Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “compliance”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

Close Roof Mounted System Temperature Estimation for Compliance to IEC TS 63126

When photovoltaic modules are installed on rooftops the temperature is dependent on both the geographic location and the mounting configuration. If the mounting structure does not provide sufficient air flow in a hot environment, the 98th percential temperature will exceed 70 degrees C which according to IEC TS 63126 requires higher levels of thermal stability testing. However, a simple there is not a clear way to determe which temperature level is needed for a particular location and system design. In this work we identify a relationship between the gap between the rooftop and a module and propose methods to describe minimum gaps for a given location. Because system designs vary in more ways than just the gap, we show how to determine an effective gap which can be simply applied to generic calculations. Lastly, we show measurements and calculations from several systems to demonstrate how this method could work.

IEC 63126↗

Multifamily Weatherization Resources: Compliance and Scaling

This presentation is part of a session providing an overview of the multifamily weatherization process from programmatic, technical, grantee, and Subgrantee perspectives and feature a panel discussion exploring the day-to-day activities of a multifamily program and how they differ from single-family weatherization projects.

ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATION,↗

Market Driven Residential Energy Codes: Comparing Performance in a Changing Technological Environment

The research project is undertaken to better understand the changing relationship between the two basic methods of building energy code compliance – prescriptive and performance – and how those methods relate to each other with respect to advancements in building energy computer simulation standards and capabilities. The International Energy Efficiency Code (IECC) is a model code adopted by many jurisdictions across the United States. Historically, the prescriptive compliance methodology has been preferred in most jurisdictions. The prescriptive methodology requires meeting or exceeding specific efficiency minimums for each envelope component. This tends to be a simple method to teach and verify. A more involved prescriptive alternative called the Total UA alternative is sometimes used. This method requires some multiplication, summing, and comparison to compute, so it is done with a fairly simple computer program. However, advances in computer and building energy simulation technology have resulted in increased use of more detailed performance compliance methods. The performance compliance method establishes the annual energy cost threshold via hourly simulation models. The compliance threshold is determined with a comparison building model simulation with geometry similar to the proposed home and with energy feature parameters and efficiencies as specified in the IECC. This project examines relationships between the two methods of building energy code compliance, including: • Overall annual energy use based on utility bill analysis by compliance method • Code official work processes with respect to compliance methods • Gaps and issues associated with building code compliance methods • Simulated energy use difference between compliance methods • Code compliance cost as a function of compliance method • Code compliance labeling effectiveness for high performance residences • Getting to net zero energy use and net zero greenhouse gas emissions through high performance code alternatives • Electronic code permitting and compliance alternatives

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Acquisition and Implementation of a Comprehensive Environmental Permits Linking Tool at Savannah River Site - 20234

Historically, Savannah River Nuclear Solutions LLC (SRNS) tracked environmental regulatory commitments and the requirements from hundreds of permits at the Savannah River Site (SRS) using several separate methods, making integrated compliance assurance cumbersome and labor-intensive. When SRNS experienced an increase in environmental issues in 2017, SRNS management and U.S. Department of Energy - Savannah River (DOE-SR) management decided a single, proactive approach was needed to capture environmental permit information (including regulations, Consent Orders, DOE Orders, and any other state or federally issued statement of requirements), track the tasks necessary to ensure compliance with these requirements, and thereby mitigate the risk of noncompliance. SRNS developed a list of mandatory objectives that the tool must meet to function as a Comprehensive Environmental Permits Linking Tool (CEPLT). A key requirement was the ability to map Site permits to their governed locations and display the associated requirements at the compliance point (e.g., outfall, stack, waste unit, etc.). Several options included modifying existing onsite resources, building a custom onsite solution, purchasing an off-the-shelf solution, and contracting an offsite developer to build a custom solution. SRNS concluded an off-the-shelf solution with configuration and customization options would provide the flexibility to fit the unique needs of Savannah River Site (SRS) while taking advantage of industry-tested software and providing a reduced deployment timeline. SRNS chose Gensuite{sup R} a, a cloud-based solution that offers numerous a la carte applications in the environmental, health, and safety arenas, as the best candidate. SRNS selected three (3) integrated applications (Compliance Calendar, Permit Manager, and Mapper) to function as the CEPLT. The Compliance Calendar module allows for creation and tracking of regulatory commitment tasks assigned to responsible environmental professionals. Permit Manager organizes permits and other requirement documents, linking the commitments in each to Compliance Calendar tasks and/or implementing procedures. Mapper provides GIS capability for mapping the data from the other two modules to their physical onsite locations. The CEPLT was configured to allow for other SRS Site Tenants to eventually utilize the applications. Additionally, DOE-SR uses the CEPLT to provide an overview of contractor environmental compliance activities and to organize DOE-specific documents and tasks. The CEPLT fulfilled the requirement of meeting current compliance needs as well as providing the ability to grow as new organizations are incorporated and functionality is expanded. SRNS now uses the CEPLT to more effectively manage permit requirements, improve knowledge transfer, and increase the Site's overall protection of the environment, the Site worker, and the public. Possible future uses of the system include integration of mobile applications for timely communication of potential non-compliant conditions and DOE complex-wide deployment allowing for enhanced DOE site and Head Quarters oversight. Implementation of CEPLT will result in cost savings, both in terms of dollars and man-hours. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Building Performance Standards and Energy Code Alignment - Technical Brief

