Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “building block assembly”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

Service Life Extension of the ISS Propulsion System Elements

The International Space Station (ISS) is a result of international collaboration in building a sophisticated laboratory of an unprecedented scale in Low Earth Orbit. After a complex assembly sequence spanning over a decade, some of the early modules launched at the beginning of the program would reach the end of their certified lives, while the newer modules were just being commissioned into operation. To maximize the return on global investments in this one-of-a-kind orbiting platform that was initially conceived for a service life until 2016, it is essential for the cutting edge research on ISS to continue as long as the station can be sustained safely in orbit. ISS Program is assessing individual modules in detail to extend the service life of the ISS to 2024, and possibly to 2028. Without life extension, Functional Cargo Block (known by its Russian acronym as FGB) and the Service Module (SM), two of the early modules on the Russian Segment, would reach the end of their certified lives in 2013 and 2015 respectively. Both FGB and SM are critical for the propulsive function of the ISS. This paper describes the approach used for the service life extension of the FGB propulsion system. Also presented is an overview of the system description along with the process adopted for developing the life test plans based on considerations of system failure modes, fault tolerance and safety provisions. Tests and analyses performed, important findings and life estimates are summarized. Based on the life extension data, FGB propulsion system, in general, is considered ready for a service life until 2028.

Kamath, Ulhas↗

Design Visualization Internship Overview

This is a report documenting the details of my work as a NASA KSC intern for the Summer Session from June 2nd to August 8th, 2014. This work was conducted within the Design Visualization Group, a Contractor staffed organization within the C1 division of the IT Directorate. The principle responsibilities of the KSC Design Visualization Group are the production of 3D simulations of NASA equipment and facilities for the purpose of planning complex operations such as hardware transportation and vehicle assembly. My role as an intern focused on aiding engineers in using 3D scanning equipment to obtain as-built measurements of NASA facilities, as well as using CATIA and DELMIA to process this data. My primary goals for this internship focused on expanding my CAD knowledge and capabilities, while also learning more about technologies I was previously unfamiliar with, such as 3D scanning. An additional goal of mine was to learn more about how NASA operates, and how the U.S. Space Program operates on a day-to-day basis. This opportunity provided me with a front-row seat to the daily maneuvers and operations of KSC and NASA as a whole. Each work day, I was able to witness, and even take part of, a small building block of the future systems that will take astronauts to other worlds. After my experiences this summer, not only can I say that my goals have been met, but also that this experience has been the highlight of my experience in higher education.

Telescience↗

Characterizing Material Scalability for Ultralight Lattice Design

Stiff yet ultra-light lattice structures constructed using digital materials have many practical applications as the building block for aircraft and other structures. By furthering our understanding of how material configuration affects the structural properties of an ultralight lattice, we can intelligently design these structures based on their intended function. Here we compare the behavior of ultralight lattice structures when fabricated by different materials. The individual unit cells of the lattice structures are referred to as voxels. The stiffness, elastic modulus, and yield strength of the specimens in compression and tension are determined through mechanical testing. Specimens are tested both as single voxel as well as 4x4x4 voxel constructions on an Instron 5982 Universal Testing System until failure. Each voxel is manufactured in bulk through injection molding, with a unit cell pitch of 76.2 mm. Individual voxels are fastened with machine screws and nuts to create assemblies. Four separate materials are used as voxel compositions in this experiment. These include a homogeneous polymer referred to as Ultem 1000, a glass-fiber reinforced polymer referred to as Ultem 2200, a polymer with chopped carbon fibers as 30% of its fill, and homogenous polypropylene. This work compares mechanical behavior, as well as the convergence behavior of the lattice as the size of the lattice assembly increases for various materials. The goal of this study is to characterize the behavior of homogenous lattices such that heterogenous lattices can be designed with different material voxels to achieve target material properties for ultralight space applications.

Sajjadi, Afsheen↗

Measurement of satellite PCS fading using GPS

A six-channel commercial GPS receiver with a custom-made 40 deg tilted, rotating antenna has been assembled to make fade measurements for personal satellite communications. The system can measure up to two times per minute fades of up to 15 dB in the direction of each tracked satellite from 10 to 90 deg elevation. Photographic fisheye lens images were used to categorize the fade data obtained in several test locations according to fade states of clear, shadowed, or blocked. Multipath effects in the form of annular rings can be observed when most of the sky is clear. Tree fading by a Pecan exceeding 3.5 dB and 12 dB at 50 to 10 percent probability, respectively, compared with median fades of 7.5 dB measured earlier and the discrepancy is attributed to the change in ratio when measuring over an area as opposed to along a line. Data acquired inside buildings revealed 'rf-leaky' ceilings. Satellite diversity gain in a shadowed environment exceeded 6 dB at the 10 percent probability.

