Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “active pressure management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

Efficient Mesofluidic Separation of Large Particles in nuclear slurries - 20408

Efficient and effective particle separation is essential to cleanup of many nuclear wastes. For example, particle separation may be used to accelerate settle-decant bottlenecks that limit the throughput necessary to achieve the U.S. Department of Energy waste cleanup mission in a timely manner. Particle separation may be used to protect downstream processing equipment from pulses of solids that may be encountered near (within a few feet of) liquid-solid interfaces during waste transfer operations, thereby preventing work stoppages. Effective particle separation may permit efficient sludge washing. These are only a few of the ways in which particle separation is important. Yet, efficient and effective particle separation in nuclear processing environments remains challenging. For example, settle-decant operations permit larger and heavier particles to settle, leaving smaller, lighter particles suspended. However, settle-decant operations are slow, convection currents may resuspend solids, hindered settling of multicomponent slurries remains incompletely understood, and predictive models for settling in graduated cylinders fail to match limited observations of settling in large waste tanks. Additionally, pumping operations can cause turbulent resuspension of particles when the pump intake is close to the settled solids layer. Filtration techniques that use membranes or partially permeable barriers retain larger particles, permitting smaller particles to permeate. However, filters, including dead-end filtration, are prone to clogging and caking, operate at elevated pressures due to minimal void volume, and increase in pressure during operations, which require more control systems. Therefore, the need for high throughput particle separation techniques that operate with modest pressure drops persists. A novel mesofluidic separator presents the opportunity to effectively and efficiently accelerate the waste cleanup mission. The separator separates large particles from process streams across a broad range of particle sizes and has no moving parts or media to replace, regenerate, or clean. This separator design has an unusually large void volume, permitting operation at much higher flow rates (and lower pressures) than traditional filtration (e.g., dead-end filtration). Industrial-scale flow rates have been demonstrated. In performance testing, mesofluidic separators operate at might flow rates (>90 gpm (0.0006 m{sup 3}/s) in piping 3 inches (0.08 m) in diameter; Re>10{sup 5}), with modest pressure drop (∼25 psi (170 KPa) in testing). In complex, aggregating waste simulants, the separator loses <25% of flow projected over months without back pulsing or chemical cleaning. Mesofluidic separation presents infrastructure advantages, reduces risk, and provides mission impact. Infrastructure advantages include implementation within existing transfer systems, plug and play without facility modifications to safety systems, and operation at low pressures. The separator is flexible in location, may be positioned within or outside of waste tanks, and may replace or augment dead-end and cross-flow filters. Mesofluidic separation reduces risk by minimizing waste (no media to replace or regenerate and no cleaning chemicals to handle and dispose) and by minimizing filter change-out consistent with as low as reasonably achievable (ALARA) exposure to workers. The potential mission impact of these separators is substantial. The separator has potential to support, simplify, and accelerate in-farm transfers and waste feed delivery. Furthermore, the separator can free up settling and holding tanks in the Direct Feed Low-Activity Waste (DFLAW) mission by reducing or eliminating post-transfer settling and wait times with the potential to free up 1 Mgal (4000 m{sup 3}) of double-shell tank space. This paper quantitatively compares mesofluidic separation to dead-end filtration, discusses scale-up results, and considers the separator's potential to efficiently and effectively reduce the long-term environmental ability of particulate-rich nuclear wastes. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Long-term patterns of post-fire harvest diverge among ownerships in the Pacific West, U.S.A.

Abstract Post-fire harvest (PFH) is a forest management practice designed to salvage value from burned timber, mitigate safety hazards from dead trees, reduce long-term fuels, and prepare sites for replanting. Despite public controversy and extensive ecological research, little is known about how much PFH occurs on private and public lands in the U.S. Pacific West, or how practices changed with shifting forest policy and increasing area burned over the last three decades. We mapped PFH across 2.2M burned hectares in California, Oregon, and Washington between 1986-2017 and used time series intervention analysis to compare trends in area, rate (% of burned area harvested), and mean patch size between private (0.5M ha) and federal (1.6M ha) forest land and across a gradient of burn severity. Harvest rates varied by ownership (4.9% federal, 18.6% private, 8.0% overall), and practices evolved and diverged over the study period. PFH area and rate declined across all ownerships in the mid-1990s during a period of reduced fire activity. As area burned increased between the early 2000s and late 2010s, PFH area rebounded and surpassed late-1980s levels, while rates remained relatively low. On federal lands, PFH practices shifted in the early-to-mid 1990s towards lower rates (10.3% to 3.8%) and smaller patches (6.0 to 3.3 ha), following policy changes and increased litigation. PFH rates on federal lands decreased at all levels of burn severity, with the largest decreases (6.2% to 1.2%) in forests with low tree mortality (i.e. fire refugia). Conversely, private PFH rates and mean patch sizes more than doubled in forests burned at very low-to-moderate severity. Our results highlight how PFH practices have shifted with policy, socio-economic pressure, and increasing area burned over 31 years in the Pacific West. A similar area of post-fire harvest is now dispersed over larger fires, with practices diverging substantially between ownerships.

Zuspan, Aaron (ORCID:0000000315833710)↗

Modeling Efforts to Gain Insight into Historical Leak Events from the Single-Shell Tank A-105 in the Hanford 241-A Tank Farm - 20113

The 241-A Tank Farm is a single-shell tank (SST) farm constructed to store process waste from Hanford nuclear operations. Millions of gallons of nuclear waste were stored in the 241-A Tank Farm SSTs and some of the SSTs leaked in the past. In addition, spills and pipeline leaks during transfers and storage and intentional discharges to cribs and trenches resulted in releasing waste to the ground. Tank liner leaks are referred to as 'leaks' and all other discharges to the soil are referred to as 'releases.' Liquid waste that could be removed by pumping has been removed from all of the SSTs to reduce the potential for future leaks. The most significant historical leak event in 241-A Tank Farm occurred in 1965 when tank A-105 experienced a pressurized steam event. This event resulted in damage to the inner steel liner flooring of A-105, which was separated from the sidewalls over part of its circumference and buckled up to 2.5 m, vertically. During this event up to 7,570 L of contaminated liquid may have leaked to the adjacent soil. This leak occurred under extreme temperature and pressure conditions. Modeling efforts to better understand the nature and extent of historical leaks from subsurface SSTs that were used to store highly radioactive, self-boiling liquid wastes at 241-A Tank Farm have recently been undertaken. These efforts have compiled the available historical information to support a preliminary non-isothermal, multiphase flow and chemical transport modeling effort to re-create the conditions under which the leaks occurred and to formulate a conceptual model as to the extent and distribution of leaked radioactive contaminants in the adjacent soil material. The focus of this work was on developing an understanding of the key features, processes and bounding conditions related to tank A-105 leak events that occurred in the 1960's. The activities include estimation of leak composition, non-isothermal multiphase flow and transport modeling, and geochemical modeling. The STOMP{sup C} Water-Air-Energy modeling code was utilized to implement the three-dimensional representation of the subsurface tank and the surrounding flow field. Once constructed, the model was used to evaluate the conceptual understanding of leaks originating from different parts of the tank under the elevated temperature boundary conditions that were imposed by surrounding tanks at the time of the historical leaks. The chemical evolution of the liquid waste was also evaluated as it leaked from the tank under transient pressure and temperature gradients. The results of the preliminary evaluation suggested the presence of a heat-pipe effect beneath tank A-105 in which water vapor at an elevated temperature is driven away from the base of the tank to a position where water vapor cools, condenses and is then drawn back toward the tank by the strong capillary attraction of the dry soil. A non-sorbing contaminant (Tc-99) was introduced into this flow field to better understand the potential distribution patterns of leaked contaminants that may have occurred during the historical leak events. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Quantifying fission gas adsorption onto natural clinoptilolite in the presence of environmental air and water

