Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “cost data”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

On-the-fly machine-learning for high-throughput experiments: search for rare-earth-free permanent magnets

Advanced materials characterization techniques with ever-growing data acquisition speed and storage capabilities represent a challenge in modern materials science, and new procedures to quickly assess and analyze the data are needed. Machine learning approaches are effective in reducing the complexity of data and rapidly homing in on the underlying trend in multi-dimensional data. Here, we show that by employing an algorithm called the mean shift theory to a large amount of diffraction data in high-throughput experimentation, one can streamline the process of delineating the structural evolution across compositional variations mapped on combinatorial libraries with minimal computational cost. Data collected at a synchrotron beamline are analyzed on the fly, and by integrating experimental data with the inorganic crystal structure database (ICSD), we can substantially enhance the accuracy in classifying the structural phases across ternary phase spaces. We have used this approach to identify a novel magnetic phase with enhanced magnetic anisotropy which is a candidate for rare-earth free permanent magnet.

Kusne, AG↗

Low cost miniature data collection platform

The development of the RF elements of a telecommunications package involved detailed study and analysis of concepts and techniques followed by laboratory testing and evaluation of designs. The design goals for a complete telecommunications package excluding antenna were a total weight of 300 grams, in a total volume of 400 cu cm with a capability of unattended operation for a period of six months. Of utmost importance is extremely low cost when produced in lots of 10,000. Early in the program it became apparent that a single Miniature Data Collection Platform would not satisfy all users. A single high efficiency system would not satisfy a user who had available a large battery capacity but required a low cost system. Conversely, the low cost system would not satisfy the end user who had a very limited battery capacity. A system design to satisfy these varied requirements was implemented by designing several versions of the system building blocks and then constructing three systems from these building blocks.

Source record↗

Generator Interconnection Costs to the Transmission System in non-ISO Balancing Authorities [Slides]

Electric transmission system operators—including Independent System Operators (ISOs), Regional Transmission Organizations (RTOs), and utilities—require proposed power plants to undergo a series of interconnection studies before connecting to the grid. These studies assess what transmission upgrades or new infrastructure may be necessary and assign the associated costs to the project. Lawrence Berkeley National Laboratory has compiled, aggregated, and cleaned interconnection cost data, originally for ISOs/RTOs, and now for five non-ISO Balancing Authorities: PacifiCorp, Bonneville Power Authority, Duke Energy Progress, Duke Energy Carolinas and Duke Energy Florida. Insufficient transparency in interconnection cost data may contribute to rapidly expanding interconnection queues, with active queue capacities tripling between 2020 and 2024 in the studied BAs. Most projects withdraw after receiving high interconnection cost estimates. Interconnection costs have increased since the early 2000s, with average costs for "complete" projects reaching $194/kW between 2018 and 2024. Active queue projects and withdrawn projects incur substantially higher costs, primarily due to rising network upgrade costs. Recent interconnection costs in non-ISO balancing authorities are higher than in ISO regions, potentially due to a greater willingness to pay among developers. Utility-scale solar, wind, and storage projects have interconnection costs that exceed those for natural gas. However, when focusing on projects that do not withdraw from the queue, the interconnection costs for these technologies are more similar to natural gas projects. Other key findings include: (1) Larger generation projects benefit from lower proportional interconnection costs, (2) capacity transmission service (NRIS) often requires additional network investments, and (3) projects with high network upgrade costs are often clustered geographically. The dataset includes results from 2,104 interconnection studies conducted between 2000 and 2024, covering projects that are operational, withdrawn, or still progressing through the study process. The Excel file contains (a) the complete project-level interconnection cost dataset, and (b) seven additional tabs summarizing cost metrics across dimensions such as time, market structure, cost category (point of interconnection vs. broader network upgrades), fuel type, service type (ERIS vs. NRIS), generator size, and geography.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Small Hydro Reference Model Project (Final Project Report)

Small hydropower has long been developed in the United States, but still thousands of small hydro sites remain untapped. Most of them are technically and environmentally feasible but may not be cost-effective to develop at the current level of technology and carbon and fuel markets. This report aims to identify the cost drivers for small hydro generation through cost analyses, and to improve understanding of the pathways for cost reduction and the strategies for accelerating small hydro development in the United States. Reference to the empirical cost equations in literature, an initial capital cost (ICC) equation for nonpowered dam (NPD) and conduit projects has been preliminarily developed using limited project cost data collected from the Federal Energy Regulatory Commission (FERC) e-library and directly from industrial contacts. The regression analysis shows a correlation between the project ICC and plant capacity and head. The electro-mechanical equipment costs for Francis, axial flow, Kaplan, and propeller turbines are derived from the historical budget prices of a small hydro turbine manufacturer. These cost curves show the turbine-generator cost is also associated with the plant capacity and net head. In addition, the initial cost breakdowns are analyzed based on project cost data from literature and industry. It was found that the turbine-generator and the powerhouse are often the major cost components for low-head projects, whereas water conveyance is likely to be the key cost driver for high-head projects. The ICC variations for different site features, such as new greenfield sites vs. non-powered dams, are also discussed.

