Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “contingency analysis”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

Advanced flight design systems subsystem performance models. Executive summary

Subsystem performance analysis required in flight design to assess the capability of the environmental control and life support system (ECLSS) to support the flight requirements and define operational procedures under contingency flight conditions is described. Current ECLSS modeling techniques are limited in the variety of configurations and they employ batch mode computer programs execution methods. Improvements in the variety of configurations that are modeled and a reduction in effort required for modeling and analysis is accomplished by developing a modular computer program which operates interactively.

Parker, K. C.↗

Evaluation of several classification schemes for mapping forest cover types in Michigan

Landsat MSS data were evaluated for mapping forest cover types in the northern Lower Peninsula of Michigan. The study examined seasonal variations, interpretation procedures and vegetation composition/distribution and their effect on overall classification accuracy and ability to identify individual pine species. Photographic images were used for visual interpretations while digital analysis was performed using a common (ERDAS) microcomputer image processing system. The classification schemes were evaluated using contingency tables and were ranked using the KAPPA statistic. The various classification schemes were ranked differentially according to study site location. Visual interpretation procedures ranked best, or least accurate, depending on the spatial distribution and complexity of the forest cover. Supervised classification techniques were more accurate than unsupervised clustering over all sites and seasons. Maximum likelihood classification of June data was superior to any digital classification technique of February data. The study indicates that classification accuracy is more dependent on the composition and distribution of forests in the northern lower Peninsula of Michigan than on the selection of a particular classification scheme.

Hudson, W. D.↗

NASA Ares I Launch Vehicle First Stage Roll Control System Cold Flow Development Test Program Overview

The Ares I launch vehicle is the selected design, chosen to return humans to the moon, Mars, and beyond. It is configured in two inline stages: the First Stage is a Space Shuttle derived five-segment Solid Rocket Booster and the Upper Stage is powered by a Saturn V derived J-2X engine. During launch, roll control for the First Stage (FS) is handled by a dedicated Roll Control System (RoCS) located on the connecting Interstage. That system will provide the Ares I with the ability to counteract induced roll torque while any induced yaw or pitch moments are handled by vectoring of the booster nozzle. This paper provides an overview of NASA s Ares I FS RoCS cold flow development test program including detailed test objectives, types of tests run to meet those objectives, an overview of the results, and applicable lessons learned. The test article was built and tested at the NASA Marshall Space Flight Center in Huntsville, AL. The FS RoCS System Development Test Article (SDTA) is a full scale, flight representative water flow test article whose primary objective was to obtain fluid system performance data to evaluate integrated system level performance characteristics and verify analytical models. Development testing and model correlation was deemed necessary as there is little historical precedent for similar large flow, pulsing systems such as the FS RoCS. The cold flow development test program consisted of flight-similar tanks, pressure regulators, and thruster valves, as well as plumbing simulating flight geometries, combined with other facility grade components and structure. Orifices downstream of the thruster valves were used to simulate the pressure drop through the thrusters. Additional primary objectives of this test program were to: evaluate system surge pressure (waterhammer) characteristics due to thruster valve operation over a range of mission duty cycles at various feed system pressures, evaluate temperature transients and heat transfer in the pressurization system, including regulator blowdown and propellant ullage performance, measure system pressure drops for comparison to analysis of tubing and components, and validate system activation and re-activation procedures for the helium pressurant system. Secondary objectives included: validating system processes for loading, unloading, and purging, validating procedures and system response for multiple failure scenarios, including relief valve operation, and evaluating system performance for contingency scenarios. The test results of the cold flow development test program are essential in validating the performance and interaction of the Roll Control System and anchoring analysis tools and results to a Critical Design Review level of fidelity.

