Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “artemis”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

Guidance Modifications and Enhancements for Space Launch System Block-1 in Support of Artemis I and Beyond

NASA is currently building the Space Launch System (SLS) Block-1 launch vehicle for the Artemis I test flight. Design of the Artemis II mission, which will use theBlock-1 vehicle to take astronauts around the moon for the first time in decades, is also underway. The Guidance, Navigation, and Controls (GN&C) algorithms will be largely similar for the two missions. However, the extensive simulation and testing campaign for Artemis I has revealed opportunities for improvements in the GN&C algorithms, allowing more effective use of the capabilities of the SLS vehicle, and enhancing safety for the astronauts aboard. This paper will de-scribe several planned algorithm updates for the Artemis II mission. The updates enhance the Powered Explicit Guidance (PEG) algorithm and auxiliary guidance algorithms.

Matt Hawkins↗

ISRU Potential Water Mine Sites; Preliminary Evaluation for NASA Artemis Campaign

The NASA Artemis Campaign aims to return to the Moon to maintain a sustainable presence [1], and In-Situ Resource Utilization (ISRU)is a key part of sustainability. The regions of interest for the Artemis campaign, as outlined in [1] and shown in Fig 1, are at Lunar the South Pole where water ice has been identified. The potential use of this water, and oxygen/hydrogen, for NASA and commercial applications such as refueling vehicles and power systems, and supplying life support consumables is one of the considerations the NASA Artemis team is using to evaluate these regions. As such, analyses are underway to evaluate the ISRU ice mining potential of these regions of interest. To do so, a set of ground rules for ISRU sites have been developed to align with current assumptions for customer needs, hardware capabilities, initially limited infrastructure, and lunar environments/terrain. The customer could be a lander, habitat, or other asset that makes use of ISRU product within the Artemis architecture. At this time, four of the regions of influence (the ‘western’ cluster in Fig. 1) have undergone preliminary ISRU evaluation. It should be noted that variety of other efforts have done similar evaluations of this nature with different assumptions or viewpoints, such as the most recent[2]. However, most evaluations focus on large permanently shadowed regions (PSRs) and craters due to orbital data resolution limitations, whereas early ice mining operations will likely occur in much smaller PSRs

In situ resource utilization↗

Volcanic Field Sites for Artemis Testing and Training

The Artemis Program will reestablish human presence on the Moon and lead to a new era of scientific discovery and exploration. Led by the National Aeronautics and Space Administration (NASA), the Artemis Program is a collaboration of space agencies and companies around the world. An integrated effort between various disciplines of science, engineering, and mission operations is currently developing methods, facilities, and analog field locations to train astronauts and test hardware and concepts of operations. These efforts aim to best prepare for the next steps of human exploration on the lunar surface and beyond. Numerous terrestrial volcanic field sites were evaluated and selected for their unique roles in helping to prepare for the lunar surface mission phases. This effort heavily leveraged the comprehensive academic research conducted at these field sites, as well as the tremendous Apollo heritage. The currently selected volcanic field sites include the San Francisco Volcanic Field in Northern Arizona, the Potrillo Volcanic Field in southern New Mexico, the highlands of Iceland, and the Southwestern Nevada Volcanic Field. Within each of these volcanic field sites numerous specific testing and training locations are being further developed utilizing the analogous terrain and unique features in these regions. Recent Artemis testing and training events have been conducted at a number of these volcanic field sites by both a dedicated Artemis Geology Training Team and a Joint Extra Vehicular Activity (EVA) Testing Team. This presentation will highlight the selected sites as well as the objectives and accomplishments of some of the recent field-testing events and training courses. Additionally, we continually strive to pursue additional sites, locations, data sets, collaborations, and partnerships in this endeavor and welcome knowledge transfer and community input.

