Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “coordinated scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

Waste Information Management System with 2012-13 Waste Streams - 13095

The Waste Information Management System (WIMS) 2012-13 was updated to support the Department of Energy (DOE) accelerated cleanup program. The schedule compression required close coordination and a comprehensive review and prioritization of the barriers that impeded treatment and disposition of the waste streams at each site. Many issues related to waste treatment and disposal were potential critical path issues under the accelerated schedule. In order to facilitate accelerated cleanup initiatives, waste managers at DOE field sites and at DOE Headquarters in Washington, D.C., needed timely waste forecast and transportation information regarding the volumes and types of radioactive waste that would be generated by DOE sites over the next 40 years. Each local DOE site historically collected, organized, and displayed waste forecast information in separate and unique systems. In order for interested parties to understand and view the complete DOE complex-wide picture, the radioactive waste and shipment information of each DOE site needed to be entered into a common application. The WIMS application was therefore created to serve as a common application to improve stakeholder comprehension and improve DOE radioactive waste treatment and disposal planning and scheduling. WIMS allows identification of total forecasted waste volumes, material classes, disposition sites, choke points, technological or regulatory barriers to treatment and disposal, along with forecasted waste transportation information by rail, truck and inter-modal shipments. The Applied Research Center (ARC) at Florida International University (FIU) in Miami, Florida, developed and deployed the web-based forecast and transportation system and is responsible for updating the radioactive waste forecast and transportation data on a regular basis to ensure the long-term viability and value of this system. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Waste Information Management System-2012 - 12114

The Waste Information Management System (WIMS) -2012 was updated to support the Department of Energy (DOE) accelerated cleanup program. The schedule compression required close coordination and a comprehensive review and prioritization of the barriers that impeded treatment and disposition of the waste streams at each site. Many issues related to waste treatment and disposal were potential critical path issues under the accelerated schedule. In order to facilitate accelerated cleanup initiatives, waste managers at DOE field sites and at DOE Headquarters in Washington, D.C., needed timely waste forecast and transportation information regarding the volumes and types of radioactive waste that would be generated by DOE sites over the next 40 years. Each local DOE site historically collected, organized, and displayed waste forecast information in separate and unique systems. In order for interested parties to understand and view the complete DOE complex-wide picture, the radioactive waste and shipment information of each DOE site needed to be entered into a common application. The WIMS application was therefore created to serve as a common application to improve stakeholder comprehension and improve DOE radioactive waste treatment and disposal planning and scheduling. WIMS allows identification of total forecasted waste volumes, material classes, disposition sites, choke points, technological or regulatory barriers to treatment and disposal, along with forecasted waste transportation information by rail, truck and inter-modal shipments. The Applied Research Center (ARC) at Florida International University (FIU) in Miami, Florida, developed and deployed the web-based forecast and transportation system and is responsible for updating the radioactive waste forecast and transportation data on a regular basis to ensure the long-term viability and value of this system. WIMS continues to successfully accomplish the goals and objectives set forth by DOE for this project. It has replaced the historic process of each DOE site gathering, organizing, and reporting their waste forecast information utilizing different databases and display technologies. In addition, WIMS meets DOE's objective to have the complex-wide waste forecast and transportation information available to all stakeholders and the public in one easy-to-navigate system. The enhancements to WIMS made since its initial deployment include the addition of new DOE sites and facilities, an updated waste and transportation information, and the ability to easily display and print customized waste forecast, the disposition maps, GIS maps and transportation information. The system also allows users to customize and generate reports over the web. These reports can be exported to various formats, such as Adobe{sup R} PDF, Microsoft Excel{sup R}, and Microsoft Word{sup R} and downloaded to the user's computer. Future enhancements will include database/application migration to the next level. A new data import interface will be developed to integrate 2012-13 forecast waste streams. In addition, the application is updated on a continuous basis based on DOE feedback. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Waste Information Management System with 2016-17 Waste Streams - 17246

