Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “corrective action management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

Shallow Soil Polychlorinated Biphenyl Site Assessment Report

This report presents a summary of the shallow soil polychlorinated biphenyl (PCB) site assessment activities that occurred from December 2020 through July 2022 at General Services Administration Reclamation Yard, Solid Waste Management Unit (SWMU) 010, located at the John F. Kennedy Space Center (KSC), Florida. The site is monitored under KSC’s Resource Conservation and Recovery Act Corrective Action Program, which also meets the requirements of Chapter 62-780, Florida Administrative Code. For the purposes of this report, three separate shallow soil plumes, known as the Northeast Shallow Soil PCB Plume, Southeast Shallow Soil PCB Plume, and West Shallow Soil PCB Plume, were identified for this site. The activities presented in this report include seven field events conducted between December 2020 and July 2022, which include shallow soil sample collection in the Northeast, Southeast, and West Shallow Soil PCB Plumes. AECOM Technical Services, Inc., personnel collected 330 soil samples from 118 boring locations. The samples were collected at 0.5-foot depth intervals to various depths based on analytical results and depth to groundwater. The soil samples were submitted to a fixed-based laboratory for analysis by United States Environmental Protection Agency Method 8082A for total PCBs. Several soil samples had PCB concentrations above the State of Florida Direct Exposure Residential and Industrial Soil Cleanup Target Levels (SCTLs), and two soil samples had PCB concentrations above the State of Florida Leachability for Groundwater. No soil borings were located beneath impervious surfaces, such as concrete or asphalt. The current Land Use Control Implementation Plan (LUCIP) covers PCBs in soils above the residential SCTL, which includes the paved areas.

PCBs↗

Soil Interim Measures Implementation Report Q6 Radar Station – Solid Waste Management Unit 112 Locations of Concern 3 and 10 Kennedy Space Center, Florida

This report presents a summary of the soil interim measures (IM) implementation activities that occurred from January 23 through June 6, 2023, at the Q6 Radar Station (Q6RS) Solid Waste Management Unit (SWMU) 112, located at the John F. Kennedy Space Center (KSC), Florida. The site is monitored under KSC’s Resource Conservation and Recovery Act Corrective Action Program, which also meets the requirements of Chapter 62-780, Florida Administrative Code. Assessment activities have previously been performed at 10 Q6RS Locations of Concern (LOCs), identified during a SWMU assessment in 2013 (NASA 2013). Since the SWMU assessment, further confirmatory sampling and assessment was conducted for each LOC, and based on the data collected during these assessments, it was determined that Resource Conservation and Recovery Act Facility Investigation to further evaluate soil and groundwater was to be conducted at two LOCs: LOC 1 – Former Underground Storage Tanks (groundwater) and LOC 3 – Radar Antenna Refurbishment Area (soil). The LOC 1 groundwater assessment is ongoing, and the results will be presented under a separate cover. It was also determined that soil IM would be completed at two of the LOCs, LOC 3 and LOC 10 – Compressor Building Condensate Discharge. A Soil IM Work Plan was prepared and submitted in October 2021 (NASA 2021). The plan proposed excavation and disposal of barium and copper impacted soil in the LOC 3 and 10 areas. This report presents a summary and results of the soil IM implementation activities conducted at LOCs 3 and 10. The site contaminates of concern for this soil IM are barium and copper. The activities presented in this report includes soil IM implementation and groundwater sampling. From January 23 through March 24, 2023, AECOM Technical Services, Inc. (AECOM) field personnel conducted IM implementation activities in the LOC 3 and 10 areas. As presented in the IM Work Plan, shallow soils, impacted with metals, were excavated to a depth of 2 feet below land surface in the central area of the site around the radar antenna and associated equipment. AECOM personnel excavated 77.43 tons of soil using hand tools and, when able, heavy equipment. The soils were placed into lined roll-off containers, which were covered and transported under manifest to the Cedar Trail Landfill in Bartow, Florida. The site was restored to original condition using certified clean backfill material (sand), with filter fabric, and gravel. Areas outside of the excavation were restored with grass seed. On June 6, 2023, AECOM field personnel conducted groundwater sampling activities within the soil IM excavation area. AECOM personnel collected one groundwater sample from monitoring well Q6RS-MW0003. The sample was submitted to a fixed-based laboratory for analysis by United States Environmental Protection Agency Method 6020B for metals (barium and copper). Barium and copper were detected at 18 micrograms per liter (µg/L) and 14 µg/L, respectively, and were below the State of Florida Groundwater Cleanup Target Levels (GCTLs) for barium at 2,000 µg/L and copper at 1,000 µg/L.

