Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “automated scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

STF-1 Ground Operations - Automating the Planning, Scheduling, Assessment and Data Processing/Reduction for a Small Satellite

On December 16, 2018, a 3-U CubeSat named STF-1 launched as West Virginia's first spacecraft. This event marked the culmination of a run-up to launch involving the production of the spacecraft, creation/configuration of command and control infrastructure, and the evolution of its co-creation, the NASA Operational Simulator for Small Satellites (NOS3). This event also marked the beginning of a new phase: operations. While plans, procedures, and infrastructure were already in place or started for operations, many lessons were learned during the operations phase, especially during early operations (first month/commissioning phase). Additional plans, procedures, and infrastructure, especially related to communication planning and automated data processing, were created and developed to fill needs for the operation of the STF-1 mission.This paper and presentation will overview the STF-1 operations team's solutions to addressing the many needs of operating a low-earth orbiting CubeSat mission with a single ground antenna that is shared and scheduled with several other missions. The STF-1 operations team deployed a combination of virtualization technologies, ground station technology solutions, collaboration software, custom planning software solutions, and existing ground antenna scheduling solutions to create an effective and efficient CubeSat operations environment. The end-solution satisfied the operations stakeholders, which include NASA, its industry partner TMC2 Technologies, and four independent professor-student teams at West Virginia University.

Suder, Mark↗

Automated platform management system scheduling

The Platform Management System (PMS) has been established to coordinate the operation of platform systems and payloads. Since platforms are to be out of contact with the ground more than the manned base, PMS functions are required to be more autonomous than those of the manned base. Automated replanning and rescheduling will be required to effectively and efficiently meet mission goals. In a FY88 study, we developed a phased approach to automated PMS scheduling based upon use of the same scheduling engine in both ground and space components. In the past year, we implemented a baseline, first phase, PMS scheduler prototype. Presently we are integrating this scheduler into two NASA Goddard Space Flight Center testbeds, as the ground scheduler in the Scheduling Concepts, Architectures, and Networks Testbed and as the onboard scheduler in the PMS Testbed. We will investigate rescheduling issues, evaluated operational performance and enhance the prototype to demonstrate our evolutionary approach to automated PMS scheduling.

Hull, Larry G.↗

Automated Planning and Scheduling for Orbital Express (151)

The challenging timeline for DARPA's Orbital Express mission demanded a flexible, responsive, and (above all) safe approach to mission planning. Because the mission was a technology demonstration, pertinent planning information was learned during actual mission execution. This information led to amendments to procedures, which led to changes in the mission plan. In general, we used the ASPEN planner scheduler to generate and validate the mission plans. We enhanced ASPEN to enable it to reason about uncertainty. We also developed a model generator that would read the text of a procedure and translate it into an ASPEN model. These technologies had a significant impact on the success of the Orbital Express mission.

autonomy↗

Integrated resource scheduling in a distributed scheduling environment

The Space Station era presents a highly-complex multi-mission planning and scheduling environment exercised over a highly distributed system. In order to automate the scheduling process, customers require a mechanism for communicating their scheduling requirements to NASA. A request language that a remotely-located customer can use to specify his scheduling requirements to a NASA scheduler, thus automating the customer-scheduler interface, is described. This notation, Flexible Envelope-Request Notation (FERN), allows the user to completely specify his scheduling requirements such as resource usage, temporal constraints, and scheduling preferences and options. The FERN also contains mechanisms for representing schedule and resource availability information, which are used in the inter-scheduler inconsistency resolution process. Additionally, a scheduler is described that can accept these requests, process them, generate schedules, and return schedule and resource availability information to the requester. The Request-Oriented Scheduling Engine (ROSE) was designed to function either as an independent scheduler or as a scheduling element in a network of schedulers. When used in a network of schedulers, each ROSE communicates schedule and resource usage information to other schedulers via the FERN notation, enabling inconsistencies to be resolved between schedulers. Individual ROSE schedules are created by viewing the problem as a constraint satisfaction problem with a heuristically guided search strategy.

