Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “development timelines”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

Supporting research and technology for automotive Stirling engine development

The technology advancement topics described are a part of the supporting research and technology (SRT) program conducted to support the major Stirling engine development program. This support focuses on developing alternatives or backups to the engine development in critical areas. These areas are materials, seals control, combustors and system analysis. Specific objectives and planned milestone schedules for future activities as now envisioned are described. These planned SRT activities are related to the timeline of the engine development program that they must support.

Tomazic, W. A.↗

Proximity Operations for the Robotic Boulder Capture Option for the Asteroid Redirect Mission

In September of 2013, the Asteroid Robotic Redirect Mission (ARRM) Option B team was formed to expand on NASA's previous work on the robotic boulder capture option. While the original Option A concept focuses on capturing an entire smaller Near-Earth Asteroid (NEA) using an inflatable bag capture mechanism, this design seeks to land on a larger NEA and retrieve a boulder off of its surface. The Option B team has developed a detailed and feasible mission concept that preserves many aspects of Option A's vehicle design while employing a fundamentally different technique for returning a significant quantity of asteroidal material to the Earth-Moon system. As part of this effort, a point of departure proximity operations concept was developed complete with a detailed timeline, as well as DeltaV and propellant allocations. Special attention was paid to the development of the approach strategy, terminal descent to the surface, controlled ascent with the captured boulder, and control during the Enhanced Gravity Tractor planetary defense demonstration. The concept of retrieving a boulder from the surface of an asteroid and demonstrating the Enhanced Gravity Tractor planetary defense technique is found to be feasible and within the proposed capabilities of the Asteroid Redirect Vehicle (ARV). While this point of departure concept initially focuses on a mission to Itokawa, the proximity operations design is also shown to be extensible to wide range of asteroids.

Reeves, David M.↗

Crew Autonomy Through Self-Scheduling: Operational Characterization

NASA’s future long-duration exploration missions (LDEMs) will encounter increasing communication transmission delays as they move farther from Earth-based ground stations. This necessitates a new approach, as crews can no longer rely on real-time support from ground planners and must self-schedule their own operational timelines effectively and efficiently. To enable this transition, our team has developed Playbook, a mission planning and scheduling tool. Our research focuses on quantifying scheduling performance using Playbook to inform the design and development of future features to streamline timeline creation. We also aim to propose standards and guidelines for autonomous crews in LDEMs. In the past year, we have focused on further validating and quantifying the effects of countermeasure aids on self-scheduling performance. There are two software aids in Playbook (self-scheduling platform): Suggested Fixes, which propose an edit to resolve violations within a timeline, and No-Go Zones, which highlight where activities should not be scheduled on a timeline. We have made significant progress in HERA Campaign 7 (C7) data collection, increasing the number of days crew must self-schedule from 4 to 8. As a result, almost 20% of the mission is self-scheduled by the analog astronauts. We have also started data collection on a controlled lab experiment designed to quantify performance effects due to the countermeasures. We expect to present the preliminary results from both efforts. Finally, we have conducted an exploratory analysis of NASA’s HERA Campaign 6 (C6), investigating the mission-level impacts of self-scheduling. We derived basic patterns and descriptive statistics to better characterize crew autonomy through self-scheduling. We also assessed if there are any individual indicators of preference for self-scheduling, such as experience or predilection for autonomy. Preliminary analysis indicates that the HERA C6 crew self-scheduled one out of four flexible activities, indicating unprompted adoption of self-scheduling as a concept of operation for crew autonomy.