Adsorption of noble gas fission products onto naturally occurring minerals is of interest for its potential to retain or retard emissions from nuclear fuel reprocessing operations or underground nuclear explosions. However, experimental studies of trace noble gas adsorption in the presence of air and water have largely focused on synthetic materials, such as activated carbon or metal-organic frameworks. Here, in this study, adsorption of Kr and Xe onto the naturally occurring zeolitic mineral clinoptilolite is studied in the presence of nitrogen and water. By varying the composition of the gas phase and monitoring the change in the combined adsorbate mass, the adsorbed concentration of noble gas is calculated gravimetrically. For dry clinoptilolite, the concentration of adsorbed Kr and Xe is linearly correlated with noble gas pressure and Henry's Law appears satisfactory, despite the presence of nitrogen at atmospheric pressures. However, the presence of water significantly reduces the adsorbed concentration of both Kr and Xe, which is typical in nanoporous sorbents. Here, an empirical bivariate model is presented, combining the Henry's Law adsorption model for a dry adsorbent with the exponential reduction in the presence of water, as reported by Lungu and Underhill in 1999. This model provides a means to estimate the adsorbate concentration at the trace partial pressures and higher water contents relevant to field-scale modeling of fission gas transport through the vadose zone.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Evaluating the impacts of Variable Message Signs on Airport Curbside Performance Using Microsimulation

Curbs play a vital role in facilitating vehicle access and egress for individuals at airports. Inefficiently allocating this resource hinders airport accessibility and productivity, resulting in congestion, longer travel times, and increased pollution. As airport demand fluctuates throughout the day and grows over time, airports face intensified curbside pressure. Yet, curb management research is significantly less robust at airports than in urban areas. Given the unbalanced nature of airport demand—riders tend to arrive simultaneously at specific entrances at certain hours—Variable Message Sign (VMS) arises as a cost-effective technology to divert vehicles from congested to underutilized curbs. Still, VMS implementation faces a significant challenge. Historically, airports have managed VMS heuristically and by intuition rather than an evidence-based approach. This research investigates the impacts of implementing VMS on curb performance at airports. By considering different driver compliance rates (DCR), we aim to determine when the sign should be turned on and off to diverge traffic to avoid undesired externalities while enhancing curb performance. Using a validated agent-based microsimulation model, VISSIM, we analyzed the Seattle-Tacoma (SeaTac) Airport as a case study. We modeled sixteen VMS management scenarios and a baseline where the message sign is not displayed, diverging vehicles between the departures and arrivals access levels at four different moments (early morning, morning, afternoon, and late night). We quantified the effects of VMS using seven metrics, including curb productivity index (CPI), curb accessibility (CA), queue length, queue duration, delay, vehicle counts, and emissions. The results of each scenario were compared against the baseline using absolute and relative changes and Repeated Measures ANOVA. Overall, VMS improved curb performance and traffic conditions at the airport, reducing emissions by 14.8% to 8.9%. Moreover, significant reductions in queue length (1,150 ft to 100 ft) and duration (15 to 144 minutes) were observed in the sending link under all VMS policies. However, impacts on the receiving link varied based on congestion, with significant increases in queue duration (9.8 to 24 min) when congested but no substantial changes in free flow. Notably, diverging vehicles to congested links resulted in non-significant results, and activating late and deactivating late VMS affected curb productivity (-5.8% to -61.4%), curb accessibility (-16.5% to -25.8%), cumulative counts (-33.4% to -59.4%), and vehicle delay (95.98% to 594.3%). Activating VMS before congestion begins in the sending link and deactivating before a queue forms in the receiving link yield the most significant improvements: 8.1% to 10.1% in CPI, 9.4% to9.6% in CA, -29.3% to -77.9% in total delay, -11.6% to -13.9% in total emissions, and 101% to 103% in cumulative counts. As the analysis was made with a wide range of time periods, access levels, driver compliance rates, and scenarios, we believe our findings can provide valuable insights into how airports should manage VMS. Our work introduces a novel approach to the scientific airport literature, as some of our metrics were previously unexplored. Additionally, we propose a methodology that other airports can adopt to maximize their curb performance.