Vogel, Wolfhard J.↗

Advanced Manufacturing of the SLS Block 1B Payload Adapter: Engineering Development Unit

The Payload Adapter (PLA) for the Space Launch System Block 1B configuration (SLS B1B) is a structural frustum that interfaces with the Exploration Upper Stage (EUS) and the Universal Stage Adapter (USA) or the cargo fairing at the aft end and interfaces with the primary or co-manifested payload at the forward end. The primary structure is composed of a single piece aluminum forward ring, a segmented aluminum aft ring, eight carbon composite sandwich panels, and composite bonded longitudinal joints. The PLA is designed and fabricated in-house at MSFC. Development and flight article builds are joint efforts between the Materials & Processes Laboratory (EM), the Spacecraft & Vehicle Systems Department (EV), the Space Systems Department (ES), and the Test Laboratory (ET). The large-scale manufacturing efforts associated with this task include the fabrication of pathfinder panels; the fabrication and assembly of a full-scale Manufacturing Demonstration Article (MDA); the fabrication, assembly, and test of an Engineering Demonstration Unit (EDU); the fabrication, assembly, and test of a qualification Article; and the fabrication, assembly, and proof test of subsequent flight articles. The PLA team recently completed assembly of the EDU. The final assembly included the instillation of the co-manifested secondary payload, NEST, and the instillation and tensioning of the Payload Separation System (PSS). This poster will detail the assembly process which includes: (1) composite panel to ring assembly, (2) adhesive bonding for the longitudinal joints, and (3) instillation of the NEST and PSS. The PLA EDU is prepared to undergo modal and static load testing.

Monique Wallace↗

NASA's Space Launch System: Unprecedented Payload Capabilities

As NASA turns 60 and plans to transition the International Space Station (ISS) and other low-Earth orbit (LEO) activities to commercial enterprises, the Agency's human exploration program turns its focus to deep space. With missions planned to send astronauts back to the Moon and to construct a lunar orbiting Gateway for surface access as well as science experiments and technology demonstrations, NASA requires a vehicle with capabilities for launching more mass and volume than is currently commercially available. To that end, NASA and its private sector partners are building the Space Launch System (SLS) super heavy-lift launch vehicle, which will send the new Orion crew capsule, eventually with a complement of four astronauts, to cislunar space for the first time since the Apollo Program in the 1960s and 1970s. NASA Kennedy Space Center's (KSC's) Exploration Ground Systems (EGS) Program has upgraded and refurbished ground and launch facilities to process, assemble and launch NASA's new deep space exploration system, which is managed by the Exploration Systems Development (ESD) organization in the Human Exploration and Operations Mission Directorate (HEOMD). Offering an unmatched combination of power, payload capacity and departure energy, the evolvable SLS features the world's most proven propulsion system: solid rocket boosters and RS-25 main engines with a modified Delta Cryogenic Second Stage (DCSS) cryogenic upper stage. The initial SLS configuration, Block 1, will deliver at least 26 metric tons (t) to trans-lunar injection (TLI). The second variant, Block 1B, will deliver at least 34 t to TLI in its crew configuration and at least 40 t to TLI in its cargo configuration. The Block 1 cargo vehicle will fly with an industry-standard 5 m fairing while the Block 1B cargo configuration will accommodate 8 m-diameter fairings in varying lengths. The Block 2 vehicle will incorporate upgraded boosters and possibly larger fairings for launching Mars-class payloads to deep space. Although designed to enable human exploration of deep space, the vehicle also provides game-changing benefits for large science payloads and even harnesses excess capacity to provide small satellites with access to deep space. Three flights of the Block 1 vehicle are now planned; the first vehicle, being built for a test flight known as Exploration Mission-1 (EM-1), is nearing completion at NASA and contractor sites across the United States. In fact, hardware for the second mission has also been built. This paper will provide an overview of the SLS vehicle, with a focus on its payload accommodations and the missions enabled by the unprecedented payload volume and departure energy of SLS. This paper also describes the status of the manufacturing and integration for first flight and beyond.