Trevor Graff↗

Establishing Trust in NASA’s Artemis Program Computer-Human Interface (CHI) Implementation

The NASA Artemis program will return humans to the moon. This time, with the help of commercial and international partners, the program’s objective is a permanent moon base. The moon base infrastructure, including an orbiting moon station and moon surface assets, will be developed for astronauts to stay for the long haul to learn to live and work on another planet in preparation for an eventual Humans-to-Mars mission. As the roundtrip communication delays increase in deep space exploration, more onboard systems autonomy and functionality will be needed to maintain and control the vehicle or habitat. These mission constraints will change the current Earth-based spacecraft ground control support approach that will demand more safe, efficient, and effective Computer-Human Interface (CHI) control. For Artemis, CHI is defined as the elements that the crew interfaces with-audio, video, lighting, and crew controls. Understanding how CHI will need to evolve to support deep space missions will be critical for the Artemis program-especially crew controls which is the focus of this paper. How does NASA ensure crew controls are reliable to control complex systems and prevent a catastrophic event due to human error-especially when the astronauts could be physiologically and/or psychologically impaired? NASA’s approach to mitigating catastrophic hazards in human spaceflight system development such as crew controls is through a holistic system engineering and Human System Integration methodology that embraces NASA’s Human-Rating Requirements-ensuring human performance characteristics to control/safely recover the crew from hazardous situations within the human interface design are considered. This paper discusses, at a high level, CHI for the Artemis program. Next, a discussion of what it means to human-rate a space system crew controls and how trust in the human-computer interface begins with the NASA human rating requirements. Finally, a discussion on how systems engineering, and the human system integration process ensures that crew control implementation incorporates the NASA human-rating requirements.

Human-Rating↗

Artemis Internal Science Team Update: Data and Software Development

Artemis will reestablish human presence on the Moon and lead to a new era of scientific discovery and exploration. Led by the National Aeronautics and Space Administration (NASA), Artemis includes a collaboration of space agencies and companies from around the world. In support of Artemis, a cross-disciplinary effort of science, engineering, mission operations, and human factors personnel is developing the best methods, facilities, and field locations to test hardware, train astronauts, and evaluate modern concepts of operations. This abstract, as part of the Artemis Internal Science Team (AIST), provides an update to the science-relevant data and software developments and integrated testing efforts that have occurred in 2022.

M. J. Miller↗

Early Artemis Surface Navigation: Challenges, Approaches, and Opportunities

The early Artemis missions represent the return of humanity to the surface of the Moon and provide opportunities for meeting early science and exploration goals. Position, Navigation, and Timing (PNT) capabilities are a fundamental element and inform operational design, flight rules, and the ability to meet these. This paper provides an overview of the needs, potential implementations, challenges, and concepts of operations in the initial human surface missions, Artemis III and IV. These early excursions are a crucial learning opportunity to gain more experience in the actual operational environment for Artemis V and beyond where exploration objectives and complexity increases. As part of the study, the team defined a threshold performance navigation requirement (including position and orientation) to meet crew safe return and assessed a breadth of navigation approaches that could be deployed to augment the crew’s baseline navigation capability. Data was collected in terms of size, mass, power, operational constraints, environment constraints, interface, and performance to define the technical metrics. Given these, the trade team conducted polling among the various Artemis Campaign elements to capture preference, integration challenges, and operational impacts. These were used to develop weightings and inform a ranked order of solutions across each of the early missions. The results of the study recommended augmenting the initial orientation capability with additional navigation sensors to provide coarse position and heading information to the crew to enable a safe contingency walk-back when out of video range. The team identified opportunities for embedding this hardware in future scenarios to provide an integrated solution. With the deployment of the LunaNet’s Lunar Augmented Navigation System, the crew will be able to maintain accurate real-time navigation knowledge with minimal physical impacts. Discussion of future testing and continued analysis is included in this paper. These forward plans and long-term architecture systems will enable a powerful navigation approach for orbiting and surface users, enabling a high level of scientific return and crew safety.