Gutierrez, Jorge D.↗

Findings on Subtask 3.1 - Bakken Rich Gas Enhanced Oil Recovery Project

Total in-place oil for the Bakken petroleum system (BPS) (which includes the Bakken and Three Forks Formations) has been estimated to be 600 billion barrels (bbl). However, BPS wells have decline rates as high as 85% over the first 3 years of their lives, and primary recovery factors typically range from 3% to 10% of original oil in place. Given the low initial recovery rates, even small incremental productivity improvements could dramatically increase technically recoverable oil in the BPS. One potential solution is enhanced oil recovery (EOR) using gas injection, such as carbon dioxide (CO2) or hydrocarbon (HC) gases. While commonly used in conventional reservoirs, CO2 EOR in unconventional tight oil reservoirs has been limited to pilot tests. EOR using rich gas (mixture of methane, ethane, and propane) has also been employed in numerous pilots in several unconventional plays and has recently been successfully applied in the Eagle Ford play. If successful, large-scale gas-based EOR in the BPS could dramatically increase oil productivity and recovery factors and extend the life of the play for decades. While CO2 may be a technically suitable working fluid for EOR in the BPS, supplies are limited and costs for using CO2 in EOR pilots are prohibitively high. Meanwhile, produced gas flaring has presented challenges for BPS operators in North Dakota. Analysis conducted by the North Dakota Pipeline Authority indicates that the current gas-gathering infrastructure in North Dakota is insufficient to accommodate all of the associated gas that is produced from the BPS. The geographically isolated location of North Dakota relative to large natural gas markets, combined with suppressed natural gas prices, has made it economically challenging for industry to invest capital in expanding gas-gathering infrastructure in the state. These circumstances led to a research program conducted by the Energy & Environmental Research Center (EERC) in partnership with Liberty Resources Management Company LLC (LR) to examine the potential to use rich gas injection for EOR and mitigate flaring. A rich gas EOR pilot test was designed and executed by LR at its Stomping Horse development area in Williams County, North Dakota. From July 2018 through May 2019, a total of 160 million standard cubic feet (MMscf) of rich produced gas was injected into the BPS using five different wells in a sequential injection strategy. LR’s Leon–Gohrick drill spacing unit (DSU) was used as the test site. Regulatory oversight was provided by the North Dakota Industrial Commission (NDIC). Technical support was provided by the EERC through a series of laboratory, modeling, and field-based activities, and additional post-pilot research activities incorporated learnings from the test, developed new laboratory data, improved fracture modeling methods, and developed machine learning and big data analytics. The results from the Stomping Horse rich gas EOR pilot activities indicate that developing an effective, economical EOR approach for the BPS will require more field tests. Another key lesson learned from the Stomping Horse tests is that detailed pre- and posttest data on reservoir conditions and fluids production are essential. Robust reservoir characterization provides information that is crucial to creating realistic geomodels and conducting valid dynamic simulations of potential EOR scenarios. A detailed understanding of the completions and production history of offset wells is also necessary for valid test result interpretations. This knowledge is essential to designing the operational parameters of injectivity tests and interpreting the results. A conformance control strategy is also essential to success. Laboratory-based examinations of rich gas interactions with reservoir fluids and rocks were conducted, with an emphasis on determining the ability to mobilize oil in the tight reservoir rocks and shales of the BPS. Injection fluid composition was shown to have a positive impact on reducing reservoir oil minimum miscibility pressure (MMP), reducing interfacial tension (IFT), and altering wettability. IFT and contact angle measurements demonstrated that wettability can be altered in the presence of rich gas, suggesting the potential to improve oil recovery. Iterative modeling of surface infrastructure and reservoir performance using data generated by the various project activities was conducted. A geologic model of the Stomping Horse area was built; history-matched oil, gas, and water production was used in simulations of various EOR scenarios. Early programmatic modeling results were used to support LR’s design and operation of the EOR pilot and to provide insight regarding optimization of future commercial-scale BPS EOR design and operations. Post-pilot modeling focused on alternative methods of understanding complex fracture networks and accelerating simulation time. These led to improved simulation run times and provide excellent history-matching results. Several of these iterative models were used as the bases for developing algorithms into machine learning and big data analytics. History matching in reservoir simulation is time-consuming and computer processing-intensive. Machine learning algorithms were created, and an automated history-matching tool was developed. A large set of synthetic reservoir simulations were created to generate well responses (oil, gas, and water production, well bottomhole pressure [BHP], and tracer or propane breakthrough) for a set of EOR operating parameters that included offset well status (open or closed), injectate (rich gas or propane), injection rate, and injection well BHP. A user interface was developed to provide real-time visualization. Machine learning-based models were developed to provide rapid forecasting of well performance given a set of user-defined EOR operating parameters. These predictive models allow the user to modify the offset well status, injection rate, and injection well BHP and rapidly forecast future production performance. The combination of real-time visualization tools with real-time forecasting tools provides a framework for real-time control—operational changes that the EOR site operator can enact (e.g., changing gas injection rates) to affect the observed performance and potentially improve the EOR outcome. There is great reason to be optimistic about the future of EOR in the Bakken. The results of the laboratory studies suggest significant potential for high rates of oil mobilization using produced field gas injection under the right conditions. The results of the lab studies, combined with rigorous statistical analysis of well production data and associated modeling efforts, confirm the notion that fluid mobility within the reservoir is controlled by fractures. As more knowledge is gained about the nature and distribution of fracture networks in the Bakken, the industry will be in a better position to predict and, ultimately, influence fluid mobility. New field tests are necessary to develop a more complete understanding of those conditions. Thoughtful and creatively engineered field tests within a well-characterized geologic setting will yield the fundamental knowledge needed to take Bakken oil production to the next level. This subtask was cofunded through the EERC–U.S. Department of Energy Joint Program on Research and Development for Fossil Energy-Related Resources Cooperative Agreement No. DE-FE0024233. Nonfederal funding was provided by the North Dakota Industrial Commission’s Oil and Gas Research Program and Computer Modelling Group.

04 OIL SHALES AND TAR SANDS↗

Study of alkaline carbonate cooling to mitigate Ex-Vessel molten corium accidents

To mitigate adverse effects from molten corium following a reactor pressure vessel failure (RPVF), some new reactor designs employ a core catcher and a sacrificial material (SM), such as ceramic or concrete, to stabilize the molten corium and avoid containment breach. Existing reactors cannot easily be modified to include these SMs but could be modified to allow injectable cooling materials. Current reactor designs are limited to using water to stabilize the corium, but this can create other issues such as reaction of water with the concrete forming hydrogen gas. Here the novel SM proposed is a granular carbonate mineral that can be used in existing light water reactor plants. The granular carbonate will decompose when exposed to heat, inducing an endothermic reaction to quickly solidify the corium in place and producing a mineral oxide and carbon dioxide. Corium spreading is a complex process strongly influenced by coupled chemical reactions, including decay heat from the corium, phase change, and reactions between the concrete containment and available water. A recently completed Sandia National Laboratories laboratory directed research and development (LDRD) project focused on two research areas: experiments to demonstrate the feasibility of the novel SM concept, and modeling activities to determine the potential applications of the concept to actual nuclear plants. Small-scale experiments using lead oxide (PbO) as a surrogate for molten corium demonstrate that the reaction of the SM with molten PbO results in a fast solidification of the melt due to the endothermic carbonate decomposition reaction and the formation of open pore structures in the solidified PbO from CO 2 released during the decomposition. A simplified carbonate decomposition model was developed to predict thermal decomposition of carbonate mineral in contact with corium. This model was incorporated into MELCOR, a severe accident nuclear reactor code. A full-plant MELCOR simulation suggests that by the introduction of SM to the reactor cavity prior to RPVF ex-vessel accident progression, e.g., core-concrete interaction and core spreading on the containment floor, could be delayed by at least 15 h; this may be enough for additional accident management to be implemented to alleviate the situation.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Challenges and Solutions in Operation and Lay-Up of the Modular Caustic- Side Solvent Extraction Unit - 20078

