Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “commissioning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

Commissioning & Characterization of Magnetized Gridded Thermionic Electron Source

Collaborative efforts to design and fabricate a magnetized gridded thermionic electron source have been conducted between Xelera and Jefferson Lab. Commissioning and characterization of an electron gun fabricated by Xelera was performed to benchmark the viability of future electron source designs and capabilities. The work involved simulation, installation, trouble-shooting, modifications of the design, commissioning, characterization, and magnetization of the electron beam produced. A specially designed cavity as well as novel diagnostic tools and methods were developed, implemented, and experimentally tested. Finally, the gun was used to demonstrate a previously unachieved current of magnetized electron beam from a gridded thermionic source of this uniquely compact size. This thesis addresses the following scientific and technological challenges: building a compact gridded thermionic electron source, producing high current magnetized electron beam, and demonstrating novel characterization measurements for magnetized beam.

Stefani, Mark↗

Monitoring Based Commissioning: Step-by-Step Approach to Implementation in Chiller Plants

Chilled water systems consume a significant portion of the energy in manufacturing, and inefficient operation could significantly influence utility bills and the environmental footprint of a facility. One way to ensure long-term energy-efficient plant operation is to ensure that chilled water system equipment, such as chillers, cooling towers, and pumps, are running at their best. Periodic operational assessments help to meet efficiency objectives for cooling plants. However, occasional set point and operational changes resulting from short-term fluctuations cause the plant operation to deviate from optimal. These changes accumulate over time, and operational efficiency deteriorates. Significant energy efficiency improvement potential in chilled water systems can be achieved by operational changes alone. Recent developments in information technology and the industrial internet of things data processing ability have overcome traditional problems and given rise to a new paradigm: monitoring-based commissioning (MBCx). Commissioning platforms and fault detection and diagnostics capabilities have evolved over time and presented more sophisticated abilities to efficiently control process cooling plants. The typical architectures of the MBCx process and a detailed approach to implement the process for chilled water systems are presented. A case study highlighting the energy-and cost-savings potential of MBCx systems is also presented.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

The Construction of the sPHENIX Detector and Status of Its Commissioning

sPHENIX is the first new major detector at RHIC in over twenty years. It is designed for pioneering studies of the Quark Gluon Plasma and Cold QCD phenomena using high-pT jet and heavy flavor probes with a broad kinematic reach and a capability to take large statistics sets of A+A, p+p and p+A data. sPHENIX construction was completed in April 2023. It was commissioned and took first Au+Au data in the RHIC 2023 Run. This paper describes the details of the detector design, challenges of sPHENIX construction, progress on the commissioning and first data from the RHIC 2023 run.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Investigation and Mitigation of a Prominent Off-Axis Stray Light Path in Rubin Observatory Commissioning

The "scratched tape" stray light feature is the most prominent and prevalent stray light artifact identified during the commissioning of the Vera C. Rubin Observatory. The scratched tape feature originates when light from large off-axis angles (~20 deg) passes between the mid-level and center-section light baffles, reflects off the primary mirror, and illuminates the LSST Camera focal plane. This scenario represented an unobstructed stray light path to the sky during Rubin commissioning due to delays in the integration of the dome slit light-wind screen. This document describes the identification, modeling, characterization, and mitigation of the scratched tape stray light artifact.

Drlica-Wagner, Alex [Fermilab; Chicago U., Astron.↗

Pumped Storage Hydropower FAST Commissioning Technical Analysis

This report is designed to address barriers and solutions to modern pumped storage hydropower (PSH) development by establishing baseline project development knowledge, defining key aspects of project development, and identifying opportunities to reduce project timelines, costs, and risks. This report’s scope includes post-licensing activities and excludes factors related to permitting or licensing. The U.S. PSH fleet is composed of 43 projects providing the majority (95%) of utility-scale electricity storage in the US. However, only one new PSH facility has become operational in the past 20 years. Several factors contribute to diminishing PSH growth in the US, including the magnitude of project costs and financing interest during development and construction; the length of time from project investment until project revenue; permitting challenges and construction risks; competition from other storage technologies; and unrecognized energy storage valuation. Although innovative PSH concepts (including underground, small, and modular systems) have been investigated, widespread application has yet to occur. In short, the time, cost, and risk associated with modern PSH development has resulted in limited recent growth in the United States, despite the rising energy storage demand from increased deployment of variable renewable technologies. To address these challenges, the US Department of Energy’s (DOE) Water Power Technologies Office initiated the PSH Furthering Advancements to Shorten Time to (FAST) Commissioning project, aimed at catalyzing new solutions, designs, and strategies to accelerate PSH development. This report uses available data from previous license applications, ongoing project cost data, and other global PSH project information based on a typical closed-loop PSH project.

