Summary of Analytical Results from Samples Supporting Tank Closure Cesium Removal (TCCR) Batch 3 and Modeling Results for Cs Loading on CST

Savannah River Remediation (SRR) is currently operating the Tank Closure Cesium Removal (TCCR) process to remove 137 Cs from tank waste supernate using an ion exchange process. As part of that process, Savannah River National Laboratory (SRNL) receives and analyzes samples in support of the qualification of each batch to be processed. SRNL recently received supernate samples retrieved from Tank 10H as well as in-tank batch contact samples for characterization in support of qualifying Batch 3 for processing through the TCCR unit. Some results from analysis of those samples have been previously reported. This report documents the remaining analyses of the in-tank batch contact samples as well as the results of ZAM (Zheng, Anthony, Miller) isotherm modeling performed for comparison to the measured results. Results of the additional analyses include analysis of the loading of other radionuclides besides 137 Cs on the crystalline silicotitanate (CST) contained within the in-tank batch contact test samples. Results from those analyses revealed the next highest contributor to the activity on the CST was 90 Sr with an average loading of 2.76E+08 dpm/g CST compared to 3.56E+10 dpm/g CST for the 137Cs. Isotopes of plutonium were also detected on the samples. ZAM modeling was performed using the measured composition of the Tank 10H Batch 3 qualification samples. The modeling predicted a maximum Cs loading approximately 2.2x higher than the measured result. This is a slightly lower ratio (expected/measured) compared to what was observed for the prior TCCR in-tank batch contact testing performed for Batches 1A and 2 where the ZAM results were 2.7-2.8x higher than the measured values.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

CST Batch Contact Equilibrium Testing of TCCR Tank 10H Batch 1 and 1A Waste Supernate Samples

The Tank Closure Cesium Removal (TCCR) system uses ion exchange columns filled with crystalline silicotitanate media to process radioactive waste solutions for the removal of Cs-137. TCCR currently focuses on dissolving Savannah River Site (SRS) Tank 10H waste (primarily sodium saltcake solids) within the tank followed by at-tank ion exchange column treatment. Equilibrium batch contact tests conducted in the SRNL Shielded Cells laboratory and associated analyses indicated that both the Tank 10H Batch 1 (pre-production) and 1A (production) waste supernates are unique solutions for which CST cesium removal performance is lower than predicted by ZAM modeling. Cesium distribution coefficients (K d ), percent removal, and CST loading data for the TCCR production supernate batch are provided in Table ES-1. ZAM-based cesium loading predictions are compared to the observed loading for the production batch in Figure ES-1, where significantly lower performance was observed than predicted by the model. Even lower cesium loading results (versus ZAM) were observed previously for the in-tank “teabag” batch contact samples.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Characterization and CST Batch Contact Equilibrium Testing of Aged TCCR Tank 10H Batch 1A and 2 Process Supernate Samples

The Tank Closure Cesium Removal (TCCR) system uses ion exchange columns filled with Crystalline Silicotitanate (CST) media to process radioactive waste solutions for the removal of Cs-137. TCCR currently focuses on dissolving Savannah River Site (SRS) Tank 10H waste (primarily sodium saltcake solids) within the tank followed by at-tank ion exchange column treatment. Previous equilibrium batch contact tests conducted in the SRNL Shielded Cells laboratory and associated analyses indicated that CST cesium removal performance was lower than predicted by ZAM modeling for TCCR Tank 10H Production Supernate Batch 1A. An average cesium distribution coefficient of 1,948 mL/g which corresponds to 94.1% Cs + removal was observed for Batch 1A supernate at 38 °C in January of 2019 using laboratory pretreated IONSIV™ R9120-B a CST from Lot #209900034 (predominant TCCR CST batch) at a phase ratio of 122 mL/g. This cesium loading was approximately 32% lower than model predictions, presumably due to ion exchange competition or fouling associated with alkaline earth or transition metals present in the solutions at low levels. The current testing was designed to: 1) evaluate whether supernate compositional changes during storage would result in improved cesium removal performance with CST, and 2) assist in media selection and handling protocols for future TCCR columns by evaluating several CST manufacturer batches as well as samples of one CST batch which had been pretreated using two different methods (field and laboratory methods).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Waste reduction and process improvements in the analysis of plutonium by x-ray fluorescence