The Modular Caustic-Side Solvent Extraction (CSSX) Unit (MCU) was designed and constructed to provide interim salt waste processing so that the Liquid Waste Disposition Program (LWDP) could continue waste removal and tank closure until start-up of the Salt Waste Processing Facility (SWPF). MCU processes Clarified Salt Solution (CSS), or salt solution (SS) that has undergone actinide removal/filtration, to produce two waste streams: the cesium laden Strip Effluent (SE), which is incorporated into glass at the Defense Waste Processing Facility (DWPF), and the cesium depleted Decontaminated SS (DSS), which is incorporated into grout at the Saltstone Production Facility (SPF). MCU completed start-up in 2008 with an initial operating life of 3 years and design life of 5 years. Prior to reaching the end of the design life, multiple critical components were upgraded and/or replaced to mitigate risks associated with any delays in SWPF start-up. During the remainder of operation (until June 2019), MCU was challenged to maximize processing with minimal additional modifications to repair/improve aging infrastructure, while maintaining low levels of risk to workers and the environment. Notable challenges during the extended operating life of the facility involved both mechanical and operational issues. Two of the most significant issues were the increased frequency of Process Vessel Ventilation (PVV) High Efficiency Particulate Air (HEPA) filter change-outs and the biofouling of the SE coalescer (SEC). The major impacts of both issues were that replacement of these components 1) resulted in high exposure to workers, and 2) required substantial downtime, thus hindering achievement of processing goals. PVV HEPA filter replacements are required based on dose rate and differential pressure (dP) limits. After introducing a higher-curie feed to MCU, the operating time between change outs was reduced by approximately half. SEC replacements are required based on dP limits. After restarting from an extended outage, the operating life of the SEC was significantly reduced by more than half due to biofouling. As a result of extensive troubleshooting and process improvements, the facility was able to recover performance and extend the operating life of the PVV HEPA filters and the SEC media. Through troubleshooting both of these issues, the facility was also able to learn from prior experience and adapt in order to minimize down time and maintain throughput. Although the facility took advantage of short periods of downtime to perform nonintrusive troubleshooting and minor corrective/preventative maintenance activities, longer outages were periodically required for corrective maintenance involving process cell entry. During these outages, remote tools and specialized shield plates were employed to minimize dose to workers. Mock-ups of non-routine maintenance activities were critical to early identification of potential issues and improvements, which shortened outage duration. Consistent with the facility's operational strategy, evolutions needed for MCU layup were identified and sequenced to ensure safe conditions within the facility, meet pre-defined criteria for lay-up configuration, and protect workers, while minimizing the impact to SWPF integration. De-inventory and flushing of process areas was prioritized so that the total residual inventory was reduced as efficiently as possible. This paper discusses lessons learned and best practices from troubleshooting unique issues, performing complex maintenance activities, and implementing a layup strategy that best supports the overall system mission. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Evaluation of Engineered Barrier Systems (FY19 Report)

This report describes research and development (R&D) activities conducted during fiscal year 2019 (FY19) specifically related to the Engineered Barrier System (EBS) R&D Work Package in the Spent Fuel and Waste Science and Technology (SFWST) Campaign supported by the United States (U.S.) Department of Eneregy (DOE). The R&D activities focus on understanding EBS component evolution and interactions within the EBS, as well as interactions between the host media and the EBS. A primary goal is to advance the development of process models that can be implemented directly within the Genreric Disposal System Analysis (GDSA) platform or that can contribute to the safety case in some manner such as building confidence, providing further insight into the processes being modeled, establishing better constraints on barrier performance, etc.The FY19 EBS activities involved not only modeling and analysis work, but experimental work as well. The report documents the FY19 progress made in seven different research areas as follows: (1) thermal analysis for the disposal of dual purpose canisters (DPCs) in sedimentary host rock using the semianalytical method, (2) tetravalent uranium solubility and speciation, (3) modeling of high temperature, thermal-hydrologic-mechanical-chemical (THMC) coupled processes, (4) integration of coupled thermalhydrologic- chemical (THC) model with GDSA using a Reduced-Order Model, (5) studying chemical controls on montmorillonite structure and swelling pressure, (6) transmission x-ray microscope for in-situ nanotomography of bentonite and shale, and (7) in-situ electrochemical testing of uranium dioxide under anoxic conditions. The R&D team consisted of subject matter experts from Sandia National Laboratories, Lawrence Berkeley National Laboratory (LBNL), Los Alamos National Laboratory (LANL), Pacific Northwest National Laboratory (PNNL), the Bureau de Recherches Géologiques et Minières (BRGM), the University of California Berkeley, and Mississippi State University. In addition, the EBS R&D work leverages international collaborations to ensure that the DOE program is active and abreast of the latest advances in nuclear waste disposal. For example, the FY19 work on modeling coupled THMC processes at high temperatures relied on the bentonite properties from the Full-scale Engineered Barrier EXperiment (FEBEX) Field Test conducted at the Grimsel Test Site in Switzerland. Overall, significant progress has been made in FY19 towards developing the modeling tools and experimental capabilities needed to investigate the performance of EBS materials and the associated interactions in the drift and the surrounding near-field environment under a variety of conditions including high temperature regimes.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Generic Post-Closure Safety Assessment for Deep Borehole Disposal of Heat-Generating Waste - 20451

The deep borehole disposal (DBD) concept for high-activity waste consists of drilling a large-diameter borehole into crystalline basement rock to a depth of about 5,000 m, placing waste packages in the lower portion of the borehole - the waste emplacement zone - and sealing and plugging the upper portion of the borehole with a combination of bentonite, cement plugs, and sand or crushed rock ballast. The waste emplacement zone is several times deeper than typical mined repositories and is well below the typical maximum depth of fresh groundwater resources. Recent work describes a generic reference case for deep borehole disposal of Cs and Sr capsules stored at the Hanford Site. Two scenarios are described: an undisturbed (nominal) scenario, and disturbed scenario, in which a waste package is stuck adjacent to a transmissive fracture zone in crystalline basement. Simulations of the processes affecting radionuclide release and transport in the two scenarios provide the basis for quantitative post-closure performance assessment (PA) of the reference case. This paper presents a probabilistic PA of the stuck waste package scenario, i.e. uncertainties affecting radionuclide mobilization and transport are propagated through 200 realizations of a predictive model to quantify uncertainties in predicted radionuclide concentrations within the borehole and the fracture zone. Simulations predict no radionuclide transport in the borehole to distances greater than 100 m above the stuck waste package. An assumed lateral pressure gradient results in predictions of limited radionuclide transport in the fracture zone at a lateral distance of 200 m from the stuck waste package. These results complement previous results for the nominal scenario and contribute to the development of a generic safety case for DBD. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

