Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “development timelines”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

National Geothermal Data System Hub Deployment Timeline (Appendix E-1-d)

Excel spreadsheet describing activity, spending, and development for the four data hubs (Arizona Geoloical Survey, Kentucky Geological Survey, Illinois Geological Survey, and Nevada Bureau of Mines and Geology) serving data for the National Geothermal Data System under the State Contributions to the National Geothermal Data System Project.

15 GEOTHERMAL ENERGY↗

Energy Commissioning Agent/Auditor Online Training Program

The original objective of this project was to create a comprehensive training and deployment program - suitable for in-person delivery in the New York metro region – focused on educating building commissioning authorities and energy auditors. The NJIT Center for Building Knowledge was to have sole responsibility for this curriculum development and deployment plan effort. Very early in the project timeline, however, the scope of the project evolved – with DOE and NETL approval - to become a collaborative effort between NJIT and Portland Energy Conservation, Inc. (PECI). The structure of this collaboration involved PECI taking the lead on developing a comprehensive curriculum program suitable for in-person delivery, and NJIT taking the lead on turning this curriculum into a comprehensive online training program that would complement – and extend the reach of – the in-person curriculum.

Evans, Deane↗

Working With Your Utility Series: Interconnection Basics

This training provided information on interconnection basics for federal agencies developing distributed energy projects. Considerations covered included: Understanding interconnection processes and timelines, interconnection siting considerations, technology-specific interconnection issues, and interconnect agreements. This webinar is the first in a multi-part series on working with electric utilities to develop distributed energy projects on federal sites.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Zinc against COVID-19? Symptom surveillance and deficiency risk groups

A wide variety of symptoms is associated with Severe Acute Respiratory Syndrome Coronavirus 2 (SARS-CoV-2) infection, and these symptoms can overlap with other conditions and diseases. Knowing the distribution of symptoms across diseases and individuals can support clinical actions on timelines shorter than those for drug and vaccine development. Here, we focus on zinc deficiency symptoms, symptom overlap with other conditions, as well as zinc effects on immune health and mechanistic zinc deficiency risk groups. There are well-studied beneficial effects of zinc on the immune system including a decreased susceptibility to and improved clinical outcomes for infectious pathogens including multiple viruses. Zinc is also an anti-inflammatory and anti-oxidative stress agent, relevant to some severe Coronavirus Disease 2019 (COVID-19) symptoms. Unfortunately, zinc deficiency is common worldwide and not exclusive to the developing world. Lifestyle choices and preexisting conditions alone can result in zinc deficiency, and we compile zinc risk groups based on a review of the literature. It is also important to distinguish chronic zinc deficiency from deficiency acquired upon viral infection and immune response and their different supplementation strategies. Zinc is being considered as prophylactic or adjunct therapy for COVID-19, with 12 clinical trials underway, highlighting the relevance of this trace element for global pandemics. Using the example of zinc, we show that there is a critical need for a deeper understanding of essential trace elements in human health, and the resulting deficiency symptoms and their overlap with other conditions. This knowledge will directly support human immune health for decreasing susceptibility, shortening illness duration, and preventing progression to severe cases in the current and future pandemics.

59 BASIC BIOLOGICAL SCIENCES↗

In-Conduit Hydropower for Public Water Supply Systems: Development Challenges and Costs

Conduit hydropower leverages existing water infrastructure to provide energy solutions, though deployment has been slow. A 2022 US Department of Energy (DOE)–funded report led by Oak Ridge National Laboratory (ORNL) summarizes a reconnaissance-level study of hydropower potential at national conduits (Kao et al., 2022). The report includes power and energy estimates across three major sectors of conduit hydropower potential: municipal, agricultural, and industrial. Water resources include public water supply systems (municipal and industrial), irrigation canal systems (agricultural), thermoelectric cooling systems (industrial), and wastewater systems (municipal and industrial). In total, 1.41 GW of power potential was estimated nationwide. Subsequently, DOE has funded ORNL through the Conduit Hydropower Engineering, Evaluation, and Technology Acceleration project (CHEETA) to improve deployment potential for conduit hydropower. Work thus far has focused on “in-conduit” hydropower (ICH)—or “in-pipe” hydropower—for public water supply systems, though the project is planning to cover conduit hydropower more broadly. The timeline of ORNL’s conduit hydropower related research and development (R&D) is shown in Figure 1. The results of CHEETA should benefit the hydropower industry by providing insights into costs, barriers, and other considerations that impact project development. The hydropower industry and municipal/industrial conduit stakeholders will use the output to inform development decisions and advance low-impact hydropower growth in the US.

