Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “construction costs”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

Cost-Effectiveness of ANSI/ASHRAE/IES Standard 90.1-2019 for Oklahoma

This report describes the methodology and results of a state cost-effectiveness analysis of ASHRAE Standard 90.1-2019. Moving to the Standard 90.1-2019 edition from Standard 90.1-2016 is found to be cost-effective for the state. Annual energy cost savings, added construction costs, and life-cycle costs are all described and presented here for various building types and climate zones.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Cost-Effectiveness of ANSI/ASHRAE/IES Standard 90.1-2019 for Oregon

This report describes the methodology and results of a state cost-effectiveness analysis of ASHRAE Standard 90.1-2019. Moving to the Standard 90.1-2019 edition from Standard 90.1-2016 is found to be cost-effective for the state. Annual energy cost savings, added construction costs, and life-cycle costs are all described and presented here for various building types and climate zones.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Cost-Effectiveness of ANSI/ASHRAE/IES Standard 90.1-2019 for Pennsylvania

This report describes the methodology and results of a state cost-effectiveness analysis of ASHRAE Standard 90.1-2019. Moving to the Standard 90.1-2019 edition from Standard 90.1-2016 is found to be cost-effective for the state. Annual energy cost savings, added construction costs, and life-cycle costs are all described and presented here for various building types and climate zones.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Cost-Effectiveness of ANSI/ASHRAE/IES Standard 90.1-2019 for Rhode Island

This report describes the methodology and results of a state cost-effectiveness analysis of ASHRAE Standard 90.1-2019. Moving to the Standard 90.1-2019 edition from Standard 90.1-2016 is found to be cost-effective for the state. Annual energy cost savings, added construction costs, and life-cycle costs are all described and presented here for various building types and climate zones.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Cost-Effectiveness of ANSI/ASHRAE/IES Standard 90.1-2019 for South Carolina

This report describes the methodology and results of a state cost-effectiveness analysis of ASHRAE Standard 90.1-2019. Moving to the Standard 90.1-2019 edition from Standard 90.1-2016 is found to be cost-effective for the state. Annual energy cost savings, added construction costs, and life-cycle costs are all described and presented here for various building types and climate zones.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Cost-Effectiveness of ANSI/ASHRAE/IES Standard 90.1-2019 for South Dakota

This report describes the methodology and results of a state cost-effectiveness analysis of ASHRAE Standard 90.1-2019. Moving to the Standard 90.1-2019 edition from Standard 90.1-2016 is found to be cost-effective for the state. Annual energy cost savings, added construction costs, and life-cycle costs are all described and presented here for various building types and climate zones.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Cost-Effectiveness of ANSI/ASHRAE/IES Standard 90.1-2019 for Tennessee

This report describes the methodology and results of a state cost-effectiveness analysis of ASHRAE Standard 90.1-2019. Moving to the Standard 90.1-2019 edition from Standard 90.1-2016 is found to be cost-effective for the state. Annual energy cost savings, added construction costs, and life-cycle costs are all described and presented here for various building types and climate zones.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Cost-Effectiveness of ANSI/ASHRAE/IES Standard 90.1-2019 for Utah

This report describes the methodology and results of a state cost-effectiveness analysis of ASHRAE Standard 90.1-2019. Moving to the Standard 90.1-2019 edition from Standard 90.1-2016 is found to be cost-effective for the state. Annual energy cost savings, added construction costs, and life-cycle costs are all described and presented here for various building types and climate zones.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Cost-Effectiveness of ANSI/ASHRAE/IES Standard 90.1-2019 for Vermont

This report describes the methodology and results of a state cost-effectiveness analysis of ASHRAE Standard 90.1-2019. Moving to the Standard 90.1-2019 edition from Standard 90.1-2016 is found to be cost-effective for the state. Annual energy cost savings, added construction costs, and life-cycle costs are all described and presented here for various building types and climate zones.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Cost-Effectiveness of ANSI/ASHRAE/IES Standard 90.1-2019 for Virginia

