Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “contingency analysis”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

An assessment of nominal and contingency altitude reboost scenarios during Space Station assembly

The results of an analysis of several reboost scenarios for nominal and contingency SS operations during the Phase I assembly sequence are presented. Space Station program requirements on assembly and operational altitudes are outlined, and essential features of the SS reaction control system are described. A nominal reboost strategy designed to meet the current program requirements is presented. In addition, reboost strategies are developed for several contingency scenarios, including one missed STS mission, and an extended STS outage. It is shown that the time-averaged propellant 'cost' of maintaining altitude is greatest for equivalent continuous-thrusting altitude maintenance; it decreases with increasing reboost/rendezvous time interval to an asymptotic minimum value.

Bilardo, Vincent J., Jr.↗

The cryogenics analysis program for Apollo mission planning and analysis

The cryogenics analysis program was developed as a simplified tool for use in premission planning operations for the Apollo command service module. Through a dynamic development effort, the program has been extended to include real time and postflight analysis capabilities with nominal and contingency planning features. The technical aspects of the program and a comparison of ground test and mission data with data generated by using the cryogenics analysis program are presented. The results of the program capability to predict flight requirements also are presented. Comparisons of data from the program with data from flight results, from a tank qualifications program, and from various system anomalies that have been encountered are discussed. Future plans and additional considerations for the program also are included. Among these plans are a three tank management scheme for hydrogen, venting profile generation for Skylab, and a capability for handling two gas atmospheres. The plan for two gas atmospheres will involve the addition of the capability to handle nitrogen as well as oxygen and hydrogen.

Scott, W.↗

International Space Station (ISS) Accommodation of a Single US Assured Crew Return Vehicle (ACRV)

The following report was generated to give the International Space Station (ISS) Program some additional insight into the operations and issues associated with accommodating a single U.S. developed Assured Crew Return Vehicle (ACRV). During the generation of this report, changes in both the ISS and ACRV programs were factored into the analysis with the realization that most of the work performed will eventually need to be repeated once the two programs become more integrated. No significant issues associated with the ISS accommodating the ACRV were uncovered. Kinematic analysis of ACRV installation showed that there are viable methods of using Shuttle and Station robotic manipulators. Separation analysis demonstrated that the ACRV departure path clears the Station structure for all likely contingency scenarios. The payload bay packaging analysis identified trades that can be made between payload bay location, Shuttle Remote Manipulator System (SRMS) reach and eventual designs of de-orbit stages and docking adapters.

Mazanek, Daniel D.↗

Contingency Power Study for Short Haul Civil Tiltrotor

AlliedSignal Engines (AE) defined a number of concepts that significantly increased the horsepower of a turboshaft engine to accommodate the loss of an engine and enable the safe landing of a twin-engined, 40-passenger, short haul civil tiltrotor. From these concepts, "Water/Methanol Injection," a "Better Power Turbine Than Required," and a "Secondary Combustor For Interturbine Reheat" were chosen, based on system safety and economics, for more detailed examination. Engine performance, mission, and cost analysis of these systems indicated contingency power levels of 26 to 70 percent greater than normal rated takeoff could be attained for short durations, thus enabling direct operating cost savings between 2 and 6 percent.

Eisenberg, Joseph D.↗

A Comment on the Suspected Solar Neutrino-Solar Activity Connection

Recently, it has been proposed that there exists a highly statistically significant (at greater than or equal to 98% level of confidence) relationship between Ar-37 production rate (viz., solar neutrinos) and the Ap geomagnetic index (viz., solar particles), based on the (chi)-square goodness-of-fit test and correlation analysis, for the interval 1970-1990. While a relationship between the two parameters, indeed, seems to be discernible, the strength of the relationship has been overstated. Instead of being significant at the afore-mentioned level of confidence, the relationship is found to be significant at only greater than or equal to 95% level of confidence, based on Yates' modification to the (chi)-square test for 2 x 2 contingency tables. Likewise, while correlation analysis yields a value of r = 0.2691, it is important to note that such a value suggests that only about 7% of the variance can be 'explained' by the inferred correlation and that the remaining 93% of the variance must be attributed to other sources.