Butt, Adam↗

Experiences with Extra-Vehicular Activities in Response to Critical ISS Contingencies

Initial "Big 14" work was put to the test for the first time in 2010. Deficiencies were found in some of the planning and approaches to that work; Failure Response Assessment Team created in 2010 to address deficiencies -Identify and perform engineering analysis in operations products prior to failure; incorporate results into operations products -Identify actions for protecting ISS against a Next Worse Failure after the first failure occurs -Better document not only EVA products but also planning products, assumptions, and open actions; Pre-failure investments against critical failures best postures ISS for swift response and recovery -A type of insurance policy -Has proven effective in a number of contingency EVA cases since 2010. Planning for MBSU R&R in 2012, Second PM R&R in 2013, EXT MDM R&R in 2014; Current FRAT schedule projects completion of all analysis in 2018

Van Cise, Edward A.↗

Sensor performance report, volume 4 (S-190A)

A summary of efforts expended to determine the radiometric accuracy and signal to noise ratio achieved by the S190A multispectral camera is reported. The technique used was to computer model the photographic system and to compare theoretical results to known or measured radiometric values. The two sources used as known targets for radiometric evaluation were the film broadband sensitometry and the lunar disc. From the analysis it appears feasible to attain an accuracy of 10% or better in radiometric accuracy. This however is contingent on contemporaneously exposing the target and spectral sensitometry.

Mendlowitz, R. A., Sr.↗

Compressive Failure of Fiber Composites under Multi-Axial Loading

This paper examines the compressive strength of a fiber reinforced lamina under multi-axial stress states. An equilibrium analysis is carried out in which a kinked band of rotated fibers, described by two angles, is sandwiched between two regions in which the fibers are nominally straight. Proportional multi-axial stress states are examined. The analysis includes the possibility of bifurcation from the current equilibrium state. The compressive strength of the lamina is contingent upon either attaining a load maximum in the equilibrium response or satisfaction of a bifurcation condition, whichever occurs first. The results show that for uniaxial loading a non-zero kink band angle beta produces the minimum limit load. For multi-axial loading, different proportional loading paths show regimes of bifurcation dominated and limit load dominated behavior. The present results are able to capture the beneficial effect of transverse compression in raising the composite compressive strength as observed in experiments.

Basu, Shiladitya↗

An exploration of function analysis and function allocation in the commercial flight domain

The applicability is explored of functional analysis methods to support cockpit design. Specifically, alternative techniques are studied for ensuring an effective division of responsibility between the flight crew and automation. A functional decomposition is performed of the commercial flight domain to provide the information necessary to support allocation decisions and demonstrate methodology for allocating functions to flight crew or to automation. The function analysis employed 'bottom up' and 'top down' analyses and demonstrated the comparability of identified functions, using the 'lift off' segment of the 'take off' phase as a test case. The normal flight mission and selected contingencies were addressed. Two alternative methods for using the functional description in the allocation of functions between man and machine were investigated. The two methods were compared in order to ascertain their relative strengths and weaknesses. Finally, conclusions were drawn regarding the practical utility of function analysis methods.

Mcguire, James C.↗

Control of Technology Transfer at JPL

Controlled Technology: 1) Design: preliminary or critical design data, schematics, technical flow charts, SNV code/diagnostics, logic flow diagrams, wirelist, ICDs, detailed specifications or requirements. 2) Development: constraints, computations, configurations, technical analyses, acceptance criteria, anomaly resolution, detailed test plans, detailed technical proposals. 3) Production: process or how-to: assemble, operated, repair, maintain, modify. 4) Manufacturing: technical instructions, specific parts, specific materials, specific qualities, specific processes, specific flow. 5) Operations: how-to operate, contingency or standard operating plans, Ops handbooks. 6) Repair: repair instructions, troubleshooting schemes, detailed schematics. 7) Test: specific procedures, data, analysis, detailed test plan and retest plans, detailed anomaly resolutions, detailed failure causes and corrective actions, troubleshooting, trended test data, flight readiness data. 8) Maintenance: maintenance schedules and plans, methods for regular upkeep, overhaul instructions. 9) Modification: modification instructions, upgrades kit parts, including software

Jet Propulsion Laboratory (JPL)↗

A Simulation Based Approach for Contingency Planning for Aircraft Turnaround Operation System Activities in Airline Hubs

Commercial aircraft undergo a significant number of maintenance and logistical activities during the turnaround operation at the departure gate. By analyzing the sequencing of these activities, more effective turnaround contingency plans may be developed for logistical and maintenance disruptions. Turnaround contingency plans are particularly important as any kind of delay in a hub based system may cascade into further delays with subsequent connections. The contingency sequencing of the maintenance and logistical turnaround activities were analyzed using a combined network and computer simulation modeling approach. Experimental analysis of both current and alternative policies provides a framework to aid in more effective tactical decision making.