analog↗

InSight Robotic Arm Testing Activities for HP3 Mole Anomaly Recovery on Mars

The InSight lander’s Heat Flow and Physical Properties Package (HP3 ) was deployed on Mars in February 2019 and began attempting to penetrate to its target depth range of 3-5 meters shortly thereafter. However, the mole’s downward progress stopped after only 35 cm of penetration. In response, the project convened an Anomaly Response Team (ART) and since then has been attempting to diagnose the problem and assist the mole using the tools available on Mars. The key asset used in this effort has been the Instrument Deployment System (IDS), which includes two cameras and a robotic Instrument Deployment Arm (IDA). Since the IDS was originally intended only to deploy InSight’s primary instruments to the Martian surface, new testbed setups, experiments, and operational protocols (e.g., command sequences) were required and had to be developed on a short timeline. The HP3 Mole ART first focused on gathering all observable data on Mars about the state of the mole and Support Structure Assembly (SSA), as well as the physical properties of the Martian regolith. This included using the robotic arm to point the IDC (Instrument Deployment Camera) at the SSA during diagnostic hammering attempts to observe motion of the SSA and science tether. Images taken during these attempts revealed some motion of the SSA, but no apparent change in mole depth. At JPL, the IDS and Testbed teams re-created the hardware configuration on Mars based on limited knowledge of the mole’s state. They devised and tested techniques to use the robotic arm and cameras to accomplish previously untested activities on Mars, including imaging the HP3 , using the IDA to interact with the terrain, and using the IDA to move the SSA away from the partially-embedded mole. The team executed the more promising techniques on Mars. After diagnostic hammering on Mars, the team decided to move the SSA to gain visibility of the mole’s configuration and access to the soil around the mole. After developing the technique and practicing the maneuver in the InSight testbed, the team lifted the SSA on Mars and placed it behind the mole. This revealed a pit surrounding the now exposed mole, observations of which provided essential clues for determining the root cause of the mole’s lack of progress. The IDS and Testbed teams altered the testbed to match the situation on Mars. They devised IDA techniques to determine the Martian soil properties and assist the mole’s descent. They tested these techniques in the testbed and executed the more promising ones on Mars. These include using the robotic arm to alter the regolith near the mole and to push on the mole while it hammers. This paper discusses the anomaly resolution testing in the testbed at JPL, describes how the IDS team prepared for the anomaly recovery activities on Mars, and provides preliminary results of the efforts to assist the HP3 mole on Mars.

Kim, Junggon↗

Crew Autonomy Through Self-Scheduling: Guidelines for Crew Scheduling Performance Envelope and Mitigation Strategies

NASA’s future long duration exploration missions (LDEMs) will encounter increasing communication transmission delays as they move farther from Earth-based ground stations. Because crews can no longer rely on real-time support from ground planners, they will have to self-schedule their own operational timelines effectively and efficiently. To enable this, our team develops Playbook, a mission planning and scheduling tool. Our research focuses on quantifying scheduling performance using Playbook to inform the design and development of future features aimed at streamlining timeline creation. We also aim to propose standards and guidelines for autonomous crews in LDEMs. This year, we discuss preliminary results from HERA Campaign 6.

self-scheduling↗

Overview of NASA space station activities

The architecture, functions, and human activities on-board a space station are discussed. A manned presence is regarded as essential for innovative actions and successful exploitation of weightless conditions. The station itself could be a cluster of modules for habitation, power, operations, docking, experimentation, and storage. Additionally, the station could provide an interface for free-flying platforms and teleoperated satellite services, as well as a base for establishing space-based manufacturing facilities. NASA has projected timelines that include initial development funding in 1987, full capabilities before the year 2000, and initial costs for minimum capabilities of $7.5-9 billion. Architecture, mission requirements, trade-offs, and concepts are currently being defined as a prelude to systems development. Attention is being given to participation by both the DoD and other governments, and to defining the capabilities of the station, including habitability, closed-loop life-support system, the scope of science application and data transfer, and the power requirements.

Tilton, E. L., III↗

Access flight hardware design and development

Several items were found to be of immense value in the design and development of the Assembly Concept for Construction of Erectable Space Structures (ACCESS) hardware. The early availability of mock-up and engineering test hardware helped to develop the concept and prove the feasibility of the experiment. The extensive neutral buoyancy testing was invaluable in developing the procedures and timelines, proving that the hardware functioned as intended, and effectively trained the astronauts. The early involvement of the crew systems/astronaut personnel was extremely beneficial in shaping the design to meet the EVA compatibility requirements. Also, the early definition of coupled loads and on-orbit dynamic responses can not be overemphasized due to the relative uncertainty in the magnitude of these loads and their impact on the design.