This report describes the methodology and results of a state cost-effectiveness analysis of ASHRAE Standard 90.1-2019. Moving to the Standard 90.1-2019 edition from Standard 90.1-2016 is found to be cost-effective for the state. Annual energy cost savings, added construction costs, and life-cycle costs are all described and presented here for various building types and climate zones.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Cost-Effectiveness of ANSI/ASHRAE/IES Standard 90.1-2019 for West Virginia

This report describes the methodology and results of a state cost-effectiveness analysis of ASHRAE Standard 90.1-2019. Moving to the Standard 90.1-2019 edition from Standard 90.1-2016 is found to be cost-effective for the state. Annual energy cost savings, added construction costs, and life-cycle costs are all described and presented here for various building types and climate zones.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Cost-Effectiveness of ANSI/ASHRAE/IES Standard 90.1-2019 for Wisconsin

This report describes the methodology and results of a state cost-effectiveness analysis of ASHRAE Standard 90.1-2019. Moving to the Standard 90.1-2019 edition from Standard 90.1-2016 is found to be cost-effective for the state. Annual energy cost savings, added construction costs, and life-cycle costs are all described and presented here for various building types and climate zones.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Cost-Effectiveness of ANSI/ASHRAE/IES Standard 90.1-2019 for Wyoming

This report describes the methodology and results of a state cost-effectiveness analysis of ASHRAE Standard 90.1-2019. Moving to the Standard 90.1-2019 edition from Standard 90.1-2016 is found to be cost-effective for the state. Annual energy cost savings, added construction costs, and life-cycle costs are all described and presented here for various building types and climate zones.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Cost of Fish Exclusion and Passage Technologies for Hydropower

Hydropower represents a reliable source of renewable energy and accounts for approximately 7% of the total electrical generation in the United States. Future expansion of hydropower is likely to be in the form of either smaller new stream development projects or powering existing non-powered dams. For these new projects to be successful, careful analysis of risks, costs, and uncertainty to offset reduced power production as well as ensuring the protection and safe passage of migratory fish to gain public support, will be required. Exclusion and passage are two common approaches to protect fish from entrainment and impingement at hydropower facilities. The thresholds for entrainment risk and requirements for exclusion and passage often differ depending on the species involved, the characteristics of the facility, and the goals of stakeholders. While the costs associated with environmental mitigations represent a large proportion of the total costs required for the licensing of hydropower facilities, little quantitative information is present within the literature regarding the specific costs of fish exclusion and passage. Working with FOA awardee Natel Energy, scientists at Oak Ridge National Laboratory were tasked with assessing the capital construction costs for downstream fish exclusion and passage infrastructure. This report used keyword searches of an existing environmental mitigation cost data set and manual extraction of additional cost data associated with protection, mitigation, and enhancement (PM&E) measures related to positive barrier screening and passage from regulatory licensing documents available in the Federal Energy Regulatory Commission (FERC) eLibrary. This approach yielded a total of 50 PM&E mitigation measures with estimated capital construction costs pertaining to positive barrier screens, 142 pertaining to passage studies, and 26 pertaining to passage-related studies. PM&E measures associated with positive barrier screens represented <10% of the 171 total FERC project dockets available in the data set. These data were highly skewed toward conventional relicensing projects, as <7% were associated with new stream development (NSD) projects. Results from these data indicate highly variable costs associated with fish screening, with flow-normalized costs one to two orders of magnitude higher for screening with the highest exclusion capability (≤0.09 in. spacing) compared with coarser screening (1 to 2 in.). Furthermore, estimated capital costs of passage infrastructure were positively related to the scale of the project based on installed capacity for some, but not all, types of passage. These data provide an initial baseline for estimating exclusion and passage costs for hydropower development and may help developers consider options for more fish-friendly generation technologies, though gaps remain relating to a lack of data, particularly for NSD projects. More data may still be available within the FERC eLibrary, but significant effort will be required to manually identify and extract the data for future analyses.