Significant modifications were made to a sample preparation process for quantifying gallium in plutonium metal by wavelength dispersive X-ray fluorescence. These changes were made to minimize waste and improve process safety and efficiency. Sample sizes were reduced, cheaper sample preparation acids were used, and safety improvements were implemented. Using this modified process, results from analyzing a batch oftest samples indicated that relative precision and accuracy were {approx}0.2% and {approx}0.1% respectively, which is comparable to that obtained using the older, established sample preparation method.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Summary of Expedited Results from Samples Supporting Tank Closure Cesium Removal (TCCR) Batch 3

Savannah River Remediation (SRR) is currently operating the Tank Closure Cesium Removal (TCCR) process to remove 137 Cs from tank waste supernate using an ion exchange process. As part of that process, Savannah River National Laboratory (SRNL) receives and analyzes samples in support of the qualification of each batch to be processed. SRNL recently received supernate samples retrieved from Tank 10H as well as in-tank batch contact samples for characterization in support of qualifying Batch 3 for processing through the TCCR unit. SRNL received and characterized a set of dip samples collected from Tank 10H (one surface and one variable depth sample). No solids were observed in either sample and therefore the samples were combined, and a suite of analyses were performed on the composite sample. The density of the combined sample was 1.174 g/mL (0.18 %RSD), which was consistent with the measured sodium concentration of 3.54 M (0.08 %RSD). The 137Cs activity in the sample was 4.75E+07 dpm/mL (4.28 %RSD) and the total Cs concentration was calculated to be 1.54 mg/L (1.16E-05 M). The in-tank batch contact samples consist of 0.1 g of crystalline silicotitanate (CST) contained within a teabag device. Duplicate samples were submerged in Tank 10H supernate for a period of about 13 days, after which time they were retrieved and transferred to SRNL for analysis. At SRNL the CST was rinsed to remove excess salt solution and the CST was then air dried before being digested for analysis. Results of the analysis indicated a 137 Cs loading of 3.66E+10 ± 1.40E+09 dpm/g or 16.5 ± 0.63 Ci/kg CST . This value represents a bounding upper limit as it includes the addition of two sigma uncertainty from replicate analysis of the individual teabag samples as well as the addition of the small amount of 137 Cs activity measured in the rinse solutions. The above values are based on the air-dried mass of CST. Correcting to the true dry mass using a F-factor of 0.8191 results in a maximum loading of 20.2 ± 0.77 Ci/kg CST .

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Characterization of Tank 9H Salt Dissolution Batch 2B in Support of Tank Closure Cesium Removal (TCCR) 1A Batch 2 Preparations

Savannah River Mission Completion (SRMC) is currently preparing the second batch of material to be processed through the Tank Closure Cesium Removal (TCCR) 1A system. The feed for TCCR 1A consists of dissolved saltcake from Tank 9H. The second batch of salt to make up processing Batch 2 (Batch 2B) has recently been dissolved in Tank 9H and transferred to Tank 10H where it was composited with the first part of the batch (Batch 2A) in preparation for processing through the TCCR 1A unit. Savannah River National Laboratory (SRNL) received samples from the recent batch (2B) of dissolved salt for characterization. Two samples from Batch 2B were received for characterization, a surface sample and a variable depth sample (VDS). Neither sample contained significant solids, although the VDS appeared slightly cloudy as compared to the surface sample. The sodium concentrations of both the surface and VDS filtrate samples were approximately 5.8 M, and the 137 Cs activity was 9.8E+07 dpm/mL in the surface sample and 9.5E+07 dpm/mL in the VDS. The total Cs concentrations were 2.5 mg/L and 2.4 mg/L in the surface sample and VDS, respectively, using the gamma activity and the Cs isotopic ratios determined by ICP-MS. The alpha activity was below the detection limit in both samples. Nitrate was the dominant anion present, and the samples were primarily concentrated sodium nitrate solutions with hydroxide, nitrite, and carbonate present at 0.1 – 0.2 M. In general, the Batch 2B samples were more dilute than the previously characterized Batch 2A samples.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