Chadwick Sloan Lee↗

Shallow Soil Polychlorinated Biphenyl Site Assessment Report: General Services Administration Reclamation Yard Solid Waste Management Unit 010

This report presents a summary of the shallow soil polychlorinated biphenyl (PCB) site assessment activities that occurred from December 2020 through July 2022 at General Services Administration Reclamation Yard, Solid Waste Management Unit (SWMU) 010, located at the John F. Kennedy Space Center (KSC), Florida. The site is monitored under KSC’s Resource Conservation and Recovery Act Corrective Action Program, which also meets the requirements of Chapter 62-780, Florida Administrative Code. For the purposes of this report, three separate shallow soil plumes, known as the Northeast Shallow Soil PCB Plume, Southeast Shallow Soil PCB Plume, and West Shallow Soil PCB Plume, were identified for this site. The activities presented in this report include seven field events conducted between December 2020 and July 2022, which include shallow soil sample collection in the Northeast, Southeast, and West Shallow Soil PCB Plumes. AECOM Technical Services, Inc., personnel collected 330 soil samples from 118 boring locations. The samples were collected at 0.5-foot depth intervals to various depths based on analytical results and depth to groundwater. The soil samples were submitted to a fixed-based laboratory for analysis by United States Environmental Protection Agency Method 8082A for total PCBs. Several soil samples had PCB concentrations above the State of Florida Direct Exposure Residential and Industrial Soil Cleanup Target Levels (SCTLs), and two soil samples had PCB concentrations above the State of Florida Leachability for Groundwater. No soil borings were located beneath impervious surfaces, such as concrete or asphalt. The current Land Use Control Implementation Plan (LUCIP) covers PCBs in soils above the residential SCTL, which includes the paved areas.

soil assessment↗

Software Assists in Extensive Environmental Auditing

The Base Enivronmental Management System (BEMS) is a Web-based application program for managing and tracking audits by the Environmental Office of Stennis Space Center in conformity with standard 14001 of the International Organization for Standardization (ISO 14001). (This standard specifies requirements for an environmental-management system.) BEMS saves time by partly automating what were previously manual processes for creating audit checklists; recording and tracking audit results; issuing, tracking, and implementing corrective-action requests (CARs); tracking continuous improvements (CIs); and tracking audit results and statistics. BEMS consists on an administration module and an auditor module. As its name suggests, the administration module is used to administer the audit. It helps administrators to edit the list of audit questions; edit the list of audit locations; assign manditory questions to locations; track, approve, and edit CARs; and edit completed audits. The auditor module is used by auditors to perform audits and record audit results: It helps the auditors to create audit checklists, complete audits, view completed audits, create CARs, record and acknowledge CIs, and generate reports from audit results.

Callac, Christopher↗

Software Assists in Extensive Environmental Auditing

The Base Environmental Management System (BEMS) is a Web-based application program for managing and tracking audits by the Environmental Office of Stennis Space Center in conformity with standard 14001 of the International Organization for Standardization (ISO 14001). (This standard specifies requirements for an environmental-management system.) BEMS saves time by partly automating what were previously manual processes for creating audit checklists; recording and tracking audit results; issuing, tracking, and implementing corrective-action requests (CARs); tracking continuous improvements (CIs); and tracking audit results and statistics. BEMS consists of an administration module and an auditor module. As its name suggests, the administration module is used to administer the audit. It helps administrators to edit the list of audit questions; edit the list of audit locations; assign mandatory questions to locations; track, approve, and edit CARs; and edit completed audits. The auditor module is used by auditors to perform audits and record audit results: it helps the auditors to create audit checklists, complete audits, view completed audits, create CARs, record and acknowledge CIs, and generate reports from audit results.

