Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “collaborative grid”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

Distributed Generation Cost-Benefit and Ratemaking Considerations for Idaho

This memo was completed through the Grid Modernization Laboratory Consortium (GMLC), a strategic partnership between the U.S. Department of Energy (DOE) and the national laboratories to bring together leading experts, technologies, and resources to collaborate on the goal of modernizing the nation’s grid. The GMLC was established as part of the DOE Grid Modernization Initiative to accelerate the development of technology, modeling analysis, tools, and frameworks to help enable grid modernization. Special thanks to DOE project leads, Larry Mansueti and Elaine Ulrich, and the laboratory project lead for this effort, Peter Cappers from Lawrence Berkeley National Laboratory (LBNL). The Idaho Public Utility Commission (IPUC) Staff requested this technical assistance to improve their understanding of the emerging, complex, and consequential issues around distributed energy resource (DER) rate design to help the staff achieve its goal of making a fair, just, and reasonable rate design recommendation with respect to Order 34147 under Case No. IPC-E-17-13. 2 PNNL-28285 In Case No. IPC-E-17-13, Idaho Power requested authorization from the IPUC to establish new rate schedules for residential and small general service customers with on-site generation. The IPUC’s Order No. 34046 of May 9, 2018 authorized Idaho Power to (IPUC 2018a): Close Schedule 84 and create Schedule 6 for residential on-site generators and Schedule 8 for small general service on-site generators; Acknowledge smart inverter technology; Make proposed revisions to interconnection Schedule 72; Open an Idaho Power-specific docket to “to comprehensively study the costs and benefits of on-site generation on Idaho Power’s system, as well as proper rates and rate design, transitional rates, and related issues of compensation for net excess energy provided as a resource” to Idaho Power; File a study with the IPUC “exploring fixed-cost recovery in basic charges and other rate design options prior to its next general rate case.”

24 POWER TRANSMISSION AND DISTRIBUTION↗

PinBus Interface for Interoperable, Grid-Responsive Devices

A very simple appliance interface was suggested by this author and his co-authors during Grid-Interop 2007. The approach was based on a successful collaboration between utilities, a major appliance manufacture, and the manufacturer of a load control module during the U.S. Department of Energy’s Grid Friendly Appliance project. The suggested approach was based on the assumption that demand-response objectives could be effectively communicated to and from many small electrical loads like appliances by simply agreeing on the meaning of the binary states of several shared connector pins. It was argued that this approach could pave the way for a wave of demand-response-ready appliances and greatly reduced expenses for utilities’ future demand-response programs. The approach could be supported by any of the many competing serial communication protocols and would be generally applicable to most end-use devices.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Automated and Distributed Monte Carlo Generation for GlueX

MCwrapper is a set of systems that manages the entire Monte Carlo production workflow for GlueX and provides standards for how that Monte Carlo is produced. MCwrapper was designed to be able to utilize a variety of batch systems in a way that is relatively transparent to the user, thus enabling users to quickly and easily produce valid simulated data at home institutions worldwide. Additionally, MCwrapper supports an autonomous system that takes user’s project submissions via a custom web application. The system then atomizes the project into individual jobs, matches these jobs to resources, and monitors the jobs status. The entire system is managed by a database which tracks almost all facets of the systems from user submissions to the individual jobs themselves. Users can interact with their submitted projects online via a dashboard or, in the case of testing failure, can modify their project requests from a link contained in an automated email. Beginning in 2018 the GlueX Collaboration began to utilize the Open Science Grid (OSG) to handle a bulk of simulation tasks; these tasks are currently being performed on the OSG automatically via MCwrapper. This talk will outline the entire system of MCwrapper, its use cases, and the unique challenges facing the system.

Britton, Thomas↗

Smart Grid R&D SSM KIER FY17 Report.

This report summarizes collaborative efforts between Secure Scalable Microgrid and Korean Institute of Energy Research team members . The efforts aim to advance microgrid research and development towards the efficient utilization of networked microgrids . The collaboration resulted in the identification of experimental and real time simulation capabilities that may be leveraged for networked microgrids research, development, and demonstration . Additional research was performed to support the demonstration of control techniques within real time simulation and with hardware in the loop for DC microgrids .