13 HYDRO ENERGY↗

Hydropower Geotechnical Foundations: Current Practice and Innovation Opportunities for Low-Head Applications

Hydropower is a renewable energy resource that produces electricity from flowing water under pressure. Engineered hydropower structures, such as dams, are used to create a hydraulic head, enabling a turbinegenerator unit to convert pressurized flow into electricity. While hydropower has been a source of renewable energy since antiquity, new development in the United States has slowed in recent decades. Based on recent resource assessments, the largest opportunity to expand hydropower in the United States is from new stream-reach development (i.e., new hydropower development along stream-reaches that do not currently have hydroelectric facilities or other forms of infrastructure, such as dams). Roughly 75% of identified new stream-reach development potential is from low-head sites (less than 30 ft of head), which typically suffer from smaller power densities and higher normalized costs, given economies of scale. Hydropower developers and other stakeholders are thus interested in strategies to reduce initial capital costs while practicing sustainable development to maximize environmental compatibility with minimal disruption to natural aquatic life, sediment, and water flows. Historically, civil works have represented a significant cost driver for new hydropower development, with the foundation system representing a major cost component and source of uncertainty. The foundation system is the collection of engineered structural features (e.g. cutoff trenches, walls, grouting, anchors) constructed at or below the preconstruction ground surface that interfaces between the overlying structures (superstructures) and the bed material below (subsurface). Development of a hydropower foundation system must consider the various characteristics of the surrounding stream environment and subsurface while adhering to the engineering requirements of the superstructure that it supports. The care of water, excavation, and other construction activities are important features of foundation design and construction. The design and construction cost of the foundation system is largely dependent on the site geology and riverbed composition and is influenced by the level of geotechnical assessment required and conducted. Thus, a hydropower facility’s geotechnical foundation is often highly site-specific, with proper site selection and assessment being important to project success. The foundation system is designed to provide structural stability (of the foundation and dam), limit seepage, ensure public safety, and maintain functionality for the project life, during both construction and facility operations. Inadequate foundation or dam design can result in dam failure and the uncontrolled release of significant volumes of water, which could cause a high number of casualties and extensive property damage downstream of the failure. According to the Association of State Dam Safety Officials, approximately 30% of all historical dam failures in the United States are attributed to foundation or abutment defects, and another 20% are attributed to piping or seepage through the embankment, foundation, or abutment. To ameliorate these safety considerations, foundations often require massive amounts of construction material (e.g., grout, concrete, engineered dam fill) and long construction times. Foundation design also requires significant analysis prior to construction because the initial in-stream and abutment subsurface conditions are site-specific, and sufficient data for them often are lacking. Current practice requires on-site assessment, using expensive drilling and invasive and non-invasive investigation methods, to determine the expected cost of foundation material and treatment. Additionally, foundation construction often requires site dewatering (and other care of water activities), which involves constructing temporary diversion structures upstream and often downstream, called cofferdams, and water diversion systems that route water around the construction site. Cofferdams and water diversion systems can drastically increase construction costs and contribute to environmental disruption, including modification of flow patterns and benthic habitats. Given the technical, economic, and environmental challenges associated with hydropower foundations, opportunities exist to improve the current state of practice and to develop new and innovative solutions to Hydropower is a renewable energy resource that produces electricity from flowing water under pressure. Engineered hydropower structures, such as dams, are used to create a hydraulic head, enabling a turbinegenerator unit to convert pressurized flow into electricity. While hydropower has been a source of renewable energy since antiquity, new development in the United States has slowed in recent decades. Based on recent resource assessments, the largest opportunity to expand hydropower in the United States is from new stream-reach development (i.e., new hydropower development along stream-reaches that do not currently have hydroelectric facilities or other forms of infrastructure, such as dams). Roughly 75% of identified new stream-reach development potential is from low-head sites (less than 30 ft of head), which typically suffer from smaller power densities and higher normalized costs, given economies of scale. Hydropower developers and other stakeholders are thus interested in strategies to reduce initial capital costs while practicing sustainable development to maximize environmental compatibility with minimal disruption to natural aquatic life, sediment, and water flows. Historically, civil works have represented a significant cost driver for new hydropower development, with the foundation system representing a major