Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “baseline program”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

Computing Benefits and Costs for Propulsion Systems

Flexible computer model developed for evaluating benefits and costs of placing large space systems into operational orbits. Model contains performance envelopes of three primary propulsion systems for orbit transfer based on three low-thrust engines. Allows for any mission model to be input into program. Model also allows user to easily vary program to examine effects of various ratings and weighting of benefit parameters for baseline engines. Program written in FORTRAN IV for use on IBM 370 computer.

Hamlyn, K.↗

Alternative approaches to space-based power generation

Satellite Power Stations (SPS) would generate electrical power in space for terrestrial use. Their geosynchronous orbit location permits continuous microwave power transmission to ground receiving antenna farms. Eight approaches to the generation of the electrical power to be transmitted were investigated. Configurations implementing these approaches were developed through an optimization process intended to yield the lowest cost for each. A complete program was baselined for each approach, identifying required production rates, quantities of launches, required facilities, etc. Each program was costed, including the associated launches, orbital assembly, and maintenance operations. The required electric power charges to amortize these costs were calculated. They range from 26 to 82 mills/kWh (ground busbar).

Gregory, D. L.↗

Report of the Cost Assessment and Validation Task Force on the International Space Station

The Cost Assessment and Validation (CAV) Task Force was established for independent review and assessment of cost, schedule and partnership performance on the International Space Station (ISS) Program. The CAV Task Force has made the following key findings: The International Space Station Program has made notable and reasonable progress over the past four years in defining and executing a very challenging and technically complex effort. The Program size, complexity, and ambitious schedule goals were beyond that which could be reasonably achieved within the $2.1 billion annual cap or $17.4 billion total cap. A number of critical risk elements are likely to have an adverse impact on the International Space Station cost and schedule. The schedule uncertainty associated with Russian implementation of joint Partnership agreements is the major threat to the ISS Program. The Fiscal Year (FY) 1999 budget submission to Congress is not adequate to execute the baseline ISS Program, cover normal program growth, and address the known critical risks. Additional annual funding of between $130 million and $250 million will be required. Completion of ISS assembly is likely to be delayed from one to three years beyond December 2003.

Source record↗

Cost Assessment and Validation Task Force on the International Space Station

The Cost Assessment and Validation (CAV) Task Force was established for independent review and assessment of cost, schedule and partnership performance on the International Space Station (ISS) Program. The CAV Task Force has made the following key findings: The International Space Station Program has made notable and reasonable progress over the past four years in defining and executing a very challenging and technically complex effort; The Program, size, complexity, and ambitious schedule goals were beyond that which could be reasonably achieved within the $2.1 billion annual cap or $17.4 billion total cap; A number of critical risk elements are likely to have an adverse impact on the International Space Station cost and schedule; The schedule uncertainty associated with Russian implementation of joint Partnership agreements is the major threat to the ISS Program; The Fiscal Year (FY) 1999 budget submission to Congress is not adequate to execute the baseline ISS Program, cover normal program, growth, and address the known critical risks. Additional annual funding of between $130 million and $250 million will be required; and Completion of ISS assembly is likely to be delayed from, one to three years beyond December 2003.

Source record↗

New light Higgs boson and short-baseline neutrino anomalies

Here, the low-energy excesses observed by the MiniBooNE experiment have, to date, defied a convincing explanation under the standard model even with accommodation for nonzero neutrino mass. In this paper we explore a new oscillation mechanism to explain these anomalies, invoking a light neutrinophilic Higgs boson, conceived to induce a low Dirac neutrino mass in accord with experimental limits. Beam neutrinos forward scattering off of a locally overdense relic neutrino background give rise to a novel matter effect with an energy-specific resonance. An enhanced oscillation around this resonance peak produces flavor transitions which are highly consistent with the MiniBooNE neutrino- and antineutrino-mode data sets. The model provides substantially improved χ2 values beyond either the no-oscillation hypothesis or the more commonly explored 3+1 sterile neutrino hypothesis. This mechanism would introduce distinctive signatures at each baseline in the upcoming short-baseline neutrino program at Fermilab, presenting opportunities for further exploration.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Computer output microfilm (FR80) systems software documentation, volume 2

The system consists of a series of programs which convert digital data from magnetic tapes into alpha-numeric characters, graphic plots, and imagery that is recorded on the face of a cathode ray tube. A special camera photographs the face of the tube on microfilm for subsequent display on a film reader. The applicable documents which apply to this system are delineated. The functional relationship between the system software, the standard insert routines, and the applications programs is described; all the applications programs are described in detail. Instructions for locating those documents are presented along with test preparations sheets for all baseline and/or program modification acceptance tests.

Source record↗

Coulomb sum rule for 4 He and 16 O from coupled-cluster theory

We demonstrate the capability of coupled-cluster theory to compute the Coulomb sum rule for the 4 He and 16 O nuclei using interactions from chiral effective field theory. We perform several checks, including a few-body benchmark for 4He. We provide an analysis of the center-of-mass contaminations, which we are able to safely remove. We then compare with other theoretical results and experimental data available in the literature, obtaining a fair agreement. This is a first and necessary step towards initiating a program for computing neutrino-nucleus interactions from first principles in coupled-cluster theory and supporting the experimental long-baseline neutrino program with a state-of-the-art theory that can reach medium-mass nuclei.