24 POWER TRANSMISSION AND DISTRIBUTION↗

Residential Vehicle-to-Home Backup Power Capabilities: Key Findings from a ComEd Beneficial Electrification R&D Pilot

This report summarizes key findings from a collaborative technical study of residential, non-grid-tied vehicle-to-home (V2H) backup power systems in Commonwealth Edison’s (ComEd’s) service territory. The work integrates (1) a feeder-level technoeconomic analysis (TEA) using historical outage-event data and simulated electric-vehicle (EV) driving/charging profiles to estimate potential reliability and customer interruption-cost impacts under V2H and vehicle-to-grid (V2G) adoption scenarios; (2) controlled laboratory performance testing of a representative V2H backup ecosystem to characterize transfer-to-backup behavior, sustained power delivery, efficiency trends, and repeatable reliability limitations; and (3) a cybersecurity assessment aligned with NIST Cybersecurity Framework (CSF) 2.0 and ISO/SAE 21434 to evaluate interface-level risk drivers and identify program-relevant mitigations. Results indicate that V2H can provide measurable resilience value, but outcomes are strongly context dependent on outage patterns and the share of events that are “V2H-applicable.” Typical transfer-to-backup behavior clustered on the order of minutes, but rare long-delay edge cases were observed (including an event approaching 30 minutes) and should be treated as a reliability risk. High-power testing showed that peak-rated output is not necessarily continuously deliverable; stable operation may require operation below nameplate ratings and attention to thermal and installation constraints. The cybersecurity assessment highlights a broad attack surface spanning commissioning, home networks, embedded services, and cloud/OTA pathways, motivating minimum controls for secure onboarding, signed updates, patch cadence, and coordinated vulnerability response for any scaled deployment.

24 POWER TRANSMISSION AND DISTRIBUTION↗

GridStat – Cyber Security and Regional Deployment Project Report

GridStat is a developing communication technology to provide real-time data delivery services to the electric power grid. It is being developed in a collaborative effort between the Electrical Power Engineering and Distributed Computing Science Departments at Washington State University. Improving the cyber security of GridStat was the principle focus of this project. A regional network was established to test GridStat’s cyber security mechanisms in a realistic environment. The network consists of nodes at Pacific Northwest National Laboratory, Idaho National Laboratory, and Washington State University. Idaho National Laboratory (INL) was tasked with performing the security assessment, the results of which detailed a number or easily resolvable and previously unknown issues, as well as a number of difficult and previously known issues. Going forward we recommend additional development prior to commercialization of GridStat. The development plan is structured into three domains: Core Development, Cyber Security and Pilot Projects. Each domain contains a number of phased subtasks that build upon each other to increase the robustness and maturity of GridStat.

99 GENERAL AND MISCELLANEOUS↗

Developing Technology Performance Level Assessments for Early-Stage Wave Energy Converter Technologies: Preprint

The advantage of using Technology Performance Level (TPL) in conjunction with Technology Readiness Level (TRL) assessments in guiding technology development trajectories to successful outcomes in less time, at less overall cost, and with less encountered risk has been well articulated in the literature. In partnership with industry and international collaborators, a TPL assessment methodology for grid-connected applications has been developed through the application of the systems engineering approach. Metrics under seven different categories have been developed, weighted based on their relative relevance, and combined to yield a composite score. The methodology has been implemented in a spreadsheet tool plus a web application specifically aimed at assessing early stage (TRL 1-3) concepts. The target use cases are (a) technology developers improving their design, to find fatal flaws early, to get feedback on current design, to identify areas of improvement that will yield the highest return on investment, (b) reviewers assessing technologies in competitions or for making funding decisions, (c) investor or project developer doing due diligence, (d) policy makers landscaping the technology domain for formulating R&D strategy. The methodology and the tools are undergoing continuous improvement based on the experience and lessons learnt from applying it to internal and external marine energy technology development projects. The methodology is also being adapted for assessing WECs servicing markets outside the continental grid - broadly categorized as Powering the Blue Economy (PBE) applications. Such applications have vastly different functional requirements entailing a modification of the methodology to account for their higher risk tolerance, reduced price sensitivities, lower power needs, different permitting protocols, etc. This paper presents the latest status of the TPL assessment methodology and tools, describes its adaptation to select PBE markets, and explores its extension to other domains where it could provide a comprehensive and holistic measure of a nascent or disruptive technology's technoeconomic performance potential.