cost component and source of uncertainty. The foundation system is the collection of engineered structural features (e.g. cutoff trenches, walls, grouting, anchors) constructed at or below the preconstruction ground surface that interfaces between the overlying structures (superstructures) and the bed material below (subsurface). Development of a hydropower foundation system must consider the various characteristics of the surrounding stream environment and subsurface while adhering to the engineering requirements of the superstructure that it supports. The care of water, excavation, and other construction activities are important features of foundation design and construction. The design and construction cost of the foundation system is largely dependent on the site geology and riverbed composition and is influenced by the level of geotechnical assessment required and conducted. Thus, a hydropower facility’s geotechnical foundation is often highly site-specific, with proper site selection and assessment being important to project success. The foundation system is designed to provide structural stability (of the foundation and dam), limit seepage, ensure public safety, and maintain functionality for the project life, during both construction and facility operations. Inadequate foundation or dam design can result in dam failure and the uncontrolled release of significant volumes of water, which could cause a high number of casualties and extensive property damage downstream of the failure. According to the Association of State Dam Safety Officials, approximately 30% of all historical dam failures in the United States are attributed to foundation or abutment defects, and another 20% are attributed to piping or seepage through the embankment, foundation, or abutment. To ameliorate these safety considerations, foundations often require massive amounts of construction material (e.g., grout, concrete, engineered dam fill) and long construction times. Foundation design also requires significant analysis prior to construction because the initial in-stream and abutment subsurface conditions are site-specific, and sufficient data for them often are lacking. Current practice requires on-site assessment, using expensive drilling and invasive and non-invasive investigation methods, to determine the expected cost of foundation material and treatment. Additionally, foundation construction often requires site dewatering (and other care of water activities), which involves constructing temporary diversion structures upstream and often downstream, called cofferdams, and water diversion systems that route water around the construction site. Cofferdams and water diversion systems can drastically increase construction costs and contribute to environmental disruption, including modification of flow patterns and benthic habitats. Given the technical, economic, and environmental challenges associated with hydropower foundations, opportunities exist to improve the current state of practice and to develop new and innovative solutions to challenges frequently encountered with traditional approaches. With this understanding, it is critically important to understand and document the current state of practice for hydropower geotechnical foundations, identify key challenges, and define opportunities for innovative solutions. To this end, this report documents the current state of practice across the three main phases of geotechnical foundation development: (1) geotechnical site assessment, (2) design, and (3) construction for hydropower systems. It also describes the major challenges with conventional approaches and identifies opportunities for innovation to reduce hydropower foundations costs, timelines, and risks. Key takeaways from this report include the following: Approximately 80% of available low-head sites are expected to have foundations on soil beds rather than rock beds, suggesting that rockfill and earthfill dams may be the most cost-effective conventional dam type for new projects.; Geotechnical and geologic investigation activities are time-consuming and expensive but are essential to define the parameters and criteria needed for foundation design.; Certain riverbed soil and bedrock types present significant technical challenges or require expensive foundation construction, which can prove financially prohibitive for low-head project development.; Modular hydropower design and prefabricated modular foundations represent a promising but unproven paradigm for new hydropower development. Design and construction approaches using optimized and highly repeatable, reliable components would benefit project cost, time, and risk but require additional research and development.; Temporary construction features for foundations, including cofferdams, water diversion, and water control systems, can prove costly and have inherent construction risk.; For economically viable development, hydropower geotechnical foundations should be limited to 4 to 15% of the project’s total initial capital costs. Many proposed projects have experienced cost overruns attributable to foundation difficulties or surprises during construction. These overruns may have been due to inadequate investigations, lack of adequate engineering effort to tailor the structures to site geology and topography, and/or contractual terms, among other considerations.; Challenges for hydropower foundations and opportunities for innovative technology solutions are identified in the following areas (consistent with the three main phases of foundation development): Geotechnical site assessment, Foundation design and materials, Construction methods and technology. Ultimately, this report aims to provide information about geotechnical foundations for low-head hydropower and to motivate transformative technologies to support hydropower growth.