The Waste Information Management System (WIMS) 2016-17 was updated to support the Department of Energy (DOE) accelerated cleanup program. The schedule compression required close coordination and a comprehensive review and prioritization of the barriers that impeded treatment and disposition of the waste streams at each site. Many issues related to waste treatment and disposal were potential critical path issues under the accelerated schedule. In order to facilitate accelerated cleanup initiatives, waste managers at DOE field sites and at DOE Headquarters in Washington, D.C., needed timely waste forecast and transportation information regarding the volumes and types of radioactive waste that would be generated by DOE sites over the next 35 years. Each local DOE site historically collected, organized, and displayed waste forecast information in separate and unique systems. In order for interested parties to understand and view the complete DOE complex-wide picture, the radioactive waste and shipment information of each DOE site needed to be entered into a common application. The WIMS application was therefore created to serve as a common application to improve stakeholder comprehension and improve DOE radioactive waste treatment and disposal planning and scheduling. WIMS allows identification of total forecasted waste volumes, material classes, disposition sites, choke points, technological or regulatory barriers to treatment and disposal, along with forecasted waste transportation information by rail, truck and inter-modal shipments. The Applied Research Center (ARC) at Florida International University (FIU) in Miami, Florida, developed and deployed the web-based forecast and transportation system and is responsible for updating the radioactive waste forecast and transportation data on a regular basis to ensure the long-term viability and value of this system. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Waste Information Management System with 2014-15 Waste Streams - 15178

The Waste Information Management System (WIMS) 2014-15 was updated to support the Department of Energy (DOE) accelerated cleanup program. The schedule compression required close coordination and a comprehensive review and prioritization of the barriers that impeded treatment and disposition of the waste streams at each site. Many issues related to waste treatment and disposal were potential critical path issues under the accelerated schedule. In order to facilitate accelerated cleanup initiatives, waste managers at DOE field sites and at DOE Headquarters in Washington, D.C., needed timely waste forecast and transportation information regarding the volumes and types of radioactive waste that would be generated by DOE sites over the next 40 years. Each local DOE site historically collected, organized, and displayed waste forecast information in separate and unique systems. In order for interested parties to understand and view the complete DOE complex-wide picture, the radioactive waste and shipment information of each DOE site needed to be entered into a common application. The WIMS application was therefore created to serve as a common application to improve stakeholder comprehension and improve DOE radioactive waste treatment and disposal planning and scheduling. WIMS allows identification of total forecasted waste volumes, material classes, disposition sites, choke points, technological or regulatory barriers to treatment and disposal, along with forecasted waste transportation information by rail, truck and inter-modal shipments. The Applied Research Center (ARC) at Florida International University (FIU) in Miami, Florida, developed and deployed the web-based forecast and transportation system and is responsible for updating the radioactive waste forecast and transportation data on a regular basis to ensure the long-term viability and value of this system. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Waste Information Management System with 2015-16 Waste Streams - 16463

The Waste Information Management System (WIMS) 2015-16 was updated to support the Department of Energy (DOE) accelerated cleanup program. The schedule compression required close coordination and a comprehensive review and prioritization of the barriers that impeded treatment and disposition of the waste streams at each site. Many issues related to waste treatment and disposal were potential critical path issues under the accelerated schedule. In order to facilitate accelerated cleanup initiatives, waste managers at DOE field sites and at DOE Headquarters in Washington, D.C., needed timely waste forecast and transportation information regarding the volumes and types of radioactive waste that would be generated by DOE sites over the next 35 years. Each local DOE site historically collected, organized, and displayed waste forecast information in separate and unique systems. In order for interested parties to understand and view the complete DOE complex-wide picture, the radioactive waste and shipment information of each DOE site needed to be entered into a common application. The WIMS application was therefore created to serve as a common application to improve stakeholder comprehension and improve DOE radioactive waste treatment and disposal planning and scheduling. WIMS allows identification of total forecasted waste volumes, material classes, disposition sites, choke points, technological or regulatory barriers to treatment and disposal, along with forecasted waste transportation information by rail, truck and inter-modal shipments. The Applied Research Center (ARC) at Florida International University (FIU) in Miami, Florida, developed and deployed the web-based forecast and transportation system and is responsible for updating the radioactive waste forecast and transportation data on a regular basis to ensure the long-term viability and value of this system. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Waste Information Management System with 2017-18 Waste Streams - 18302