Adeleye, Sanya↗

Rapid Contingency Simulation Modeling of the NASA Crew Launch Vehicle

The NASA Crew Launch Vehicle is a two-stage orbital launcher designed to meet NASA's current as well as future needs for human space flight. In order to free the designers to explore more possibilities during the design phase, a need exists for the ability to quickly perform simulation on both the baseline vehicle as well as the vehicle after proposed changes due to mission planning, vehicle configuration and avionics changes, proposed new guidance and control algorithms, and any other contingencies the designers may wish to consider. Further, after the vehicle is designed and built, the need will remain for such analysis in the event of future mission planning. An easily reconfigurable, modular, nonlinear six-degree-of-freedom simulation matching NASA Marshall's in-house high-fidelity simulator is created with the ability to quickly perform simulation and analysis of the Crew Launch Vehicle throughout the entire launch profile. Simulation results are presented and discussed, and an example comparison fly-off between two candidate controllers is presented.

Betts, Kevin M.↗

Space Shuttle Probabilistic Risk Assessment (SPRA) Iteration 3.2

The Shuttle is a very reliable vehicle in comparison with other launch systems. Much of the risk posed by Shuttle operations is related to fundamental aspects of the spacecraft design and the environments in which it operates. It is unlikely that significant design improvements can be implemented to address these risks prior to the end of the Shuttle program. The model will continue to be used to identify possible emerging risk drivers and allow management to make risk-informed decisions on future missions. Potential uses of the SPRA in the future include: - Calculate risk impact of various mission contingencies (e.g. late inspection, crew rescue, etc.). - Assessing the risk impact of various trade studies (e.g. flow control valves). - Support risk analysis on mission specific events, such as in flight anomalies. - Serve as a guiding star and data source for future NASA programs.

Boyer, Roger L.↗

Skylab experiment performance evaluation manual. Appendix P: Experiment T003 inflight aerosol analysis (DOT/MSFC)

A series of analyses is presented for experiment T003, inflight aerosol analysis, to be used for evaluating the performance of the Skylab corollary experiments under preflight, inflight, and post-flight conditions. Experiment contingency plan workaround procedure and malfunction analyses are presented in order to assist in making the experiment operationally successful.

Purushotham, K. S.↗

Trajectory Design Considerations for Exploration Mission 1

Exploration Mission 1 (EM-1) will be the first mission to send an uncrewed Orion Multi-Purpose Crew Vehicle (MPCV) to cislunar space in the fall of 2019. EM-1 was originally conceived as a lunar free-return mission, but was later changed to a Distant Retrograde Orbit (DRO) mission as a precursor to the Asteroid Redirect Mission. To understand the required mission performance (i.e., propellant requirement), a series of trajectory optimization runs was conducted using JSC's Copernicus spacecraft trajectory optimization tool. In order for the runs to be done in a timely manner, it was necessary to employ a parallelization approach on a computing cluster using a new trajectory scan tool written in Python. Details of the scan tool are provided and how it is used to perform the scans and post-process the results. Initially, a scan of daily due east launched EM-1 DRO missions in 2018 was made. Valid mission opportunities are ones that do not exceed the useable propellant available to perform the required burns. The initial scan data showed the propellant and delta-V performance patterns for each launch period. As questions were raised from different subsystems (e.g., power, thermal, communications, flight operations, etc.), the mission parameters or data that were of interest to them were added to the scan output data file. The additional data includes: (1) local launch and landing times in relation to sunrise and sunset, (2) length of eclipse periods during the in-space portion of the mission, (3) Earth line of sight from cislunar space, (4) Deep Space Network field of view looking towards cislunar space, and (5) variation of the downrange distance from Earth entry interface to splashdown. Mission design trades can also be performed based on the information that the additional data shows. For example, if the landing is in darkness, but the recovery operations team desires a landing in daylight, then an analysis is performed to determine how to change the mission design to meet this request. Also, subsystems request feasibility of alternate or contingency mission designs, such as adding an Orion main engine checkout burn or Orion completing all of its burns using only its auxiliary thrusters. This paper examines and presents the evolving trade studies that incorporate subsystem feedback and demonstrate the feasibility of these constrained mission trajectory designs and contingencies.