SLUDGE WASHING AND DEMONSTRATION OF THE DWPF FLOWSHEET IN THE SRNL SHIELDED CELLS FOR SLUDGE BATCH 7A QUALIFICATION

Waste Solidification Engineering (WSE) has requested that characterization and a radioactive demonstration of the next batch of sludge slurry (Sludge Batch 7a*) be completed in the Shielded Cells Facility of the Savannah River National Laboratory (SRNL) via a Technical Task Request (TTR). This characterization and demonstration, or sludge batch qualification process, is required prior to transfer of the sludge from Tank 51 to the Defense Waste Processing Facility (DWPF) feed tank (Tank 40). The current WSE practice is to prepare sludge batches in Tank 51 by transferring sludge from other tanks. Discharges of nuclear materials from H Canyon are often added to Tank 51 during sludge batch preparation. The sludge is washed and transferred to Tank 40, the current DWPF feed tank. Prior to transfer of Tank 51 to Tank 40, SRNL simulates the Tank Farm and DWPF processes with a Tank 51 sample (referred to as the qualification sample). Sludge Batch 7a (SB7a) is composed of portions of Tanks 4, 7, and 12; the Sludge Batch 6 heel in Tank 51; and a plutonium stream from H Canyon. SRNL received the Tank 51 qualification sample (sample ID HTF-51-10-125) following sludge additions to Tank 51. This report documents: (1) The washing (addition of water to dilute the sludge supernate) and concentration (decanting of supernate) of the SB7a - Tank 51 qualification sample to adjust sodium content and weight percent insoluble solids to Tank Farm projections. (2) The performance of a DWPF Chemical Process Cell (CPC) simulation using the washed Tank 51 sample. The simulation included a Sludge Receipt and Adjustment Tank (SRAT) cycle, where acid was added to the sludge to destroy nitrite and reduce mercury, and a Slurry Mix Evaporator (SME) cycle, where glass frit was added to the sludge in preparation for vitrification. The SME cycle also included replication of five canister decontamination additions and concentrations. Processing parameters were based on work with a non-radioactive simulant. (3) Vitrification of a portion of the SME product and characterization and durability testing (as measured by the Product Consistency Test (PCT)) of the resulting glass. (4) Rheology measurements of the initial slurry samples and samples after each phase of CPC processing. This program was controlled by a Task Technical and Quality Assurance Plan (TTQAP), and analyses were guided by an Analytical Study Plan. This work is Technical Baseline Research and Development (R&D) for the DWPF. It should be noted that much of the data in this document has been published in interoffice memoranda. The intent of this technical report is bring all of the SB7a related data together in a single permanent record and to discuss the overall aspects of SB7a processing.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Comparison of Waste Feed Delivery Small Scale Mixing Demonstration Simulant to Hanford Waste

The Hanford double-shell tank (DST) system provides the staging location for waste feed delivery to the Hanford Tank Waste Treatment and Immobilization Plant (WTP). Hall (2008) includes WTP acceptance criteria that describe physical and chemical characteristics of the waste that must be certified as acceptable before the waste is transferred from the DSTs to the WTP. One of the more challenging requirements relates to the sampling and characterization of the undissolved solids (UDS) in a waste feed DST. The objectives of Washington River Protection Solutions' (WRPS) Small Scale Mixing Demonstration (SSMD) project are to understand and demonstrate the DST sampling and batch transfer performance at multiple scales using slurry simulants comprised of UDS particles and liquid (Townson 2009). The SSMD project utilizes geometrically scaled DST feed tanks to generate mixing, sampling, and transfer test data. In Phase 2 of the testing, RPP-49740, the 5-part simulant defined in RPP-48358 was used as the waste slurry simulant. The Phase 2 test data are being used to estimate the expected performance of the prototypic systems in the full-scale DSTs. As such, understanding of the how the small-scale systems as well as the simulant relate to the full-scale DSTs and actual waste is required. The focus of this report is comparison of the size and density of the 5-part SSMD simulant to that of the Hanford waste. This is accomplished by computing metrics for particle mobilization, suspension, settling, transfer line intake, and pipeline transfer from the characterization of the 5-part SSMD simulant and characterizations of the Hanford waste. In addition, the effects of the suspending fluid characteristics on the test results are considered, and a computational fluid dynamics tool useful to quantify uncertainties from simulant selections is discussed.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Analytical Results from final Salt Batch 9 Routine DSSHT and SEHT Monthly Samples