Exploration Mission-1↗

Flight Software Dictionary Development for the Mars2020 Rover

The Mars2020 project, developed and operated by the Jet Propulsion Laboratory (JPL), successfully landed the Perseverance rover and its flying companion Ingenuity on the surface of Mars on February 18th 2021. Perseverance combines heritage and cutting-edge flight software and hardware to accomplish crucial mission requirements related to Martian surface sampling. The design, development, and operation of NASA’s large strategic science missions require the ability to communicate spacecraft capabilities to hundreds of engineers across multiple disciplines. The interaction between flight and ground software development, Verification and Validation (V&V), Assembly, Test, and Launch Operations (ATLO), and management each demand quick understanding of unique slices of information for each discipline. This information includes the current capabilities of the flight system as well as future capabilities and their status as they are developed and tested. Despite the fundamental and critical nature of this information, the flight software dictionaries used to track it are a stumbling block for many projects. These dictionaries provide the cornerstone for the interpretation of data sent from the spacecraft, allowing for quick comprehension by engineers on the ground. During both spacecraft development and operations, flight software dictionary management includes significant challenges due to the large number of interfacing systems and the subtle yet distinct needs of each.The engineering of flight software dictionaries for Mars2020 had numerous challenges, most-notably: parallel dictionary development to support simultaneous separate flight software build campaigns for each mission phase (cruise and surface), managing requests for operations-enabling information without perturbing the heritage interface with the rover, and the introduction of new tools by the dictionary stakeholders that forced the dictionary team to innovate and redesign the heritage tool chain. These challenges generated guiding principles for the dictionary development effort: emphasize coding best practices and unit testing in the dictionary code development tool chain, use institutionally provided COTS (commercial-off-the-shelf) tools whenever possible, and maintain the heritage flight-ground interface all while advancing operations-enabling information via a loosely coupled interface.Throughout development and operations, the Mars2020 dictionary toolchain included IBM DOORS Next Generation, GitHub, Microsoft Excel, Docker, Jenkins, and a significant custom-built Python codebase. Significant interfaces included JPL’s command and control software, heritage flight software team tools and processes, and the many cloud-based ground tools developed for the mission.This paper will discuss the requirements for the Mars2020 dictionary development, the development team’s response to those requirements, lessons learned throughout the process, steps taken towards automated deliveries and continuous integration of stakeholder inputs, potential toolchain improvements for Mars2020, and key takeaways that could be applied to future missions.

Pyrzak, Guy↗

Test Plan. GCPS Task 4, subtask 4.2 thrust structure development

The Single Stage To Orbit (SSTO) vehicle is designed to lift off from a vertical position, go into orbit, return to earth for a horizontal landing, and be reusable for the next mission. (NASA baseline only) In order to meet its performance goals, the SSTO relies on light weight structure and the use of 8 tri-propellant engines. These engines are mounted to the thrust structure. This test plan addresses selection of the material for this structure, and the integrity of the design through testing of elements and a full-scale subcomponent. This test plan supports the development of the design for an advanced composite thrust structure for a Single Stage to Orbit manned, heavy launch vehicle. The thrust structure is designed to transmit very high thrust loads from the engines to the rest of the vehicle (see Figure 1 ). The thrust structure will also be used for primary attachment of the twin vertical tails and possibly act as the aft attach point for the wing. The combination of high loading, high vibration, long service life and high acoustic environments will need to be evaluated by tests. To minimize design risk, a building block approach will be used. We will first screen materials to determine which materials show the most promise for this application. Factors in this screening will be the suitability of these materials for chosen design concepts, particularly concerning specific strength, environmental compatibility and applicability to fabrication processes. Next we will characterize two material systems that will be used in the design; the characterization will allow us to generate preliminary design data that will be used for the analysis. Element testing will be performed to evaluate critical structural locations under load. Final testing on the full scale test article will be performed to verify the design and to demonstrate predictability of the analysis. Additionally, risks associated with fabricating full scale thrust structures will be reduced through testing activities. One of the major concerns that stems from full scale fabrication is the realities of size and the associated complexities of handling, manufacturing, and assembly. The need exists to fabricate, assemble and test_representative joint specimens to achieve_confidence in the design and manufacturing technologies being proposed.

Greenberg, H. S.↗

Cryotank Skin/Stringer Bondline Analysis

The need for light weight structure for advanced launch systems have presented great challenges and led to the usage of composites materials in a variety of structural assemblies where joining of two or more components is imperative. Although joints can be mechanically bolted, adhesive bonding has always been a very desirable method for joining the composite components, particularly for the cryotank systems, to achieve maximum structural efficiency. This paper presents the analytical approach resulted from the conceptual development of the DC-Y composite cryotank, conducted under the NASA/Boeing NRA 8-12 Partnership, to support the continued progress of SSTO (Single-Stage-To-Orbit) concepts. One of the critical areas of design was identified as the bonded interface between the skin (tank wall) and stringer. The approach to analyze this critical area will be illustrated through the steps which were used to evaluate the structural integrity of the bondline. Detailed finite element models were developed and numerous coupon test data were also gathered as part of the approach. Future plan is to incorporate this approach as a building block in analyzing bondline for the cryotank systems of RLVs (Reusable Launch Vehicles).