metrics↗

Developing Technology Performance Level Assessments for Early-Stage Wave Energy Converter Technologies

The advantage of using Technology Performance Level (TPL) in conjunction with Technology Readiness Level (TRL) assessments in guiding technology development trajectories to successful outcomes in less time, at less overall cost, and with less encountered risk has been well articulated in the literature. In partnership with industry and international collaborators, a TPL assessment methodology for grid-connected applications has been developed through the application of the systems engineering approach. Metrics under seven different categories have been developed, weighted based on their relative relevance, and combined to yield a composite score. The methodology has been implemented in a spreadsheet tool plus a web application specifically aimed at assessing early stage (TRL 1-3) concepts. The target use cases are (a) technology developers improving their design, to find fatal flaws early, to get feedback on current design, to identify areas of improvement that will yield the highest return on investment, (b) reviewers assessing technologies in competitions or for making funding decisions, (c) investor or project developer doing due diligence, (d) policy makers landscaping the technology domain for formulating R&D strategy. The methodology and the tools are undergoing continuous improvement based on the experience and lessons learnt from applying it to internal and external marine energy technology development projects. The methodology is also being adapted for assessing WECs servicing markets outside the continental grid - broadly categorized as Powering the Blue Economy (PBE) applications. Such applications have vastly different functional requirements entailing a modification of the methodology to account for their higher risk tolerance, reduced price sensitivities, lower power needs, different permitting protocols, etc. This paper presents the latest status of the TPL assessment methodology and tools, describes its adaptation to select PBE markets, and explores its extension to other domains where it could provide a comprehensive and holistic measure of a nascent or disruptive technology's technoeconomic performance potential.

metrics↗

Impacts of Large Amounts of Wind Power on Design and Operation of Power Systems; Results of IEA Collaboration

There are a multitude of studies completed and ongoing related to the cost of wind integration. However, the results are not easy to compare. An international forum for exchange of knowledge of power system impacts of wind power has been formed under the IEA Implementing Agreement on Wind Energy. IEA WIND R&D Task 25 on “Design and Operation of Power Systems with Large Amounts of Wind Power” produced a state-of-the-art report in October 2007, where the most relevant wind-power grid integration studies were analyzed, especially regarding methodologies and input data. This paper summarizes the results from 18 case studies, with discussion on differences in methodology as well as issues that have been identified to impact the cost of wind integration.

17 WIND ENERGY↗

gridPULSE: Catalog of National Laboratory Testing Resources for Grid Devices

This catalog was created through the Grid Modernization Laboratory Consortium's (GMLC) Testing Network project. The GMLC is a strategic partnership between the Department of Energy (DOE) and its National Laboratories to bring together leading experts, technologies, and resources to collaborate on the goal of modernizing the nation's electric grid. The benefits of the GMLC include more efficient use of resources; shared networks; improving learning and preservation of knowledge; enhanced lab coordination and collaboration; and regional perspective and relationships with local stakeholders and industry.

24 POWER TRANSMISSION AND DISTRIBUTION↗

CSI4 Analysis to Inform California Grid Integration Rules for PV

Sandia National Laboratories (Sandia) and Electric Power Research Institute, Inc. (EPRI) are collaborated to develop guidelines for effective use of smart inverters given the unique hosting capacity of the California grid. A key outcome of this project will be recommended settings for the smart inverter functions currently being considered as part of the modification to Rule 21. Additionally, this project will provide thresholds of smart inverter set points for which manufacturers can specify their equipment and suggested default settings that are applicable for most utility needs and feeder configurations in California. These results will directly contribute to the goals of the California Public Utilities Commission (CPUC) to enable and enhance integrating PVs on the electric grid.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Enabling Efficient, Responsive, and Resilient Buildings: Collaboration Between the United States and India

