Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “deployment timelines”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

Orbiter Capability for Providing Water to the International Space Station according to the Most Probable Flight Attitudes

Water to be generated by, delivered to, and processed by the International Space Station (ISS) is a critical Environmental Control and Life Support (ECLS) element, especially for the early ISS missions. A significant portion of the water required by the ISS shall be provided by the Shuttle Transportation System (STS) Orbiter. The balance of water generated by the Orbiter Fuel Cells (FC), minus that water consumed by the Orbiter Flash Evaporator System (FES) and crew, is available for transfer to the ISS. During later missions, crew respired and perspired water, as well as effluent water from the Orbiter LiOH canisters, will be collected as condensate and available for transfer to the ISS. Orbiter radiator performance provides the most variance in determining the amount of net Orbiter water available for transfer to the ISS. As radiator performance decreases, the dependence upon the FES (and FC water) increases for rejecting Orbiter waste heat. Generally, radiator performance decreases as the ISS assembly size increases (especially as solar arrays are added), and also as beta angle increases. ISS solar array deployment necessitates the use of models with articulating solar arrays (for Earth local-vertical attitudes), as array position dramatically affects Orbiter radiator performance. Recent developments in the relaxation of beta angle limitations have also increased the complexity and difficulty of providing water to the ISS. Other factors that may hinder the ability to transfer water are the number of empty Contingency Water Containers (CWCs) available, duration of open-hatch time, crew activity timeline, and full CWC storage capability. A parametric study has been accomplished that provides a quick-reference table for determining expected water generation rates for ISS missions 2A.2 through 7A.1. An hourly Orbiter water generation rate is reported according to a matrix that consists of: (1) (six) significant changes in ISS assembly configuration; (2) (four) beta angles (0 deg. , +37 deg., +53 deg. , and +75 deg.); (3) the (three) most representative ISS attitudes (XPOP-O, XPOP-180 and +XVV); (4) (four) Orbiter radiator configurations (both stowed, starboard deployed, port deployed, and both deployed) and (5) the (two) conditions (radiator inlet temperatures and fuel cell power) most consistent with sleep and wake periods. Those permutations of higher probability of occurrence than others have been identified. Another parametric study has been accomplished that provides a quick-reference table for determining expected water generation rates for ISS assembly complete missions. An hourly Orbiter water generation rate is reported according to a matrix that consists of: (1) (seven) beta angles (-75 deg., -60 deg., -30 deg., 0 deg., +30 deg., +60 deg., and +75 deg.); (2) the (nine) PYR angles that define the corners of the envelope; (3) (four) Orbiter radiator configurations (both stowed, starboard deployed, port deployed, and both deployed) and (4) the (two) conditions (radiator inlet temperatures and fuel cell power) most consistent with sleep and wake periods.

Dunaway, Brian↗

Agentic workflow enables the recovery of critical materials from complex feedstocks via selective precipitation

We present a multi-agentic workflow for critical materials recovery that deploys a series of AI agents and automated instruments to recover critical materials from produced water and magnet leachates. This approach achieves selective precipitation from real-world feedstocks using simple chemicals, accelerating the development of efficient, adaptable, and scalable separations to a timeline of days, rather than months and years.

Ritchhart, Andrew J.↗

RAVIS: Resource Forecast and Ramp Visualization for Situational Awareness - An Introduction to the Open-Source Tool and Use Cases

The Resource Forecast and Ramp Visualization for Situational Awareness (RAVIS) is an open-source tool for visualizing variable renewable resource forecasts and ramp alerts for significant up/down ramps in renewable resource and the consequent net-load. The modular dashboard of RAVIS contains configurable panes for viewing- probabilistic time series forecasts, ramp event alerts on the look-ahead timeline, spatially resolved resource sites and forecasts, and system simulation and market clearing data such as transmission lines utilization, nodal prices and available generation flexibility. RAVIS uses a technology suite that is assembled to provide optimum visualization facility while maintaining a wide pool of potential deployment and client environments. The tool is designed to take advantage of web application technologies, open source visualization libraries and tooling. Utilizing this technology will enable deployment in any environment, using any operating system, and is scalable to much higher spatial and temporal scales of visualization. As a prototype of the tool and demonstrating a use case of variable renewable integration, RAVIS currently integrates site-specific solar power forecasts in the California Independent System Operator (CAISO) and Mid-continent ISO (MISO) footprint from the IBM WattSun forecasting platform, and also superimposes market simulation data for CAISO footprint from as in-house NREL market clearing tool. The tool has the ability to alert the viewer for excessive up or down ramps for both individual solar sites as well as regionally aggregated net-load ramps, and alerts can also be qualified with respect to available flexible generation. This report will provide an introduction to the RAVIS tool, and summarize the above mentioned capabilities, typical use cases and possible extensions of the tool. The RAVIS development team believes there are likely to be high economic and reliability benefits of integrating probabilistic forecasts of variable renewables into control center visualizations and improved ramp events situational awareness for system operators and forecasting teams in the ISOs and electric utilities in comparison with their business as usual practices.