Callac, Christopher↗

Software Assists in Extensive Environmental Auditing

The Base Environmental Management System (BEMS) is a Web-based application program for managing and tracking audits by the Environmental Office of Stennis Space Center in conformity with standard 14001 of the International Organization for Standardization (ISO 14001). (This standard specifies requirements for an environmental-management system.) BEMS saves time by partly automating what were previously manual processes for creating audit checklists; recording and tracking audit results; issuing, tracking, and implementing corrective-action requests (CARs); tracking continuous improvements (CIs); and tracking audit results and statistics. BEMS consists of an administration module and an auditor module. As its name suggests, the administration module is used to administer the audit. It helps administrators to edit the list of audit questions; edit the list of audit locations; assign mandatory questions to locations; track, approve, and edit CARs; and edit completed audits. The auditor module is used by auditors to perform audits and record audit results: it helps the auditors to create audit checklists, complete audits, view completed audits, create CARs, record and acknowledge CIs, and generate reports from audit results.

Callac, Christopher↗

Using Hyperspectral Imagery to Identify Turfgrass Stresses

The use of a form of remote sensing to aid in the management of large turfgrass fields (e.g. golf courses) has been proposed. A turfgrass field of interest would be surveyed in sunlight by use of an airborne hyperspectral imaging system, then the raw observational data would be preprocessed into hyperspectral reflectance image data. These data would be further processed to identify turfgrass stresses, to determine the spatial distributions of those stresses, and to generate maps showing the spatial distributions. Until now, chemicals and water have often been applied, variously, (1) indiscriminately to an entire turfgrass field without regard to localization of specific stresses or (2) to visible and possibly localized signs of stress for example, browning, damage from traffic, or conspicuous growth of weeds. Indiscriminate application is uneconomical and environmentally unsound; the amounts of water and chemicals consumed could be insufficient in some areas and excessive in most areas, and excess chemicals can leak into the environment. In cases in which developing stresses do not show visible signs at first, it could be more economical and effective to take corrective action before visible signs appear. By enabling early identification of specific stresses and their locations, the proposed method would provide guidance for planning more effective, more economical, and more environmentally sound turfgrass-management practices, including application of chemicals and water, aeration, and mowing. The underlying concept of using hyperspectral imagery to generate stress maps as guides to efficient management of vegetation in large fields is not new; it has been applied in the growth of crops to be harvested. What is new here is the effort to develop an algorithm that processes hyperspectral reflectance data into spectral indices specific to stresses in turfgrass. The development effort has included a study in which small turfgrass plots that were, variously, healthy or subjected to a variety of controlled stresses were observed by use of a hand-held spectroradiometer. The spectroradiometer readings in the wavelength range from 350 to 1,000 nm were processed to extract hyperspectral reflectance data, which, in turn, were analyzed to find correlations with the controlled stresses. Several indices were found to be correlated with drought stress and to be potentially useful for identifying drought stress before visible symptoms appear.

Hutto, Kendall↗

Earned Value Management (EVM) Implementation Handbook

The purpose of this handbook is to provide EVM guidance for the effective application, implementation, and utilization of EVM on NASA programs, projects, major contracts, and subcontracts in a consolidated reference document. EVM is a project management process that effectively integrates a project’s scope of work with schedule and cost elements for optimum project planning and control. The goal is to achieve timely and accurate quantification of progress that will facilitate management by exception and enable early visibility into the nature and the magnitude of technical, cost and schedule problems as well as the intended course and success of corrective actions.