Building energy codes focus on building design, construction and renovation and have significantly increased building efficiency since the first national energy code was published in 1975. Most jurisdictions have energy codes based on ANSI/ASHRAE/IES Standard 90.1 (hereto referred to as Standard 90.1) and the International Energy Conservation Code (IECC). Compliance options available in these model energy codes include a prescriptive path, whole building performance paths – including IECC Total Building Performance (TBP), Standard 90.1 Energy Cost Budget (ECB) method and Performance Rating Method (PRM) – and system performance paths for envelope and heating, ventilation, and air-conditioning systems. Building performance standard (BPS) policies are an emerging policy tool used by jurisdictions to reduce the operational energy use or greenhouse gas (GHG) emissions of the existing commercial building stock. BPS policies vary widely between jurisdictions and are tailored to each location’s climate and energy goals. Intuitively, projects that met a recent edition of the energy code should comply with the BPS targets. However, some new buildings may struggle with meeting the BPS for the following reasons: 1. Energy codes focus on the design of the building and its projected ability to perform efficiently, while BPS compliance is dependent on the actual ongoing performance of the building, considering variables like occupancy, operation, and maintenance. 2. There are significant differences in the methodologies used to determine BPS compliance versus code compliance, including how each handles compliance metrics, handling of building amenities, and renewable energy generation. 3. The prescriptive compliance path in the energy code is based on performance of individual building components, as opposed to the performance compliance path which accounts for holistic building design strategies and interdependent building systems. This can result in a significant variability in post-occupancy performance for buildings built using the prescriptive path. Designs on the lower end of the permitted efficiency range may struggle with meeting the BPS.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Developing a Prototype Methodology to Rank CO2-EOR Wells and Assess Their Reuse Potential for Geologic Carbon Storage

This paper presents a prototype methodology to assess the possible transition of Class II carbon dioxide-enhanced oil recovery (CO2-EOR) wells to Class VI wells. The focus is on wellbore construction materials—casing, cement, tubing, and the packer—and includes comprehensive workflows to evaluate these materials, with primary emphasis on compliance with Environmental Protection Agency (EPA) Class VI well construction and conversion guidelines. These workflows systematically assess material properties and performance criteria to ensure regulatory compliance and optimize long-term wellbore integrity and functionality. Utilizing Python scripts and JavaScript Object Notation (JSON) representations, the study automates checks on digitized Texas Railroad Commission (TRRC) data to rank wells based on workflow criteria. By emphasizing critical factors such as casing integrity, cementing techniques, tubing compatibility, and packer selection, the methodology helps well owners and operators prioritize wells for potential reuse as CO2 injection wells. Given limitations in digitized data, manual user verification is required in some sections. Future improvements include integrating non-digitized data through web scraping and machine learning techniques. This research serves as a practical guide for stakeholders, supporting environmental compliance and sustainable well operations.

geologic carbon sequestration↗

National Emission Standards for Hazardous Air Pollutants – Radionuclide Emissions Calendar Year 2020