Zoch, David↗

Automated Platform Management System Scheduling

The Platform Management System was established to coordinate the operation of platform systems and instruments. The management functions are split between ground and space components. Since platforms are to be out of contact with the ground more than the manned base, the on-board functions are required to be more autonomous than those of the manned base. Under this concept, automated replanning and rescheduling, including on-board real-time schedule maintenance and schedule repair, are required to effectively and efficiently meet Space Station Freedom mission goals. In a FY88 study, we developed several promising alternatives for automated platform planning and scheduling. We recommended both a specific alternative and a phased approach to automated platform resource scheduling. Our recommended alternative was based upon use of exactly the same scheduling engine in both ground and space components of the platform management system. Our phased approach recommendation was based upon evolutionary development of the platform. In the past year, we developed platform scheduler requirements and implemented a rapid prototype of a baseline platform scheduler. Presently we are rehosting this platform scheduler rapid prototype and integrating the scheduler prototype into two Goddard Space Flight Center testbeds, as the ground scheduler in the Scheduling Concepts, Architectures, and Networks Testbed and as the on-board scheduler in the Platform Management System Testbed. Using these testbeds, we will investigate rescheduling issues, evaluate operational performance and enhance the platform scheduler prototype to demonstrate our evolutionary approach to automated platform scheduling. The work described in this paper was performed prior to Space Station Freedom rephasing, transfer of platform responsibility to Code E, and other recently discussed changes. We neither speculate on these changes nor attempt to predict the impact of the final decisions. As a consequence some of our work and results may be outdated when this paper is published.

Hull, Larry G.↗

System/360 Computer Assisted Network Scheduling (CANS) System

Computer assisted scheduling techniques that produce conflict-free and efficient schedules have been developed and implemented to meet needs of the Manned Space Flight Network. CANS system provides effective management of resources in complex scheduling environment. System is automated resource scheduling, controlling, planning, information storage and retrieval tool.

Brewer, A. C.↗

Industrial Hygiene Issues

This breakout session is a traditional conference instrument used by the NASA industrial hygiene personnel as a method to convene personnel across the Agency with common interests. This particular session focused on two key topics, training systems and automation of industrial hygiene data. During the FY 98 NASA Occupational Health Benchmarking study, the training system under development by the U.S. Environmental Protection Agency (EPA) was deemed to represent a "best business practice." The EPA has invested extensively in the development of computer based training covering a broad range of safety, health and environmental topics. Currently, five compact disks have been developed covering the topics listed: Safety, Health and Environmental Management Training for Field Inspection Activities; EPA Basic Radiation Training Safety Course; The OSHA 600 Collateral Duty Safety and Health Course; and Key program topics in environmental compliance, health and safety. Mr. Chris Johnson presented an overview of the EPA compact disk-based training system and answered questions on its deployment and use across the EPA. This training system has also recently been broadly distributed across other Federal Agencies. The EPA training system is considered "public domain" and, as such, is available to NASA at no cost in its current form. Copies of the five CD set of training programs were distributed to each NASA Center represented in the breakout session. Mr. Brisbin requested that each NASA Center review the training materials and determine whether there is interest in using the materials as it is or requesting that EPA tailor the training modules to suit NASA's training program needs. The Safety, Health and Medical Services organization at Ames Research Center has completed automation of several key program areas. Mr. Patrick Hogan, Safety Program Manager for Ames Research Center, presented a demonstration of the automated systems, which are described by the following: (1) Safety, Health and Environmental Training. This system includes an assessment of training needs for every NASA Center organization, course descriptions, schedules and automated course scheduling, and presentation of training program metrics; (2) Safety and Health Inspection Information. This system documents the findings from each facility inspection, tracks abatement status on those findings and presents metrics on each department for senior management review; (3) Safety Performance Evaluation Profile. The survey system used by NASA to evaluate employee and supervisory perceptions of safety programs is automated in this system; and (4) Documentation Tracking System. Electronic archive and retrieval of all correspondence and technical reports generated by the Safety, Health and Medical Services Office are provided by this system.

Brisbin, Steven G.↗

NASA Systems Autonomy Demonstration Project - Development of Space Station automation technology

A 1984 Congressional expansion of the 1958 National Aeronautics and Space Act mandated that NASA conduct programs, as part of the Space Station program, which will yield the U.S. material benefits, particularly in the areas of advanced automation and robotics systems. Demonstration programs are scheduled for automated systems such as the thermal control, expert system coordination of Station subsystems, and automation of multiple subsystems. The programs focus the R&D efforts and provide a gateway for transfer of technology to industry. The NASA Office of Aeronautics and Space Technology is responsible for directing, funding and evaluating the Systems Autonomy Demonstration Project, which will include simulated interactions between novice personnel and astronauts and several automated, expert subsystems to explore the effectiveness of the man-machine interface being developed. Features and progress on the TEXSYS prototype thermal control system expert system are outlined.