Strip Effluent Hold Tank (SEHT) and Decontaminated Salt Solution Hold Tank (DSSHT) samples from several of the “microbatches” of Integrated Salt Disposition Project (ISDP) Salt Batch (“Macrobatch”) 9 have been analyzed for 238 Pu, 90 Sr, 137 Cs, cations (Inductively Coupled Plasma Emission Spectroscopy - ICPES), and in some cases anions (Ion Chromatography Anions - IC-A). These three samples are from Salt Batch 9 material in the Modular Caustic-Side Solvent Extraction Unit (MCU) system, and prior to actual Salt Batch 10 processing. These samples are known to contain contactor cleaning material and should not be considered typical for samples under operating conditions. While the DSSHT sample is typical of this type of sample, the SEHT samples indicate a gross inclusion of nitric acid, likely from contactor cleaning solutions.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Analysis of DWPF Sludge Batch 6 (Macrobatch 7) Pour Stream Glass Samples

The Defense Waste Processing Facility (DWPF) began processing Sludge Batch 6 (SB6), also referred to as Macrobatch 7 (MB7), in June 2010. SB6 is a blend of the heel of Tank 40 from Sludge Batch 5 (SB5), H-Canyon Np transfers and SB6 that was transferred to Tank 40 from Tank 51. SB6 was processed using Frit 418. During processing of each sludge batch, the DWPF is required to take at least one glass sample to meet the objectives of the Glass Product Control Program and to complete the necessary Production Records so that the final glass product may be disposed of at a Federal Repository. Four pour stream glass samples and two Melter Feed Tank (MFT) slurry samples were collected while processing SB6. The samples were transferred to the Savannah River National Laboratory (SRNL) where they were analyzed.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Analysis of DWPF Sludge Batch 6 (Macrobatch 7): Pour Stream Glass Samples

The Defense Waste Processing Facility (DWPF) began processing Sludge Batch 6 (SB6), also referred to as Macrobatch 7 (MB7), in June 2010. SB6 is a blend of the heel of Tank 40 from Sludge Batch 5 (SB5), H-Canyon Np transfers and SB6 that was transferred to Tank 40 from Tank 51.1 SB6 was processed using Frit 418. Sludge is received into the DWPF Chemical Processing Cell (CPC) and is processed through the Sludge Receipt and Adjustment Tank (SRAT) and Slurry Mix Evaporator Tank (SME). The treated sludge slurry is then transferred to the Melter Feed Tank (MFT) and fed to the melter. During processing of each sludge batch, the DWPF is required to take at least one glass sample to meet the objectives of the Glass Product Control Program (GPCP) and to complete the necessary Production Records so that the final glass product may be disposed of at a Federal Repository. The DWPF requested various analyses of radioactive glass samples obtained from the melter pour stream during processing of SB6 as well as reduction/oxidation (REDOX) analysis of MFT samples to determine the impact of Argon bubbling. Sample analysis followed the Task Technical and Quality Assurance Plan (TTQAP) and an Analytical Study Plan (ASP). Four Pour Stream (PS) glass samples and two MFT slurry samples were delivered to the Savannah River National Laboratory (SRNL) from the DWPF. Table 1-1 lists the sample information for each pour stream glass sample. SB6 PS3 (S03472) was selected as the official pour stream sample for SB6 and full analysis was requested. This report details the visual observations of the as-received SB6 PS No.3 glass sample as well as results for the chemical composition, Product Consistency Test (PCT), radionuclide content, noble metals, and glass density. REDOX results will be provided for all four pour stream samples and vitrified samples of MFT-558 and MFT-568A. Where appropriate, data from other pour stream samples will be provided.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Evaluation of Material Balance Approaches for Hanford Direct-Feed Low Activity Waste Processing - 20022