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

An Airborne Communications Roadmap for the U.S. Federal Air Marshal Service: Overview and Status

Following the events of September 11, 2001, the responsibilities, operations and numbers of the U.S. Federal Air Marshal Service (FAMS) wer e greatly expanded. With this expansion, new critical research and te chnology needs were identified, including the need for air to ground telecommunications capabilities. To address this need, the FAMS has cr eated a working group to develop, deploy and enhance aviation communi cations with respect to security and law enforcement. This paper presents the working group's progress to date in generating a FAMS air-gro und communications roadmap identifying expected communications servic es, technology maturity, and technology gaps over a timeline. The paper includes a communications preliminary requirements summary and syst em performance characteristics needed to meet identified operational needs. The system engineering process utilized is presented beginning with the identification of users, their operational needs and relevant constraints. The operational needs are translated to desired airbor ne communications services. System technical performance requirements associated with the identified services are summarized. In addition, notional communications architectures addressing the requirements are presented. Finally, future plans to identify and assess potential ca ndidate systems and their associated technical architectures, gaps and barriers to implementation are discussed. The paper addresses the cu rrent, near term (within 5 years) and far term (10 years) timeframes for such an airborne communications system.

Martzaklis, Konstantinos S.↗

Ground Software Technologies – Embracing Change: Mission Drivers and Technology Opportunities to Enable Long Lived Missions

Mission lifecycles have proven to extend well beyond their original design. The benefits to this are countless but introduce challenges in today’s rapidly changing ground infrastructure and software technologies used to enable mission success. What remains constant is the risk posture missions maintain when accepting change and the use of new technologies. Larger missions are ready for change in early lifecycle development but near launch and especially in operations, few continue to evolve beyond what is set in place in phase C. This paper will discuss how the Advance Multi-Mission Operations System (AMMOS) intends to address, three driving missions concerns: Maintaining functionality (hardware/software) for decades, rapidly responding to security vulnerabilities in software, and finally the ability to quickly evolve infrastructure and software changes. These driving concerns are briefly described below: 1. Maintaining functionality (hardware/software) for decades. Hardware updates considerably faster than 10 years ago. Expectations that a system can remain in place for more than 10 years is no longer valid. Expecting to find hardware replacements for a system older than 5 years will increasingly become more and more challenging. How than do missions plan for hardware changes for long lived missions? Principle Objective: Provide abstraction by virtualizing and containerizing software abstract away any hardware dependencies and package up the application lightweight units. 2. Rapidly responding to security vulnerabilities in software. Cost is often the main impediment and largely driven by the revalidation and testing of system that undergo change. In todays, environment security updates are a major diver demanding systems remain up to date. How then do missions accept these changes and avoid large testing efforts? Principle Objective: Help reduce the cost of re-testing by automation of testing, deployment, and compartmentalizing change. 3. Ability to quickly evolve infrastructure and software changes. Responding quickly to change is similar to the second concern in this paper regarding security vulnerabilities. In this case, it address broader concerns of updating software and infrastructure on a more realistic timeline. How do missions stay up to date with the most recent versions of software and allowing for improved functionality? Principle Objective: Use continuous integration techniques at the system level to ensure rapid turnaround. This paper explores each of these concerns in more detail. It focuses the AMMOS’s current plans, challenges and current roadmap.