Nguyen, Bao↗

Structural evaluation of curved stiffened composite panels fabricated using a THERM-Xsm process

The use of composites in aircraft structures is often limited by material and manufacturing costs which, for some designs and applications, are prohibitively high. To increase the frequency of application of composites in primary airframe components alternative manufacturing processes are sought that reduce cost and/or enhance structural efficiency. One alternative process involves the use of THERM-Xsm as the pressure transfer medium during autoclave curing. THERM-Xsm, a silicon-based flow able polymer which behaves like a liquid under autoclave presssure, transmits quasi-hydrostatic pressure to all contacting surfaces of the part to be cured. Once the autoclave pressure is relieved, THERM-Xsm reverts back to the powdery solid state and can be reused many times. The THERM-Xsm process to be evaluated is depicted and consists of (1) enclosing the tool and part to be cured by a set of frames that create a box, (2) pouring THERM-Xsm powder onto the part and filling the box, and (3) placing a vacuum bag over the box assembly. In this program, a separating non-porous film (Teflon) was placed between the part to be cured and THERM-Xsm powder to avoid any contamination. The use of THERM-Xsm has two significant advantages over conventional manufacturing procedures. First, it eliminates complicated hard tooling since it guarantees uniform pressure transfer and thus, good compaction at complex structural details (such as frame-stiffener intersections and corners). Second, it greatly simplifies vacuum bagging, since once the part to be cured is covered by THERM-Xsm powder, the vacuum bag need only conform to a relatively flat shape reducing significantly the number of pleats required. A program is on-going at Sikorsky Aircraft to evaluate the structural performance of complex composite fuselage structures made with this THERM-Xsm process and to quantify the impact of THERM-Xsm on manufacturing labor hours and cost. The program involves fuselage panel optimization analysis, a building block test program where structural details representative of the full-scale article are analyzed and tested, and static and fatigue test/analysis of the full-scale test articles. The main results of this program are reported.

Kassapoglou, Christos↗

NASA's Space Launch System Program Update

Hardware and software for the world's most powerful launch vehicle for exploration is being welded, assembled, and tested today in high bays, clean rooms and test stands across the United States. NASA's Space Launch System (SLS) continued to make significant progress in 2014 with more planned for 2015, including firing tests of both main propulsion elements and the program Critical Design Review (CDR). Developed with the goals of safety, affordability, and sustainability, SLS will still deliver unmatched capability for human and robotic exploration. The initial Block 1 configuration will deliver more than 70 metric tons of payload to low Earth orbit (LEO). The evolved Block 2 design will deliver some 130 metric tons to LEO. Both designs offer enormous opportunity and flexibility for larger payloads, simplifying payload design as well as ground and on-orbit operations, shortening interplanetary transit times, and decreasing overall mission risk. Over the past year, every vehicle element has manufactured or tested hardware. An RS-25 liquid propellant engine was hotfire-tested at NASA's Stennis Space Center, Miss. for the first time since 2009 exercising and validating the new engine controller, the renovated A-1 test stand, and the test teams. Four RS-25s will power the SLS core stage. A qualification five-segment solid rocket motor incorporating several design, material, and process changes was scheduled to be test-fired in March at the prime contractor's facility in Utah. The booster also successfully completed its Critical Design Review (CDR) validating the planned design. All six major manufacturing tools for the core stage are in place at the Michoud Assembly Facility in Louisiana, and have been used to build numerous pieces of confidence, qualification, and even flight hardware, including barrel sections, domes and rings used to assemble the world's largest rocket stage. SLS Systems Engineering accomplished several key tasks including vehicle avionics software and hardware build and testing, scale model acoustic and base heating tests. Construction of the Interim Cryogenic Propulsion Stage (ICPS) began. Advanced development provided a look into the future of SLS. Shell buckling knockdown factor testing refined decades-old design margins that added thousands of pounds to rocket payloads. Adaptive manufacturing and structured light scanning development promised to cut the cost and time associated with manufacturing and testing. This paper will provide an overview of the progress made over the past year and provide a glimpse of 2015 milestones and beyond on the way to the first launch in 2018.

May, Todd↗

NASA's Space Launch System Program Update

Hardware and software for the world's most powerful launch vehicle for exploration is being welded, assembled, and tested today in high bays, clean rooms and test stands across the United States. NASA's Space Launch System (SLS) continued to make significant progress in 2014 with more planned for 2015, including firing tests of both main propulsion elements and the program Critical Design Review (CDR). Developed with the goals of safety, affordability, and sustainability, SLS will still deliver unmatched capability for human and robotic exploration. The initial Block 1 configuration will deliver more than 70 metric tons of payload to low Earth orbit (LEO). The evolved Block 2 design will deliver some 130 metric tons to LEO. Both designs offer enormous opportunity and flexibility for larger payloads, simplifying payload design as well as ground and on-orbit operations, shortening interplanetary transit times, and decreasing overall mission risk. Over the past year, every vehicle element has manufactured or tested hardware. An RS-25 liquid propellant engine was hotfire-tested at NASA's Stennis Space Center, Miss. for the first time since 2009 exercising and validating the new engine controller, the renovated A-1 test stand, and the test teams. Four RS-25s will power the SLS core stage. A qualification five-segment solid rocket motor incorporating several design, material, and process changes was scheduled to be test-fired in March at the prime contractor's facility in Utah. The booster also successfully completed its Critical Design Review (CDR) validating the planned design. All six major manufacturing tools for the core stage are in place at the Michoud Assembly Facility in Louisiana, and have been used to build numerous pieces of confidence, qualification, and even flight hardware, including barrel sections, domes and rings used to assemble the world's largest rocket stage. SLS Systems Engineering accomplished several key tasks including vehicle avionics software and hardware build and testing, scale model acoustic and base heating tests. Construction of the Interim Cryogenic Propulsion Stage (ICPS) began. Advanced development provided a look into the future of SLS. Shell buckling knockdown factor testing refined decades-old design margins that added thousands of pounds to rocket payloads. Adaptive manufacturing and structured light scanning development promised to cut the cost and time associated with manufacturing and testing. This paper will provide an overview of the progress made over the past year and provide a glimpse of 2015 milestones and beyond on the way to the first launch in 2018.