13 HYDRO ENERGY↗

Selection and characterization of FcεRI phospho-ITAM specific antibodies

Post-translational modifications, such as the phosphorylation of tyrosines, are often the initiation step for intracellular signaling cascades. Pan-reactive antibodies against modified amino acids (e.g., anti-phosphotyrosine), which are often used to assay these changes, require isolation of the specific protein prior to analysis and do not identify the specific residue that has been modified (in the case that multiple amino acids have been modified). Phosphorylation state-specific antibodies (PSSAs) developed to recognize post-translational modifications within a specific amino acid sequence can be used to study the timeline of modifications during a signal cascade. We utilized the FcεRI receptor as a model system to develop and characterize high-affinity PSSAs using phage and yeast display technologies. We determined three β-subunit antibodies that recognized: 1) phosphorylation of tyrosines Y 218 or Y 224 ; 2) phosphorylation of the Y 228 tyrosine; and 3) phosphorylation of all three tyrosines. We used these antibodies to study the receptor activation timeline of FcεR1 in rat basophilic leukemia cells (RBL-2H3) upon stimulation with DNP 24 -BSA. We also selected an antibody recognizing the N-terminal phosphorylation site of the γ-subunit (Y 65 ) of the receptor and applied this antibody to evaluate receptor activation. Recognition patterns of these antibodies show different timelines for phosphorylation of tyrosines in both β and γ subunits. Our methodology provides a strategy to select antibodies specific to post-translational modifications and provides new reagents to study mast cell activation by the high-affinity IgE receptor, FcεRI.

59 BASIC BIOLOGICAL SCIENCES↗

Results of Modeling and Simulation Support to Specia Nuclear Material Handling Facility Operations - 16053

Newport News Shipbuilding (NNS) is the sole designer and provider of nuclear powered aircraft carriers and one of only two companies in the United States to build nuclear powered submarines. As part of the upkeep of aircraft carriers, the ships return to NNS once in their lifetime for a complex overhaul and to be refueled. In support of overhaul operations NNS maintains a state of the art Special Nuclear Material (SNM) handling facility. Due to the complex nature of the operations that occur within this facility, during the design and initial operation of the building NNS developed a facility simulation model to provide decision support during the project planning and operational phases. This tool allows users to experiment with process times, process order, equipment utilization, personnel utilization and spatial utilization. By capturing the planned operations, time distributions for operations, equipment sizes and uses and personnel requirements, the tool accurately reflects the planned use of the facility. This realism allows the user to experiment with any aspect of the facility, in a controlled and cost effective space, and determine how changes or potential delays may impact overall facility operations. Thus the model allows for rapid exploration of multiple scenarios to determine likely outcomes, allowing a user to identify risks well ahead of their realization and explore mitigation strategies in a controlled space, to determine the ideal path forward. The tool was successful during the initial operation of the facility in helping to identify and mitigate risks related to the complex operations occurring during SNM handling. The tool is now in use to support planning for the next series of operations that will occur within the facility. The initial operations the model supported occurred during the deactivation of the USS Enterprise, and future operation will focus on the overhaul of Nimitz class aircraft carriers. The NNS planning team is currently using the tool to assess potential risks and challenges that are identified as potentially impacting the schedule and timelines for these overhaul processes. In addition, the NNS development team is working to add new operational steps to the model, capturing work that is occurring near the facility, but which directly impacts the facilities operational abilities. In conjuncture with the engineering planning division, the NNS development team has run over 20 complex scenarios through the tool. The team has provided output from these scenarios to both NNS personnel and government representatives. To date the model has successfully supported the identification of several feasible paths to incorporate new processes, dictated by the work to support a overhaul vs a deactivation. The model also provides a spatial arrangement component that allows users to experiment with different equipment placement within the facility. Due to the fidelity of the model, arranging equipment with the spatial component allows a user to set up the facility in an experimental layout and run the processes inside the facility to determine if the layout will be feasible, or if it would impact operational capabilities. Additionally, the spatial component allows for visual collaboration between stakeholders to ensure all operational personnel are aware of the current and planned layout, and that they do not locate equipment or work stations in locations that would interfere with facility operations. The spatial component, in combination with the simulation component, has resulted in several documented improvements in process. These include: the identification of additional equipment which could be stored outside the facility, without impacting operations, to increase space; confirmation of the ideal placement of a large water tank; and identification of several risks related to planned equipment storage area, allowing the team to develop new plans and avoid realizing the risk. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Agentic workflow enables the recovery of critical materials from complex feedstocks via selective precipitation

We present a multi-agentic workflow for critical materials recovery that deploys a series of AI agents and automated instruments to recover critical materials from produced water and magnet leachates. This approach achieves selective precipitation from real-world feedstocks using simple chemicals, accelerating the development of efficient, adaptable, and scalable separations to a timeline of days, rather than months and years.