The U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Field Office (NNSA/NFO) operates the Nevada National Security Site (NNSS) and the North Las Vegas Facility (NLVF). From 1951 through 1992, the NNSS was the continental testing location for U.S. nuclear weapons. Radionuclides in air from NNSS activities have been monitored since the initiation of atmospheric testing. After 1962, testing was limited to underground detonations, which greatly reduced radiation exposure to the public. Since the end of nuclear testing in 1992, radiation monitoring has focused on detecting airborne radionuclides from historically contaminated soils because this sources dominates the potential offsite dose. These radionuclides are derived from re-suspension of soil (primarily by wind) and emission of tritium-contaminated soil moisture through evapotranspiration. Low amounts of legacy-related tritium are also emitted to air at the NLVF, an NNSS support complex in North Las Vegas. To protect the public from harmful levels of manmade radiation, the Clean Air Act, National Emission Standards for Hazardous Air Pollutants (NESHAP), specifically the National Emission Standards for Emissions of Radionuclides Other Than Radon From Department of Energy Facilities (40 CFR 61, Subpart H, 2020) limits the release of radioactivity from a DOE facility to that which would cause 10 millirem per year (mrem/y) effective dose equivalent (EDE) to any member of the public. This limit does not include radiation unrelated to NNSS activities. Unrelated doses could come from naturally occurring radioactive elements, from sources such as medically or commercially used radionuclides, or from sources outside of the United States, such as Japan’s Fukushima nuclear power plant, which was damaged in 2011. NNSA/NFO demonstrates compliance with the NESHAP limit by reporting environmental measurements of radionuclide air concentrations at critical receptor locations on the NNSS. This alternative was proposed and formerly submitted to the U.S. Environmental Protection Agency (EPA) in 2001 (EPA 2001a) and has been the method used to demonstrate compliance with the 40 CFR 61.92 dose standard since 2005. Six locations on the NNSS have been established to act as critical receptor locations to demonstrate compliance with the NESHAP limit. These locations are closer to radionuclide releases than where the public resides so they act as protective substitutes for public receptor locations. Compliance is demonstrated if the measured annual average concentration is less than the NESHAP Concentration Level (CL) for Environmental Compliance listed in Table 2 of 40 CFR 61, Appendix E. For multiple radionuclides, compliance is demonstrated when the sum of the fractions (determined by dividing each radionuclide’s concentration by its CL and then adding the fractions together) is less than 1.0. The EPAapproved air transport model, called the Clean Air Package 1988 (CAP88-PC) is also used to calculate the effective dose equivalent to the maximally exposed individual from NNSS air emissions. CAP88-PC was also used to calculate the population dose, or the collective EDE (expressed as person-rem [roentgen equivalent man] per year [person-rem/y]) for all individuals combined who reside within 80 kilometers (km) of NNSS emission sources. In 2020, the potential dose from radiological emissions to air from both current and past NNSS activities was well below the 10 mrem/y dose limit. This is demonstrated by both the air sampling data collected at critical receptor air monitoring stations and CAP88-PC modeling. The average concentrations of radioactivity at air critical receptor stations ranged from 0.2% to a maximum of 4.2% of the allowed NESHAP limit. CAP88-PC modeling of all 2020 NNSS radionuclide emissions showed the maximally exposed individual to be in Amargosa Valley and this individual received a potential dose of 0.063 mrem/y. The collective dose was calculated to be 0.29 person-rem/year for the 521,300 people who lived within 80 km of NNSS emission sources.

99 GENERAL AND MISCELLANEOUS↗

Commercial Building Energy Code Field Study (Final Report)

What is the dollar value of increasing compliance with the energy code? Ultimately, this is the question that policy makers, funders, and program implementers care about. With this in mind, Pacific Northwest National Laboratory (PNNL) developed a new methodology capable of determining how much energy cost savings could potentially be gained through better compliance with the code (Rosenberg et al. 2016). On March 2, 2016 DOE issued Funding Opportunity Announcement (FOA) Number DE-FOA-0001532, requesting proposals to develop and test a methodology for identifying the commercial energy code requirements that can provide the maximum cost-effective energy and cost savings through increased compliance. Awarded to the Institute for Market Transformation, this report summarizes the development and testing of a commercial code compliance methodology, including a summary of results, statistical analysis of sample, and best practices for others implementing a commercial energy code compliance field study.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Commercial Building Energy Code Field Study: Data Collection Methodology and Protocol