6 ≤ A ≤ 19A ≤ 5↗

The ICARUS light detection system (Fermilab Italian summer student program 2023)

The ICARUS T600 detector is the largest Liquid Argon Time Projection Chamber ever used on a neutrino beam, and it acts as the far detector of the Short Baseline Neutrino program at Fermilab. Its purpose is the study of the possibility of the existence of a fourth sterile neutrino in the O(eV2) mass range that could take part in the neutrino oscillations. The light detection system of the ICARUS detector plays the role of localising in space and time the neutrino interactions taking place inside the detector, collecting the argon scintillation photons generated when an event occurs. This light detection system also has a crucial role in the trigger system and the rejection of the huge amount of background cosmic events, working together with the trigger request signals sent by the beam complex. In August 2023 part of the cables that are used to carry the signals from the photomultipliers to the electronics were replaced with a new model, because a deterioration of the quality of the signal inside the cables had previously been observed. An analysis of the performance of the new cables was carried out, comparing laser run data collected before and after the change of the cable model, and it was proved that the introduction of the new cables lead to a general improvement of the quality of the signals reaching the electronics.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

A Retrospective Assessment of Correlation between Occupational and Public Radiation Protection Programs Performance Metrics at a FUSRAP Site - 17546

A retrospective assessment of the occupational and environmental radiation protection programs includes the consideration of performance metrics at the qualitative and quantitative level. When key radiation protection (RP) program metrics are tracked over the course of several years, correlations may present themselves. Strong correlations between variables may be considered when establishing or validating baseline RP Program elements (i.e., controls, monitoring regimes, and additional ALARA measures) for the safe excavation and handling of naturally occurring radioactive materials comingled in soil-like wastes at FUSRAP sites. (authors)

61 RADIATION PROTECTION AND DOSIMETRY↗

Structural technology challenges for evolutionary growth of Space Station Freedom

A proposed evolutionary growth scenario for Space Station Freedom was defined recently by a NASA task force created to study requirements for a Human Exploration Initiative. The study was an initial response to President Bush's July 20, 1989 proposal to begin a long range program of human exploration of space including a permanently manned lunar base and a manned mission to Mars. This growth scenario evolves Freedom into a critical transportation node to support lunar and Mars missions. The growth scenario begins with the Assembly Complete configuration and adds structure, power, and facilities to support a Lunar Transfer Vehicle (LTV) verification flight. Evolutionary growth continues to support expendable, then reusable LTV operations, and finally, LTV and Mars Transfer Vehicle (MTV) operations. The significant structural growth and additional operations creating new loading conditions will present new technological and structural design challenges in addition to the considerable technology requirements of the baseline Space Station Freedom program. Several structural design and technology issues of the baseline program are reviewed and related technology development required by the growth scenario is identified.

Doiron, Harold H.↗

SBND Analysis using ML Reconstruction Chain

As part of the Short Baseline Neutrino (SBN) Program at Fermilab, the Short Baseline Near Detector (SBND) is positioned in the Booster Neutrino Beam (BNB) and explores neutrino-argon interactions with unprecedented statistics. SBND is a Liquid Argon Time Projection Chamber (LArTPC). Electrons produced through ionization drift toward three wire planes, providing signals that form 2D images of particle trajectories. I introduce the Scalable Particle Imaging using Neural Embeddings (SPINE) framework, which employs a Machine Learning (ML)-based 3D reconstruction using a series of neural networks. Here, we present SPINE’s reconstruction chain, analysis approaches, and results from our latest simulation samples.

43 PARTICLE ACCELERATORS↗

TAVERNS and the space station software support environment

The Space Station Information System (SSIS) provides the data processing capability for the Space Station Program (SSP). The Software Support Environment (SSE) System for the SSP is the collection of software, procedures, standards, hardware specification, documentation, policy, and training materials. The Ada programming language was baselined by the Space Station Program Office as the language for development and maintenance of all space station software including the software of the SSE itself. The Test And Validation Environment for Remote Networked Systems (TAVERNS) is a distributed philosophy for development and validation of Ada applications software for the space station and as such is closely related to the SSE. An overview of the system is provided.

Howes, Norman R.↗

Potential Constraints to Neutrino-Nucleus Interactions Based on Electron Scattering Data

A thorough understanding of neutrino-nucleus interactions physics is crucial to achieving precision goals in broader neutrino physics programs. The complexity of nuclei comprising the detectors and limited understanding of their weak response constitutes one of the biggest systematic uncertainties in neutrino experiments - both at intermediate energies affecting the short- and long-baseline neutrino programs as well as at lower energies affecting coherent scattering neutrino programs. While electron and neutrino interactions are different at the primary vertex, many underlying relevant physical processes in the nucleus are the same in both cases, and electron scattering data collected with precisely controlled kinematics, large statistics and high precision allows one to constrain nuclear properties and specific interaction processes. To this end, electron-nucleus scattering experiments provide vital complementary information to test, assess and validate different nuclear models and event generators intended to be used in neutrino experiments. In fact, for many decades, the study of electron scattering off a nucleus has been used as a tool to probe the properties of that nucleus and its electromagnetic response. While previously existing electron scattering data provide important information, new and proposed measurements are tied closely to what is required for the neutrino program in terms of expanding kinematic reach, the addition of relevant nuclei and information on the final states hadronic system.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

