Sand Shadow in Curiosity's Gale Crater Field Site

The Mars Science Laboratory (MSL) mission is focused on assessing the past or present habitability of Mars, through interrogation of environment and environmental records at the Curiosity rover field site in Gale crater. The MSL team has two methods available to collect, process and deliver samples to onboard analytical laboratories, the Chemistry and Mineralogy instrument (CheMin) and the Sample Analysis at Mars (SAM) instrument suite. One approach obtains samples by drilling into a rock, the other uses a scoop to collect loose regolith fines. Scooping was planned to be first method performed on Mars because materials could be readily scooped multiple times and used to remove any remaining, minute terrestrial contaminants from the sample processing system, the Collection and Handling for In-Situ Martian Rock Analysis (CHIMRA). Because of this cleaning effort, the ideal first material to be scooped would consist of fine to very fine sand, like the interior of the Serpent Dune studied by the Mars Exploration Rover (MER) Spirit team in 2004 [1]. The MSL team selected a linear eolian deposit in the lee of a group of cobbles they named Rocknest (Fig. 1) as likely to be similar to Serpent Dune. Following the definitions in Chapter 13 of Bagnold [2], the deposit is termed a sand shadow. The scooping campaign occurred over approximately 6 weeks in October and November 2012. To support these activities, the Mars Hand Lens Imager (MAHLI) acquired images for engineering support/assessment and scientific inquiry.

Edgett, K. S.↗

Detecting the Presence of Intrusive Drilling in Secure Transport Containers Using Non-Contact Millimeter-Wave Radar

We employ a 77–81 GHz frequency-modulated continuous-wave (FMCW) millimeter-wave radar to sense anomalous vibrations during vehicle transport at highway speeds for the first time. Secure metallic containers can be breached during transport by means of drilling into their sidewalls but detecting a drilling signature is difficult because the large vibrations of transport drown out the small vibrations of drilling. For the first time, we demonstrate that it is possible to use a non-contact millimeter-wave radar sensor to detect this micron-scale intrusive drilling while highway-speed vehicle movement shakes the container. With the millimeter-wave radar monitoring the microdoppler signature of the container’s vibrating walls, we create a novel signal-processing pipeline consisting of range–angle tracking, time–frequency analysis, horizontal stripe image convolution, and principal component analysis to create a robust and powerful detection statistic to alarm if drilling is present. To support this pipeline, we develop a statistical model combining the vibrating container and the random vibrations induced by vehicle movement to explore the robustness of the sensor’s detection capabilities. The presented results strongly support the inclusion of a millimeter-wave radar vibration sensor into a transport security system.

Wagner, Samuel↗

Geothermal Play-Fairway Analysis of Washington State Prospects: Final Report

The Washington State Geothermal Play-Fairway Analysis overcomes the exploration challenges posed by dense vegetation, glacial deposits, and extreme precipitation. The geothermal play-fairways we target are locations where heat, permeability, and saturated porosity are present in sufficient volume to provide adequate heat exchange at depths accessible by modern drilling technology. The three study areas lie along the Cascade Range magmatic arc and are near Mount Baker, Mount St. Helens, and the Wind River Valley. The seven-year project is divided into three phases. In Phase 1 we build on a previous statewide assessment of geothermal resources and develop an initial modeling approach. The results are a series of favorability, uncertainty, and risk maps for three targeted study areas. Based on these initial results, we collect new geologic and geophysical data to further refine our modeling and reduce exploration uncertainty in Phase 2. We improve the modeling method to handle the new data and update the favorability, uncertainty, and risk maps. We also update the conceptual geothermal resource models. In Phase 3 we validate our modeling approach by drilling two temperature-gradient holes and collecting and analyzing core, image logs, and new geochemistry. Our modeling approach improves on an earlier statewide method through a more-rigorous and detailed assessment of heat and permeability. Permeability potential is assessed through geomechanical modeling of the deformation that can generate and maintain reservoir porosity and permeability. Metrics to inform heat potential include temperature-gradient wells, which are sparse in Washington; proximity of Quaternary volcanic vents and young intrusive rock; spring temperature; and reservoir temperature inferred from geothermometry. We weight the individual components using an expert-guided approach known as the Analytical Hierarchy Process. During Phase 2 we also develop a fluid-filled fracture model, and an infrastructure model that helps to delineate areas which are more favorable for geothermal development based on proximity to transmission lines, elevation, land ownership and use restrictions, and availability of process water. New geologic and geophysical data is collected during Phase 2 in each of our three main study areas. At Mount Baker and north of Mount St. Helens we conduct 1:24,000-scale geologic mapping and lidar analysis to better constrain the location and character of surface faults; detailed mapping in the Wind River Valley was completed just prior to the start of this project. Ages of intrusive rocks are determined with 40 Ar/ 39 Ar geochronology, though all of our samples are Miocene or older. We collect ground based gravity observations (a total of 1,580 new stations) in all of our study areas and ground-based magnetic lines (a total of 93 km) at Mount Baker. These data are combined with existing gravity and aeromagnetic data and used to constrain fault locations and geometry. Two to three cross sections are constructed at each study area using the mapped surface geology and forward-modeling of the gravity and magnetic data; these cross sections form the basis for our updated conceptual models. We collect magnetotelluric surveys at Mount Baker and Mount St. Helens and these data are inverted to form a resistivity model from the surface to about 10 km depth; each model shows conductive zones that can be interpreted as upwelling geothermal fluids. At Mount St. Helens we deploy a passive seismic array and use the newly detected events to refine the location of the Saint Helens seismic zone. We also employ ambient-noise tomography to develop a detailed seismic-velocity model for the study area and use this model to help constrain our cross sections and conceptual model. Based on the new data collected during Phase 2—and our updated models—we develop a campaign of temperature-gradient holes and core analysis to validate our modeling in Phase 3. Drill hole MB76-31 is located near Little Park Creek, 11 km west-southwest of the summit of Mount Baker, and is 1,471 ft deep. About 410 ft of core from the lower portion of the hole—and image logs from ~175 ft below ground surface to the bottom—are collected and analyzed. Water samples are collected and processed for geothermometry. Drill hole MSH17-24 is located along upper Schultz Creek, 16 km north-northeast of Mount St. Helens and has core from 470 ft to the bottom at 1,053 ft. We did not collect image logs due to borehole stability concerns, but water samples are collected and analyzed for geothermometry. Repeat temperature-gradient measurements are made at both sites and thermal conductivity is measured from core samples. At MB76-31, the equilibrated temperature gradient of 64°C/km and calculated heat flow of 141–159 mW/m 2 is more than twice the regional average. Detailed mapping and analysis of the core, coupled with correlation to the image logs, indicates a history of permeability generation consistent with our predictions of high permeability. Because the site has high favorability in the Phase 2 model, we consider the results a positive validation of the modeling. At site MSH17-24, the equilibrated temperature gradient of ~15°C/km and calculated heat flow of 41–43 mW/m 2 are similar to regional. Geochemical analysis of the water samples indicates a meteoric source without any geothermal component. Detailed outcrop-based mapping of fault exposures near the drill site and analysis of image logs from nearby boreholes indicates a history of permeability generation consistent with our predictions. Because the site has low favorability in the Phase 2 model, we consider the results a positive validation of the modeling. Together, the two sites provide a reasonably positive validation of the Phase 2 modeling and should encourage future use of this modeling approach.