Ritchhart, Andrew J.↗

Preliminary Analysis of Nuclear-Powered Data Center Scenarios

This report provides a comprehensive analysis of the potential for nuclear energy to meet the growing energy demands of data centers (DCs). It evaluates the technical, economic, and socio-environmental implications of coupling Nuclear Power Plants (NPPs) with DCs, providing initial responses to several key research questions: What is the potential increased energy demand from DCs in the U.S., in the short, medium and long term? The U.S. is experiencing a rapid increase in energy demand from DCs, with projections indicating a total increase of 24-74 GWy(e) by 2028. Meeting this demand with nuclear energy would require 27–85 GWe of installed capacity. While this surge is expected to slow in the long term, the DC industry needs reliable, scalable, and clean energy sources. How much nuclear capacity can be deployed to meet DC demand and in which timeframe? Several pathways for increasing nuclear capacity were identified, including uprates, restarts of recently retired reactors, power purchase agreements with existing fleet, and new construction. Approximately 20‒28 GWe of nuclear capacity could be dedicated to DCs by the early 2030s. How much High Assay Low Enriched Uranium (HALEU) would be needed to support some nuclear deployment scenarios for DCs? Meeting the deployment targets announced by Google and Amazon for the Kairos Power Fluoride-Salt-Cooled High-Temperature Reactor or KP-FHR (~500 MWe by 2035) and the Xe-100 (~1 GWe by 2040), respectively, requires ramping up 19.75% enriched HALEU production to ~6 t/yr by 2040. What types of nuclear energy/DC coupling options exist, and what are the different benefits/challenges? Five coupling options were analyzed, ranging from grid-connected configurations to colocated, behind-the-meter setups. Key design considerations include the proximity to high- and/or medium-voltage transmission lines, the desired internal fault tolerance, and the sources of alternative/backup power during outages. Each coupling option offers unique benefits and challenges in terms of reliability, system costs, regulation, timeline, etc. A list of NPP/DC deployment scenarios was developed, considering existing or newly built NPP or DC projects. Colocated DCs with new small modular reactors or large reactors on greenfield and brownfield sites are the focus of this report. What types of reactors, especially what size, may be incentivized by DCs? Reactor sizing optimization revealed that the ideal reactor size and number of units depend on DC demand, coupling configurations defined in this report, and other economic factors. Larger reactors are preferred for high-demand DCs and grid-connected systems, while larger number of smaller reactors are better suited for DC configurations without grid backup. Which sites may be compatible with co-located nuclear-powered DCs? Siting those projects is a complicated evaluation factoring local water resources, grid connection availability and reliability, IT infrastructure, local work force, proximity to population zones, etc. For this effort greenfield and brownfield sites such as retired coal-fired plants were used to evaluate this question. This evaluation is not meant to recommend any particular site but it highlights key siting criteria and demonstrates large-scale site availability. What are the socio-economic impacts of co-located nuclear-powered DCs? Those projects generate substantial economic benefits to the local economy, particularly in urban settings. Hyperscale DCs colocated with nuclear power plants (sized around 1 GW of power) can create nearly 1,700 jobs for annual operations and more than 7,300 jobs among the supply chain and local businesses as a result of increased household spending. Rural projects also provide significant benefits, but at lower magnitudes compared to urban deployments.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

First-of-a-Kind Fuel-bearing Molten Chloride Irradiation Experiment

As a dozen MSR developers in the U.S. work toward an aggressive commercialization timeline, many of their fueled-salts—notably, chloride-based compositions—have never been irradiated. Licensing and operating these reactors requires an understanding of (1) the source term, radiation chemistry, and gas generation; (2) unanticipated irradiation-induced corrosion effects; and (3) the impact of burnup on thermophysical properties, all of which can be deduced through irradiation testing. Idaho National Laboratory (INL) is ideally suited to leverage its expertise in chloride salt chemistry, as well as its Neutron Radiography Reactor (NRAD) facility in the Hot Fuels Examination Facility (HFEF) at the Materials and Fuels Complex (MFC), to conduct the world’s first fuel-bearing chloride salt irradiation and fill in the knowledge gaps pertaining to salt chemistry under irradiation. Molten-salt Research Temperature-controlled Irradiation (MRTI) consists of a salt-containing capsule that is internally heated inside of a secondary containment. The experiment must rely on resistive heating to melt the salt before irradiation (to avoid the impact of radiolysis) and once the reactor is turned on and fission reactions commence in the salt, the resistive power can then be reduced. Salt-immersed thermocouples coupled to a controller allow for the heater power to be adjusted as needed to meet experimental objectives. The bulk of the experimental results will be achieved through Post-Irradiation Examination (PIE). At which point a range of different measurements are anticipated to assess the salt/plenum/wall composition, the capsule corrosion rate, and the evolution of salt properties.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Economic Impact of Permitting Timelines on Produced Geothermal Power