Christopher Lewis Sadler↗

Interim Measure Report South Water Pump Station Potential Release Location 213 – Location of Concern 2 Kennedy Space Center, Florida

This report presents a summary of the polychlorinated biphenyl (PCB) interim measure (IM) activities that occurred in December 2022 and March 2023 at Location of Concern (LOC) 2 – Electrical Equipment Area associated with the South Water Pump Station (SWPS) Potential Release Location (PRL) 213, located at the John F. Kennedy Space Center (KSC), Florida. The SWPS site is monitored under KSC’s Resource Conservation and Recovery Act Corrective Action Program, which also meets the requirements of Chapter 62-780, Florida Administrative Code. Assessment activities have previously been performed at six SWPS LOCs identified during a Solid Waste Management Unit assessment in 2013. Based on the data collected during these assessments, it was determined that IM activities would be completed at one of the LOCs, LOC 2 – Electrical Equipment Area, and an IM Work Plan was prepared and approved. In 2019, demolition of the SWPS buildings and structures was completed, allowing for additional assessment at LOC 2, and it was determined that soil excavation to remove PCB-impacted soils was no longer required for LOC 2. The IM activities conducted following demolition are presented in this report and include shallow soil sample collection, conducted in December 2022, and monitoring well installation and groundwater sampling, both conducted in March 2023. AECOM Technical Services, Inc. (AECOM) personnel collected two soil samples from two boring locations, SWPS-SB0005 and SWPS-SB0018. The samples were collected at 0 to 0.5 feet below land surface (bls). AECOM also conducted oversight of one monitoring well installation, SWPS-MW0001 screened from 4 to 14 feet bls, and then subsequently collected one groundwater sample from SWPS-MW0001. The samples were submitted to a fixed-based laboratory for analysis by United States Environmental Protection Agency Method 8082A for total PCBs. There were no detections of PCBs in soil or groundwater during the reporting period.

Chadwick Sloan Lee↗

Solid Rocket Booster (SRB) - Evolution and Lessons Learned During the Shuttle Program

The Solid Rocket Booster (SRB) element integrates all the subsystems needed for ascent flight, entry, and recovery of the combined Booster and Motor system. These include the structures, avionics, thrust vector control, pyrotechnic, range safety, deceleration, thermal protection, and retrieval systems. This represents the only human-rated, recoverable and refurbishable solid rocket ever developed and flown. Challenges included subsystem integration, thermal environments and severe loads (including water impact), sometimes resulting in hardware attrition. Several of the subsystems evolved during the program through design changes. These included the thermal protection system, range safety system, parachute/recovery system, and others. Obsolescence issues occasionally required component recertification. Because the system was recovered, the SRB was ideal for data and imagery acquisition, which proved essential for understanding loads and system response. The three main parachutes that lower the SRBs to the ocean are the largest parachutes ever designed, and the SRBs are the largest structures ever to be lowered by parachutes. SRB recovery from the ocean was a unique process and represented a significant operational challenge; requiring personnel, facilities, transportation, and ground support equipment. The SRB element achieved reliability via extensive system testing and checkout, redundancy management, and a thorough postflight assessment process. Assembly and integration of the booster subsystems was a unique process and acceptance testing of reused hardware components was required for each build. Extensive testing was done to assure hardware functionality at each level of stage integration. Because the booster element is recoverable, subsystems were available for inspection and testing postflight, unique to the Shuttle launch vehicle. Problems were noted and corrective actions were implemented as needed. The postflight assessment process was quite detailed and a significant portion of flight operations. The SRBs provided fully redundant critical systems including thrust vector control, mission critical pyrotechnics, avionics, and parachute recovery system. The design intent was to lift off with full redundancy. On occasion, the redundancy management scheme was needed during flight operations. This paper describes some of the design challenges, how the design evolved with time, and key areas where hardware reusability contributed to improved system level understanding.

Kanner, Howard S.↗

Lessons Learned for Cx PRACA. Constellation Program Problem Reporting, Analysis and Corrective Action Process and System

This slide presentation reviews the Constellation Program Problem Reporting, Analysis and Corrective Action Process and System (Cx PRACA). The goal of the Cx PRACA is to incorporate Lessons learned from the Shuttle, ISS, and Orbiter programs by creating a single tool for managing the PRACA process, that clearly defines the scope of PRACA applicability and what must be reported, and defines the ownership and responsibility for managing the PRACA process including disposition approval authority. CxP PRACA is a process, supported by a single information gathering data module which will be integrated with a single CxP Information System, providing interoperability, import and export capability making the CxP PRACA a more effective and user friendly technical and management tool.