ALARA Review for Venting of Flanged Tritium Waste Containers (FTWCs) at TA-54

This project will vent headspace hydrogen and oxygen from specialized high-pressure storage vessels called flanged tritium waste containers (FTWCs). There are four of these containers located in Los Alamos National Laboratory’s (LANL’s) Technical Area 54 (TA-54), Building 1028. This building is in the southwest corner of LANL’s Material Disposal Area G. The vented headspace gas is expected to contain tritium in the form of water vapor, elemental hydrogen or a combination of both. The venting operation is expected to take place in 2025. There will be a series of operational readiness reviews prior to venting activities commencing. The FTWCs at TA-54 contain tritium-contaminated metal parts and molecular sieve media, which is a pebble-like material used to absorb water vapor from the air. This molecular sieve media inside the FTWCs is contained in metal canisters, along with some loose media material in bags. Over time, tritiated water vapor that had been adsorbed onto the media can become liberated into the FTWC headspace gas. Radiolysis can cause separation of the water vapor into its hydrogen and oxygen components, resulting in the potentially hazardous gas mixture within the FTWC. LANL has determined that continued tritium storage in these containers can pose an unsafe condition due to possible hydrogen and oxygen gas buildup within the FTWCs with a potential for explosion if sparks are generated within the FTWCs. To mitigate this hazard, the FTWCs will be stabilized by venting them in-place to remove hazardous gases.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Materials for Advanced Ultra-Supercritical (A-USC) Steam Turbines --- A-USC Component Demonstration

The U.S. Advanced Ultra-Supercritical (A-USC) Consortium was formed in 2001 as a government/industry program, sponsored by the U.S. Department of Energy (DOE) and the Ohio Coal Development Office (OCDO) and cost shared by industrial and not-for-profit partners. The purpose of the consortium was to advance the state of the art for power generation by evaluating and developing materials that allow the use of advanced steam cycles in coal-based power plants. These advanced cycles, with steam temperatures up to 1400°F (760°C), can increase the efficiency of coal-fired boilers from an average of 35% (current U.S. fleet) to more than 45% higher heating value (HHV) (>49% lower heating value [LHV]). The increase in a plant’s efficiency is limited unless new materials able to withstand these higher operating temperatures and pressures are identified and approved for use. The A-USC Consortium identified these needed materials during earlier phases of the program. It developed the welding and joining techniques along with manufacturing processes for casting and wrought products made from these new high-nickel alloys. It subjected these materials to extensive laboratory and steam loop testing. It then obtained ASME code approval for their use in U.S. boiler systems. The program’s successes leave this last remaining activity (ComTest Phase 2) that the U.S. utility industry has recommended to be accomplished prior to commercialization. The focus of the activity is the evaluation and demonstration of commercial readiness for “full scale” components to be made from these nickel-based alloy materials and provided by a U.S. domestic supply chain that is new to working with these alloys. According to studies completed by the Electric Power Research Institute (EPRI), the cost of an A-USC plant is approximately 20% higher than a non-A-USC plant because of its use of nickel-based alloys needed for the high temperature operating conditions. However, CO 2 reductions of approximately 30% from the current fleet average provide a strong incentive for its consideration. The actual costs and perceived value for CO 2 abatement will determine whether new or retrofitted plants are undertaken, although decisions to build A-USC plants in India would indicate its economic feasibility while also being part of a global carbon emissions strategy. The work by the A-USC Consortium, prior to the start of the ComTest project, has included lab scale and pilot scale materials testing, both in air and oxy-combustion. This testing has included air-cooled and steam-cooled “loops” that were installed into existing operating utility boilers to gain exposure of these materials to realistic conditions of high temperature and corrosion caused by the constituents in the coal ash. The A-USC Consortium also gained ASME Code approval of the Inconel 740 material, has cast and extruded the largest high nickel precipitation hardened alloys, and developed unique welding techniques to avoid problems identified by the competing European program. However, as valuable as these material test loops and accomplishments have been for obtaining information, their scale is below that required to minimize the risk associated for a U.S. utility to build a multibillion-dollar A-USC power plant. To reduce the final identified risk barrier to full-scale commercialization of these advanced materials and systems, the A-USC Consortium (guided by a utility industry advisory committee) has identified the key areas of the technology they desire to see as being capable of full-scale manufacturing and/or fabrication from an identified, capable U.S. domestic supplier base. A significant amount of work was accomplished during Phase 1 to identity the components, as well as the component size, that would be manufactured from advanced alloys such as Inconel 740H or Haynes 282 alloys. Pathways to supply these components for ComTest have been identified, as well as any further development that would be required. The Phase 2 effort used Phase 1 findings for designing these key full-scale components for A-USC boilers and turbines to include large castings; extrusions, forgings, fabrication of water walls and steam loops with headers from advanced materials, raw material (such as pipe extrusion billets) are at the commercial readiness level to permit advancement to a demonstration project. The Phase 2 work scope was addressed by a diverse team, including government, industry, and not-for-profit partners. The work scope under Phase 2 addressed fabrication of components identified as being outside of the proven capabilities of the existing supply chain, including the following: Steam turbine rotor forging and Haynes 282 nozzle carrier casting Superheater and reheater header and tube assemblies Large-diameter pipe extrusions and forgings Test valve articles to support ASME Code approval. In addition, key fabrication steps were completed, including boiler weld overlays and simulated field repairs. Throughout, extensive inspection and quality assurance testing of the components were performed. The team worked to advance ASME Code approval for key components and processes. Although much of the focus of ComTest Phase 2 was the high-temperature nickel-based alloy materials, a broader range of materials were incorporated, which would be representative of the materials used in full-scale A-USC power plant applications and have cross-cutting applicability on other high-temperature power generation options, such as advanced nuclear, supercritical CO 2 cycles, and central solar receivers. This report that has been submitted is organized in the following manner: Section 1 contains an Executive Summary. Section 2 discusses the ComTest project background and organization. Section 3 discusses project management and reporting. Section 4 discusses the procurement of nickel-based alloy and other A-USC materials and components. Section 5 discusses the fabrication of procurement of nickel-based alloy and other A-USC materials and components. Section 6 discusses the fabrication of cast nickel-based A-USC steam turbine components. Section 7 discusses the fabrication of forged nickel-based A-USC steam turbine piping and steam pipe components. Section 8 discusses the qualification of pressure relieve valves (PRVs) for A-USC power plants. Section 9 discusses proposed plans for future evaluation of A-USC components. Section 10 contains the summary and conclusion.