Giovannoni, Brian J.↗

Large-scale Multiphysics Simulations of Small Modular Reactors Operating in Natural Circulation

Thanks to the advancements in high-performance computing, advanced modeling and simulation have become crucial in driving the development and deployment of next-generation nuclear reactors, such as small modular reactors (SMRs). SMRs offer the promise of cost-effective baseload electricity production and improved safety, while addressing some of the challenges associated with large reactor designs, such as high capital costs and extended construction timelines. As part of the Exascale Computing Project, the large-scale multiphysics simulation of an entire SMR primary system has been achieved by combining computational fluid dynamics and neutronics. In addition to the successful demonstration of full-core SMR simulations, the current study integrated the impact of natural circulation into the system. Natural circulation is the primary mechanism driving coolant circulation in SMRs. The mass flow rate in the core depends on the core power, and a numerical model has been developed to predict it. The pressure drop caused by the helical coil steam generator was also accounted for by developing a pressure drop correlation based on high-fidelity large eddy simulation results, further improving prediction accuracy. In conclusion, the results of the study demonstrate that the implemented natural circulation model is effective in predicting the responses of SMR full-core multiphysics simulations.

ECP↗

Far-field mission planning for nap-of-the-earth flight

In the face of numerically superior hostile forces, deployment of individual vehicles to the right place, at the right time, and the ability to plan missions with less conservatism, will become significant force multipliers. Far-field mission planning is one of the enabling technologies that will facilitate force coordination through management of mission timeline, vehicle survivability and fuel constraints. On-board replanning is required to deal responsively with departures from nominal plan execution that result from imperfect knowledge of and temporal variability in the mission environment. The far-field planning problem is posed as a constrained optimization problem and algorithms and structural organization are proposed for the solution.

Deutsch, Owen L.↗

OSIRIS-REx Entry, Descent, and Landing Performance

The Origins, Spectral Interpretation, Resource Identification, Security, Regolith Explorer (OSIRIS-REx) was the third mission in NASA’s New Frontiers program. OSIRIS-REx launched out of Cape Canaveral, Florida on September 8, 2016, with a science goal to return a minimum of 60 g of a primitive asteroid’s surface, specifically the near-Earth asteroid Bennu. The sample return capsule (SRC) successfully touched down at UTTR on the morning of September 24, 2023. The entry, descent, and landing (EDL) sequence had an off-nominal deployment of the parachute, but the spacecraft safely landed within the pre-flight prediction of the landing ellipse and the payload was safely recovered. This paper discusses the pre-flight EDL modeling and simulation and focus on predictions for EDL operations. Flight observations such as timeline are compared to the predicted timeline produced by the EDL simulation.

EDL↗

OSIRIS-REx Entry, Descent, and Landing Performance

The Origins, Spectral Interpretation, Resource Identification, Security, Regolith Explorer (OSIRIS-REx) was the third mission in NASA’s New Frontiers program. OSIRIS-REx launched out of Cape Canaveral, Florida on September 8, 2016, with a science goal to return a minimum of 60 g of a primitive asteroid’s surface, specifically the near-Earth asteroid Bennu. The sample return capsule (SRC) successfully touched down at UTTR on the morning of September 24, 2023. The entry, descent, and landing (EDL) sequence had an off-nominal deployment of the parachute, but the spacecraft safely landed within the pre-flight prediction of the landing ellipse and the payload was safely recovered. This paper discusses the pre-flight EDL modeling and simulation and focus on predictions for EDL operations. Flight observations such as timeline are compared to the predicted timeline produced by the EDL simulation.

EDL↗

Space-to-Ground Interactions While Conducting Scientific Fieldwork Under Mars Mission Constraints