Evan Anzalone↗

Early Artemis Surface Navigation: Challenges, Approaches, and Opportunities

The early Artemis missions represent the return of humanity to the surface of the Moon and provide opportunities for meeting early science and exploration goals. Position, Navigation, and Timing (PNT) capabilities are a fundamental element and inform operational design, flight rules, and the ability to meet these. This paper provides an overview of the needs, potential implementations, challenges, and concepts of operations in the initial human surface missions, Artemis III and IV. These early excursions are a crucial learning opportunity to gain more experience in the actual operational environment for Artemis V and beyond where exploration objectives and complexity increases. As part of the study, the team defined a threshold performance navigation requirement (including position and orientation) to meet crew safe return and assessed a breadth of navigation approaches that could be deployed to augment the crew’s baseline navigation capability. Data was collected in terms of size, mass, power, operational constraints, environment constraints, interface, and performance to define the technical metrics. Given these, the trade team conducted polling among the various Artemis Campaign elements to capture preference, integration challenges, and operational impacts. These were used to develop weightings and inform a ranked order of solutions across each of the early missions. The results of the study recommended augmenting the initial orientation capability with additional navigation sensors to provide coarse position and heading information to the crew to enable a safe contingency walk-back when out of video range. The team identified opportunities for embedding this hardware in future scenarios to provide an integrated solution. With the deployment of the LunaNet’s Lunar Augmented Navigation System, the crew will be able to maintain accurate real-time navigation knowledge with minimal physical impacts. Discussion of future testing and continued analysis is included in this paper. These forward plans and long-term architecture systems will enable a powerful navigation approach for orbiting and surface users, enabling a high level of scientific return and crew safety.

Evan Anzalone↗

Preliminary Medical Risk Estimates and Clinical Capability Needs for Artemis IV

BACKGROUND Human exploration spaceflight missions to the Moon and Mars present unprecedented challenges for in- mission medical care. Compared with the ISS, the greater distance from Earth will mean increased mission durations, communication delays, limited to no resupply opportunities, and significant limitations on the evacuation of ill or injured crew. Spacecraft mass, volume, and power will be curtailed while higher demands will be placed on the crew’s knowledge, skills, and abilities. In this higher risk environment, it is important to: a) quantitatively estimate human system risk attributable to medical conditions, a process known as Probabilistic Risk Analysis, and b) use these estimates to inform medical system design. IMPACT (Informing Mission Planning via Analysis of Complex Tradespaces) is a PRA and medical trade space analysis tool developed by NASA to advance exploration mission medical system design. IMPACT v1.0 improves upon and will soon replace NASA’s existing tool, the Integrated Medical Model, with: a novel evidence base baselined to exploration environments; an expanded list of 119 medical conditions; a significant increase in the number of medical resources that can be utilized and in the flexibility of their use; and the modelling of time lost performing mission-specific tasks due to medical conditions. METHODOLOGY: This abstract will present IMPACT estimates of medical system risk and clinical capability needs for the Artemis IV mission. Artemis IV is currently scheduled for 2026 and will visit the Gateway space station in lunar orbit prior to the second lunar landing of the Artemis program. The baseline Artemis IV mission that was modeled was 28 days in duration with phases including Orion outbound, 4 days on the Gateway space station in lunar orbit, 2 crew on the surface of the Moon for approximately one week, an additional 5 days on Gateway, and then return to Earth. This baseline was compared to two alternative 34-day design reference missions (DRMs) that shifted the lunar sortie earlier or later in the mission profile. Assumptions included 2 female and 2 male crew and a notional medical system mass of 25 kg. Medical system risk estimates include loss of crew life (LOCL), consideration of medical evacuation (known as return to definitive care – RTDC), and an estimate of crew time lost due to medical conditions (Task Time Lost – TTL). The presentation will also describe the medical conditions that are the greatest drivers of risk as well as the clinical capabilities and resources that have the largest effect on risk. RESULTS: All three DRMs had very low probability of LOCL from medical conditions, primarily due to short duration. RTDC was also similar across the DRMs. In contrast, TTL was higher in the early lunar sortie DRM due to earlier occurrence of EVA-related medical conditions. Taken as a whole, there was no clinically significant difference in medical risk across the three missions. Results for clinical capabilities and an example medical equipment list will be discussed but were similar across DRMs.