Bull, John S.↗

Automating Deep Space Network scheduling and conflict resolution

The Deep Space Network (DSN) is a central part of NASA's infrastructure for communicating with active space missions, from earth orbit to beyond the solar system. We describe our recent work in modeling the complexities of user requirements, and then scheduling and resolving conflicts on that basis. We emphasize our innovative use of background 'intelligent' assistants' that carry out search asynchrnously while the user is focusing on various aspects of the schedule.

conflict resolution↗

Assessing Resilience of Scheduled Performance-Based Navigation Arrival Operations

This paper assesses the resilience of scheduled Performance-Based Navigation (PBN) arrival operations. Resilience is defined as an ability to return to nominal operations following a schedule perturbation. Results from a Human-in-the- Loop (HITL) experiment that included off-nominal events to perturb the schedule are described. The schedule comes from a precision trajectory-based arrival manager. The experiment collected data regarding the response to perturbed schedules in three conditions, where: 1) a disturbance rejection algorithm made schedule adjustments automatically, 2) a Traffic Management Coordinator (TMC) participant made schedule adjustments manually, or 3) no schedule adjustments were made. Analyses showed that the simulation’s scheduled PBN operations have inherent resilience, recovering from more than half of the perturbed schedules even with no schedule adjustments. Resilience to the same off-nominal events improved with schedule adjustments; an increased proportion of perturbed schedules recovered within the length of operation run, and the average duration of the schedule’s perturbed state decreased. Compared to the manual schedule adjustments condition, a greater number of schedule adjustments occurred for the same off-nominal events in the automated condition. However, perturbed schedules were recovered more frequently and perturbations were less severe in the automated condition. Subjective and objective workload in the manual and the automated schedule adjustment conditions were similar to the no schedule adjustment condition.

Resilience↗

Incremental Scheduling Engines: Cost Savings through Automation

As humankind embarks on longer space missions farther from home, the requirements and environments for scheduling the activities performed on these missions are changing. As we begin to prepare for these missions it is appropriate to evaluate the merits and applicability of the different types of scheduling engines. Scheduling engines temporally arrange tasks onto a timeline so that all constraints and ob.jectives are met and resources are not over-booked. Scheduling engines used to schedule space missions fall into three general categories: batch, mixed-initiative, and incremental. This paper, presents an assessment of the engine types, a discussion of the impact of human exploration of the moon and Mars on planning and scheduling, and the applicability of the different types of scheduling engines. This paper will pursue the hypothesis that incremental scheduling engines may have a place in the new environment; they have the potential to reduce cost, to improve the satisfaction of those who execute or benefit from a particular timeline (the customers), and to allow astronauts to plan their own tasks and those of their companion robots.

Jaap, John↗

Pitch Guidance Optimization for the Orion Abort Flight Tests

The National Aeronautics and Space Administration created the Constellation program to develop the next generation of manned space vehicles and launch vehicles. The Orion abort system is initiated in the event of an unsafe condition during launch. The system has a controller gains schedule that can be tuned to reduce the attitude errors between the simulated Orion abort trajectories and the guidance trajectory. A program was created that uses the method of steepest descent to tune the pitch gains schedule by an automated procedure. The gains schedule optimization was applied to three potential abort scenarios; each scenario tested using the optimized gains schedule resulted in reduced attitude errors when compared to the Orion production gains schedule.

Stillwater, Ryan Allanque↗

APGEN Scheduling: 15 Years of Experience in Planning Automation

In this paper, we discuss the scheduling capability of APGEN (Activity Plan Generator), a multi-mission planning application that is part of the NASA AMMOS (Advanced Multi- Mission Operations System), and how APGEN scheduling evolved over its applications to specific Space Missions. Our analysis identifies two major reasons for the successful application of APGEN scheduling to real problems: an expressive DSL (Domain-Specific Language) for formulating scheduling algorithms, and a well-defined process for enlisting the help of auxiliary modeling tools in providing high-fidelity, system-level simulations of the combined spacecraft and ground support system.

sequencing↗

Coordinating complex decision support activities across distributed applications

Knowledge-based technologies have been applied successfully to automate planning and scheduling in many problem domains. Automation of decision support can be increased further by integrating task-specific applications with supporting database systems, and by coordinating interactions between such tools to facilitate collaborative activities. Unfortunately, the technical obstacles that must be overcome to achieve this vision of transparent, cooperative problem-solving are daunting. Intelligent decision support tools are typically developed for standalone use, rely on incompatible, task-specific representational models and application programming interfaces (API's), and run on heterogeneous computing platforms. Getting such applications to interact freely calls for platform independent capabilities for distributed communication, as well as tools for mapping information across disparate representations. Symbiotics is developing a layered set of software tools (called NetWorks! for integrating and coordinating heterogeneous distributed applications. he top layer of tools consists of an extensible set of generic, programmable coordination services. Developers access these services via high-level API's to implement the desired interactions between distributed applications.

Adler, Richard M.↗

Hypertext-Based Design of a User Interface for Scheduling

Operations Mission Planner (OMP) is an ongoing research project at JPL that utilizes Artificial Intelligence techniques to create an intelligent, automated planning and scheduling system. The challenge with a user interface is to 1) present as much information as possible at a given moment and 2) allow the user to quickly navigate through the various types of displays. This paper describes a design which applies the hypertext model to solve user interface problems. The general paradigm is to provide maps and search queries to allow the user to quickly find an interesting conflict or problem. Then allow the user to navigate through the displays in a hypertext fashion.

hypertext↗