The Waste Information Management System (WIMS) 2017-18 was updated to support the Department of Energy (DOE) accelerated cleanup program. The schedule compression required close coordination and a comprehensive review and prioritization of the barriers that impeded treatment and disposition of the waste streams at each site. Many issues related to waste treatment and disposal were potential critical path issues under the accelerated schedule. In order to facilitate accelerated cleanup initiatives, waste managers at DOE field sites and at DOE Headquarters in Washington, D.C., needed timely waste forecast and transportation information regarding the volumes and types of radioactive waste that would be generated by DOE sites over the next 35 years. Each local DOE site historically collected, organized, and displayed waste forecast information in separate and unique systems. In order for interested parties to understand and view the complete DOE complex-wide picture, the radioactive waste and shipment information of each DOE site needed to be entered into a common application. The WIMS application was therefore created to serve as a common application to improve stakeholder comprehension and improve DOE radioactive waste treatment and disposal planning and scheduling. WIMS allows identification of total forecasted waste volumes, material classes, disposition sites, choke points, technological or regulatory barriers to treatment and disposal, along with forecasted waste transportation information by rail, truck and intermodal shipments. The Applied Research Center (ARC) at Florida International University (FIU) in Miami, Florida, developed and deployed the web-based forecast and transportation system and is responsible for updating the radioactive waste forecast and transportation data on a regular basis to ensure the long-term viability and value of this system. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Waste Information Management System with 2018-19 Waste Streams - 19106

The Waste Information Management System (WIMS) 2018-19 was updated to support the Department of Energy (DOE) accelerated cleanup program. The schedule compression required close coordination and a comprehensive review and prioritization of the barriers that impeded treatment and disposition of the waste streams at each site. Many issues related to waste treatment and disposal were potential critical path issues under the accelerated schedule. In order to facilitate accelerated cleanup initiatives, waste managers at DOE field sites and at DOE Headquarters in Washington, D.C., needed timely waste forecast and transportation information regarding the volumes and types of radioactive waste that would be generated by DOE sites over the next 35 years. Each local DOE site historically collected, organized, and displayed waste forecast information in separate and unique systems. In order for interested parties to understand and view the complete DOE complex-wide picture, the radioactive waste and shipment information of each DOE site needed to be entered into a common application. The WIMS application was therefore created to serve as a common application to improve stakeholder comprehension and improve DOE radioactive waste treatment and disposal planning and scheduling. WIMS allows identification of total forecasted waste volumes, material classes, disposition sites, choke points, technological or regulatory barriers to treatment and disposal, along with forecasted waste transportation information by rail, truck and intermodal shipments. The Applied Research Center (ARC) at Florida International University (FIU) in Miami, Florida, developed and deployed the web-based forecast and transportation system and is responsible for updating the radioactive waste forecast and transportation data on a regular basis to ensure the long-term viability and value of this system. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Waste Information Management System with 2019-20 Waste Streams - 20491

The Waste Information Management System (WIMS) 2019-20 was updated to support the Department of Energy (DOE) accelerated cleanup program. The schedule compression required close coordination and a comprehensive review and prioritization of the barriers that impeded treatment and disposition of the waste streams at each site. Many issues related to waste treatment and disposal were potential critical path issues under the accelerated schedule. In order to facilitate accelerated cleanup initiatives, waste managers at DOE field sites and at DOE Headquarters in Washington, D.C., needed timely waste forecast and transportation information regarding the volumes and types of radioactive waste that would be generated by DOE sites over the next 35 years. Each local DOE site historically collected, organized, and displayed waste forecast information in separate and unique systems. In order for interested parties to understand and view the complete DOE complex-wide picture, the radioactive waste and shipment information of each DOE site needed to be entered into a common application. The WIMS application was therefore created to serve as a common application to improve stakeholder comprehension and improve DOE radioactive waste treatment and disposal planning and scheduling. WIMS allows identification of total forecasted waste volumes, material classes, disposition sites, choke points, technological or regulatory barriers to treatment and disposal, along with forecasted waste transportation information by rail, truck and intermodal shipments. The Applied Research Center (ARC) at Florida International University (FIU) in Miami, Florida, developed and deployed the web-based forecast and transportation system and is responsible for updating the radioactive waste forecast and transportation data on a regular basis to ensure the long-term viability and value of this system. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Automation of Coordinated Planning Between Observatories: The Visual Observation Layout Tool (VOLT)