Zhang, Qin Fen (Katherine)↗

Decommissioning costs - some international perspectives and initiatives. Presentation for Panel discussion. Session No. 024: 'Getting a Handle on Decommissioning Costs - a Global Perspective'

Financing for decommissioning: Are the cost estimates valid? Are the financing arrangements suitable? Are the fund management systems appropriate? Cost estimates are estimated, analysed and updated on a regular basis, but cost comparisons are not straight-forward. There is an incomplete understanding of variability between estimates. Multiple internal and external factors impact estimates: Institutional, legal and policy, purpose, Strategies and plans, overall context, Facility characteristics and history Contingencies and risk, Limited actual cost data. The financing arrangements: there exists a range of systems in place for the implementation of Funding Policy and Strategy, but there are Considerable variations in: Calculating funding requirements, contributions/provisions, Allocating risks and requirements for securities Managing funds and accounting, adjusting the system, Managing disbursements, Reporting and supervision. All cost estimates for future decommissioning activities include considerable uncertainties. These uncertainties will gradually diminish with growing experience from current and planned projects. Different costing methods have different data requirements. Their reliability depends on the extent to which various data are available and applicable to the specific case being considered. Independent of the assessment method, some uncertainty is inevitable in all estimates of future costs. Analysis of the costing method may be useful in order to locate the key uncertainties in each specific estimate. NEA's Decommissioning Cost Estimation Group (DCEG) was Created in 2008 to foster the exchange of information and experience. It Aims to enhance the credibility, reliability, and auditability of the cost estimation process. It Helps define international good practices in decommissioning cost estimation. However, some major challenges remain. Weaknesses in: Understanding relations between estimates and actual costs, Lack of relevant cost data, sharing data. How might be addressed: Improved sharing of cost data, Systematic analyses of estimates and actual costs, Developing benchmarking approaches.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Space-based solar power conversion and delivery systems study. Volume 2: Engineering analysis

The technical and economic feasibility of Satellite Solar Power Systems was studied with emphasis on the analysis and definition of an integrated strawman configuration concept, from which credible cost data could be estimated. Specifically, system concepts for each of the major subprogram areas were formulated, analyzed, and iterated to the degree necessary for establishing an overall, workable baseline system design. Cost data were estimated for the baseline and used to conduct economic analyses. The baseline concept selected was a 5-GW crystal silicon truss-type photovoltaic configuration, which represented the most mature concept available. The overall results and major findings, and the results of technical analyses performed during the final phase of the study efforts are reported.

Source record↗

Study of Alternate Space Shuttle Concepts. Volume 2, Part 2: Concept Analysis and Definition

This is the final report of a Phase A Study of Alternate Space Shuttle Concepts by the Lockheed Missiles & Space Company (LMSC) for the National Aeronautics and Space Administration George C. Marshall Space Flight Center (MSFC). The eleven-month study, which began on 30 June 1970, is to examine the stage-and-one-half and other Space Shuttle configurations and to establish feasibility, performance, cost, and schedules for the selected concepts. This final report consists of four volumes as follows: Volume I - Executive Summary, Volume II - Concept Analysis and Definition, Volume III - Program Planning, and Volume IV - Data Cost Data. This document is Volume II, Concept Analysis and Definition.

Source record↗

Full-scale testing, production and cost analysis data for the advanced composite stabilizer for Boeing 737 aircraft. Volume 1: Technical summary

The full scale ground test, ground vibration test, and flight tests conducted to demonstrate a composite structure stabilizer for the Boeing 737 aircraft and obtain FAA certification are described. Detail tools, assembly tools, and overall production are discussed. Cost analyses aspects covered include production costs, composite material usage factors, and cost comparisons.

Aniversario, R. B.↗

Advanced Fuel Cycle Cost Basis Report: Module D1-1: Uranium-based Ceramic LWR Fuel Fabrication (Rev.2)

Cost module on LWR fuel fabrication to accompany the Advanced Fuel Cycle Cost Basis Report. In this update, we are adding detailed life cycle cost data and a calculated, levelized fabrication cost derived from a non-proprietary bottom-up estimate prepared in 1978 by Oak Ridge National Laboratory (ORNL) (Judkins and Olsen 1978a). In 2018, the 1978 ORNL estimate was escalated by SA&I authors to 2017 USD using factors that represent inflation, escalation above inflation typical of nuclear projects, and the effects of more stringent safety and environmental regulations. In this FY-21 document, the $/kgU results in 2017 USD from the unpublished 2018 interim study (Williams and Ganda 2018) can be escalated to 2020 USD using a factor of 1.052. The literature-based unit cost (or price) data from previous (2004–2017) AFC-CBRs are escalated to 2020 USD using factors from Chapter 8 of the main FY-21 AFC-CBR document. This data, in addition to the results of the updated bottom-up estimate, are used to define the “what-it-takes” (WIT) range for the unit fabrication costs for conventional ceramic UOX light-water reactor (LWR) fuel. This FY-23 document also includes calculated unit costs for accident-tolerant LWR fuels (ATFs) of three different types. Some of these fuels constitute a ceramic pelletized form with fuel meat uranium compounds other than UO2 (a.k.a.,. UOX), thus the change in the title of this module in which the word “UO2” is changed to “Uranium-based Ceramic.”