The Hanford Site has accumulated millions of gallons of tank waste from reprocessing spent fuel to recover plutonium, uranium, cesium, and strontium. The supernatant from the accumulated tank waste will be treated using a Direct Feed Low-Activity Waste approach. The supernatant will be treated to remove solids and cesium in the Tank-Side Cesium Removal process in the Hanford tank farm, then vitrified in a semi-batch process in the Hanford Waste Treatment and Immobilization Plant (WTP). Currently, each batch of feed is sampled at three locations prior to being fed to the melter: the feed qualification tank in the Hanford tank farm as well as the concentrate receipt vessel (CRV) and melter feed preparation vessel (MFPV) in the WTP. The feed qualification sample is taken from a large batch of accumulated feed, only two to three samples are expected each year. Approximately 275 samples from the CRVs and 1100 samples from the MFPV are expected each year. An evaluation was performed to determine if a material balance based on the feed qualification sample could replace most of the sampling in the CRVs and MFPVs. The evaluation consisted of three elements: (1) determination of the practicality of using a material balance to estimate the stream composition of the CRV and MFPV contents, (2) evaluation of whether the material balance could be automated using the existing process control system, and (3) determination of the uncertainty in glass composition using the material balance approach. It is assumed that periodic sampling at the CRV and MFPV would be performed periodically to re-baseline the material balance, evaluations are in progress to determine the frequency of this periodic sampling. Process sample locations downstream of the melter were reviewed as well, but the partitioning of semi-volatile species in the melter was determined to preclude extending the material balance approach past the melter. It was determined that replacement of the CRV sample location was feasible and did not increase process uncertainty or significantly impact waste loading. Replacement of the MFPV sample was also determined to be feasible, but that measurement of the glass former chemical addition may be needed prior to addition of these chemicals to the MFPV. This measurement could be performed by an in situ laser-induced breakdown spectroscopy (LIBS) system. Limited tests were performed to evaluate LIBS for direct measurements of the low-activity waste melter feed. The use of a material balance would eliminate over 1200 samples each year if only 10% of the CRV and MFPV batches are sampled and could likely allow the WTP laboratory to operate on days only versus 24/7 operation. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Probing the interaction of U (VI) with phosphonate-functionalized mesoporous silica using solid-state NMR spectroscopy

The fundamental interaction of U (VI) with diethylphosphatoethyl triethoxysilane functionalized SBA-15 mesoporous silica is studied by macroscopic batch experiments and solid-state NMR spectroscopy. DPTS-functionalized silica has been shown to extract U (VI) from nitric acid solutions at or above pH 3. Extraction is dependent on pH and ionic strength. Single-pulse 31 P NMR on U (VI) contacted samples revealed that U (VI) only interacts with a fraction of the ligands present on the surface. At pH 4 the U (VI) extraction capacity of the material is limited to 27–37% of the theoretical capacity, based on ligand loading. We combined single pulse 31 P NMR on U (VI) -contacted samples with batch studies to measure a ligand-to-metal ratio of approximately 2 : 1 at pH 3 and 4. Batch studies and cross-polarization NMR measurements reveal that U (VI) binds to deprotonated phosphonate and/or silanol sites. We use 31 P– 31 P DQ-DRENAR NMR studies to compare the average dipolar coupling between phosphorus spins for both U (VI) -complexed and non-complexed ligand environments. Furthermore, these measurements reveal that U (VI) extraction is not limited by inadequate surface distribution of ligands, but rather by low stability of the surface phosphonate complex.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Development of a continuous synthesis process for carbamazepine using validated in-line Raman spectroscopy and kinetic modelling for disturbance simulation