Fulfilling the promise of the era of great observatories, NASA now has more than three space-based astronomical telescopes operating in different wavebands. This situation provides astronomers with the unique opportunity of simultaneously observing a target in multiple wavebands with these observatories. Currently scheduling multiple observatories simultaneously, for coordinated observations, is highly inefficient. Coordinated observations require painstaking manual collaboration among the observatory staff at each observatory. Because they are time-consuming and expensive to schedule, observatories often limit the number of coordinated observations that can be conducted. In order to exploit new paradigms for observatory operation, the Advanced Architectures and Automation Branch of NASA's Goddard Space Flight Center has developed a tool called the Visual Observation Layout Tool (VOLT). The main objective of VOLT is to provide a visual tool to automate the planning of coordinated observations by multiple astronomical observatories. Four of NASA's space-based astronomical observatories - the Hubble Space Telescope (HST), Far Ultraviolet Spectroscopic Explorer (FUSE), Rossi X-ray Timing Explorer (RXTE) and Chandra - are enthusiastically pursuing the use of VOLT. This paper will focus on the purpose for developing VOLT, as well as the lessons learned during the infusion of VOLT into the planning and scheduling operations of these observatories.

Maks, Lori↗

Developing a Reduced 240-Bus WECC Dynamic Model for Frequency Response Study of High Renewable Integration

The ongoing changes in the generation resource mix, driven by the rapid adoption of inverter-based resources (IBR) as well as the early retirement of synchronous generators, are bringing new challenges to the planning and operation of bulk electric power systems. Consequently, there is an increasing need to understand, design, and quantify the reliability service provision from IBRs by performing integrated scheduling and dynamic simulations. However, test systems that have consistent scheduling and dynamic models rarely exist largely because of the decoupled nature of the two simulations on a synchronous generator-dominated system. This paper develops the dynamic model of a reduced Western Electricity Coordinating Council (WECC) system. In conjunction with the existing scheduling model, it is suitable for integrating scheduling and dynamic simulations. The reduced 240-bus WECC model reflects the generation resource mix of the Western Interconnection as of 2018. Moreover, the developed dynamic model is validated against field frequency events measured by FNET/GridEye and preserves the dominant inter-area oscillation mode in WECC.

dynamic simulation↗

The Road to a TERRA Operational System

EOS-Terra (formerly known as AM-1) is the first in a series of NASA Earth Observing System (EOS) spacecraft. This paper describes what it took to get ready for Terra, the problems encountered along the way, and the challenge of making an integrated system and integrated team out of many diverse systems and groups, including the international partners and agencies. This paper describes how the coordination role for system resources scheduling, system configuration management, and status reporting was implemented, and the vital role this coordination effort played for enhanced productivity and improved communication across the teams. Lessons which can be learned from this major effort are presented.

Kelly, Angelita C.↗

The Composition of the Master Schedule

Over a period of about four months, the IVS Coordinating Center (IVSCC) each year composes the Master Schedule for the IVS observing program of the next calendar year. The process begins in early July when the IVSCC contacts the IVS Network Stations to request information about available station time as well as holiday and maintenance schedules for the upcoming year. Going through various planning stages and a review process with the IVS Observing Program Committee (OPC), the final version of the Master Schedule is posted by early November. We describe the general steps of the composition and illustrate them with the example of the planning for the Master Schedule of the 2010 observing year.