In support of the U.S. Department of Energy’s Commercial Buildings Energy Code Field Study, this data collection methodology and protocol provides guidance on all aspects of undertaking a compliance study, from development of a sampling plan to recruitment to code requirements and compliance checks for each energy code measure specified to be collected. The protocol also includes a data collection form that captures all key information needed for analysis of commercial energy code compliance. This methodology was developed by the Institute for Market Transformation in coordination with Pacific Northwest National Laboratory (PNNL) and the U.S. Department of Energy Building Energy Codes Program with the objective of assisting states, jurisdictions, utilities and others as they seek to measure and demonstrate compliance rates with energy codes in commercial buildings, as well as to target areas for improvement through increased energy code compliance and broader energy-efficiency programs. It is also intended to facilitate a consistent and replicable approach to research studies of this type and establish a transparent data set representing baseline construction practices across the U.S.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Commercial Building Energy Code Field Study: Data Collection Methodology and Protocol

In support of the U.S. Department of Energy’s Commercial Buildings Energy Code Field Study, this data collection methodology and protocol provides guidance on all aspects of undertaking a compliance study, from development of a sampling plan to recruitment to code requirements and compliance checks for each energy code measure specified to be collected. The protocol also includes a data collection form that captures all key information needed for analysis of commercial energy code compliance. This methodology was developed by the Institute for Market Transformation in coordination with Pacific Northwest National Laboratory (PNNL) and the U.S. Department of Energy Building Energy Codes Program with the objective of assisting states, jurisdictions, utilities and others as they seek to measure and demonstrate compliance rates with energy codes in commercial buildings, as well as to target areas for improvement through increased energy code compliance and broader energy-efficiency programs. It is also intended to facilitate a consistent and replicable approach to research studies of this type and establish a transparent data set representing baseline construction practices across the U.S.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Laboratory Drilling Test Data of PDC bits with Sierra White Granite Rock

This file contains unprocessed drilling data tests on Sierra White Granite (SWG) using two new PDC bits. The tests were conducted at Sandia National Laboratories (SNL) in the Hard Rock Drilling Facility (HRDF). The collected data includes ROP data at rotational speeds of 80, 120, and 160 RPMs, with incremental weight on bit (WOB) up to 5100 lbs. The diameter of the 4-bladed and 5-bladed PDC bits was 3 3/4" and supplied by National Oilwell Varco (NOV). Five tests modes were conducted for both bits, which are as follow: (1) Rigid configuration, with no vibration compliance (2) Flywheel configuration (3) Torsional compliance configuration (4) Axial Compliance configuration (5) Combined Axial and Torsional compliance configuration Note: the WOB and torque in the drilling data should be calibrated by zeroing the WOB and torque when the drill bit tags the rock sample.

15 GEOTHERMAL ENERGY↗

Behind-the-Meter Solar Accounting in Renewable Portfolio Standards

If a behind-the-meter solar photovoltaic (BTM PV) system is adopted, how does that influence the total amount of renewable electricity in its state in the long run (i.e., after the existence of the generator is reflected in the relevant utility's generation mix)? Would we expect the total amount of renewable generation to increase on a 1:1 basis with the BTM PV's generation? Or could it be something more, or something less? We show in this paper that the answer can depend on two key elements of how BTM PV is accounted for in a state’s renewable portfolio standard (RPS): (1) whether renewable energy certificates (RECs) from BTM PV can be used for RPS compliance, and (2) whether load served by generation from BTM PV counts as load covered by the RPS. These two elements combine into four possible accounting options, and we characterize the implications of each under the simplifying assumptions that the RPS is binding and the BTM PV RECs are used for compliance when allowed. For example, if load served by BTM PV generation counts toward the RPS load and BTM PV RECs cannot be used for compliance, the presence of BTM does not change the amount of RECs that the utility is required to retire, and yet additional RECs will be retired by the BTM PV owner - therefore, the total amount of renewable generation would increase on a 1:1 basis with the BTM PV generation. In contrast, under a common RPS design in which BTM PV RECs can be used for compliance and the load served by BTM PV generation is not covered by the RPS, the presence of BTM PV and transfer of RECs for compliance can actually decrease the total amount of renewable generation in the state, relative to a situation in which there is no BTM PV.