13 HYDRO ENERGY↗

Enhancing Performance Contracts with Monitoring-Based Commissioning (MBCx)

To support federal and commercial building owners in understanding, procuring, and implementing monitoring-based commissioning (MBCx) software tools, this report provides an overview of their capabilities, the MBCx process, and how MBCx can be integrated into—and benefit—each phase of a performance contract. This report is intended to spur increased use of MBCx in performance contracts, whether an agency has previously installed or is considering adding MBCx at the time of their project. Additionally, case studies illustrate successful experiences using MBCx within performance contracts at a university campus and across a large number of buildings managed by the General Services Administration.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Furthering Advancements to Shorten the Time (FAST) to Commissioning for Pumped Storage Hydropower (PSH) Prize: Cooperative Research and Development (Final Report)

The National Renewable Energy Laboratory initiated a Prize with support from Argonne National Laboratory (ANL), Oak Ridge National Laboratory (ORNL), and Pacific Northwest National Laboratory (PNNL), and sponsored by the U.S. Department of Energy Water Power Technologies Office (DOE WPTO) to encourage ideas to reduce the time to commissioning for PSH projects. As a result, nine finalists have been chosen to develop their concepts in advance of the FAST Prize Pitch Contest to be held on October 7, 2019. The National Labs will provide technical and business advisement to the noted FAST Prize finalists in preparation for this Pitch Contest.

16 TIDAL AND WAVE POWER↗

Commissioning the James Webb Space Telescope Observatory

The James Webb Space Telescope (JWST) is going through final integration and testing and is planned to launch in 2021. The last remaining optical challenge for JWST is to fully align the observatory in flight to meet the optical requirements but this effort involves many system considerations to do this safely and efficiently and the entire effort will take several months. This talk will cover what it takes to deploy and optically commission the telescope including the many interactions and constraints of deployment, thermal, optical, attitude control and contamination properties of the observatory. The talk will cover the final optical requirements that the telescope will need to meet and will provide the roadmap of timelines, cooldown profiles, Wavefront Sensing and Control steps, system constraint considerations, and implementation of lessons learned from the ground test campaign that will result in meeting those optical requirements. The talk will also cover the organizational structure and processes in place to assure this process will be successful and efficient.

Commissioning JWST OBS↗

The James Webb Space Telescope: Its Commissioning and Technology

The James Webb Space Telescope (JWST) launched on December 25th, 2021. During the first 120 days of the mission the telescope and mirrors were deployed and the 18 primary segments and secondary mirror were aligned from millimeters to nanometers. This process led to an optical system that is limited only by the laws of physics. JWST is the first segmented, large cryogenic telescope that has been in flown in space and its deployment was an incredible first step in the advancement of large space telescopes. This talk will discuss the origin of several key technologies as well as the commissioning process from the perspective of the telescope including launch, deployments, alignments. It will culminate with a summary of how well the telescope is performing.

James Webb Space Telescope↗

Vacuum commissioning and operation result after the KSTAR PFC upgrade

The first vacuum commissioning after the installation of new tungsten mono-block cassette divertor has been successfully conducted in KSTAR. The tungsten divertor has been installed in the lower divertor region to handle the high divertor heat loads up to 10 MW/m 2 . On the one hand, the plasma facing components except for the tungsten divertor in the KSTAR vacuum vessel still consists of graphite tiles. Thus, it was much more challenging to maintain high-quality vacuum condition mainly because of various possible impurity sources inside the vessel compared with previous experiment campaigns. In this paper, the detailed procedure for securing vacuum condition of the KSTAR tokamak after the installation of the new tungsten divertor is presented. The vacuum condition is also examined regarding the plasma start-up and the long-pulse high-performance quality.