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

The 30 GHz solid state amplifier for low cost low data rate ground terminals

This report details the development of a 20-W solid state amplifier operating near 30 GHz. The IMPATT amplifier not only met or exceeded all the program objectives, but also possesses the ability to operate in the pulse mode, which was not called for in the original contract requirements. The ability to operate in the pulse mode is essential for TDMA (Time Domain Multiple Access) operation. An output power of 20 W was achieved with a 1-dB instantaneous bandwidth of 260 MHz. The amplifier has also been tested in pulse mode with 50% duty for pulse lengths ranging from 200 ns to 2 micro s with 10 ns rise and fall times and no degradation in output power. This pulse mode operation was made possible by the development of a stable 12-diode power combiner/amplifier and a single-diode pulsed driver whose RF output power was switched on and off by having its bias current modulated via a fast-switching current pulse modulator. Essential to the overall amplifier development was the successful development of state-of-the-art silicon double-drift IMPATT diodes capable of reproducible 2.5 W CW output power with 12% dc-to-RF conversion efficiency. Output powers of as high as 2.75 W has been observed. Both the device and circuit design are amenable to low cost production.

Ngan, Y. C.↗

Optics Enabled Networks and Architectures for Data Center Cost and Power Efficiency

Bandwidth demand for datacenter networks continues as performance increases and is further fueled by the exploding demand for AI and new HPC workloads. Managing power and costs will require a range of solutions including new networking and workload specialized architectures, composable systems and optical circuit switching. In this study we focus primarily on two topics, examining the benefits of flatter networks (enabled mainly by means of co-packaged-optics-enabled switches) and the utilization improvement potential for composable (disaggregated) systems, while discussing specialized hardware and networks, and optical circuit switching more briefly.

99 GENERAL AND MISCELLANEOUS↗

EverGREEN 2045: An Energy Mix to Decarbonize Washington State

Washington State’s future resource mix is likely to be comprised of intermittent renewables and carbon-free generation including hydropower by 2045. Generation will likely be comprised of wind, solar photovoltaic (PV), batteries, pumped storage hydropower (PSH), existing nuclear power plants, and potentially enhanced geothermal systems and advanced nuclear reactor technologies. To assess the cost and stability of the future resource mix, we partner with X-energy (advanced reactor design) and AltaRock Energy (enhanced geothermal system) for proprietary cost data. After estimating the costs of these two new technologies, we design plausible future resource mix scenarios to meet Washington State’s Clean Energy Transformation Act which transitions the state to carbon-free generation by 2045. We assess the cost and stability of the future resource mix with power system analysis tools, finding revenues are sufficient to cover variable operating and maintenance costs for most technologies providing power in 2030 and 2045, but capacity payments or power purchase agreements will likely be necessary for flexible resources, including enhanced geothermal systems and advanced nuclear reactors, to participate in the future resource mix.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Briefing Materials for Technical Presentations, Volume B: The LACIE Symposium

Tables, charts, and LACIE segments are used to demonstrate the accuracy of estimated crop conditions and yield from 1974 to 1976, and to demonstrate the benefits of meteorological and LANDSAT data. Developments in data acquisition, sampling, and reduction are reviewed. The USDA application test system is highlighted with emphasis on user requirements, technology transfer, data base design, and cost data models for data base operation and management.

Source record↗

Government conceptual estimating for contracting and management

The use of the Aerospace Price Book, a cost index, and conceptual cost estimating for cost-effective design and construction of space facilities is discussed. The price book consists of over 200 commonly used conceptual elements and 100 systems summaries of projects such as launch pads, processing facilities, and air locks. The cost index is composed of three divisions: (1) bid summaries of major Shuttle projects, (2) budget cost data sheets, and (3) cost management summaries; each of these divisions is described. Conceptual estimates of facilities and ground support equipment are required to provide the most probable project cost for budget, funding, and project approval purposes. Similar buildings, systems, and elements already designed are located in the cost index in order to make the best rough order of magnitude conceptual estimates for development of Space Shuttle facilities. An example displaying the applicability of the conceptual cost estimating procedure for the development of the KSC facilities is presented.

Brown, J. A.↗

Assessing 21st century contaminants of concern using integrative passive sampling devices to obtain more meaningful and cost-effective data on impacts from stormwater runoff

In many cases stormwater compliance monitoring is labor intensive, expensive, and largely unsuccessful in providing the data needed to support stormwater management goals. In addition, data from manual grab sampling and automated composite sampling are rarely collected in a manner that provides the information required to identify sources of contamination, evaluate the effectiveness of Best Management Practices, or inform effective decision making. Furthermore, monitoring is often driven by the need to meet low concentration benchmarks for metals and other constituents that do not take into account loading into the receiving waters, resulting in arbitrary monitoring requirements (monthly or seasonally) that are not tied to the driving forces within the watershed such as hydrology (flow regime), weather (storm events and antecedent dry periods), and upland land use and cover (Rosen and Johnston 2015, US Navy 2016).

stormwater, passive samplers, trace metals↗