May, Todd↗

Trends in lignin modification: a comprehensive analysis of the effects of genetic manipulations/mutations on lignification and vascular integrity

A comprehensive assessment of lignin configuration in transgenic and mutant plants is long overdue. This review thus undertook the systematic analysis of trends manifested through genetic and mutational manipulations of the various steps associated with monolignol biosynthesis; this included consideration of the downstream effects on organized lignin assembly in the various cell types, on vascular function/integrity, and on plant growth and development. As previously noted for dirigent protein (homologs), distinct and sophisticated monolignol forming metabolic networks were operative in various cell types, tissues and organs, and form the cell-specific guaiacyl (G) and guaiacyl-syringyl (G-S) enriched lignin biopolymers, respectively. Regardless of cell type undergoing lignification, carbon allocation to the different monolignol pools is apparently determined by a combination of phenylalanine availability and cinnamate-4-hydroxylase/"p-coumarate-3-hydroxylase" (C4H/C3H) activities, as revealed by transcriptional and metabolic profiling. Downregulation of either phenylalanine ammonia lyase or cinnamate-4-hydroxylase thus predictably results in reduced lignin levels and impaired vascular integrity, as well as affecting related (phenylpropanoid-dependent) metabolism. Depletion of C3H activity also results in reduced lignin deposition, albeit with the latter being derived only from hydroxyphenyl (H) units, due to both the guaiacyl (G) and syringyl (S) pathways being blocked. Apparently the cells affected are unable to compensate for reduced G/S levels by increasing the amounts of H-components. The downstream metabolic networks for G-lignin enriched formation in both angiosperms and gymnosperms utilize specific cinnamoyl CoA O-methyltransferase (CCOMT), 4-coumarate:CoA ligase (4CL), cinnamoyl CoA reductase (CCR) and cinnamyl alcohol dehydrogenase (CAD) isoforms: however, these steps neither affect carbon allocation nor H/G designations, this being determined by C4H/C3H activities. Such enzymes thus fulfill subsidiary processing roles, with all (except CCOMT) apparently being bifunctional for both H and G substrates. Their severe downregulation does, however, predictably result in impaired monolignol biosynthesis, reduced lignin deposition/vascular integrity, (upstream) metabolite build-up and/or shunt pathway metabolism. There was no evidence for an alternative acid/ester O-methyltransferase (AEOMT) being involved in lignin biosynthesis.The G/S lignin pathway networks are operative in specific cell types in angiosperms and employ two additional biosynthetic steps to afford the corresponding S components, i.e. through introduction of an hydroxyl group at C-5 and its subsequent O-methylation. [These enzymes were originally classified as ferulate-5-hydroxylase (F5H) and caffeate O-methyltransferase (COMT), respectively.] As before, neither step has apparently any role in carbon allocation to the pathway; hence their individual downregulation/manipulation, respectively, gives either a G enriched lignin or formation of the well-known S-deficient bm3 "lignin" mutant, with cell walls of impaired vascular integrity. In the latter case, COMT downregulation/mutation apparently results in utilization of the isoelectronic 5-hydroxyconiferyl alcohol species albeit in an unsuccessful attempt to form G-S lignin proper. However, there is apparently no effect on overall G content, thereby indicating that deposition of both G and S moieties in the G/S lignin forming cells are kept spatially, and presumably temporally, fully separate. Downregulation/mutation of further downstream steps in the G/S network [i.e. utilizing 4CL, CCR and CAD isoforms] gives predictable effects in terms of their subsidiary processing roles: while severe downregulation of 4CL gave phenotypes with impaired vascular integrity due to reduced monolignol supply, there was no evidence in support of increased growth and/or enhanced cellulose biosynthesis. CCR and CAD downregulation/mutations also established that a depletion in monolignol supply reduced both lignin contents supply reduced both lignin contents and vascular integrity, with a concomitant shift towards (upstream) metabolite build-up and/or shunting.The extraordinary claims of involvement of surrogate monomers (2-methoxybenzaldehyde, feruloyl tyramine, vanillic acid, etc.) in lignification were fully disproven and put to rest, with the investigators themselves having largely retracted former claims. Furthermore analysis of the well-known bm1 mutation, a presumed CAD disrupted system, apparently revealed that both G and S lignin components were reduced. This seems to imply that there is no monolignol specific dehydrogenase, such as the recently described sinapyl alcohol dehydrogenase (SAD) for sinapyl alcohol formation. Nevertheless, different CAD isoforms of differing homology seem to be operative in different lignifying cell types, thereby giving the G-enriched and G/S-enriched lignin biopolymers, respectively. For the G-lignin forming network, however, the CAD isoform is apparently catalytically less efficient with all three monolignols than that additionally associated with the corresponding G/S lignin forming network(s), which can more efficiently use all three monolignols. However, since CAD does not determine either H, G, or S designation, it again serves in a subsidiary role-albeit using different isoforms for different cell wall developmental and cell wall type responses.The results from this analysis contrasts further with speculations of some early investigators, who had viewed lignin assembly as resulting from non-specific oxidative coupling of monolignols and subsequent random polymerization. At that time, though, the study of the complex biological (biochemical) process of lignin assembly had begun without any of the (bio)chemical tools to either address or answer the questions posed as to how its formation might actually occur. Today, by contrast, there is growing recognition of both sophisticated and differential control of monolignol biosynthetic networks in different cell types, which serve to underscore the fact that complexity of assembly need not be confused any further with random formation. Moreover, this analysis revealed another factor which continues to cloud interpretations of lignin downregulation/mutational analyses, namely the serious technical problems associated with all aspects of lignin characterization, whether for lignin quantification, isolation of lignin-enriched preparations and/or in determining monomeric compositions. For example, in the latter analyses, some 50-90% of the lignin components still cannot be detected using current methodologies, e.g. by thioacidolysis cleavage and nitrobenzene oxidative cleavage. This deficiency in lignin characterization thus represents one of the major hurdles remaining in delineating how lignin assembly (in distinct cell types) and their configuration actually occurs.