The Biologic Analog Science Associated with Lava Terrains (BASALT) project is a 4-year program dedicated to iteratively designing, implementing, and evaluating concepts of operations (ConOps) and supporting capabilities to enable and enhance scientific exploration for future human Mars missions. BASALT incorporates three field deployments during which real (non-simulated) biological and geochemical field science is conducted at two high-fidelity Mars analog locations under simulated Mars mission conditions, including communication de-lays and data transmission limitations. BASALT’s primary science objective is to investigate how the redox conditions of altered basaltic environments affect the development of microbial communities in these Mars-relevant settings. Field sites include the active East Rift Zone on the Big Island of Hawaii, reminiscent of early Mars when basaltic volcanism and interaction with water were widespread, and the dormant eastern Snake River Plain in Idaho, similar to present-day Mars where basaltic volcanism is rare and most evidence for volcano-driven hydrothermal activity is relict. BASALT’s primary science operations objective is to investigate exploration ConOps and capabilities that facilitate scientific return during human-robotic exploration under Mars mission constraints. Each field deployment consists of ten extravehicular activities (EVAs) on the volcanic flows in which two extravehicular and two intravehicular (IV) crew-members conduct the science while communicating across time delay and under bandwidth constraints with an Earth-based Mission Support Center (MSC) comprised of expert scientists and operators. Communication latencies of 5 and 15-minute one-way light time and low (0.512 Mb/s uplink, 1.54 Mb/s down-link) and high (5.0 Mb/s uplink, 10.0 Mb/s downlink) bandwidth conditions are being evaluated. EVA crewmembers communicate with the MSC via voice and text messaging and provide scientific instrument data, still imagery, video streams, and GPS tracking information. The MSC reviews this data across delay and provides recommendations for presampling and sampling tasks. The scientists used dynamic leaderboards (priority rank-ing lists), to track and rank candidate samples relative to one another and against the science objectives for the current EVA and the overall mission. Updates to the dynamic leaderboards are relayed regularly to the IV crewmembers to provide scientific feedback from Earth and to help minimize crew idle time (time spent waiting for Earth input during which no productive tasks are performed). EVA timelines are strategically designed to enable continuous (delayed) feedback from an Earth-based science team while simultaneously minimizing crew idle time. Such timelines are operationally advantageous, reducing transport costs by eliminating the need for crews to return to the same locations on multiple EVAs while still providing opportunities for recommendations from science experts on Earth, and scientifically advantageous by minimizing the potential for cross-contamination across sites. This paper will highlight the space-to-ground interaction results from the three BASALT field deployments, including planned versus actual EVA time-line data, ground assimilation times (the amount of time available to the MSC to provide input to the crew), and idle time. Furthermore, we describe how these results vary under the different communication latency and bandwidth conditions. Together, these data will provide a basis for guiding and prioritizing capability development for future human exploration missions.

Beaton, Kara H.↗

Microgravity and Materials Processing Facility study (MMPF): Requirements and Analyses of Commercial Operations (RACO) preliminary data release

This requirements and analyses of commercial operations (RACO) study data release reflects the current status of research activities of the Microgravity and Materials Processing Facility under Modification No. 21 to NASA/MSFC Contract NAS8-36122. Section 1 includes 65 commercial space processing projects suitable for deployment aboard the Space Station. Section 2 contains reports of the R:BASE (TM) electronic data base being used in the study, synopses of the experiments, and a summary of data on the experimental facilities. Section 3 is a discussion of video and data compression techniques used as well as a mission timeline analysis.

Source record↗

Analysis of architectures for the scientific exploration of Enceladus

In 2007, a JPL Rapid Mission Architecture (RMA) analysis team identified and evaluated a broad set of mission architecture options for a suite of scientific exploration objectives targeting the Saturnian moon Enceladus. Primary science objectives were largely focused on examination of the driving mechanisms and extent of interactions by the plumes of Enceladus recently discovered by Cassini. Investigation of the architectural trade space spanned a wide range of options, from high-energy flybys of Enceladus as a re-instrumented expansion on the Cassini mission, to more complex, multi-element combinations of Enceladus orbiters carrying multiple variants of in-situ deployable systems. Trajectory design emerged as a critical element of the mission concepts, enabling challenging missions on Atlas V and Delta IV-Heavy class launch vehicles. Various Enceladus Flagship-class mission concepts identified were analyzed and compared against several first-order figures of merit, including mass, cost, risk, mission timeline, and associated science value with respect to accomplishment of the full set of science objectives. Results are presented for these comparative analyses and the characterization of the explored trade space.

Strange, N.↗

Expedited desalination permitting enables adaptive planning and water system cost reduction

Seawater desalination is a drought-proof water supply for coastal cities, but widespread development of desalination plants in the U.S. has been limited by both cost and the complexity of permitting processes designed to minimize environmental impact . This work estimates the value of accelerating the permitting timeline without changing environmental or social standards. On average, faster permitting reduces the frequency of desalination plant construction and operation, the overall costs of robust water system operation, the environmental impacts of drought-tolerant water supplies due to shorter duration of plant operation. Expedited permitting allows fundamental changes in how water infrastructure is deployed, facilitating a transition from anticipatory construction and continuous operation of seawater desalination capacity as a redundant drought buffer to just-in-time (i.e. adaptive) deployment of seawater desalination capacity when critical drought thresholds are crossed. We demonstrate the value of expedited desalination permitting in enabling adaptive planning and reducing water system costs using a simple case study in Santa Barbara, CA. We discuss additional forms of adaptive water infrastructure planning as enabled by faster permitting and address their challenges and opportunities. Lastly, we identify synergies between innovation in adaptive planning, innovation in expedited permitting practices, and innovation in water technology.