01 COAL, LIGNITE, AND PEAT↗

Interfacial Pressure Improves Calendar Aging of Lithium Metal Anodes

Lithium metal is a very attractive anode material because its theoretical specific capacity is approximately 10 times higher than conventional graphite anodes. Despite great promise, Li anodes suffer from capacity fade due to instabilities with the electrolyte as well as stranding of active Li. We have previously shown that applied interfacial pressure improves Li anode cycling because the pressure reduces the propensity for Li isolation and enables easier reconnection. Many researchers have also shown that calendar aging can lead to Li capacity loss and this has been attributed to either electrolyte decomposition with concurrent Li corrosion or to the formation of stranded Li. Our prior research focused on calendar aging during cycling suggests the mechanism for calendar aging is largely related to stranding of Li during rest and reconnection of the stranded Li upon further cycling, evidenced by similar average Coulombic efficiencies and Li loss in cells with and without rest. Because our calendar aging studies suggest Li stranding as a major cause of Coulombic efficiency drops and our Li cycling studies suggest this can be mitigated partially through applied interfacial pressure, we hypothesized that applied pressure would improve calendar aging by reducing stranded Li and enabling reconnection. We systematically varied applied pressure (0-1000 kPa) on Li metal anodes during cycling tests with and without intermittent calendar aging periods. Though the Coulombic efficiency decreases during aging periods, the lost capacity is recovered during subsequent cycles, as shown though average Coulombic efficiency and cumulative Li capacity loss analysis. We find that application of pressure partially mitigates calendar aging, in accordance with our hypothesis that calendar aging is caused by Li standing and can be mitigated to some degree with interfacial pressure. This is further supported by our results showing that the average Coulombic efficiency and cumulative Li capacity losses are similar over 50 cycles for cells that were continuously cycled and cells with periodic calendar aging periods. This result indicates that the losses during aging are reversible, which is consistent with Li stranding and reconnection. We show that pressure is one mitigation technique that helps reduce Li calendar aging in this study, but our finding that calendar aging is primarily governed by the stranding and reconnection of dead Li has wider implications. This research suggests that other mitigations which have been shown to prevent dead Li formation or encourage reconnection during cycling would also likely be successful for the purpose of improving calendar aging. The authors were supported by a Laboratory Directed Research and Development (LDRD) program. This work was performed, in part, at the Center for Integrated Nanotechnologies, an Office of Science User Facility operated for the U.S. Department of Energy (DOE) Office of Science. Sandia National Laboratories is a multi-mission laboratory managed and operated by National Technology & Engineering Solutions of Sandia, LLC (NTESS), a wholly owned subsidiary of Honeywell International Inc., for the U.S. Department of Energy's National Nuclear Security Administration (DOE/NNSA) under contract DE-NA0003525. This written work is authored by an employee of NTESS. The employee, not NTESS, owns the right, title and interest in and to the written work and is responsible for its contents. This work was authored in part by the National Renewable Energy Laboratory, operated by Alliance for Sustainable Energy, LLC, for the U.S. Department of Energy (DOE) under Contract No. DE-AC36-08GO28308. Any subjective views or opinions that might be expressed in the written work do not necessarily represent the views of the U.S. Government.

applied pressure↗

Nuclear Safety [Vol. 36, No. 2, July-December 1995]

Nuclear Safety is a journal that covers significant issues in the field of nuclear safety. Its primary scope is safety in the design, construction, operation, and decommissioning of nuclear power reactors worldwide and the research and analysis activities that promote this goal, but it also encompasses the safety aspects of the entire nuclear fuel cycle, including fuel fabrication, spent-fuel processing and handling, and nuclear waste disposal, the handling of fissionable materials and radioisotopes, and the environmental effects of all these activities. Table of Contents for this issue follows. THE CHORNOBYL ACCIDENT: 195 The Chornobyl Accident Revisited, Part III: Chernobyl Source Term Release Dynamics and Reconstruction of Events During the Active Phase, A. R. Sich; GENERAL SAFETY CONSIDERATIONS: 218 Second ANS Workshop on the Safety of Soviet-Designed Nuclear Power Plants, R. A. Bari; 234 Elements of a Nuclear Criticality Safety Program, C. M. Hopper; 243 Rickover, Excellence, and Criticality Safety Programs, R. E. Wilson; ACCIDENT ANALYSIS: 249 Transient Analysis of the PIUS Advanced Reactor Design with the TRAC-PF1/MOD2 Code, B. E. Boyack, J. L Steiner, S. C. Harmony, H. J. Stumpf, and J. F. Lime; 278 The Hierarchy-By-Interval Approach to Identifying Important Models that Need Improvement in Severe-Accident Simulation Codes, T. J. Heames, M. Khatib-Rahbar, J. E. Kelly, R. P. Jenks-Johnson, and Y.-S. Chen; 290 RELAP5/MOD3 Code Coupling Model, R. P. Martin; 299 Missiles Caused by Severe Pressurized-Water Reactor Accidents, R. Krieg; DESIGN FEATURES: 310 Validation of COMMIX with Westinghouse AP-600 PCCS Test Data, J. G. Sun, T. H. Chien, J. Ding, and W T. Sha; ENVIRONMENTAL EFFECTS: 321 Spent Nuclear Fuel Characterization for a Bounding Reference Assembly for the Receiving Basin for Off-Site Fuel, S. D. Kahook, R. L. Garrett, L. R. Canas, and M J. Beckum; OPERATING EXPERIENCES: 332 Reactor Shutdown Experience, Compiled by J. W. Cletcher; U.S. NUCLEAR REGULATORY COMMISSION INFORMATION AND ANALYSES: 335 Reactor Coolant System Blowdown at Wolf Creek on September 17, 1994, J. V. Kauffman and S. L. Israel; RECENT DEVELOPMENTS: 344 Reports, Standards, and Safety Guides, D. S. Oueener; 349 Proposed Rule Changes as of June 30, 1995; ANNOUNCEMENTS: 320 Symposium on Acceptability of Risk From Radiation—Application to Manned Space Flight; 320 24th DOE/NRC Nuclear Air Cleaning and Treatment Conference; 361 Radiation Biology and Radiation Protection— Modern Developments and Tendencies in Radiation Biology; 362 1997 IEEE Sixth Conference on Human Factors and Power Plants; 354 The Authors; 360 Reviewers of Nuclear Safety, Vol. 36.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Nuclear Safety [Vol. 36, No. 2, July-December 1995]