D Hilmers↗

Preliminary Medical Risk Estimates and Clinical Capability Needs for Late Artemis Missions

BACKGROUND Human exploration spaceflight missions to the Moon and Mars present unprecedented challenges for in- mission medical care. Compared with the ISS, the greater distance from Earth will mean increased mission durations, communication delays, limited to no resupply opportunities, and significant limitations on the evacuation of ill or injured crew. Spacecraft mass, volume, and power will be curtailed while higher demands will be placed on the crew’s knowledge, skills, and abilities. In this higher risk environment, it is important to: a) quantitatively estimate human system risk attributable to medical conditions, a process known as Probabilistic Risk Analysis, and b) use these estimates to inform medical system design. IMPACT (Informing Mission Planning via Analysis of Complex Tradespaces) is a PRA and medical trade space analysis tool developed by NASA to advance exploration mission medical system design. IMPACT v1.0 improves upon and will soon replace NASA’s existing tool, the Integrated Medical Model, with: a novel evidence base baselined to exploration environments; an expanded list of 119 medical conditions; a significant increase in the number of medical resources that can be utilized and in the flexibility of their use; and the modelling of time lost performing mission-specific tasks due to medical conditions. METHODOLOGY: This abstract will present IMPACT estimates of medical system risk and clinical capability needs for the Artemis IV mission. Artemis IV is currently scheduled for 2026 and will visit the Gateway space station in lunar orbit prior to the second lunar landing of the Artemis program. The baseline Artemis IV mission that was modeled was 28 days in duration with phases including Orion outbound, 4 days on the Gateway space station in lunar orbit, 2 crew on the surface of the Moon for approximately one week, an additional 5 days on Gateway, and then return to Earth. This baseline was compared to two alternative 34-day design reference missions (DRMs) that shifted the lunar sortie earlier or later in the mission profile. Assumptions included 2 female and 2 male crew and a notional medical system mass of 25 kg. Medical system risk estimates include loss of crew life (LOCL), consideration of medical evacuation (known as return to definitive care – RTDC), and an estimate of crew time lost due to medical conditions (Task Time Lost – TTL). The presentation will also describe the medical conditions that are the greatest drivers of risk as well as the clinical capabilities and resources that have the largest effect on risk. RESULTS: All three DRMs had very low probability of LOCL from medical conditions, primarily due to short duration. RTDC was also similar across the DRMs. In contrast, TTL was higher in the early lunar sortie DRM due to earlier occurrence of EVA-related medical conditions. Taken as a whole, there was no clinically significant difference in medical risk across the three missions. Results for clinical capabilities and an example medical equipment list will be discussed but were similar across DRMs.

D. Hilmers↗

NASA’s Space Launch System: Powering Artemis and Enabling Discovery

The debut launch of NASA’s super-heavy lift SLS (Space Launch System) rocket in November 2022 opened a new era of deep space exploration. Called the Artemis I mission, the launch sent an uncrewed Orion spacecraft more than 268,000 miles from Earth into a distant retrograde orbit (DRO) about the Moon, before splashing down in the Pacific Ocean 25 days later. While the mission was critical for multiple reasons to NASA’s Artemis campaign, the data collected during the first launch of SLS was vital to understanding how the launch vehicle performs in the flight environment. The test flight provided real-world data to ground and improve models, on-ground testing, and vehicle performance. Data returned show a nominal launch, with many parameters accurate to pre-flight predictions to within tenths of a percent. Equipped with the data, the SLS team is readying the Artemis II vehicle. Beginning with the fourth flight, SLS variants will have multiple upgrades, which increase the capability of the rocket to enable the nation’s most ambitious missions of returning astronauts to the Moon and lunar vicinity. Current hardware progress, as well as Artemis I flight data, will be provided. Additionally, the test programs that enabled the successful first flight will be discussed.