Despite having a large geothermal power potential in the United States, only a small fraction has been developed for power generation. Various barriers, including technical, financial, and regulatory permit delays, are attributed to lower contribution of geothermal energy in the national grid. Unpredictable environmental reviews and permitting timelines are some of the non-technical barriers that can cause delays in geothermal exploration and utilization plans. This study shows that the geothermal permitting timelines can vary from six months to several years, depending on the presence or absence of biological resources, cultural resources, and sensitive environmental issues at the project site. The potential impacts of these permit barriers can range from investors abandoning geothermal development to making the product (i.e., electricity) more expensive and uncompetitive.

15 GEOTHERMAL ENERGY↗

Experimental Investigations into the Corrosion of Alloy 625 Using NaCl-PuCl3 Molten Salt in a Natural Circulation Microloop

Molten salt reactors (MSRs) can potentially revolutionize the nuclear industry by providing a path to a near-zero nuclear waste fuel cycle, contributing to more sustainable energy sources. As a plethora of MSR developers in the United States work toward an aggressive commercialization timeline, many of their fueled-salts—notably, chloride-based compositions—have limited operational testing with nuclear material. Licensing and operating these reactors require an understanding of corrosion effects on reactor materials of construction under operational conditions. The TerraPower Molten Chloride Fast Reactor (MCFR) is a liquid-fueled chloride-salt fast reactor which has received notable interest from the utility sector based on its desirable economic characteristics. The reactor operates at low pressure but does not require the use of highly reactive chemicals, leading to a reduced use of concrete and steel during construction. Additionally, liquid fuel allows for inherently stable behavior and natural circulation during a loss-of-site-power scenario. MCFR can be refueled while operating which makes it compatible with variable generation sources such as wind and solar. MCFR is a breed-and-burn in-situ reactor that does not implement any chemical processing or separations in the fuel cycle. Only mechanical filtration of noble metals and off-gassing of noble gases are utilized while the actinides stay mixed with the fuel at all times. The MCFR will require technology development to reach commercialization. With a breed-and-burn in-situ reactor like MCFR, the transmutation of fertile U-238 to fissile Pu-239 allows for much greater fuel utilization.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Assessment of Economic Impact of Permitting Timelines on Produced Geothermal Power in Imperial County, California

Despite having a large geothermal power potential in the United States, only a small fraction has been developed for power generation. Various barriers, including technical, financial, and regulatory permit delays, are attributed to lower contribution of geothermal energy in the national grid. Unpredictable environmental reviews and permitting timelines are some of the non-technical barriers that can cause delays in geothermal exploration and utilization plans. Our study shows that the geothermal permitting timelines can vary from six months to several years, depending on the presence or absence of biological resources, cultural resources, and sensitive environmental issues at the project site. The potential impacts of these permit barriers can range from investors abandoning geothermal development to making the product (i.e., electricity) more expensive and uncompetitive. In this study, we conducted economic analysis to assess the impact of permitting timelines on cost of produced electricity from geothermal resources using data from existing geothermal plants as well as prospective sites. In this paper, we present collected timelines data, approach, and results of economic impact of permitting timelines on geothermal power. We evaluated the various environmental management and permit review processes by considering a hypothetical geothermal project in the Salton Sea Known Geothermal Resource Area. Because of the variety of the biological and environmental issues and the involvement of local, state, and federal agencies with overlapping jurisdictions, this project could go through one of the many California Environmental Quality Act (CEQA) and National Environmental Policy Act (NEPA) review scenarios that range from the least to the most complex in its circumstances. The fastest CEQA/NEPA review timelines would have the project completed in six years. In contrast, the project would substantially need longer time to complete if it were located in an area with significant environmental resources or cultural issues that required permitting from various agencies. With increasing project completion timelines, the simplified levelized cost of electricity (sLCOE) can be 4 to 11% higher with longer CEQA/NEPA review timelines than the sLCOE value with the fastest CEQA/NEPA review timeline. Lengthier CEQA/NEPA review timelines could also result in loss of $64 million to $227 million in potential revenue. Such significant economic impacts could determine the success of a geothermal project.