Nuclear Safety is a journal that covers significant issues in the field of nuclear safety. Its primary scope is safety in the design, construction, operation, and decommissioning of nuclear power reactors worldwide and the research and analysis activities that promote this goal, but it also encompasses the safety aspects of the entire nuclear fuel cycle, including fuel fabrication, spent-fuel processing and handling, and nuclear waste disposal, the handling of fissionable materials and radioisotopes, and the environmental effects of all these activities. Table of Contents for this issue follows. THE CHORNOBYL ACCIDENT: 195 The Chornobyl Accident Revisited, Part III: Chernobyl Source Term Release Dynamics and Reconstruction of Events During the Active Phase, A. R. Sich; GENERAL SAFETY CONSIDERATIONS: 218 Second ANS Workshop on the Safety of Soviet-Designed Nuclear Power Plants, R. A. Bari; 234 Elements of a Nuclear Criticality Safety Program, C. M. Hopper; 243 Rickover, Excellence, and Criticality Safety Programs, R. E. Wilson; ACCIDENT ANALYSIS: 249 Transient Analysis of the PIUS Advanced Reactor Design with the TRAC-PF1/MOD2 Code, B. E. Boyack, J. L Steiner, S. C. Harmony, H. J. Stumpf, and J. F. Lime; 278 The Hierarchy-By-Interval Approach to Identifying Important Models that Need Improvement in Severe-Accident Simulation Codes, T. J. Heames, M. Khatib-Rahbar, J. E. Kelly, R. P. Jenks-Johnson, and Y.-S. Chen; 290 RELAP5/MOD3 Code Coupling Model, R. P. Martin; 299 Missiles Caused by Severe Pressurized-Water Reactor Accidents, R. Krieg; DESIGN FEATURES: 310 Validation of COMMIX with Westinghouse AP-600 PCCS Test Data, J. G. Sun, T. H. Chien, J. Ding, and W T. Sha; ENVIRONMENTAL EFFECTS: 321 Spent Nuclear Fuel Characterization for a Bounding Reference Assembly for the Receiving Basin for Off-Site Fuel, S. D. Kahook, R. L. Garrett, L. R. Canas, and M J. Beckum; OPERATING EXPERIENCES: 332 Reactor Shutdown Experience, Compiled by J. W. Cletcher; U.S. NUCLEAR REGULATORY COMMISSION INFORMATION AND ANALYSES: 335 Reactor Coolant System Blowdown at Wolf Creek on September 17, 1994, J. V. Kauffman and S. L. Israel; RECENT DEVELOPMENTS: 344 Reports, Standards, and Safety Guides, D. S. Oueener; 349 Proposed Rule Changes as of June 30, 1995; ANNOUNCEMENTS: 320 Symposium on Acceptability of Risk From Radiation—Application to Manned Space Flight; 320 24th DOE/NRC Nuclear Air Cleaning and Treatment Conference; 361 Radiation Biology and Radiation Protection— Modern Developments and Tendencies in Radiation Biology; 362 1997 IEEE Sixth Conference on Human Factors and Power Plants; 354 The Authors; 360 Reviewers of Nuclear Safety, Vol. 36.

05 NUCLEAR FUELS↗

North Dakota Integrated Carbon Storage Complex Feasibility Study. Final report

In spring 2017, the Energy & Environmental Research Center (EERC) initiated an effort to determine the feasibility of developing a commercial-scale CO 2 geologic storage complex able to store 50+ million tonnes (Mt) of CO 2 in central North Dakota safely, permanently, and economically. The objective was to fulfill the goals of the U.S. Department of Energy (DOE) Carbon Storage Assurance Facility Enterprise (CarbonSAFE) Initiative and address technical and nontechnical challenges specific to commercial-scale deployment of a CO2 storage project. The findings clearly show that the concept of capturing CO 2 from a lignite-fired electrical generation facility in central North Dakota and safely and permanently storing the CO 2 in the deep subsurface is indeed technically, economically, and socially feasible. This project evaluated two study areas and their respective geologic storage complexes located adjacent to separate coal-fired facilities in North Dakota: the Basin Electric Power Cooperative (BEPC)-owned Great Plains Synfuels Plant (GPSP) and the Minnkota Power Cooperative (Minnkota)-owned Milton R. Young Station (MRYS). These locations, one with CO 2 capture in place and an existing CO 2 pipeline, are bolstered by progressive North Dakota pore space ownership and long-term liability laws. These elements and a motivated team created an ideal synergistic scenario for ensuring success of the CarbonSAFE Initiative and promoting North Dakota’s statewide vision for carbon management. The project included drilling two new geologic characterization wells, integrating an existing 3-D seismic survey, creating a geologic model subsequently used for injection simulation, a risk assessment, public outreach, and generating a site development plan based on results. In addition, the performance of select National Risk Assessment Partnership tools was evaluated. The geologic characterization wells were drilled ~5600 feet deep to the Broom Creek Formation; ~350 feet of core was retrieved from each well. The core included the Broom Creek (targeted injection zone) and a portion of the overlying Opeche Shale (seal). The Flemmer-1 well, west of Beulah, North Dakota, yielded 169 feet of sandstone. The BNI-1 well located south of Center, North Dakota, yielded 124 feet of sandstone. In each case, laboratory analysis of the sandstone showed permeability in the 300–1000-mD range, with porosity of 20%–30%. The Flemmer-1 well was sited within the boundaries of an existing 3-D seismic survey. Colocating the well with the seismic survey maximized the relationship between new and legacy data and developed a first-of-its-kind interpretation of the geologic fabric of the Broom Creek. Geologic characterization data were integrated into a 5544-mi 2 geocellular model that encompassed both new wells and stratigraphy from the surface to the Amsden Formation (underlying the Broom Creek). The model was later expanded vertically to include the deeper Black Island–Deadwood interval to examine its potential viability as a storage target. The geocellular model provided the foundation for dynamic simulation of CO 2 into the Broom Creek. Results of the simulation suggest that the Broom Creek could accept the DOE target rate of 2 Mt/yr of CO 2 into as few as two wells. To bracket the expected capture from MRYS, simulations were also investigated for a 4-Mt/yr rate near MRYS. Although more wells are needed (two additional), the Broom Creek still has the storage resource to accept the CO 2 at the increased rate. A risk assessment exercise was conducted to identify and assess technical and nontechnical risks that could prevent potential candidate storage complexes within the study area from serving as commercial storage sites. The assessment identified and evaluated six technical risk categories: 1) CO 2 injectivity, 2) storage capacity, 3) lateral migration of CO 2 , 4) lateral pressure propagation, 5) vertical migration of CO 2 or formation brine, and 6) induced seismicity. Following two rounds of analysis and scoring, no risks were determined to preclude continued efforts to develop carbon capture, utilization, and storage (CCUS) in central North Dakota. The risk assessment results will be used to guide future site characterization, modeling and simulation, and monitoring activities. A specific nontechnical strategic risk based on challenges that may be realized in amalgamation of pore space resulted in vertically expanding the geologic model to incorporate the potential for stacked storage in multiple saline reservoirs. By including the Black Island–Deadwood interval (the basal sedimentary reservoir in this region), the amalgamated areal extent could be reduced by as much as 45%. Working with a smaller geographic area reduces risks and costs associated with monitoring and pore space leasing. An economic evaluation incorporating capture; transport (<5 mi); Class VI wells; permitting; and monitoring, verification, and accounting suggests implementing commercial-scale CCUS is economically attractive if the federal tax benefits of 45Q are included. This is validated by Minnkota’s continued pursuit of CO 2 capture and geologic storage at MRYS through its Project Tundra initiative, indicating that there is a business case for CCUS in central North Dakota. Currently, North Dakota is the only state with underground injection control (UIC) Class VI primacy. Built into the North Dakota Century Code is a series of regulatory requirements that guide the process to obtain a Class VI CO 2 storage facility permit. As part of this project, a site development plan was compiled to assure compliance with North Dakota’s requirements to permit a commercial-scale CO 2 storage operation and includes a prospective time line encompassing a general breakdown of activities. In total, an estimated 30 months would be needed to execute the necessary steps to attain a North Dakota CO 2 storage facility permit. Outreach was an integral part of the project and encompassed any project-related activity that had contact or exposure beyond the project team. The goals of outreach were to foster an environment from which stakeholders could make informed decisions about the project and gauge community receptiveness to a CCUS project. A consistent set of messages and outreach products were developed in conjunction with an outreach advisory board that integrated project partners and team members. To gauge public acceptability of geologically storing CO 2 , 5611 households in the project area were invited to participate in an online survey. The survey results indicate that the public attitude regarding CCUS is neutral to positive, with strong sentiment that CO 2 capture and storage may be an approach to maintain the economic vitality of the region. To achieve project objectives, critical support in the form of financial backing, engineering evaluations, site access, outreach collaboration, operations data, risk assessment/evaluation, and software access was provided by BEPC, the North Dakota Industrial Commission Lignite Research Council, ALLETE Clean Energy, BNI Energy, North American Coal Corporation, Minnkota, Prairie Public Broadcasting, Computer Modelling Group Ltd., and Schlumberger.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Transporting Non-Compliant TRU Wastes in the OPTIMUS{sup TM} Packages - 20493