13 HYDRO ENERGY↗

Affordable Solid Panel "Perfect Wall" System

The SPS is an innovative interpretation of the “perfect wall” concept, in which environmental control layers are located on the exterior side of the structural components, as opposed to traditional cavity insulated, stud-framed walls. The primary objective of this study is to validate the SPS technology in terms of its constructability, cost, and performance. Specifically for this project, we partnered with two affordable housing nonprofits in Minnesota—Twin Cities Habitat for Humanity and Urban Homeworks—to build five new houses using SPS walls, as well as two high-performance stud-framed comparison homes. We also reviewed cost and performance data from 13 SPS homes built prior to this project by MonoPath and Spero Environmental Builders. Reviewing the outcomes of these 20 homes total, we find promising results in terms of constructability, cost, and performance, although more structural performance data are needed before this new technology can see widespread adoption.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Software Verification and Validation Guidelines for Non-Linear Soil-Structure Interaction Analysis

Seismic analysis of structures, systems, and components (SSCs), including the consideration of soil-structure interaction (SSI) effects, is an important and required step in the design and licensing of nuclear power plant SSCs important to safety. Historically, the SSI analysis of nuclear structures has been performed using equivalent linear methods. However, there has been considerable industry investment in alternative seismic design and analysis approaches to reduce the construction cost of new reactors. Toward that goal and in alignment with the Licensing Modernization Project (LMP) framework, the Nuclear Regulatory Commission (US NRC) has proposed a risk-informed, performance-based approach to seismic design that allows inelastic response in those nuclear plant structures not required for confinement. As a complementary effort, reactor designers are exploring nonlinear seismic analysis methods to optimize structural designs and reduce construction costs.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

SSR COST – COmposite Structural Technologies for advanced reactor deployment (Final Scientific/Technical Report)

Moltex is designing a Generation 4 or Advanced nuclear reactor, the molten salt fast spectrum SSR-W. The design intent is to reduce the cost and complexity of the nuclear systems by relying on inherent safety characteristics, instead of engineered systems. One such characteristic as a natural tendency for power to decrease as temperature increases. Another characteristic that improves natural safety is the fact that the working fluids (molten salts) are at atmospheric pressure at operating temperatures. This significantly reduces the need for pressure boundary components and systems. Moltex is highly motivated to develop simple and economic reactors to reduce the carbon intensity and improve energy security of global electricity production. The COST project investigated the opportunities for reducing construction cost of advanced reactors with the adoption of Rigid Elastic Composite Civil works (RECC). The construction design and methods used in currently operational light water power plants would generally be suboptimal for the SSR-W since there is no requirement for civil structures to withstand high pressure accidents such as hydrogen combustion or steam explosion. In parallel to downselecting the most promising RECC-type technology, accident scenarios representing the largest credible challenge to the SSR-W civil and construction design were modelled. The capability of an SSR-W reactor constructed with and without the selected construction technology was evaluated and the consequential licensing challenges identified. A construction schedule and cost estimate of the SSR-W with and without the selected RECC construction technology was developed. Once the above data was collected, then Moltex was able to review the safety performance, license-ability and cost/schedule benefit of applying the preferred construction technology. The CAPEX/NPV benefit was quantified, and the licensing risks and opportunities were documented. Finally, the CAPEX/NPV benefit of the advanced construction technology was modest due to the suitability of traditional stick-built construction for the SSR-W design. However, previously unidentified benefits of the advanced construction technology were revealed during the studies that could credibly de-risk certain aspects of the design to be licensed. Since licensing (duration and delays) are very significant in new build project costs, the cost benefits may be significant. Further studies on the risk reduction of the construction technology are foreseen.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