Review, Academic↗

Thermal Protection Systems Technology Transfer from Apollo and Space Shuttle to the Orion Program

This paper describes how the Orion program is utilizing the Thermal Protection System (TPS) experience from the Apollo and Space Shuttle programs to reduce program risk and improve affordability to meet NASA's future manned exploration missions. The Orion program successfully completed the Exploration Flight Test (EFT-1) mission in 2014 and is currently assembling, integrating, and testing the next spacecraft for the Exploration Mission (EM-1) to meet the flight test objectives of an unmanned orbital mission to the moon and return to earth in 2019. The Orion spacecraft production operations are located in the Neil Armstrong Operations and Checkout (O&C) facility at the Kennedy Space Center (KSC) providing an affordable and seamless delivery approach of vehicles directly to the launch site eliminating spacecraft transportation and additional checkout testing. Innovative vehicle design, manufacturing and test operations approaches are maturing and evolving with each Orion vehicle build to support the challenging NASA exploration mission requirements beyond Low Earth Orbit (LEO) while reducing program cost and schedule impacts. An example of Orion's evolution is the incorporation of an improved heat shield design, assembly and testing approach to meet the higher re-entry velocities for a lunar return for the EM-1 mission. The EFT- 1 heat shield was based on the Apollo heat shield manufacturing processes and was assembled at a supplier location and then transported to KSC for final integration. The EM-1 heat shield is now manufactured, assembled, tested, and installed into the spacecraft at the O&C facility reducing program cost and production schedules. The transition of the Space Shuttle TPS capabilities has enabled Orion to provide a human rated capsule design using proven materials and processes established over years of orbiter re-entry missions. The Orion Crew Module (CM) TPS configuration is derived from the Apollo CM approach utilizing improved materials and processes developed from the Space Shuttle program. The Orion EFT-1 heat shield utilized the Avcoat ablative material from Apollo which was injected into a honeycomb substrate and has been updated for EM-1 incorporating a block configuration bonded to a composite shell structure. This approach utilizes the proven Avcoat material for the heat shield ablator and is utilizing derived bonding and inspection methods and techniques from the Space Shuttle tile experience. The Orion back shell TPS configuration is based on Space Shuttle tile designs using proven tile materials and coatings. The Orion forward bay cover utilizes the high temperature tiles similar to the back shell tiles and low temperature blankets derived from the Space Shuttle program reducing weight impacts. Space Shuttle Multi-Layer Insulation (MLI) is installed in the Orion capsule to control the interior temperature environment providing a light weight design. These TPS design approaches have performed successfully on the Orion first flight test on EFT-1 and are incorporated in the configuration for the next flight test for EM-1. Completion of these two flight tests will certify the TPS for the Orion program for human rated exploration missions and has reduced the development cost to the Orion program. In addition to transitioning the Space Shuttle TPS design configurations to Orion, the supporting manufacturing infrastructure, manufacturing processes, and inspection methods are also incorporated into the Orion assembly operations at KSC. This has avoided significant startup schedule and costs impacts of new capabilities and development of support operations necessary to fabricate, install, inspect, and validate the TPS installations for the Orion spacecraft. The Thermal Protection System Facility (TPSF) which supported the Space Shuttle program provides the heat shield Avcoat blocks and the back shell AETB-8 tiles for Orion program. Extending the existing Space Shuttle TPS operations at KSC provides onsite support to the Orion spacecraft assembly operations. A significant benefit to the Orion program is the transition of the Space Shuttle technician work force at KSC. This highly skilled workforce was able to transition to the Orion program and immediately support the TPS installation operations. They brought with them the human rated manufacturing and assembly operations culture that was critical to the Space Shuttle success avoiding the retraining cost and schedule impacts of a new workforce to Orion. The technician skills certification program from the Space Shuttle was found to be compatible with the Lockheed Martin technician certification programs enabling a seamless training process utilizing process similarity avoiding the cost of retraining the work force to Orion standards. The existing workforce is certificated for multiple processes enabling reassignment of technicians to other tasks in the Orion AI&P operations reducing the overall touch labor manpower requirements. Additional benefits of using the Space Shuttle workforce is the incorporation of the lessons learned from Space Shuttle processes to improve the Orion TPS processes. This has resulted in a continuous evolution of TPS processes to improve the producibility and reduce the program cost for the TPS for the Orion program. Transitioning the Apollo and Space Shuttle TPS designs, processes, and technician workforce has been instrumental in enabling Orion to successfully meet the program challenges for NASA's exploration missions of the future.