Dawn, Timothy F.↗

High Precision and Spatial Resolution Chemical Interrogation of Planetary Materials Using fs-LA/LIBS in Tandem With Multi-Collector ICP-MS

Combining femtosecond laser ablation (fs-LA) with laser-induced breakdown spectroscopy (LIBS), together with multi-collector inductively coupled plasma mass spectrometry (MC-ICPMS), can provide remarkable insights into the composition, structure, and therefore geologic history of planetary materials and their terrestrial analogs. Using the Applied Spectra iX-fs-Tandem LA-LIBS Instrument and the Nu SP1700 MC-ICP-MS housed within the Center for Isotope Cosmochemistry and Geochronology at NASA Johnson Space Center, we present preliminary tandem fs-LA-(MC)-ICP-MS/LIBS measurements of planetary analog materials. The synergistic integration of fs-LA-LIBS offers high spatial resolution elemental mapping, enabling the identification of microscale variations within samples. Simultaneously, the MC-ICP-MS can deliver precise isotopic analyses, and integrating the two datasets yields a wealth of geochemical information for a given sample. LA-based chemical mapping experiment designs are contingent on the information sought (i.e., quantitative, or semi-quantitative) and the preferred or available volume of material removed for the analysis. For example, occasionally, there are significant limitations in the depth of ablation due to the sample value, the amount of material available, or simply the need to coordinate with other in-situ techniques. In these limited sample scenarios, the “depth-controlled” chemical maps allow for precise post-mapping ion-polishing of the sample, while the isotopic and elemental maps can be used for targeting future analyses (e.g., conventional LA analyses, SIMS analyses, and micro milling for solution ICP-MS/TIMS). The emerging methodology will establish a powerful tool for investigation of astromaterials and materials returned by future planetary sample science missions.

Jacob B Setera↗

Distributed Sensing and Reasoning for Advanced Air Mobility Health Management and Mission Assurance

As envisioned, Advanced Air Mobility (AAM) and Urban Air Mobility (UAM) will introduce new vehicles and operations within the national airspace, moving people and cargo safely and efficiently at a much larger scale than today. Driven by transformative technology and revolutionary aircraft, this movement must still manage technical, regulatory, operational, and policy challenges. NASA’s work in support of AAM and UAM includes, but is not limited to tools, technologies, and architectures for distributed sensing of aircraft, data & reasoning services exchange, Human-Autonomy Teaming (HAT), contingency management, and vehicle health management. This paper builds upon these concepts and evaluates the use of distributed sensing and infrastructure assistance towards health management and mission assurance of UAM vehicles in specific operational scenarios. Through analysis of these example missions, aided by the data produced by the conceptual distributed sensing and reasoning infrastructure, we define opportunities for state estimation, diagnosis, and key decision points affecting the health state of the vehicle and the airspace volume. As a result, we define a number of measurable health state parameters providing relevant information to drive decision-making in contingency situations or feed automation tools in support of operators and managers.