John Honeycutt↗

Assessing the Influence of Decompression Sickness on Medical Risk for Artemis

As NASA begins to shift its focus from LEO missions to the Moon and beyond, our understanding of the risk associated with human spaceflight is challenged by mission profiles and objectives far different from preceding missions. For Artemis, one of these aspects is surface Extra Vehicular Activity (EVA) tempo, in which the crew will perform 3 to 4 surface EVA’s in quick succession. The crew health and performance risk associated with EVA Decompression Sickness (DCS) and its associated countermeasures, is an important consideration for Artemis missions given this new and unprecedented EVA frequency. Successfully completing Artemis mission objectives relies heavily on the crew being able to perform and complete these EVAs. This analysis quantifies how medical risk changes when accounting for the expected increase in DCS risk due to the increase in EVA frequency. If there is an occurrence of DCS during a mission, appropriate downtime needs to be accounted for. Treatment for DCS requires crewmember to stop the current EVA and return to the habitat. This impacts the current EVA the crew is performing, could potentially delay the next EVA, and increases the chance of the crewmember being unable to perform future EVAs. Capturing the downtime and impact of that downtime based on the number of DCS occurrences allows us to better understand how the risk associated with DCS affects the overall medical risk and completion of missions that have more frequent EVA tempo. There are preventative strategies and mitigation countermeasures to decrease the chance of DCS occurring such as different prebreathe protocols, variable suit pressure, and vehicle pressure settings. Modeling the medical risk with and without different DCS countermeasures enables quantitative comparisons of risk reduction associated with each DCS countermeasure. We present results on how these countermeasures affect medical risks and quantify changes in the medical kit contents with respect to the countermeasures implemented within Artemis-class missions.

Clara Gasiewski↗

Artemis I Space Launch System Base Heat Shield Thermal Protection System Performance

The Space Launch System (SLS) Core Stage base heat shield experienced the highest external heating environments on the entire launch vehicle during Artemis I ascent flight. This result was consistent with design predictions. The base heat shield experiences P50 cork combustion dynamics at low altitudes, plume-induced recirculation at moderate altitudes and then in-space base flow physics out to Main Engine Cut-Off (MECO). The base heat shield thermal protection system (TPS) is composed of a P50 cork ablator which is bonded to a substrate. The heat shield protects the gimbal actuation system, RS-25 turbomachinery systems and other aft section sensitive components during ascent. This paper estimates the base heat shield TPS performance from Artemis I using flight data from the NASA Langley Research Center’s Scientifically Calibrated In-Flight Imagery (SCIFLI) Airborne Multispectral Imager (SAMI), development flight instrumentation (DFI) and other TPS recession flight measurements. Predictions from computational and ground test-derived engineering ablation models and observations are also applied. Since no base heat shield substrate thermocouple data were obtained for Artemis I, an estimate of the TPS performance data is derived here. This data assesses thermal margin of the SLS Core Stage base heat shield and best informs the Artemis II Crewed mission to the moon.

aerothermodynamics↗

NASA’s SLS (Space Launch System) Rocket Ready for Artemis II Lunar Mission

In early 2026, NASA will launch the Artemis II mission, an approximately 10-day long lunar mission that will fly three NASA astronauts and one CSA (Canadian Space Agency) astronaut on a free-return trajectory around the Moon, following a one-day checkout of their Orion spacecraft in Earth orbit. The mission will be the first to launch astronauts aboard NASA’s Orion spacecraft and on top of the agency’s SLS (Space Launch System) rocket. The mission will also deploy four 12U CubeSats as secondary payloads from the Orion stage adapter, following Orion separation and departure. The payloads, developed by four of NASA’s international partners, will perform a variety of science and technology investigations. The SLS and Orion for the mission are currently stacked in the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida and are undergoing final preparations to rollout to Launch Pad 39B for a tanking test before launch. In addition to preparations for the Artemis II mission, significant progress is being made on the SLS for the Artemis III mission, which is targeted to return astronauts to the lunar surface no later than 2029. Major components of the core stage and solid rocket boosters are already at NASA Kennedy undergoing build-up for the mission. Data from the Artemis II launch and mission, as well as progress to subsequent missions, as available, will be presented.

Bruce R Askins↗

NASA’s SLS (Space Launch System) Rocket Ready for Artemis II Lunar Mission

In early 2026, NASA will launch the Artemis II mission, an approximately 10-day long lunar mission that will fly three NASA astronauts and one CSA (Canadian Space Agency) astronaut on a free-return trajectory around the Moon, following a one-day checkout of their Orion spacecraft in Earth orbit. The mission will be the first to launch astronauts aboard NASA’s Orion spacecraft and on top of the agency’s SLS (Space Launch System) rocket. The mission will also deploy four 12U CubeSats as secondary payloads from the Orion stage adapter, following Orion separation and departure. The payloads, developed by four of NASA’s international partners, will perform a variety of science and technology investigations. The SLS and Orion for the mission are currently stacked in the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida and are undergoing final preparations to rollout to Launch Pad 39B for a tanking test before launch. In addition to preparations for the Artemis II mission, significant progress is being made on the SLS for the Artemis III mission, which is targeted to return astronauts to the lunar surface no later than 2029. Major components of the core stage and solid rocket boosters are already at NASA Kennedy undergoing build-up for the mission. Data from the Artemis II launch and mission, as well as progress to subsequent missions, as available, will be presented.