Mitigation of failure modes in the continuous synthesis (CS) of a drug substance (DS) has the potential to widen the adoption of continuous manufacturing (CM) technologies by the pharmaceutical industry. Here, this work demonstrates the development of a robust continuous process for the synthesis of carbamazepine (CBZ), an essential medicine as per the World Health Organization (WHO), facilitated by kinetic modelling and monitored by in-line Raman spectroscopy. Accurate kinetic modelling and the use of validated process analytical technology (PAT) models for quantitative measurement were found to play an important role in developing CS of drug substances. Kinetic data for the formation of CBZ from iminostilbene (ISB) were collected by batch reaction sampling and high-performance liquid chromatography (HPLC) analysis. A non-linear solver and iterative method was applied to determine two sets of Arrhenius parameters simultaneously for the reaction system by minimizing the standard error of the model fit. The start-up and dynamic equilibrium stages for the CS of CBZ using a continuous stirred tank reactor (CSTR) were modelled based on the batch kinetic data and employed to optimize conversion and simulate process disturbances. An in-line Raman spectroscopy method was successfully developed, validated, and integrated to determine the concentrations of CBZ and ISB within the operating range for the CS. The CS kinetic model was evaluated experimentally from startup to dynamic equilibrium over 10 residence times with monitoring by HPLC and in-line Raman spectroscopy. The developed kinetic model in tandem with in-line Raman spectroscopy successfully predicted disturbances due to changes in process variables and can serve as a useful tool in the future design of advanced process control strategies for the continuous synthesis of CBZ.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Analytical Results from the Salt Batch 10 Routine DSSHT and SEHT Monthly Samples

Strip Effluent Hold Tank (SEHT) and Decontaminated Salt Solution Hold Tank (DSSHT) samples from several of the “microbatches” of Integrated Salt Disposition Project (ISDP) Salt Batch (“Macrobatch”) 10 have been analyzed for 238Pu, 90Sr, 137Cs, elemental constituents (Inductively Coupled Plasma Emission Spectroscopy - ICPES), and in some cases anions (Ion Chromatography Anions - IC-A). The included tables contain the data. These samples are from Salt Batch 10 material recently introduced into the Modular Caustic-Side Solvent Extraction Unit (MCU) system. The DSSHT results are typical for this type of sample, although the dilution due to processing is lower than expected. The August sample is known to have incorporated large amounts of rain water and cannot be compared to other DSSHT samples. The SEHT sample results are typical except for the May sample which is known to have rain water and Contactor Drain Tank (CDT) material in it.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Determining the Solubility Behavior of Kogarkoite in Simulated Nuclear Waste

Kogarkoite (Na 3 FSO 4 ) is a sparingly soluble fluoride–sulfate double salt that has been identified in high level nuclear waste sludge at the Hanford Site and, more recently, in sludge batch compilation samples at the Savannah River Site (SRS). Due to its complex dissolution behavior, which exhibits an inverse dependence on sodium ion activity, the presence of this mineral poses significant challenges to waste retrieval and processing. Incomplete dissolution during sludge washing can lead to the retention of fluoride and sulfate in the high-level waste feed, potentially causing the formation of corrosive, immiscible molten salt layers, known as "glass gall,” in vitrification melters. Current efforts to optimize flowsheet parameters and wash-water volumes are hindered by the absence of a commercially available, certified reference material, which prevents the accurate calibration of analytical methods and the verification of dissolution kinetics. To address this critical gap, this research focuses on the laboratory synthesis of pure Kogarkoite to serve as a standard for comprehensive solubility and washing performance testing. A coupled synthesis and simulant campaign was executed using an evaporative crystallization protocol designed to replicate the dynamic concentration effects observed in tank farm operations. Thirteen simulant matrices were prepared by dissolving systematically varied ratios of sodium fluoride (NaF) and sodium sulfate (Na 2 SO 4 ) in deionized water under three distinct caustic regimes: 0.0 g (control), 4.0 g (~1 M), and 12.0 g (~3 M) sodium hydroxide (NaOH). While thermodynamic equilibrium models suggest that high-caustic environments should favor the stability of the double salt7, results from this evaporative study at 25 0 C revealed a distinct kinetic divergence. Simulants with high hydroxide loading predominantly yielded large, blocky crystals of sodium sulfate decahydrate (Na 2 SO 4 .10H 2 O). Successful synthesis of pure Kogarkoite was achieved exclusively in specific NaOH-free compositional windows, where the precipitate manifested as fine, opaque granular aggregates. Ion chromatography (IC) analysis confirmed phase purity through the simultaneous stoichiometric depletion of both fluoride and sulfate from the supernatant. This successful synthesis establishes a reproducible route to generate bulk Kogarkoite, enabling the subsequent phase of quantitative dissolution testing using inhibited water to optimize sludge-batch assembly.