Rogers, John F.↗

Design of a Lunar Farside Observatory

The design of a mantendable lunar farside observatory and science base is presented. A farside observatory will allow high accuracy astronomical observations, as well as the opportunity to perform geological and low gravity studies on the Moon. The requirements of the observatory and its support facilities are determined, and a preliminary timeline for the project development is presented. The primary areas of investigation include observatory equipment, communications, habitation, and surface operations. Each area was investigated to determine the available options, and each option was evaluated to determine the advantages and disadvantages. The options selected for incorporation into the design of the farside base are presented. The observatory equipment deemed most suitable for placement on the lunar farside consist of large optical and radio arrays and seismic equipment. A communications system consisting of a temporary satellite about the L sub 2 libration point and followed by a satellite at the stable L sub 5 libration point was selected. A space station common module was found to be the most practical option for housing the astronauts at the base. Finally, a support system based upon robotic construction vehicles and the use of lunar materials was determined to be a necessary component of the base.

Source record↗

Timeline-Based Space Operations Scheduling with External Constraints

We describe a timeline-based scheduling algorithm developed for mission operations of the EO-1 earth observing satellite. We first describe the range of operational constraints for operations focusing on maneuver and thermal constraints that cannot be modeled in typical planner/schedulers. We then describe a greedy heuristic scheduling algorithm and compare its performance to both the prior scheduling algorithm - documenting an over 50% increase in scenes scheduled with estimated value of millions of dollars US. We also compare to a relaxed optimal scheduler showing that the greedy scheduler produces schedules with scene count within 15% of an upper bound on optimal schedules.

Chien, Steve↗

The Nitty Gritty: How We Make Analogs Work

NASA's Human Research Program (HRP) is becoming increasingly reliant on Isolated, Confined and Controlled (ICC) analogs to accomplish many of its research objectives. Compared to other research platforms, ICC analogs present a unique set of operational challenges that must be addressed in order to ensure a high fidelity research environment. In particular, the Human Exploration Research Analog (HERA) habitat, which is classified as an ICC environment, has been developed over the past three years to accommodate the operational needs of research investigations from each of the HRP Elements. During the development period, various types of requirements have contributed to the current operational model, which strives to achieve the highest possible level of mission fidelity with limited resources. This presentation will focus on the operational aspects of the HERA habitat, with emphasis on how we develop the analog research environment to meet researchers' needs. Specific discussion topics include mission scenario development, operational tasks, mission timeline integration, stressor implementation, console support, and improvements based on lessons learned. The information is intended to help investigators better understand the details behind HERA operations and the benefits to their research goals.

Self, A. L.↗

Design and Testing of a 2-Hour Oxygen Prebreathe Protocol for Space Walks from the International Space Station

To develop and test a 2-hour prebreathe protocol for performing extravehicular activities (EVAs) from the International Space Station (ISS). Combinations of adynamia (non-walking), prebreathe exercise, and space suit donning options (10.2 vs. 14.7 psi) were evaluated, against timeline and consumable contraints to develop an operational 2- hour prebreathe protocol. Prospective accept/reject criteria were defined for decompression sickness (DCS) and venous gas emboli (VGE) from analysis of historical DCS data, combined with risk management of DCS under ISS mission circumstances. Maximum operational DCS levels were defined based on protecting for EVA capability with two crew-members at 95% confidence, throughout ISS lifetime (within the constraints of NASA DCS disposition policy JPG 1800.3). The accept/reject limits were adjusted for greater safety based on analysis of related medical factors. Monte-Carlo simulation was performed to design a closed sequential, multi-center human trial. Protocols were tested with 4 different prebreathe exercises (Phases I-IV), prior to exposure to 4.3 psi for 4 hrs. Subject selection, Doppler monitoring for VGE, test termination criteria, and DCS definitions were standardized. Phase I: upper and lower body exercises using dual-cycle ergometry (75% VO2 max for 10 min). Phase II: ergometry plus 24 min of light exercise (simulating space-suit preparations). Phase III: same 24 min of light exercise but no ergometry, and Phase IV: 56 min of light exercise without ergometry. A prebreathe procedure was accepted if, at 95% confidence, the incidence of DCS was less than 15% (with no Type II DCS), and Grade IV VGE was less than 20%.