The OPTIMUS{sup TM} product line of packages was developed with the purpose of providing a versatile and modular packaging option for shipping problematic wastes and fissile material contents. The product line includes a high-activity design in the OPTIMUS-H and a low activity design in the OPTIMUS-L. The two variants utilize a singular containment vessel design, that is enclosed in different protective components that offer different levels of shielding along with thermal and impact protection. The thick shielding provided by the OPTIMUS-H packaging allows for higher activity contents than the OPTIMUS-L to be transported. But the lightweight design of the OPTIMUS-L packaging allows for more packages to be transported in a single shipment. The containment vessel design shared between the two packages provides leak-tight containment of all radioactive contents along with the capabilities to easily leak test and the option to inert and backfill the contents, as necessary, prior to each shipment of the package. Together the OPTIMUS package designs offer significant flexibility and are capable of handling a wide variety of waste materials and other radioactive contents. One of the primary contents covered in the initial design effort for these packages is TRU waste contents beyond the standard waste materials that are compliant with the WIPP Waste Acceptance Criteria. More specifically, the initial content of interest is TRU Waste drums containing sealed containers with potentially flammable gases. While there are multiple other packaging options available for transporting standard WIPP compliant TRU wastes, the goal of the OPTIMUS packages is to offer a superior option for transporting both standard TRU wastes as well as the more problematic non-compliant wastes, among other contents. The non-compliant TRU waste contents explicitly included for the OPTIMUS packages are standard aerosol cans and DOT 3E lecture bottles. However, the methods applied for the package containment can be easily adjusted to cover other sealed container types with potentially flammable gases. The primary challenges with including these items are both the obvious issue of potential for flammable gases (e.g. aerosol propellants) in the package, but also the uncertainty in the exact state of the contents. Because these desired contents are waste materials, the characterization of the materials present in the waste may include some uncertainties. For example, though it may be known that there are one or more aerosol cans in a TRU waste drum, it may not be known if this can is full, spent, or anywhere in between. Also there may be equal uncertainty in the contents of the aerosol can, specifically in the potentially flammable propellant remaining in the can. To include these types of non-compliant items as acceptable contents for the package, the methods utilized in the safety analyses of the OPTIMUS packages must consider all of the uncertainties in the characterization of the waste. The methods utilized cover a range of concerns with transporting contents of this nature including pressure buildup, gas generation, and gaseous combustion for demonstrating the containment of the package. The ability to transport these problematic contents in the OPTIMUS packages gives TRU waste generating sites the option to relocate these drums to an offsite location where the non-compliant items can be properly managed through removal or destruction. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Radiation Hardened Foam Cold Test Plan - Phase II: Foam Characterization Testing and Environmental Chamber Testing of FoamBag Fixative Foam

This document outlines the Phase II test objectives and implementation plan for a down-select foam fixative technology intended to facilitate activities in support of the Savannah River Site (SRS) F/H labs deactivation and decommissioning (D&D) efforts. It is a collaborative effort between Savannah River National Laboratory (SRNL), Florida International University (FIU), and the SRS F/H labs team intended to test and evaluate the potential of a polyurethane resin foam in mitigating the release of contamination during dismantling operations on radioactively contaminated piping in legacy facilities. The cold test plan addresses specific requirements highlighted by site and safety personnel and will be executed at FIU and SRNL test and lab facilities. Results from the cold tests will inform the hot test at F/H labs, which will use the foam fixative to confine and/or isolate residual contamination within a 3-dimensional void space of Hastelloy C-22 piping designated for removal from the area and transported to a designated disposal facility. Phase I testing was previously conducted using Hilti CP620 fixative foam. Results from Phase I testing indicate Hilti CP-620 fixative foam is incompatible with SRS site hot taps as an effective foam delivery method into Hastelloy C-22 piping. Phase II testing will be conducted using FoamBag TM fixative foam as an alternative fixative foam option. Phase II testing will address eight test objectives: (1) evaluation of the adhesion and bonding properties of FoamBag TM in Hastelloy C-22 piping, (2) evaluation of the adhesion of FoamBag TM in piping under various moisture conditions, (3) determination of the heat profile of FoamBag TM during curing, (4) determination of the internal pipe pressure after FoamBag TM deployment and curing, (5) conduct a leak test to determine if FoamBag TM is effective at creating a full seal within piping, (6) headspace testing of FoamBag TM to determine if there are any associated off-gas hazards during FoamBag TM curing, (7) conduct environmental chamber testing of FoamBag TM to understand how environmental parameters impacts FoamBag TM curing, and (8) conduct fire testing to evaluate FoamBag TM fire retardant characteristics.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