Bruce Askins↗

Artemis CubeSats Help Advance Exploration of the Moon, Mars, and Beyond

On April 1, NASA launched the Artemis II mission – the first crewed mission of the Artemis campaign. The nine-day lunar flyby launched on the agency’s SLS (Space Launch System) rocket and had four astronauts test the Orion spacecraft in high Earth orbit and in deep space. Four 12U CubeSats also launched on the mission, housed within the SLS’s Orion stage adapter (OSA). The spacecraft were deployed approximately five-and-a-half hours into the flight, following Orion separation and departure from SLS, as the SLS interim cryogenic propulsion stage (ICPS) and the attached OSA were in a high Earth orbit on an atmospheric disposal trajectory. All four CubeSats were successfully deployed from the launch vehicle. Deployment statuses of the spacecraft, along with updates about the SLS rocket and Artemis missions, are reported in this paper. The paper will also discuss opportunities for CubeSat payloads on future Artemis missions.

Russell Lane↗

Artemis CubeSats Help Advance Exploration of the Moon, Mars, and Beyond

On April 1, NASA launched the Artemis II mission – the first crewed mission of the Artemis campaign. The nine-day lunar flyby launched on the agency’s SLS (Space Launch System) rocket and had four astronauts test the Orion spacecraft in high Earth orbit and in deep space. Four 12U CubeSats also launched on the mission, housed within the SLS’s Orion stage adapter (OSA). The spacecraft were deployed approximately five-and-a-half hours into the flight, following Orion separation and departure from SLS, as the SLS interim cryogenic propulsion stage (ICPS) and the attached OSA were in a high Earth orbit on an atmospheric disposal trajectory. All four CubeSats were successfully deployed from the launch vehicle. Deployment statuses of the spacecraft, along with updates about the SLS rocket and Artemis missions, are reported in this paper. The paper will also discuss opportunities for CubeSat payloads on future Artemis missions.

David Hitt↗

A History of Orion Mission Design, Copernicus Software Development, and the Artemis I Trajectory

This paper describes the history of the on-orbit trajectory design and optimization for the Orion spacecraft at NASA JSC, from the initial design through the execution of the Artemis I test flight. In parallel, the Copernicus trajectory optimization tool was also being developed and was the main tool used for Orion trajectory design during this period. Finally, the paper gives an overview of the Artemis I trajectory that was flown during the Artemis I mission from November 16 - December 11, 2022.

Orion↗

Lunar Pickup Ions Observed by ARTEMIS: Spatial and Temporal Distribution and Constraints on Species and Source Locations

ARTEMIS observes pickup ions around the Moon, at distances of up to 20,000 km from the surface. The observed ions form a plume with a narrow spatial and angular extent, generally seen in a single energy/angle bin of the ESA instrument. Though ARTEMIS has no mass resolution capability, we can utilize the analytically describable characteristics of pickup ion trajectories to constrain the possible ion masses that can reach the spacecraft at the observation location in the correct energy/angle bin. We find that most of the observations are consistent with a mass range of approx. 20-45 amu, with a smaller fraction consistent with higher masses, and very few consistent with masses below 15 amu. With the assumption that the highest fluxes of pickup ions come from near the surface, the observations favor mass ranges of approx. 20-24 and approx. 36-40 amu. Although many of the observations have properties consistent with a surface or near-surface release of ions, some do not, suggesting that at least some of the observed ions have an exospheric source. Of all the proposed sources for ions and neutrals about the Moon, the pickup ion flux measured by ARTEMIS correlates best with the solar wind proton flux, indicating that sputtering plays a key role in either directly producing ions from the surface, or producing neutrals that subsequently become ionized.

Artemis↗