Kelle, Pido I.↗

A Systems Modeling Approach for Risk Management of Command File Errors

The main cause of commanding errors is often (but not always) due to procedures. Either lack of maturity in the processes, incompleteness of requirements or lack of compliance to these procedures. Other causes of commanding errors include lack of understanding of system states, inadequate communication, and making hasty changes in standard procedures in response to an unexpected event. In general, it's important to look at the big picture prior to making corrective actions. In the case of errors traced back to procedures, considering the reliability of the process as a metric during its' design may help to reduce risk. This metric is obtained by using data from Nuclear Industry regarding human reliability. A structured method for the collection of anomaly data will help the operator think systematically about the anomaly and facilitate risk management. Formal models can be used for risk based design and risk management. A generic set of models can be customized for a broad range of missions.

probabilistic risk↗

Advanced Long-Term Environmental Monitoring Systems (ALTEMIS) Artificial Intelligence Data Management Plan

Across the Department of Energy’s Environmental and Legacy Management sites, complex groundwater plumes exist that will require long-term monitoring to ensure remedial actions that have been put in place remain effective decades into the future. The current monitoring paradigm predominantly consists of groundwater well sampling, whereby samples are collected, concentrations analyzed, and plume anomalies are detected after they have occurred. The Advanced Long Term Environmental Monitoring Systems (ALTEMIS) program is a multi-lab, multi-institution team of researchers that is deploying spatially integrative technologies (i.e., real-time in situ sensor networks), coupled with artificial intelligence and machine learning, to establish a more proactive monitoring paradigm. Within this approach, plume anomalies can be predicted, and corrective actions can be established prior to the occurrence, offering a more cost-effective and robust approach to long-term monitoring. The team has deployed a variety of different in situ sensing technologies at the Savannah River Site’s F-Area Hazardous Waste Management Facility around the F-Area Seepage Basins, which are unlined basins that received 7 billion liters of acidic low-level radioactive waste from the 1950s until the late 1980s. The technologies and techniques that the team is deploying are intended to ensure that the remedial actions that have been taken by the site remain effective decades into the future. Foundational to this approach is a robust, integrated data management and analysis plan to ensure accurate and timely reporting from the variety of sensor systems that are in place. This report will outline the data management plan that has been implemented by the ALTEMIS team at the Savannah River Site and will serve as a blueprint as the technology is translated to new sites across the DOE Complex.

54 ENVIRONMENTAL SCIENCES↗

Solid Rocket Booster (SRB) Flight System Integration at Its Best

The Solid Rocket Booster (SRB) element integrates all the subsystems needed for ascent flight, entry, and recovery of the combined Booster and Motor system. These include the structures, avionics, thrust vector control, pyrotechnic, range safety, deceleration, thermal protection, and retrieval systems. This represents the only human-rated, recoverable and refurbishable solid rocket ever developed and flown. Challenges included subsystem integration, thermal environments and severe loads (including water impact), sometimes resulting in hardware attrition. Several of the subsystems evolved during the program through design changes. These included the thermal protection system, range safety system, parachute/recovery system, and others. Because the system was recovered, the SRB was ideal for data and imagery acquisition, which proved essential for understanding loads, environments and system response. The three main parachutes that lower the SRBs to the ocean are the largest parachutes ever designed, and the SRBs are the largest structures ever to be lowered by parachutes. SRB recovery from the ocean was a unique process and represented a significant operational challenge; requiring personnel, facilities, transportation, and ground support equipment. The SRB element achieved reliability via extensive system testing and checkout, redundancy management, and a thorough postflight assessment process. However, the in-flight data and postflight assessment process revealed the hardware was affected much more strongly than originally anticipated. Assembly and integration of the booster subsystems required acceptance testing of reused hardware components for each build. Extensive testing was done to assure hardware functionality at each level of stage integration. Because the booster element is recoverable, subsystems were available for inspection and testing postflight, unique to the Shuttle launch vehicle. Problems were noted and corrective actions were implemented as needed. The postflight assessment process was quite detailed and a significant portion of flight operations. The SRBs provided fully redundant critical systems including thrust vector control, mission critical pyrotechnics, avionics, and parachute recovery system. The design intent was to lift off with full redundancy. On occasion, the redundancy management scheme was needed during flight operations. This paper describes some of the design challenges and technical issues, how the design evolved with time, and key areas where hardware reusability contributed to improved system level understanding.