adaptive planning↗

Potential Cost Reduction in New Nuclear Deployments Based on Recent AP1000 Experience

The completion of Vogtle Units 3 and 4, despite significant cost and schedule overruns, a major bankruptcy, and a pandemic, demonstrates that the U.S. nuclear industry can still develop new supply chains, train a highly skilled workforce, and build large nuclear power plants. Vogtle, being a first-of-a-kind (FOAK) plant, faced overruns, but FOAK overruns can decrease with more deployments through a combination of design standardization and modularization, transferring and implementing lessons learned between consecutive projects, and innovation. This report quantifies the potential cost and schedule reductions in future AP1000 plants in the US and identifies the barriers in achieving those reductions. It starts with a summary and analysis of the cost and construction timeline data for AP1000 plants that started construction in the United States (Vogtle) and China. Motivated by the steep schedule reductions from the first to second series of AP1000 plants in China, a cost reduction model was developed to quantify potential reductions for future AP1000 builds in the US. Results show that within about 3 more builds, AP1000s can become economically attractive in large markets in the U.S., without leveraging the Investment Tax Credit (ITC) or Production Tax Credit (PTC), and much sooner if these tax credits are available. Importantly the financial risks for future AP1000 builds in the US might be much smaller than observed in the FOAK plants. The study also identifies various barriers for future builds including the availability of a supply chain and a skilled workforce, and emphasizes the importance of making investments to gather and implement lessons learned between consecutive projects.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Minerva: User-Centered Science Operations Software Capability for Future Human Exploration

In June of 2016, the Biologic Analog Science Associated with Lava Terrains (BASALT) research project conducted its first field deployment, which we call BASALT-1. BASALT-1 consisted of a science-driven field campaign in a volcanic field in Idaho as a simulated human mission to Mars. Scientists and mission operators were provided a suite of ground software tools that we refer to collectively as Minerva to carry out their work. Minerva provides capabilities for traverse planning and route optimization, timeline generation and display, procedure management, execution monitoring, data archiving, visualization, and search. This paper describes the Minerva architecture, constituent components, use cases, and some preliminary findings from the BASALT-1 campaign.

Deans, Matthew↗

Minerva: User-Centered Science Operations Software Capability for Future Human Exploration

In June of 2016, the Biologic Analog Science Associated with Lava Terrains (BASALT) research project conducted its first field deployment, which we call BASALT-1. BASALT-1 consisted of a science-driven field campaign in a volcanic field in Idaho as a simulated human mission to Mars. Scientists and mission operators were provided a suite of ground software tools that we refer to collectively as Minerva to carry out their work. Minerva provides capabilities for traverse planning and route optimization, timeline generation and display, procedure management, execution monitoring, data archiving, visualization, and search. This paper describes the Minerva architecture, constituent components, use cases, and some preliminary findings from the BASALT-1 campaign.

Deans, Matthew↗

OnAIR: Applications of The NASA On-Board Artificial Intelligence Research Platform

Infusing artificial intelligence algorithms into production aerospace systems can be challenging due to costs, timelines, and a risk averse industry. We introduce the Onboard Artificial Intelligence Research (OnAIR) platform, an open source software pipeline and cognitive architecture tool which enables full life cycle AI research for on-board intelligent systems. We begin a description and user walk-through of the OnAIR tool. Next we describe four use cases of OnAIR for both research and deployed onboard applications, detailing their use of OnAIR and the benefits it provided to development and function of each respective scenario. We conclude with remarks on future work, future planned deployments and goals for forward progression of OnAIR as a tool to enable larger AI and aerospace research community.

Cognitive Architecture↗

Lessons Learned from International Space Station Crew Autonomous Scheduling Test

In 2017, our team investigated and evaluated the novel concept of operations of astronaut self-scheduling (rescheduling their own timeline without creating violations) onboard International Space Station (ISS). Five test sessions were completed for this technology demonstration called Crew Autonomous Scheduling Test (CAST). For the first time in a spaceflight operational environment, an ISS crewmember planned, rescheduled, and executed their activities in real-time on a mobile device while abiding by flight and scheduling constraints. This paper discusses the lessons learned from deployment to execution.

planning and scheduling↗