The United States and India have among the largest economies in the world, and they continue to work together to address current and future challenges in reliable electricity supply. The acceleration to efficient, grid-responsive, resilient buildings represents a key energy security objective for federal and state agencies in both countries. The weaknesses in the Indian grid system were manifest in 2012, in the country’s worst blackout, which jeopardized the lives of half of India’s 1.2 billion people. While both countries are investing significantly in power sector reform, India, by virtue of its colossal growth rate in commercial energy intensity and commercial floor space, is better placed than the United States to integrate and test state-of-art Smart Grid technologies in its future grid-responsive commercial buildings. This paper presents a roadmap of technical collaboration between the research organizations, and public-private stakeholders in both countries to accelerate the building-to-grid integration through pilot studies in India.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Resilient Information Architecture Platform for Smart Grid (RIAPS)

A number of emerging trends will substantially alter the operation and control of the electric grid over the next several decades. These trends include ensuring resiliency under severe weather events, increasing integration of renewable electricity generation, supporting changing electricity demand patterns, and the improving cost effectiveness of distributed energy resources. To address these challenges, the future “Smart Grid” management will need to transition from centralized to coordinated distributed control paradigm. Reliable operation of the Smart Grid depends on distributed intelligence realized through software applications that run on distributed computing devices attached to the power system to collect data and collaboratively manage resources. However, much of the existing software for Smart Grid-enabled devices is either proprietary or developed with custom solutions, which limits interoperability among the heterogeneous devices and hinders the ability to manage system-level reliability, security, and resiliency requirements. Additionally, this approach makes Smart Grid applications hard to maintain, evolve, verify, and replace; resulting in high development and deployment costs. Further development of the Smart Grid requires a reusable software base-layer to move from hard-coded functionality to a plug-and-play architecture capable of managing system-level objectives and constraints in addition to providing consistent common services across heterogeneous devices and applications. Vanderbilt University, in collaboration with North Carolina State University and Washington State University has developed a foundation ‘software platform’ for developing and deploying robust, reliable, effective and secure software applications for the Smart Grid. The Resilient Information Architecture Platform for the Smart Grid (RIAPS) provides core services for building effective and powerful smart grid applications. It offers unique services for real-time data dissemination, fault tolerance, and coordination across apps distributed over the network.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Collaborative Modular Pumped Hydro Energy Storage Design Study

In May of 2017, Los Alamos National Laboratory (LANL) through the Applied Engineering Technology Division, Jemez Mountain Electric Cooperative Inc. (JMEC), and Northern New Mexico College (NNMC) agreed to enter into a small, joint, non-binding Modular Pumped Hydro (MPH) design study related to grid level energy storage to begin a process of collaboration. Los Alamos National Laboratory's mission is to solve national security challenges through scientific excellence. The mission of Northern New Mexico College is to ensure student success by providing access to affordable, community-based learning opportunities that meet the educational, cultural, and economic needs of the region. Jemez Mountain Electric Cooperative Inc. is the largest electric co-op in the State of New Mexico providing affordable and reliable electricity to customers in the five counties of Rio Arriba, Santa Fe, San Juan, McKinley and Sandoval.

13 HYDRO ENERGY↗

eMosaic: Electrification Mosaic Platform for Grid Informed Smart Charging Management (Final Scientific/Technical Report)

ABB (Prime Contractor), in collaboration with its partners at the Utah State University (USU), Idaho National Laboratory, Rocky Mountain Power (RMP), and Electric Power Engineers (EPE), have performed research, development, and wide scale demonstration of a scalable and resilient Electrification Mosaic (eMosaic) platform for Smart Charge Management (SCM) for Electric Vehicle Infrastructure. Work was completed under DE EE0009194, titled “eMosaic Electrification Mosaic Platform for Grid Informed Smart Charging Management”, funded by the US Department of Energy. The project members developed algorithms that provide localized and bulk grid services and that reduce and stabilize costs all the way down the supply chain to the PEV owner through SCM. This platform aggregates telemetry from multiple data sources as pieces of the larger picture including personal, private fleet or transportation EVs, fast chargers and other supply equipment, weather service information, and geographically distributed charging sites such as public lots, garage and retail, and private or shared usage depots. ABB and the project team designed, tested, and improved a charging management system at local/edge and cloud levels. The ultimate objective of the project was to convincingly demonstrate that the developed secure eMosaic plat-form can be readily and favorably adopted by diverse utilities and site owners at scale. This was achieved through a demonstration plan with field deployment at several physical sites across 4 states and additional scalable simulation from high fidelity charging models.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Nuclear Physics Science Network Requirements Workshop, May 2008 - Final Report