Wilson, Robert M.↗

A comment on the suspected solar neutrino -- solar activity connection

Recently, it has been proposed that there exists a highly statistically significant (at greater than or equal to 98% level of confidence) relationship between Ar-37 production rate (namely, solar neutrinos) and the Ap geomagnetic index (namely, solar particles), based on the chi-square goodness-of-fit test and correlation analysis, for the interval 1970-1990. While a relationship between the two parameters, indeed, seems to be discernible, the strength of the relationship has been overstated. Instead of being significant at the afore-mentioned level of confidence, the relationship is found to be significant at only greater than or equal to 95% level of confidence, based on Yates' modification to the chi-square test for 2 x 2 contingency tables. Likewise, while correlation analysis yields a value of r = 0.2691, it is important to note that such a value suggests that only about 7% of the variance can be 'explained' by the inferred correlation and that the remaining 93% of the variance must be attributed to other sources.

Wilson, Robert M.↗

Step 1: Human System Integration (HSI) FY05 Pilot-Technology Interface Requirements for Contingency Management

This document involves definition of technology interface requirements for Contingency Management. This was performed through a review of Contingency Management-related, HSI requirements documents, standards, and recommended practices. Technology concepts in use by the Contingency Management Work Package were considered. Beginning with HSI high-level functional requirements for Contingency Management, and Contingency Management technology elements, HSI requirements for the interface to the pilot were identified. Results of the analysis describe (1) the information required by the pilot to have knowledge of system failures and associated contingency procedures, and (2) the control capability needed by the pilot to obtain system status and procedure information. Fundamentally, these requirements provide the candidate Contingency Management technology concepts with the necessary human-related elements to make them compatible with human capabilities and limitations. The results of the analysis describe how Contingency Management operations and functions should interface with the pilot to provide the necessary Contingency Management functionality to the UA-pilot system. Requirements and guidelines for Contingency Management are partitioned into four categories: (1) Health and Status and (2) Contingency Management. Each requirement is stated and is supported with a rationale and associated reference(s).

Source record↗

On Determining the Rise, Size, and Duration Classes of a Sunspot Cycle

The behavior of ascent duration, maximum amplitude, and period for cycles 1 to 21 suggests that they are not mutually independent. Analysis of the resultant three-dimensional contingency table for cycles divided according to rise time (ascent duration), size (maximum amplitude), and duration (period) yields a chi-square statistic (= 18.59) that is larger than the test statistic (= 9.49 for 4 degrees-of-freedom at the 5-percent level of significance), thereby, inferring that the null hypothesis (mutual independence) can be rejected. Analysis of individual 2 by 2 contingency tables (based on Fisher's exact test) for these parameters shows that, while ascent duration is strongly related to maximum amplitude in the negative sense (inverse correlation) - the Waldmeier effect, it also is related (marginally) to period, but in the positive sense (direct correlation). No significant (or marginally significant) correlation is found between period and maximum amplitude. Using cycle 22 as a test case, we show that by the 12th month following conventional onset, cycle 22 appeared highly likely to be a fast-rising, larger-than-average-size cycle. Because of the inferred correlation between ascent duration and period, it also seems likely that it will have a period shorter than average length.

Wilson, Robert M.↗

A Comparison of Probabilistic and Deterministic Campaign Analysis for Human Space Exploration

Human space exploration is by its very nature an uncertain endeavor. Vehicle reliability, technology development risk, budgetary uncertainty, and launch uncertainty all contribute to stochasticity in an exploration scenario. However, traditional strategic analysis has been done in a deterministic manner, analyzing and optimizing the performance of a series of planned missions. History has shown that exploration scenarios rarely follow such a planned schedule. This paper describes a methodology to integrate deterministic and probabilistic analysis of scenarios in support of human space exploration. Probabilistic strategic analysis is used to simulate "possible" scenario outcomes, based upon the likelihood of occurrence of certain events and a set of pre-determined contingency rules. The results of the probabilistic analysis are compared to the nominal results from the deterministic analysis to evaluate the robustness of the scenario to adverse events and to test and optimize contingency planning.

Merrill, R. Gabe↗

Data Privacy for the Grid: Toward a Data Privacy Standard for Inverter-Based and Distributed Energy Resources

The traditional approach to planning the distribution grid has focused on reliability in the context of gradual and reasonably predictable load growth. Forecasts of load growth, combined with asset management practices, were used by system planners to identify upgrades to the system to maintain or improve reliability. The decisions, typically based within load flow analysis tools, included considerations about contingency scenarios and corporate forecasts (i.e., top-down predictions at a summary level of what would happen in a particular area that could impact load growth and behavior). As a result, today, this traditional approach no longer fits all purposes.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

RTO Technical Publications: A Quarterly Listing

A quarterly listing of RTO technical publications is presented. The topics include: Handbook on the Analysis of Smaller-Scale Contingency Operations in Long Term Defence Planning; 2) Radar Polarimetry and Interferometry; 3) Combat Casualty Care in Ground-Based Tactical Situations: Trauma Technology and Emergency Medical Procedures; and 4) RTO Technical Publications: A Quarterly Listing