Stewart, Michael↗

The International Space Station: Unique In-Space Testbed as Exploration Analog

Final assembly of the International Space Station (ISS) was completed in 2011. As articulated in the 2011 NASA Strategic Plan, the Agency's first goal is to extend and sustain human activities across the solar system. Thus, the emerging NASA vision is to launch a bold and ambitious new space initiative to enable human space exploration beyond low-Earth orbit to Lagrange points, the moon, near-Earth asteroids (NEAs), and Mars and its environs. To accomplish this vision, it is necessary to develop and validate innovative exploration technologies and operational concepts. With the extended life of the ISS to 2020 and possibly 2028, NASA has a mandate to maximize the potential of the Nation's newest National Laboratory. Exploration and ISS teams within NASA's Human Exploration and Operations Mission Directorate (HEOMD) have initiated a cooperative effort: the ISS Testbed for Analog Research (ISTAR), a high-fidelity operational analog that complements existing NASA terrestrial laboratory and field testing. To maximize use of the ISS platform to evaluate new exploration technologies, capabilities, and operational concepts to better comprehend and mitigate human spaceflight risks, ISTAR seeks out and encourages investigations dubbed "exploration detailed test objectives" (xDTOs). These xDTOs, building blocks of ISTAR missions, develop and optimize the operations concepts and the use of new technologies that should reduce risks and challenges facing astronauts on long exploration spaceflight voyages. In this paper, we describe (1) the rationale behind ISTAR, (2) a five-year strategic plan, (3) the approach for mission formulation, development, integration, and execution, (4) concepts for near-term missions that implement a phased approach for using ISS as an exploration testbed, and (5) the planned Mars mission simulation using the ISS. This paper will also document several challenges ISTAR must address to execute its missions.

Analog Mission↗

NASA’s Space Launch System Stands Ready on Doorstep of Maiden Voyage Launch and Progress Made to Future Missions

NASA and its partners made significant progress towards the Artemis I launch in 2022. The integrated Space Launch System (SLS)vehicleand Orion spacecraft were first rolled out of the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center (KSC) in March. SLS is a super heavy-lift vehicle to send large, strategic payloads to the Moon, Mars, and beyond. It isthebackbone of the Artemis human lunar exploration program. Rollout transported the vehicle to Launch Pad 39B for a series of tests, including the wet dress rehearsal (WDR). Multiple attempts were required to complete WDR, each building on the one before. Following the WDR campaign, NASA teams refined hardware and launch procedures, and the vehicle was prepared for its first launch attempt scheduled for August 29. Challenges with the weather and hardware resulted in a scrub on the 29th, and the second attempt was set for Sept. 3. A hydrogen leak on the tail service mast umbilical forced a scrub. NASA teams completed repairs and testing on the vehicle on Launch Pad 39B to preserve a launch attempt at the end of September. Managers chose to return the vehicle to the VAB to protect it fromthe threat of Hurricane Ian. Within the VAB, NASA further inspected and prepared SLS for selected November windows. In addition to progress to the Artemis I mission, significant progress was made on the Artemis II and Artemis III rockets. Progress was also made towards on the Block 1B and Block 2 variants, beginning on the fourth and ninth flight, respectively. Both variants will provide significant improvements in both launch mass and mission flexibility to multiple destinations. This paper will discuss Artemis I vehicle integration, testing, and available results from the launch campaign to date.