15 GEOTHERMAL ENERGY↗

An Examination of the Hydropower Licensing and Federal Authorization Process

Site-permitting and regulation are necessary to ensure hydropower projects (both original and relicensed) comply with statutory requirements and address multiple stakeholder priorities that consider a range of factors, including water quality, species protection, cultural resource impacts, and recreation. However, the time involved in acquiring a license for an individual hydropower project can be highly variable by project, leading to increased project costs, financial risks, and uncertainties. In part, this variability is the result of a regulatory structure that has evolved over time to include multiple approvals and compliance requirements administered by the Federal Energy Regulatory Commission (FERC), U.S. Army Corp of Engineers (USACE), federal land management agencies, federal and state resource agencies, and Indian Tribes. Ultimately, the time, benefits, costs, and risks to developers associated with hydropower regulatory processes and/or the preparation (e.g., studies) required for regulatory agency review are not well documented or synthesized in the public domain, which may increase uncertainty and variability within the process. This report addresses these needs by presenting results of a comprehensive examination of hydropower licensing including quantitative and qualitative analyses of timelines, causal factors, and their combined effect on risk and costs to developers.

13 HYDRO ENERGY↗

In vivo visualization of butterfly scale cell morphogenesis in Vanessa cardui

Many organisms exhibit functional micro- and nanoscale materials with structural definition and performance that challenge synthetic fabrication techniques, yet we know little about the processes that enable their formation. Using butterfly scales as a model system for functional biomaterials, we establish a timeline of scale formation and quantify relevant structural parameters for developing painted lady butterflies. We overcome challenges of previous efforts by imaging structure formation directly in living organisms, which allows us to continuously observe the evolving wing tissue and the fine details of individual scale cells. Visualization of scale structure formation in live butterflies forms the basis for modeling the underlying biomechanical processes and opens avenues for their translation into advanced fabrication strategies.

59 BASIC BIOLOGICAL SCIENCES↗

Port scanner and Testing Suite

This project addresses the challenge of identifying and managing open network ports across physical and virtual hosts. The current form of verifying ports in use required manually searching individual ports - a process that was both time- consuming and a potential bottleneck for deployment timelines. To resolve this, an automated port scanning tool was developed in Python. The tool supports simultaneous multiple port scans. To ensure functionality and long-term maintainability, a comprehensive testing suite was implemented using Python’s unittest framework. Edge cases, including valid port numbers, reversed ranges, and closed ports, were explicitly tested to ensure robust handling of real-world scenarios. The resulting tool reduces the time required to verify port security across a network, supporting both targeted and host checks and broader Classless Inter-Domain Routing (CIDR) -based network scans. This work demonstrates the value of automation and test-driven development in strengthening network security practices, and provides a foundation for future enhancements.

Rivera, Linda [Fermilab]↗

Synroc Waste Treatment Facility for Fission-based Molybdenum-99 Production - 19335

ANSTO is building a nuclear waste treatment plant that represents a significant step change in the treatment of intermediate-level waste (ILW) from Molybdenum-99 nuclear medicine production. This industrial scale facility shall deploy ANSTO Synroc technologies; a wasteform tailored for immobilizing fission products, an integrated process line for converting liquid waste into free-flowing powder, automated canister filling and sealing, and a hot isostatic pressing (HIP) system designed for remote operation. The HIP represents the last processing step to consolidate the wasteform into a final durable solid compact with the required performance characteristics. This paper shall outline the various phases of development in realising the final plant design as well as timelines to progress through cold- and hot-commissioning. Further, plans for storage and final disposal of the HIPed canister product will be discussed. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

MIT Capstone Project Assignment 1 - Existing System Design

“FPU in 5”: The National Nuclear Security Administration (NNSA) and upper management at Lawrence Livermore National Lab (LLNL) have informally set a long-term goal of decreasing the development cycle of new systems to five years or less. The driver is to be able to respond to emerging situations which require new capabilities more quickly. There are numerous approaches to solve the problem, and any single improvement is likely insufficient. Our capstone project focuses on modernizing the design development processes, production development processes, and communication between design agencies (DAs) and production agencies (PAs) to decrease the timeline from conceptual study to first production unit. Our project’s system problem statement (SPS) is below: TO decrease the time from conceptual study to first production unit BY centralizing design development, production development, and information exchange USING digital engineering techniques.

42 ENGINEERING↗