KSTAR↗

Design and commissioning of an e-beam irradiation beamline at the Upgraded Injector Test Facility at Jefferson Lab

We report the Upgraded Injector Test Facility (UITF) at Jefferson Lab is a continuous-wave superconducting linear accelerator capable of providing an electron beam with energy up to 10 MeV. A beamline for electron-beam irradiation has been designed, installed and successfully commissioned at this facility, aimed at the degradation study of 1,4-dioxane and per- and polyfluoroalkyl substances (PFAS) in wastewater treatment. A solenoid with a peak axial magnetic field of up to 0.28 T and a set of raster coils were used to obtain a Gaussian beam profile with a transverse standard deviation of ~ 15.0 mm at the target location. Monte-Carlo simulations using FLUKA were carried out to calculate the total absorbed dose and the dose distribution in the sample volume inside the target cell. The simulations were benchmarked experimentally by dosimetry mapping using optichromic dosimeters. The results of the irradiation experiments showed a ~ 95% reduction of 1,4-dioxane in ultra-pure water for a dose of 1 kGy, demonstrating the potential of electron-beam irradiation towards addressing growing challenges in environmental remediation.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

The Beta-decay Paul Trap Mk IV: Design and commissioning

Here, the Beta-decay Paul Trap is an open-geometry, linear trap used to measure the decays of 8 Li and 8 B to search for a tensor contribution to the weak interaction. In the latest 8 Li measurement of Burkey et al. (2022), β scattering was the dominant experimental systematic uncertainty. The Beta-decay Paul Trap Mk IV reduces the prevalence of β scattering by a factor of 4 through a redesigned electrode geometry and the use of glassy carbon and graphite as electrode materials. The trap has been constructed and successfully commissioned with 8 Li in a new data campaign that collected 2.6 million triple coincidence events, an increase in statistics by 30% with 4 times less β scattering compared to the previous 8 Li data set.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Commissioning results of the BNL Alternating Gradient Synchrotron booster AC dipole

Here, an AC dipole has been installed in the AGS booster as part of polarized beam developments for the future Electron Ion Collider (EIC). This will allow preserving helion beam polarization through two intrinsic resonances during acceleration to an energy corresponding to |$Gγ$| = 10.5. AC dipoles can preserve polarization by forcing the beam to undergo large amplitude vertical betatron oscillations. These coherent oscillations cause all particles to sample the strong horizontal fields of quadrupoles, and result in a full spin flip. In preparation for the AC dipole being used for polarized helions, it was first commissioned with polarized protons. The proton extraction energy was raised to allow protons to cross $Gγ$ = 0 + $v_y$ = 4.8087. As an artifact of the experiment using polarized protons, the booster settings for bunch extraction interfered with the coherent oscillations and limited the maximum coherent amplitude. This interference will be well separated in the case of polarized helions. Polarized protons crossed the $Gγ$ = 0 + $v_y$ intrinsic resonance with a full spin flip through use of the AC dipole. Simulations of the resonance crossing using Zgoubi accurately predict the polarization relative to the coherent amplitude.

43 PARTICLE ACCELERATORS↗

Commissioning a time-gated camera for fast neutron beamline spatial-energy characterization at LANSCE-WNR spallation source

An energy-resolved fast neutron beam imaging diagnostic has been successfully commissioned at the Weapons Neutron Research (WNR) spallation source within the Los Alamos Neutron Science Center (LANSCE) facility. This diagnostic replaces the existing analog phosphor image plates, which integrate across all neutron energies, as well as other particles, with a near-real-time energy-sensitive imaging capability. The system uses a fast plastic scintillator coupled with an intensified CCD camera. Specifically, the Teledyne Pi-MAX4 camera is coupled with either a 4 mm thick Eljen (EJ) 204 or 228 plastic scintillator. These scintillators are most sensitive to the fast neutrons (0.8-800 MeV) directly from the spallation source rather than low energy background radiation. Experimentally, these plastic scintillators were shown to have sufficiently fast decay to differentiate the bright gamma flash from the spallation neutrons. The spatial resolution is dominated by neutron beam divergence, with minimal additional contributions from scatter and light divergence. The system successfully resolved changes in neutron beam characteristics caused by intentional proton steering variations. Additionally, simulations of scintillator light yield as a function of thickness conducted using PHITS (with Scinful-QMD package) found that increasing scintillator thickness from 4 mm to 6 or 8 mm could potentially increase brightness ~ 3x. This may be explored if there is a need to reduce image acquisition time from several minutes to under one minute.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Ground calibration and in-flight commissioning of the Gamma-Ray and Neutron Spectrometer (GRNS) for NASA’s Psyche mission