Safety↗

Aerospace Safety Advisory Panel Annual Report for 1999

This report covers the activities of the Aerospace Safety Advisory Panel (ASAP) for the calendar year 1999.This was a year of notable achievements and significant frustrations. Both the Space Shuttle and International Space Station (ISS) programs were delayed.The Space Shuttle prudently postponed launches after the occurrence of a wiring short during ascent of the STS-93 mission. The ISS construction schedule slipped as a result of the Space Shuttle delays and problems the Russians experienced in readying the Service Module and its launch vehicle. Each of these setbacks was dealt with in a constructive way. The STS-93 short circuit led to detailed wiring inspections and repairs on all four orbiters as well as analysis of other key subsystems for similar types of hidden damage. The ISS launch delays afforded time for further testing, training, development, and contingency planning. The safety consciousness of the NASA and contractor workforces, from hands-on labor to top management, continues high. Nevertheless, workforce issues remain among the most serious safety concerns of the Panel. Cutbacks and reorganizations over the past several years have resulted in problems related to workforce size, critical skills, and the extent of on-the-job experience. These problems have the potential to impact safety as the Space Shuttle launch rate increases to meet the demands of the ISS and its other customers. As with last year's report, these work- force-related issues were considered of sufficient import to place them first in the material that follows. Some of the same issues of concern for the Space Shuttle and ISS arose in a review of the launch vehicle for the Terra mission that the Panel was asked by NASA to undertake. Other areas the Panel was requested to assess included the readiness of the Inertial Upper Stage for the deployment of the Chandra X-ray Observatory and the possible safety impact of electromagnetic effects on the Space Shuttle. The findings and recommendations in this report do not highlight any major, immediate issues that might compromise the safe pursuit of the various NASA programs. They do, however, cover concerns that the Panel believes should be addressed in the interest of maintaining NASA's excellent safety record.The Panel is pleased to note that remedial efforts for some of the findings raised are underway. Given appropriate funding and cooperative efforts among the Administration, the Congress and the various contractors, the Panel is convinced that safety problems can be avoided or solved resulting in lower risk for NASA's human space and aeronautics programs. Section II of this report contains specific findings and recommendations generated by Panel activities during the calendar year 1999. Section III presents more detailed information in support of these findings and recommendations. A current roster of Panel members, consultants, and staff is included as Appendix A. Appendix B contains NASA's response to the findings and recommendations from the 1998 annual report. It has been augmented this year to include brief explanations of why the Panel classified the NASA response as " open,""continuing," or "closed." Appendix C lists the fact-finding activities of the Panel in 1999.

Blomberg, Richard D.↗

Inadvertent Earth Reentry Breakup Analysis for the New Horizons Mission

The New Horizons (NH) spacecraft was launched in January 2006 aboard an Atlas V launch vehicle, in a mission to explore Pluto, its moons, and other bodies in the Kuiper Belt. The NH spacecraft is powered by a Radioisotope Thermoelectric Generator (RTG) which encases multiple General Purpose Heat Source (GPHS) modules. Thus, a pre-launch vehicle breakup analysis for an inadvertent atmospheric reentry in the event of a launch failure was required to assess aerospace nuclear safety and for launch contingency planning. This paper addresses potential accidental Earth reentries analyzed at the Jet Propulsion Laboratory (JPL) which may arise during the ascent to parking orbit, resulting in a suborbital reentry, as well as a departure from parking orbit, resulting in an orbital reentry.

Ling, Lisa M.↗

Conceptual Drivers for an Exploration Medical System

Interplanetary spaceflight, such as NASA's proposed three-year mission to Mars, provides unique and novel challenges when compared with human spaceflight to date. Extended distance and multi-year missions introduce new elements of operational complexity and additional risk. These elements include: inability to resupply medications and consumables, inability to evacuate injured or ill crew, uncharted psychosocial conditions, and communication delays that create a requirement for some level of autonomous medical capability. Because of these unique challenges, the approaches used in prior programs have limited application to a Mars mission. On a Mars mission, resource limitations will significantly constrain available medical capabilities, and require a paradigm shift in the approach to medical system design and risk mitigation for crew health. To respond to this need for a new paradigm, the Exploration Medical Capability (ExMC) Element is assessing each Mars mission phase-transit, surface stay, rendezvous, extravehicular activity, and return-to identify and prioritize medical needs for the journey beyond low Earth orbit (LEO). ExMC is addressing both planned medical operations, and unplanned contingency medical operations that meld clinical needs and research needs into a single system. This assessment is being used to derive a gap analysis and studies to support meaningful medical capabilities trades. These trades, in turn, allow the exploration medical system design to proceed from both a mission centric and ethics-based approach, and to manage the risks associated with the medical limitations inherent in an exploration class mission. This paper outlines the conceptual drivers used to derive medical system and vehicle needs from an integrated vision of how medical care will be provided within this paradigm. Keywords: (Max 6 keywords: exploration, medicine, spaceflight, Mars, research, NASA)

Antonsen, Erik↗