14 SOLAR ENERGY↗

U.S. State Renewables Portfolio & Clean Electricity Standards: 2023 Status Update [Slides]

This report provides an overview and status update on U.S. state renewables portfolio standards (RPS) and has been expanded from previous editions to also cover 100% clean electricity standards (CES) adopted by a growing number of states. The report, published in slide-deck form along with accompanying data files, describes recent legislative revisions, key policy design features, compliance with interim targets, past and projected impacts on clean electricity development, and compliance costs. The 2023 edition presents historical data through year-end 2022 and projections out to 2050. Key trends from this edition of the report include the following: -Evolution of state RPS and CES programs: States continue to refine and revise their RPS policies, often by adopting higher targets and/or broader CES policies. Among the 29 states plus DC with an RPS, 16 states have RPS targets of at least 50% of retail sales, and 17 states have a 100% CES or RPS target. -Historical impacts on renewables development: Roughly half of all growth in U.S. renewable electricity (RE) generation and capacity since 2000 is associated with state RPS requirements, though that percentage has declined in recent years, representing 30% of all U.S. RE capacity additions in 2022. Within some regions, particularly the Northeast and Mid-Atlantic, RPS policies play a more central role in motivating RE growth. -Future RPS and CES demand and incremental needs: RPS and CES policies will require roughly 300 terawatt-hours (TWh) of additional clean electricity supply by 2030 and 800 TWh by 2050, requiring total U.S. non-hydro RE generation to reach 28% of electricity sales by 2050 (compared to 17% today). This amounts to roughly one-quarter of EIA’s projected RE growth through 2050. -RPS target achievement to-date: States have generally met their interim RPS targets in recent years, with only a few exceptions reflecting unique, state-specific issues. Most CES targets are not yet in force. -Renewable energy certificate (REC) pricing trends: Prices for NEPOOL Class I RECs remained at roughly $\$40$ /MWh over the past year, just below alternative compliance payment (ACP) rates in the larger state markets, while PJM Tier I REC prices continued to rise, reaching $\$30$ /MWh by year-end. Prices for solar RECs (or SRECs) remained relatively stable, and continue to exhibit wide variation across states, with the highest prices ($\$200-450$ /MWh) in NJ, MA, and DC. -RPS compliance costs: RPS compliance costs average roughly 3.5% of retail electricity bills across RPS states, though vary widely from state to state, with the highest costs (8-12% of retail bills) in states with solar carve-outs and high SREC prices.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

U.S. State Renewables Portfolio & Clean Electricity Standards: 2024 Status Update [Slides]

This report provides an overview and status update on U.S. state renewables portfolio standards (RPS) and has been expanded from previous editions to also cover 100% clean electricity standards (CES) adopted by a growing number of states. The report, published in slide-deck form along with accompanying data files, describes recent legislative revisions, key policy design features, compliance with interim targets, past and projected impacts on clean electricity development, and compliance costs. The 2023 edition presents historical data through year-end 2023 and projections out to 2050. Key trends from this edition of the report include the following: -Evolution of state RPS and CES programs: States continue to refine and revise their RPS policies, often by adopting higher targets and/or broader CES policies. Among the 29 states plus DC with an RPS, 16 have RPS targets of at least 50% of retail sales, and 4 states have a 100% RPS. An additional 16 states have adopted a broader 100% CES. -Historical impacts on renewables development: Almost half of all growth in U.S. renewable electricity (RE) generation and capacity since 2000 is nominally associated with state RPS requirements. That percentage has declined over time to 35% of all U.S. RE capacity additions in 2023, though in certain regions RPS policies continue to play a dominant role in driving RE growth. -Future RPS and CES demand and incremental needs: The combined demand for clean electricity from RPS and CES policies will grow from roughly 500 TWh today to 1700 TWh by 2050. Accounting for current supplies—including existing nuclear and hydroelectric generation eligible for CES targets—RPS and CES policies will require 900 TWh of new clean electricity by 2050, equivalent to roughly 3x the historical rate of RPS-buildout. -RPS target achievement to-date: States have generally met their interim RPS targets in recent years, with only a few exceptions reflecting unique, state-specific issues. Most CES targets are not yet in force, and so little compliance experience to-date. -REC pricing trends: Prices for NEPOOL Class I RECs remained at roughly $\$40$/MWh over the past year, just below ACP rates in the larger state markets, while PJM Tier I REC prices continued to rise, reaching $\$35$/MWh by year-end 2023 and surpassing ACP levels in some states. Prices for solar RECs remained relatively stable, and continue to exhibit wide variation across states, with the highest prices ($200-450/MWh) in NJ, MA, and DC. -RPS compliance costs: RPS compliance costs average roughly 4% of retail electricity bills across RPS states, though vary widely from state to state, with the highest costs (11-12% of retail bills) in states with solar carve-outs and high SREC prices.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Guidance for Monitoring Passive Groundwater Remedies Over Extended Time Scales