Thomas, Cynthia C.↗

Argumentation for coordinating shared activities

There is an increasing need for space missions to be able to collaboratively (and competitively) develop plans both within and across missions. In addition, interacting spacecraft that interleave onboard planning and execution must reach consensus on their commitments to each other prior to execution.

scheduling↗

System Engineering on the Use for Ares I,V - the Simpler, the Better

The Ares I and Ares V Vehicles will utilize the J-2X rocket engine developed for NASA by the Pratt & Whitney Rocketdyne Company. The J-2X is an improved higher power version of the original J-2 engine used during the Apollo program. With higher power and updated requirements for safety and performance, the J-2X becomes a new engine using state-of-the-art design methodology, materials and manufacturing processes. The implementation of Systems Engineering (SE) principles enables the rapid J-2X development program to remain aligned with the ARES I and V vehicle programs, Meeting the aggressive development schedule is a challenge. Coordinating the best expertise thai NASA and PWR have to offer requires effectively utilizing resources at multiple sites. This presents formidable communication challenges. SE allows honest and open discussions of issues and problems. This simple idea is often overlooked in large and complex SE programs. Regular and effective meetings linking SE objectives to component designs are used to voice differences of opinions with customer and contractor in attendance so that the best mutual decisions can be made on the shortest possible schedule. Regular technical interchange meetings on secure program wide computer networks and CM processes are effective,in the "Controlled Change" process that exemplifies good SE. Good communication is a key effective SE implementation. The System of Systems approach is the vision of the Orion program which facilitates the establishment of dynamic SE processes at all levels including the engine. SE enables requirements evolution by facilitating organizational and process agility. Flow down and distribution of requirements is controlled by Allocation Reports which breakdown numerical design objectives (weight, reliability, etc.) into quanta goals for each component area. Linked databases of design and verification requirements helps eliminate redundancy and potential mistakes inherent m separated systems. Another tool, the Architecture Design Description, is being used to control J-2X system architecture and effectively communicate configuration changes to those involved in the design process. But the proof is in successful program accomplishment. The SE is the methodology being used to meet the challenge of completing J-2X engine certification 2 years ahead of any engine program ever developed at PWR. The Ares I SE system of systems has delivered according to expectations thus far. All major design reviews (SRR. PDR, CDR) have been successfully conducted to satisfy overall program objectives using SE as the basis for accomplishment. The paper describes SE tools and techniques utilized to achieve this success.

Kelly, William↗

Ground Segment Operations Concept for the Orion Artemis-2 Optical Communications System

The ACCESS Project (formerly Space Network) will implement an optical communications ground segment to support the Orion Artemis II Optical Communications (O2O) demonstration as part of the next manned human spaceflight mission to the moon, Artemis II. O2O implements laser communication (lasercomm) technology for operational use on the Orion series of spacecraft, as a development test objective (DTO), in order to demonstrate the feasibility and operational utility of lasercomm for human spaceflight missions. O2O consists of three segments: Space Segment, Ground Segment, and Operations Segment. The Space Segment consists of the Space Terminal Element and the Orion spacecraft. The Space Terminal Element effort is managed by the GSFC Laser-Enhanced Mission Communications Navigation and Operational Services (LEMNOS) project in collaboration with MIT Lincoln Laboratory. The Ground Segment consists of an optical ground terminal (GT) at the White Sands Complex (WSC), which is being developed in collaboration with MIT Lincoln Laboratory, the Ground Segment Operations and Analysis (GSOA) element and Ground Data Element (GDE), and a second optical GT in the Optical Communications Telescope Laboratory (OCTL) at the JPL Table Mountain Facility. The Operations Segment consists of the Artemis II Mission Control Center (MCC), the Lasercomm Space Terminal Console (LSTC), and the Lasercomm Link Planning & Analysis Center (LPAC), all located at the Johnson Space Center (JSC). O2O utilizes pulse-position modulation (PPM) direct-to-earth services resulting in an 80 Mbps downlink data rate from lunar orbit. The O2O concept of operations is to provide optical services for a minimum of 1 hour per day for each day of the Artemis II mission. O2O will utilize a 10-20 Mbps uplink data rate and 40-260 Mbps downlink data rate, depending on the Artemis II mission phase. The ACCESS project will also provide a centralized mission data interface for user data distribution and storage to the MCC and perform planning and scheduling of services in coordination with the Operations Segment for the O2O Ground Segment. The O2O Ground Segment will support the following O2O mission phases: Pre-Mission Planning; Daily Operations Planning; Event Execution; and Post-Pass Reporting. O2O will be used to exchange data files between Orion and the MCC and to distribute real-time video through the optical downlink service to the MCC; which would not be possible without the high-bandwidth link that O2O will provide to Orion. In this paper, I will discuss the O2O Ground Segment development approach and how it will support these critical O2O functions: plan and schedule the contact; acquire and track the optical link; flow information bidirectionally; distribute information; and control and accommodate the system.