NASA's Psyche spacecraft is currently enroute to the asteroid 16 Psyche, where it will perform an orbital investigation focused on determining the nature of the asteroid. A key part of this investigation is measurements of elemental composition to determine if the asteroid is rich in iron-nickel metal. To that end, the Psyche spacecraft payload includes a Gamma-Ray and Neutron Spectrometer (GRNS). GRNS is composed of two subsystems; a Gamma-Ray Spectrometer (GRS) with a high-purity germanium γ-ray sensor surrounded by a borated plastic scintillator Anti-Coincidence Shield (ACS), and a Neutron Spectrometer (NS) with three 3 He-filled gas proportional counters that are sensitive to different neutron energy regimes. We describe results from the pre-launch calibration campaign, along with early in-flight results from post-launch instrument commissioning. The information detailed here is focused on providing future users of GRNS data with the information needed to properly interpret the observations from the instrument.

Peplowski, Patrick N. [Johns Hopkins Univ., Baltim↗

Simulation studies for beam commissioning at FRIB Advanced Rare Isotope Separator

The Facility for Rare Isotope Beams (FRIB) includes a powerful superconducting driver accelerator and an Advanced Rare Isotope Separator (ARIS). The ARIS collects and purifies the rare isotope fragments of interest for experiments in nuclear physics, nuclear astrophysics, fundamental symmetries, etc. ARIS consists of a vertical pre-separator and downstream horizontal separator section (C-Bend). Each section can provide a high-resolution separation alternatively. The resolution reduction due to the emittance induced by momentum compression can be avoided by isotope separation in different dispersive planes. Beam commissioning of ARIS for the first experiments was completed and demonstrated particle identification of fragments. The beam tuning in ARIS largely relies on numerical simulations since the limited space for diagnostics. Here, we report the result of the beam trajectory correction, transverse matching, and beam-based misalignment studies at ARIS.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Hydrokinetic tidal energy resource assessment following international electrotechnical commission guidelines

Marine renewable energy can be used as a viable energy source to alleviate the impact of the climate crisis and have a carbon-free electricity sector in the future. Especially the energetic tidal streams are an attractive source of clean energy due to the periodic occurrence of high tidal flows daily. However, before any deployment of tidal turbine farms, it is essential to perform a resource assessment depending on the scope and scale of the project. Here, the International Electrotechnical Commission has developed a technical standard for assessing the tidal stream resource "IEC 62600-201 TS" to aid in this effort: determine a particular site's feasibility and perform the project layout design. In this study, we implemented and validated a high-resolution three-dimensional numerical model and provided results following the IEC TS for a project layout design in a highly energetic tidal channel, Tacoma Narrows of Puget Sound, in the State of Washington, USA. Implementation of the guidelines has helped adequately identify the undisturbed theoretical and technical resources with less bias, where the latter included energy extraction from the flow field arranging a hypothetical tidal energy converter (TEC) array. Also, following the standard, we carefully assessed the changes to channel flow properties from TECs, such as the kinetic energy flux and annual energy production (AEP), to provide the detailed information required for a larger project layout design. Ultimately, this work has shown the important role of IEC TS in tidal stream resource assessment, which can simultaneously act as a benchmark for other studies worldwide.

13 HYDRO ENERGY↗

Commissioning of a modulated pulse-power magnetron sputtering system for depositing niobium thin films

A modulated pulse-power magnetron sputtering system (MPPMS) was commissioned and used to deposit niobium on copper. MPPMS utilizes a modulated pulse train with high peak-to-average energy ratios, thereby increasing the energy density leading to the production of the energetic ions. The MPPMS modulator was designed and constructed based on large voltage/current IGBT modules, which can be externally modulated, produce bi-polar waveforms, and are readily available. A high voltage power supply provides moderate current to the IGBT module to create the precise pulse structure. The MPPMS system was used to deposit ~1 mm thick, niobium film on a copper substrate held at ~77 K to minimize Nb atom surface diffusion and maximize intrinsic film energy. Finally, the Nb film had an average grain size of ~8 nm.

42 ENGINEERING↗