Wood, T. David↗

Success Path Method: Introduction to the Success Path Method Software Tool©

As part of its commitment to advancing safety and reliability assessment methodologies, Argonne National Laboratory pioneered the use of an evaluation method called the Success Path Method (SPM) to improve risk management for offshore oil and gas operations. The development of the SPM at Argonne has been driven by the need to improve existing risk assessment methodologies by focusing on the steps necessary for success rather than failure modes alone. This is particularly important for industrial environments like offshore facilities that perform multiple functions under a continuously evolving set of operational conditions – such as water depth and temperature, currents, and weather conditions. In these dynamic environments, the traditional Probabilistic Risk Assessment (PRA) approach is far too complex as it focuses on what can go wrong – which comprises an infinite failure space that must be fully explored and understood. By shifting the focus to a finite space of success paths, the SPM enables operators and decision makers to prioritize a manageable number of steps that must go right to ensure success. Building on its five decades of experience in safety assessments for the nuclear industry, Argonne made major adaptations to existing risk assessment methods utilizing features similar to fault trees that are traditionally used in PRA to map all pathways in which the system can malfunction. In contrast, SPM identifies the components and processes that must function correctly to achieve specific outcomes – such as preventing the uncontrolled release of hydrocarbons during drilling operations. The SPM framework integrates equipment, procedures, software, processes, and human actions to ensure that physical barriers meet critical safety functions in dynamic operational conditions. This approach helps identify failure modes and improve operational risk management by narrowing the focus to key success elements, which in turn reduces uncertainty and helps users understand, manage, and respond to failures.

97 MATHEMATICS AND COMPUTING↗

Corrective Action Unit 98: Frenchman Flat Five-Year Evaluation Nevada National Security Site, Nevada (Revision 1)

The Corrective Action Unit (CAU) 98, Frenchman Flat (FF) Closure Report (CR) (NNSA/NFO, 2016) and its ensuing Records of Technical Change (ROTCs) (compiled in DOE/EMNV, 2019) required the U.S. Department of Energy (DOE), Environmental Management (EM) Nevada Program’s Underground Test Area (UGTA) Activity to collect data for five years to establish triggers for the monitoring network and analyze the monitoring points for viability in long-term monitoring. This document provides the results of the five-year evaluation and presents recommendations for future monitoring of CAU 98.

54 ENVIRONMENTAL SCIENCES↗

Single Drop Cytometry Onboard the International Space Station

Real-time lab analysis is needed to support clinical decision making and research on human missions to the Moon and Mars. Powerful laboratory instruments, such as flow cytometers, are generally too cumbersome for spaceflight. Here, we show that scant test samples can be measured in microgravity, by a trained astronaut, using a miniature cytometry-based analyzer, the rHEALTH ONE, modified specifically for spaceflight. The base device addresses critical spaceflight requirements including minimal resource utilization and alignment-free optics for surviving rocket launch. To fully enable reduced gravity operation onboard the space station, we incorporated bubble-free fluidics, electromagnetic shielding, and gravity-independent sample introduction. We show microvolume flow cytometry from 10 μL sample drops, with data from five simultaneous channels using 10 μs bin intervals during each sample run, yielding an average of 72 million raw data points in approximately 2 minutes. We demonstrate the device measures each test sample repeatably, including correct identification of a sample that degraded in transit to the International Space Station. This approach can be utilized to further our understanding of spaceflight biology and provide immediate, actionable diagnostic information for management of astronaut health without the need for Earth-dependent analysis.

Daniel J. Rea↗