NDE Technology Development Program for Non-Visual Volumetric Inspection Technology; Sensor Effectiveness Testing Report

The Pacific Northwest National Laboratory (PNNL) located in Richland, Washington, hosted and administered Sensor Effectiveness Testing that allowed four different participants to demonstrate the NDE volumetric inspection technologies that were previously demonstrated during the Technology Screening session. This document provides a Sensor Effectiveness Testing report for the final part of Phase I of a three-phase NDE Technology Development Program designed to identify and mature a system or set of non-visual volumetric NDE technologies for Hanford DST primary liner bottom inspection. Phase I of the program will baseline the performance of current or emerging non-visual volumetric NDE technologies for their ability to detect and characterize primary liner bottom flaws, and identify candidate technologies for adaptation and maturation for Phase II of the program.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

NDE Technology Development Program for Non-Visual Volumetric Inspection Technology: Technology Screening Report

The Pacific Northwest National Laboratory (PNNL) located in Richland, Washington, hosted and administered a Technology Screening test that allowed four different participants to demonstrate the NDE volumetric inspection technologies that were proposed in response to the WRPS EOI. This document provides a Technology Screening test report for the initial part of Phase I of a three-phase NDE Technology Development Program designed to identify and mature a system or set of non-visual volumetric NDE technologies for Hanford DST primary liner bottom inspection. Phase I of the program will baseline the performance of current or emerging non-visual volumetric NDE technologies for their ability to detect and characterize primary liner bottom flaws, and identify candidate technologies for adaptation and maturation for Phase II of the program.

42 ENGINEERING↗

Demand response event simulator and risk-aware bidding tool for industrial customers

Incentive Based Demand Response (IBDR) program participation delivers financial benefits to the consumers and resiliency benefits to the electricity grid. Effectively participating in these programs as an industrial consumer requires bidding strategies that balance financial risk with operational constraints. Existing bidding tools tend not to fully incorporate stochastic IBDR event modeling, program specific baseline and payment/penalty calculations, or demand reduction process control schemes that account for the cascading impacts of shutdown in complex facilities. Here, this work presents an IBDR event simulator and risk-aware bidding framework tool integrating three key components: a flexible, parameterized demand response event generator that rigorously accounts for program structures and stochasticity, a demand response operational simulation model that generates explicit control strategies for load reduction, and a Monte Carlo simulator to evaluate financial risk for varied capacity bids. A case study at a wastewater treatment plant participating in PG&E's Capacity Bidding Program demonstrates the framework's utility. In the peak capacity price month of August, optimal bidding by the wastewater treatment plant nets a mean IBDR benefit of $101,000 (67% of the August electricity bill) with 0.4% probability of a financial loss. This framework enables industrial operators to make informed bidding decisions, negotiate better program terms with demand response load aggregators, and analyze energy flexibility investments at their facilities. Ultimately, this work reduces participation barriers in IBDR programs and supports the broader goal of enhancing grid reliability and renewable energy integration.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Low Cost Atmospheric Probe Missions to the Outer Planets

Outer planet probe missions are part of the on-going Mission and Technology Roadmap effort to define the framework for the future NASA Solar System Exploration program...A baseline mission/system design is described to which the technology needs can be related.

atmospheric↗

Cosmic Background Rejection of the ICARUS experiment at Fermilab

The Short Baseline Neutrino program at Fermilab aims to explore significant regions of parameter space, applicable to sterile neutrinos at the eV mass scale, as suggested by existing experimental anomalies. To this purpose it exploits Liquid Argon Time Projection Chamber detectors located along the Booster Neutrino Beamline to measure both νe appearance and νµ disappearance: the Short Baseline Neutrino Detector and the ICARUS-T600 detector at 110 and 600 m from the neutrino source, respectively. The ICARUS T-600 Far Detector, located at shallow depth, is surrounded by a Cosmic Ray Tagger system to mitigate the cosmic ray background. On average ~ 11 muon tracks are expected to cross the detector during the ~ 1 ms drift time. The cosmic ray tagger is composed of plastic scintillator bars, ensuring near 4π coverage of the detector aiming at tagging cosmic muons and thus reject 𝛾s produced by muon interactions in the surrounding materials that can generate an electromagnetic showers mimicking a νe signal. The system allows one to disentangle cosmic rays from particles originated in a neutrino interaction inside the detector by measuring their position and crossing time. A synchronization of the cosmic ray tagger with the ICARUS photon detection system with a nanosecond accuracy allows one to reject cosmic particles recorded during the beam spill and thus select an enriched sample of neutrino triggered events ahead of the event reconstruction. An overview of the cosmic ray tagger system as well as its role in the neutrino events identification and cosmic background rejection will be presented.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