Bruce Askins↗

Semi-Automated Diagnosis, Repair, and Rework of Spacecraft Electronics

NASA's Constellation Program for Exploration of the Moon and Mars places human crews in extreme isolation in resource scarce environments. Near Earth, the discontinuation of Space Shuttle flights after 2010 will alter the up- and down-mass capacity for the International Space Station (ISS). NASA is considering new options for logistics support strategies for future missions. Aerospace systems are often composed of replaceable modular blocks that minimize the need for complex service operations in the field. Such a strategy however, implies a robust and responsive logistics infrastructure with relatively low transportation costs. The modular Orbital Replacement Units (ORU) used for ISS requires relatively large blocks of replacement hardware even though the actual failed component may really be three orders of magnitude smaller. The ability to perform in-situ repair of electronics circuits at the component level can dramatically reduce the scale of spares and related logistics cost. This ability also reduces mission risk, increases crew independence and improves the overall supportability of the program. The Component-Level Electronics Assembly Repair (CLEAR) task under the NASA Supportability program was established to demonstrate the practicality of repair by first investigating widely used soldering materials and processes (M&P) performed by modest manual means. The work will result in program guidelines for performing manual repairs along with design guidance for circuit reparability. The next phase of CLEAR recognizes that manual repair has its limitations and some highly integrated devices are extremely difficult to handle and demand semi-automated equipment. Further, electronics repairs require a broad range of diagnostic capability to isolate the faulty components. Finally repairs must pass functional tests to determine that the repairs are successful and the circuit can be returned to service. To prevent equipment demands from exceeding spacecraft volume capacity and skill demands from exceeding crew time and training limits, the CLEAR project is examining options provided by non-real time tele-operations, robotics, and a new generation of diagnostic equipment. This paper outlines a strategy to create an effective repair environment where, with the support of ground based engineers, crewmembers can diagnose, repair and test flight electronics in-situ. This paper also discusses the implications of successful tele-robotic repairs when expanded to rework and reconfiguration of used flight assets for building Constellation infrastructure elements.

Struk, Peter M.↗

James Webb Space Telescope: The First Light Machine

NASA James Webb Space Telescope (JWST) will search for the first luminous objects of the Universe to help answer fundamental questions about how the Universe came to look like it does today. At 6.5 meters in diameter, JWST will be the world's largest space telescope. Its architecture, e.g. aperture, wavelength range and operating temperature, is driven by JWST's science objectives. Introduction: Scheduled to start its 5 year mission after 2018, JWST will study the origin and evolution of galaxies, stars and planetary systems. Its science mission is to: Identify the first bright objects that formed in the early Universe, and follow the ionization history. Determine how galaxies form. Determine how galaxies and dark matter, including gas, stars, metals, overall morphology and active nuclei evolved to the present day. Observe the birth and early development of stars and the formation of planets. And, study the physical and chemical properties of solar systems for the building blocks of Life. Principle: To accomplish the JWST science objectives requires a larger aperture infrared cryogenic space telescope. A large aperture is required because the objects are very faint. The infrared spectral range is required because the objects are so far away that their ultraviolet and visible wavelength spectral lines are red-shifted into the infrared. Because the telescope is infrared, it needs to be cryogenic. And, because of the telescope is infrared, it must operate above the Earth's atmosphere, i.e. in space. JWST is probably the single most complicated mission that humanity has attempted. It is certainly the most difficult optical fabrication and testing challenge of our generation. The JWST 6.5 m diameter primary mirror is nearly a parabola with a conic constant of -0.9967 and radius of curvature at 30K of 15.880 m. The primary mirror is divided into 18 segments with 3 different prescriptions; each with its own off-axis distance and aspheric departure. The radius of curvature for all 18 segments must match to +/- 0.150 mm at 30K. JWST is diffraction limited at 2 micrometers which translates into a transmitted wavefront specification of 156 nm rms. Of that amount, 50 nm rms is allocated to the primary mirror. Each segment is allocated 22 nm rms surface error. At the start of the JWST program, the capability to make such a mirror did not exist. In 1996, NASA began a systematic and comprehensive mirror technology development effort which resulted in JWST. This program resulted in a qualified mirror fabrication process being approved in 2006. Today, all JWST primary mirror segments meet their requirements and are on schedule for a 2018 launch. The next step is system level assembly, integration and test. Ambient tests will be conducted at Goddard Space Flight Center and cryogenic system level testing will be performed in Chamber A at the Johnson Space Center.

Stahl, H. Philip↗