The Energy Sciences Network (ESnet) is the primary provider of network connectivity for the US Department of Energy Office of Science, the single largest supporter of basic research in the physical sciences in the United States of America. In support of the Office of Science programs, ESnet regularly updates and refreshes its understanding of the networking requirements of the instruments, facilities, scientists, and science programs that it serves. This focus has helped ESnet to be a highly successful enabler of scientific discovery for over 20 years. In May 2008, ESnet and the Nuclear Physics (NP) Program Office of the DOE Office of Science organized a workshop to characterize the networking requirements of the science programs funded by the NP Program Office. Most of the key DOE sites for NP related work will require significant increases in network bandwidth in the 5 year time frame. This includes roughly 40 Gbps for BNL, and 20 Gbps for NERSC. Total transatlantic requirements are on the order of 40 Gbps, and transpacific requirements are on the order of 30 Gbps. Other key sites are Vanderbilt University and MIT, which will need on the order of 20 Gbps bandwidth to support data transfers for the CMS Heavy Ion program. In addition to bandwidth requirements, the workshop emphasized several points in regard to science process and collaboration. One key point is the heavy reliance on Grid tools and infrastructure (both PKI and tools such as GridFTP) by the NP community. The reliance on Grid software is expected to increase in the future. Therefore, continued development and support of Grid software is very important to the NP science community. Another key finding is that scientific productivity is greatly enhanced by easy researcher-local access to instrument data. This is driving the creation of distributed repositories for instrument data at collaborating institutions, along with a corresponding increase in demand for network-based data transfers and the tools to manage those transfers effectively. Network reliability is also becoming more important as there is often a narrow window between data collection and data archiving when transfer and analysis can be done. The instruments do not stop producing data, so extended network outages can result in data loss due to analysis pipeline stalls. Finally, as the scope of collaboration continues to increase, collaboration tools such as audio and video conferencing are becoming ever more critical to the productivity of scientific collaborations.

97 MATHEMATICS AND COMPUTING↗

Progress on the FabrIc for Frontier Experiments project at Fermilab

The FabrIc for Frontier Experiments (FIFE) project is an ambitious, major-impact initiative within the Fermilab Scientific Computing Division designed to lead the computing model for Fermilab experiments. FIFE is a collaborative effort between experimenters and computing professionals to design and develop integrated computing models for experiments of varying needs and infrastructure. The major focus of the FIFE project is the development, deployment, and integration of Open Science Grid solutions for high throughput computing, data management, database access and collaboration within experiment. To accomplish this goal, FIFE has developed workflows that utilize Open Science Grid sites along with dedicated and commercial cloud resources. The FIFE project has made significant progress integrating into experiment computing operations several services including new job submission services, software and reference data distribution through CVMFS repositories, flexible data transfer client, and access to opportunistic resources on the Open Science Grid. Hence, the progress with current experiments and plans for expansion with additional projects will be discussed. FIFE has taken a leading role in the definition of the computing model for Fermilab experiments, aided in the design of computing for experiments beyond Fermilab, and will continue to define the future direction of high throughput computing for future physics experiments worldwide

97 MATHEMATICS AND COMPUTING↗

Data Request for the Distribution Grid Atlas

Model-based, distribution powerflow analysis is a foundational component of system planning and grid modernization efforts, but data security is an impediment to collaboration among utility engineers, researchers, developers, community members, and other stakeholders. Pacific Northwest National Laboratory (PNNL) and the National Renewable Energy Laboratory (NREL) are partnering to develop the new Distribution Grid Atlas - a publicly available catalog of realistic, geographically relevant, representative distribution feeder models without sensitive geographic information, customer data, or disclosure of utility models. We are looking for utilities to share data for the Distribution Grid Atlas.

distribution↗