Sarker, Md Sharif [Florida International Univ. (FI↗

Tank 40 final sludge batch 9 chemical and fissile radionuclide characterization results

A sample of Sludge Batch (SB) 9 was pulled from Tank 40 in order to obtain radionuclide inventory analyses necessary for compliance with the Waste Acceptance Product Specifications (WAPS)i. The SB9 WAPS sample was also analyzed for chemical composition, including noble metals, and fissile constituents, and these results are reported here. These analyses along with the WAPS radionuclide analyses will help define the composition of the sludge in Tank 40 that is fed to the Defense Waste Processing Facility (DWPF) as SB9. At the Savannah River National Laboratory (SRNL), the 3-L Tank 40 SB9 sample was transferred from the shipping container into a 4-L high density polyethylene bottle and solids were allowed to settle. Supernate was then siphoned off and circulated through the shipping container to complete the transfer of the sample. Following thorough mixing of the 3-L sample, a 547 g sub-sample was removed. This sub-sample was then utilized for all subsequent slurry sample preparations. Eight separate aliquots of the slurry were digested, four with HNO3/HCl (aqua regiaii) in sealed Teflon® vessels and four with NaOH/Na2O2 (alkali or peroxide fusioniii) using Zr crucibles. Three Analytical Reference Glass – 1iv (ARG-1) standards were digested along with a blank for each preparation. Each aqua regia digestion and blank was diluted to 1:100 with deionized water and submitted to Analytical Development (AD) for inductively coupled plasma – atomic emission spectroscopy (ICP-AES) analysis, inductively coupled plasma – mass spectrometry (ICP-MS) analysis, atomic absorption spectroscopy (AA) for As and Se, and cold vapor atomic absorption spectroscopy (CV-AA) for Hg. Equivalent dilutions of the alkali fusion digestions and blank were submitted to AD for ICP-AES analysis. Tank 40 SB9 supernate was collected from a mixed slurry sample in the SRNL Shielded Cells and submitted to AD for ICP-AES, ion chromatography (IC), total base/free OH-/other base, total inorganic carbon/total organic carbon (TIC/TOC) analyses. Weighted dilutions of slurry were submitted for IC, TIC/TOC, and total base/free OH-/other base analyses. Activities for U-233, U-235, and Pu-239 were determined from the ICP-MS data for the aqua regia digestions of the SB9 WAPS slurry using the specific activity of each isotope. The Pu-241 value was determined from a Pu-238/-241 method developed by SRNL AD and previously described.v

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Measurement of the strengths of Be and Pb4Sb by quasi-isentropic compress and release at near 100 GPa

The Ramp-compression experiments have been performed on the “Z” pulsed-power facility to investigate the strengths of Be and lead-antimony alloy. Yield strength and shear stress near peak pressure were obtained from measurements of the sound speed on release and using the Asay self-consistent method. Two S-65 grade Be samples, from batches which showed a significant difference in yield strength at ambient conditions, were found to have near identical yield strengths, which were also in agreement with similar earlier measurements on S-200 grade Be. Yield strength of Pb4Sb alloy at ~120 GPa was 1.35 GPa, while a National Ignition Facility (NIF) experiment by A. Krygier et al. (Phys. Rev. Lett. 123, 205701 (2020)) found 3.8 GPa at ~400 GPa pressure. Our result is intermediate between the ambient value and the Krygier one, but the significantly increased strength is probably not associated with the transition to the high-pressure bcc phase of lead.

42 ENGINEERING↗