Source record↗

Contingency support using adaptive telemetry extractor and expert system technologies

The 'telemetry analysis logic for operations support' prototype system constitutes an expert system that is charged with contingency planning for the NASA Hubble Space Telescope (HST); this system has demonstrated the feasibility of using an adaptive telemetry extractor/reformatter that is integrated with an expert system. A test case generated by a simulator has demonstrated the reduction of the time required for analysis of a complex series of failures to a few minutes, from the hour usually required. The HST's telemetry extractor will be able to read real-time engineering telemetry streams and disk-based data. Telemetry format changes will be handled almost instantaneously.

Bryant, Thomas↗

Renewable Energy Contingencies in Power Systems: Concept and Case Study

This paper introduces the concept of renewable energy contingencies that represent long-term/extended variability of variable renewable energy (VRE) resources, namely, significant periods (e.g., days/weeks) of low wind/solar availability. These contingencies have not received much attention to date but are likely to emerge as a major issue in some countries such as India as the share of VRE increases. Using 38 years of climate model reanalysis data for wind over India, we demonstrate that low periods of wind contingency below long-term (Indian) national average of 5 m/s can extend for more than 100 days in several zones some of which are deploying large wind farms. Even in some of the best wind resource areas in India with long term average wind speed close to 7 m/s, low wind days (e.g., 5 m/s which is substantially below average) can extend up to 60 days. We propose a four-step methodology around a co-optimization based energy-ancillary services dispatch model to assess the impact of renewable contingency and implemented it for the state of Tamil Nadu, the most wind-rich state of India. We have estimated that annual renewable contingency cost impact of 5 GW additional wind in Tamil Nadu to be in the range of US$27-76 million pa. Planning analysis should embrace the concept of renewable contingency to recognize these costs and put in place necessary spinning reserve and back-up generation resources.

Mohar Chattopadhyay↗

LADEE Preparations for Contingency Operations for the Lunar Orbit Insertion Maneuver

The Lunar Atmosphere and Dust Environment Explorer (LADEE) spacecraft was launched on September 7, 2013 UTC, and completed its mission on April 17, 2014 UTC with a directed impact to the Lunar Surface. Its primary goals were to examine the lunar atmosphere, measure lunar dust, and to demonstrate high rate laser communications. The mission objectives, much of which can be attributed to careful LADEE mission was a resounding success, achieving all planning and preparation. This paper discusses the specific preparations for fault conditions that could occur during a highly-critical phase of the mission, the Lunar Orbit Insertion (LOI). highly critical phase of the mission.

failure analysis↗

Initial planetary base construction techniques and machine implementation

Conceptual designs of (1) initial planetary base structures, and (2) an unmanned machine to perform the construction of these structures using materials local to the planet are presented. Rock melting is suggested as a possible technique to be used by the machine in fabricating roads, platforms, and interlocking bricks. Identification of problem areas in machine design and materials processing is accomplished. The feasibility of the designs is contingent upon favorable results of an analysis of the engineering behavior of the product materials. The analysis requires knowledge of several parameters for solution of the constitutive equations of the theory of elasticity. An initial collection of these parameters is presented which helps to define research needed to perform a realistic feasibility study. A qualitative approach to estimating power and mass lift requirements for the proposed machine is used which employs specifications of currently available equipment. An initial, unmanned mission scenario is discussed with emphasis on identifying uncompleted tasks and suggesting design considerations for vehicles and primitive structures which use the products of the machine processing.

Crockford, William W.↗

Managing Risk to Ensure a Successful Cassini/Huygens Saturn Orbit Insertion (SOI)

I. Design: a) S/C designed to be largely single fault tolerant; b) Operate in flight demonstrated envelope, with margin; and c) Strict compliance with requirements & flight rules. II. Test: a) Baseline, fault & stress testing using flight system testbeds (H/W & S/W); b) In-flight checkout & demos to remove first time events. III. Failure Analysis: a) Critical event driven fault tree analysis; b) Risk mitigation & development of contingencies. IV) Residual Risks: a) Accepted pre-launch waivers to Single Point Failures; b) Unavoidable risks (e.g. natural disaster). V) Mission Assurance: a) Strict process for characterization of variances (ISAs, PFRs & Waivers; b) Full time Mission Assurance Manager reports to Program Manager: 1) Independent assessment of compliance with institutional standards; 2) Oversight & risk assessment of ISAs, PFRs & Waivers etc.; and 3) Risk Management Process facilitator.

risk managment↗