Passive remediation can be appropriate where natural processes and actions such as institutional controls mitigate exposure to contaminated groundwater, achieving remedial action objectives and protectiveness of human health and the environment. Monitored natural attenuation (MNA) is a prevalent passive remediation strategy supported by a regulatory framework and monitoring design guidance. However, long-term passive remedies are usually selected in combination with at least one active remedy, such as source removal, in situ treatment, or pump-and-treat, functioning as a complementary method for achieving remediation objectives and meeting the applicable statutory and regulatory requirements. However, MNA and existing monitoring guidance primarily target situations where the remedial action objectives are met within a few decades. When time scales for passive remediation extend to many decades (50 years or more), a corresponding change in monitoring strategy is needed to adapt to the extended time scale. This document provides guidance for implementing an extended-scale monitoring (ESM) approach appropriate for long-duration passive remediation. Extended-scale is defined in this document with respect to time (i.e., a long duration of remediation) and a large enough physical scale such that downstream receptors will not be impacted within the remediation timeframe. ESM applies to slow-moving groundwater contaminant plumes and emphasizes monitoring primarily for potential exposure pathways. For this approach, the primary monitoring objective is to demonstrate that the plume diminishes before reaching the receptor zone or point of compliance and/or a receptor does not receive concentrations above the compliance limit. While the overall objectives of protecting human health and the environment are the same as for plumes where remediation can occur over a shorter time period, the time scales between decisions are longer and the dynamics of plume evolution are slower. To this end, a scenario-based strategy is described for different plume and source conditions, defining a containment and receptor zones. The containment zone is the area where the risk of exposure to groundwater contamination can be mitigated (e.g., through institutional controls) during the remediation time period. The receptor zone is defined as the area where exposure to groundwater contamination cannot be mitigated and compliance concentration standards must be met. Within the containment zone, slow plume migration may occur, leading to concentrations that exceed compliance standards. However, where distance to the receptor zone is large relative to plume migration and attenuation rate, this approach can be protective of the receptor zone. Selection of a long-duration passive remedy needs to be based on sufficient understanding of contaminant sources, hydrogeology, and contaminant plumes. A strong technical basis, supported by predictive analysis, is recommended to substantiate that contamination is expected to stay within the containment zone during the active remediation and attainment phase of the remedy, and diminish to meet compliance standards within the extended timeframe prior to reaching the receptor zone (e.g., many decades or even centuries). The ESM approach is based on verification of plume behavior and not on detailed plume dynamics. Monitoring is conducted to confirm expected behavior with an emphasis on exposure pathways to verify that plumes remain contained in areas where the protectiveness objectives can be met. ESM should not be adopted if there is significant risk of the plume extending beyond the containment zone. Given the slow movement within the containment zone, less frequent sampling is required relative to approaches used for conventional-scale remediation.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Transmission Electron Microscopy Study on the Effect of Thermal and Electrical Stimuli on Ge2Te3 Based Memristor Devices

Memristor devices fabricated using the chalcogenide Ge 2 Te 3 phase change thin films in a metal-insulator-metal structure are characterized using thermal and electrical stimuli in this study. Once the thermal and electrical stimuli are applied, cross-sectional transmission electron microscopy (TEM) and X-ray energy-dispersive spectroscopy (XEDS) analyses are performed to determine structural and compositional changes in the devices. Electrical measurements on these devices showed a need for increasing compliance current between cycles to initiate switching from low resistance state (LRS) to high resistance state (HRS). The measured resistance in HRS also exhibited a steady decrease with increase in the compliance current. High resolution TEM studies on devices in HRS showed the presence of residual crystalline phase at the top-electrode/dielectric interface, which may explain the observed dependence on compliance current. XEDS study revealed diffusion related processes at dielectric-electrode interface characterized, by the separation of Ge 2 Te 3 into Ge- and Te- enriched interfacial layers. This was also accompanied by spikes in O level at these regions. Furthermore, in-situ heating experiments on as-grown thin films revealed a deleterious effect of Ti adhesive layer, wherein the in-diffusion of Ti leads to further degradation of the dielectric layer. This experimental physics-based study shows that the large HRS/LRS ratio below the current compliance limit of 1 mA and the ability to control the HRS and LRS by varying the compliance current are attractive for memristor and neuromorphic computing applications.

Shallcross, Austin↗