optical communications↗

A Transactive Network Template for Decentralized Coordination of Electricity Provision and Value

Transactive energy systems facilitate and plan for an allocation of electricity based on distributed, value-based negotiations. They are currently extending the usage of market-based principles and transactions from wholesale electricity markets where they exist today downward into distribution systems. While many interesting transactive energy systems have been proposed, few fully decentralize price discovery and price-responsive control. Even fewer plan for extensibility that will be needed for the ultimate growth of transactive networks and for the inclusion of additional and new objectives and new flexible, responsive assets. This paper introduces a transactive network template from which an agent may be configured at its network node to negotiate for electricity with other neighboring network agents, manage a set of locally-owned supply and demand assets, and induce local power balance through price discovery. A set of base object classes defines the template and may be extended. Three important basic computational responsibilities are allocated among the base object classes—scheduling, balancing, and network coordination. These several basic classes and responsibilities may be used to represent the perspective of large and small devices and regions anywhere in the electric power grid because they are based on the self-similarity of these objects and responsibilities. Agents in a transactive network are not at all unique in these basic responsibilities. So far, these following dynamic values have been addressed by extension of the base classes: energy value, demand charges, transport losses, and impacts of distributed renewable resources. The template is designed to be further extended to address and monetize still other valuable objectives.

Transactive, Transactive network, Transactive netw↗

Data-driven optimization of mixed-integer bi-level multi-follower integrated planning and scheduling problems under demand uncertainty

The coordination of interconnected elements across the different layers of the supply chain is essential for all industrial processes and the key to optimal decision-making. Yet, the modeling and optimization of such interdependent systems are still burdensome. Here we address the simultaneous modeling and optimization of medium-term planning and short-term scheduling problems under demand uncertainty using mixed-integer bi-level multi-follower programming and data-driven optimization. Bi-level multi-follower programs model the natural hierarchy between different layers of supply chain management holistically, while scenario analysis and data-driven optimization allow us to retrieve the guaranteed feasible solutions of the integrated formulation under various demand considerations. We address the data-driven optimization of this challenging class of problems using the DOMINO framework, which was initially developed to solve single-leader single-follower bi-level optimization problems to guaranteed feasibility. This framework is extended to solve single-leader multi-follower stochastic formulations and its performance is characterized by well-known single and multi-product process scheduling case studies. Through our data-driven algorithmic approach, we present guaranteed feasible solutions to linear and nonlinear mixed-integer bi-level formulations of simultaneous planning and scheduling problems and further characterize the effects of the scheduling level complexity on the solution performance, which spans over several hundred continuous and binary variables, and thousands of constraints.

42 ENGINEERING↗

An Approximation Algorithm for a Task Allocation, Sequencing and Scheduling Problem Involving a Human-Robot Team

Here we present an approximation algorithm for a Task Allocation, Sequencing and Scheduling Problem (TASSP) involving a team of human operators and robots. The robots have to travel to a given set of targets and collaboratively work on the tasks at the targets with the human operators. The problem aims to find a sequence of targets for each robot to visit and schedule the tasks at the targets with the human operators such that each target is visited exactly once by some robot, the scheduling constraints are satisfied and the maximum mission time of any robot is minimum. This problem is a generalization of the single Traveling Salesman Problem and is NP-Hard. Given k robots and m human operators, an algorithm is developed for solving the TASSP with an approximation ratio equal to 5/2- 1/k when m ≥ k and equal to 7/2 -1/k otherwise. Computational results are also presented to corroborate the performance of the proposed algorithm.

42 ENGINEERING↗