15 GEOTHERMAL ENERGY↗

Methane Clathrate Hydrate Prospecting

A method of prospecting for methane has been devised. The impetus for this method lies in the abundance of CH4 and the growing shortages of other fuels. The method is intended especially to enable identification of subpermafrost locations where significant amounts of methane are trapped in the form of methane gas hydrate (CH4(raised dot)6H2O). It has been estimated by the U.S. Geological Survey that the total CH4 resource in CH4(raised dot) 6H2O exceeds the energy content of all other fossil fuels (oil, coal, and natural gas from non-hydrate sources). Also, CH4(raised dot)6H2O is among the cleanest-burning fuels, and CH4 is the most efficient fuel because the carbon in CH4 is in its most reduced state. The method involves looking for a proxy for methane gas hydrate, by means of the combination of a thermal-analysis submethod and a field submethod that does not involve drilling. The absence of drilling makes this method easier and less expensive, in comparison with prior methods of prospecting for oil and natural gas. The proposed method would include thermoprospecting in combination with one more of the other non-drilling measurement techniques, which could include magneto-telluric sounding and/or a subsurface-electrical-resistivity technique. The method would exploit the fact that the electrical conductivity in the underlying thawed region is greater than that in the overlying permafrost.

Duxbury, N.↗

A Drilling Mission to Search for Biosignatures of Life on Mars Simulated in Atacama Chile

Missions to search for evidence of life on Mars, including Mars Science Laboratory(MSL)are using drilling systems to get beneath the high oxidized and radiated surface where biomolecules may be preserved. MSL drill holes show that even at shallow depth the subsurface is more reduced and therefor more likely to preserve biosignatures. Analysis of these reduced materials yielded the first detection of organic carbon compounds on Mars[1].While MSL was capable of drilling only 10 cm, the ExoMars mission now planned for a 2022 launch will feature a rover carrying a 2 m drill, motivated by desire to penetrate beneath the irradiated surface. The Atacama Rover Astrobiology Drilling Studies(ARADS)was a PSTAR project that used flight prototype technologies in a highly relevant Mars analog site, together with related scientific studies, to better understand how to best search for life on Mars. ARADS field work was performed in Atacama Chile and featured a rover-mounted 1.2m auguring drill to acquire subsurface samples that were analyzed with flight prototype instruments designed to search for chemical signatures of life.

C R Stoker↗

Laser drilling of vias in dielectric for high density multilayer LSHI thick film circuits

A design analysis of a high density multilevel thick film digital microcircuit used for large scale integration is presented. The circuit employs 4 mil lines, 4 mil spaces and requires 4 mil diameter vias. Present screened and fired thick film technology is limited on a production basis to 16 mil square vias. A process whereby 4 mil diameter vias can be fabricated in production using laser technology was described along with a process to produce 4 mil diameter vias for conductor patterns which have 4 mil lines and 4 mil spacings.

Cocca, T.↗

NETL Coal Energy Atlas: A Collection of Coal/Energy Related Maps

The NETL Coal Energy Atlas contains a comprehensive collection of coal and energy-related maps and graphics curated by the National Energy Technology Laboratory (NETL) Systems Analysis group. It serves as a living document providing an overview of the U.S. coal and energy sectors. The volume is structurally organized into six key thematic areas. Ultimately, the atlas functions as a modular baseline for data integration, allowing researchers to drill down into specific regional locations or customize geographic base layers for advanced systems analysis.

bituminous coal↗