Gernhardt, Michael L.↗

Timeline as Unifying Concept for Spacecraft Operations

The notion of Timeline has been used informally in spacecraft operations software for some time, but it has not heretofore been formalized and unified either syntactically or semantically. We have formalized and unified the Timeline so that the commonality can be exploited to reduce the cost of developing and using spacecraft operations software. The Timeline can then be used as the common data structure for storage and communications between spacecraft planning and operations software elements.

decision making↗

Autonomous Real Time Requirements Tracing

One of the more challenging aspects of software development is the ability to verify and validate the functional software requirements dictated by the Software Requirements Specification (SRS) and the Software Detail Design (SDD). Insuring the software has achieved the intended requirements is the responsibility of the Software Quality team and the Software Test team. The utilization of Timeliner-TLX(sup TM) Auto-Procedures for relocating ground operations positions to ISS automated on-board operations has begun the transition that would be required for manned deep space missions with minimal crew requirements. This transition also moves the auto-procedures from the procedure realm into the flight software arena and as such the operational requirements and testing will be more structured and rigorous. The autoprocedures would be required to meet NASA software standards as specified in the Software Safety Standard (NASASTD- 8719), the Software Engineering Requirements (NPR 7150), the Software Assurance Standard (NASA-STD-8739) and also the Human Rating Requirements (NPR-8705). The Autonomous Fluid Transfer System (AFTS) test-bed utilizes the Timeliner-TLX(sup TM) Language for development of autonomous command and control software. The Timeliner- TLX(sup TM) system has the unique feature of providing the current line of the statement in execution during real-time execution of the software. The feature of execution line number internal reporting unlocks the capability of monitoring the execution autonomously by use of a companion Timeliner-TLX(sup TM) sequence as the line number reporting is embedded inside the Timeliner-TLX(sup TM) execution engine. This negates I/O processing of this type data as the line number status of executing sequences is built-in as a function reference. This paper will outline the design and capabilities of the AFTS Autonomous Requirements Tracker, which traces and logs SRS requirements as they are being met during real-time execution of the targeted system. It is envisioned that real time requirements tracing will greatly assist the movement of autoprocedures to flight software enhancing the software assurance of auto-procedures and also their acceptance as reliable commanders

Plattsmier, George I.↗

Mars Surface Operations via Low-Latency Telerobotics from Phobos

To help assess the feasibility and timing of Low-Latency Telerobotics (LLT) operations on Mars via a Phobos telecommand base, operations concepts (ops cons) and timelines for several representative sequences for Mars surface operations have been developed. A summary of these LLT sequences and timelines will be presented, along with associated assumptions, operational considerations, and challenges.

telerobotics↗

Steps Towards the Integration of Conflict Resolution with Metering and Scheduling

NASA Ames Research Center is developing decision support tool technology for air traffic controllers to improve the efficiency and capacity of National Airspace System. The goal is to provide technology, tools and procedures that result in the highest possible level of user preferred trajectories whenever possible with safe and efficient traffic management when necessary. The work is being conducted under the NASA Advanced Air Transportation Technology Program in cooperation with the FAA through the Inter-Agency Integrated Product Team. The objective is to develop technology and procedures that lead towards a seamless integration of conflict resolution with metering and scheduling for arrival aircraft and en route aircraft that are under metering restrictions. A requirement is that the integration incorporate user preferred trajectories. The ultimate goal is the implementation and validation of the Descent Advisor (DA) concept which provides clearance advisories to a sector controller that simultaneously meet metering constraints, are conflict free, incorporate a user preferred (e.g., minimum fuel) descent profile, and generally require no further corrective clearance as the aircraft transitions from en route cruise into the TRACON. The DA concept may also be applied to en route aircraft under metering constraints, e.g., miles-in-trail. To achieve the DA concept a stepwise development and field evaluation is anticipated. This paper addresses the initial steps towards implementation of the DA. The Traffic Management Advisor (TMA) computes arrival time sequence and required delay information for display to the sector controller during periods when arrivals must be metered due to landing rate restrictions at the airport. The Initial Conflict Probe (ICP) compares trajectory predictions for all aircraft and alerts the controller when any two aircraft are predicted to violate separation standards (5 mi. and 2000 ft. in en route airspace). ICP also includes a trial planning function allowing the controller to develop and check a separate "what if" trajectory for conflict resolution. TMA and ICP currently operate independent of one another and have separate controller displays. The TMA meter list is on the radar controller's plan view display. The ICP is still under development, but the current concept calls for a list of predicted conflicts at the data controller position. The research described herein address two steps towards the implementation of DA. The first is to develop a concept for integrated display of conflict and metering information on a controller's display. The objective is to provide the controller with situational awareness of one problem while he develops a solution to the other. The next step is to expand the concept for display of automated clearance advisories for one problem (e.g., metering) which take into account the other problems (e.g., conflicts). Information to be communicated between TMA and ICP to facilitate' manual or automated advisories is being identified as the concept matures. In order to study the ICP/TMA integration concept the CTAS conflict probe capability has been adapted to Ft. Worth Center. The system is being validated in the laboratory with all-track data and for non -interference with TMA, TMA is already running as a daily use prototype at Ft. Worth Center. A laboratory prototype system has been developed under the CTAS baseline which combines conflict and metering information on a common user interface. Elements of the user interface are shown in Figure 1. In this simple illustration the user sees the simultaneous effect of a trial plan on meter fix delay and conflict status. Delay information is shown in the aircraft flight data block, the meter list, and the TMA timeline. Experience during Descent Advisor development and observations at Ft. Worth Center high and low attitude arrival sectors during metering suggests that manual trial planning will be unworkable during rush periods due to high controller workload.

McNally, B. David↗

Autonomous Real Time Requirements Tracing

One of the more challenging aspects of software development is the ability to verify and validate the functional software requirements dictated by the Software Requirements Specification (SRS) and the Software Detail Design (SDD). Insuring the software has achieved the intended requirements is the responsibility of the Software Quality team and the Software Test team. The utilization of Timeliner-TLX(sup TM) Auto- Procedures for relocating ground operations positions to ISS automated on-board operations has begun the transition that would be required for manned deep space missions with minimal crew requirements. This transition also moves the auto-procedures from the procedure realm into the flight software arena and as such the operational requirements and testing will be more structured and rigorous. The autoprocedures would be required to meet NASA software standards as specified in the Software Safety Standard (NASASTD- 8719), the Software Engineering Requirements (NPR 7150), the Software Assurance Standard (NASA-STD-8739) and also the Human Rating Requirements (NPR-8705). The Autonomous Fluid Transfer System (AFTS) test-bed utilizes the Timeliner-TLX(sup TM) Language for development of autonomous command and control software. The Timeliner-TLX(sup TM) system has the unique feature of providing the current line of the statement in execution during real-time execution of the software. The feature of execution line number internal reporting unlocks the capability of monitoring the execution autonomously by use of a companion Timeliner-TLX(sup TM) sequence as the line number reporting is embedded inside the Timeliner-TLX(sup TM) execution engine. This negates I/O processing of this type data as the line number status of executing sequences is built-in as a function reference. This paper will outline the design and capabilities of the AFTS Autonomous Requirements Tracker, which traces and logs SRS requirements as they are being met during real-time execution of the targeted system. It is envisioned that real time requirements tracing will greatly assist the movement of autoprocedures to flight software enhancing the software assurance of auto-procedures and also their acceptance as reliable commanders.

Plattsmier, George↗

Space Shuttle Orbiter - Countdown

The status of Orbiter launch planning is reviewed, with consideration given to major structure elements, subsystem and component development, readiness for launch, and follow-on Orbiters. It is noted that timelines in the completion of each increment of development of the first Orbital Flight Vehicle become increasingly crucial as the scheduled launch date approaches. Concurrent with the testing and finalization of this vehicle's software and hardware construction are the preliminary developmental stages of future Shuttle Orbiters.

Cohen, A.↗