Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “acceptability envelope”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

Flight research capabilities of the NASA/Army Rotor Systems Research Aircraft

After a brief description of the Rotor Systems Research Aircraft (RSRA), the paper reviews their flight capabilities and limitations. A favorable assessment is given to the expected research capabilities of the RSRA. The structural limitations should not significantly constrain the flight envelope for research operations; the handling qualities, though not optimum, are within the parameters originally predicted; and there are no fundamental dynamics problems. Although the accuracy of the force and moment measurement system has not yet been quantified by calibration, it is expected to be acceptable after calibration.

White, S., Jr.↗

System-Level Design of a Shape Memory Alloy Actuator for Active Clearance Control in the High-Pressure Turbine

This paper describes results of a numerical analysis evaluating the feasibility of high-temperature shape memory alloys (HTSMA) for active clearance control actuation in the high-pressure turbine section of a modern turbofan engine. The prototype actuator concept considered here consists of parallel HTSMA wires attached to the shroud that is located on the exterior of the turbine case. A transient model of an HTSMA actuator was used to evaluate active clearance control at various operating points in a test bed aircraft engine simulation. For the engine under consideration, each actuator must be designed to counteract loads from 380 to 2000 lbf and displace at least 0.033 inches. Design results show that an actuator comprised of 10 wires 2 inches in length is adequate for control at critical engine operating points and still exhibits acceptable failsafe operability and cycle life. A proportional-integral-derivative (PID) controller with integrator windup protection was implemented to control clearance amidst engine transients during a normal mission. Simulation results show that the control system exhibits minimal variability in clearance control performance across the operating envelope. The final actuator design is sufficiently small to fit within the limited space outside the high-pressure turbine case and is shown to consume only small amounts of bleed air to adequately regulate temperature.

DeCastro, Jonathan A.↗

Progress on Shape Memory Alloy Actuator Development for Active Clearance Control

Results of a numerical analysis evaluating the feasibility of high-temperature shape memory alloys (HTSMA) for active clearance control actuation in the high-pressure turbine section of a modern turbofan engine has been conducted. The prototype actuator concept considered here consists of parallel HTSMA wires attached to the shroud that is located on the exterior of the turbine case. A transient model of an HTSMA actuator was used to evaluate active clearance control at various operating points in a test bed aircraft engine simulation. For the engine under consideration, each actuator must be designed to counteract loads from 380 to 2000 lbf and displace at least 0.033 in. Design results show that an actuator comprised of 10 wires 2 in. in length is adequate for control at critical engine operating points and still exhibit acceptable failsafe operability and cycle life. A proportional-integral-derivative (PID) controller with integrator windup protection was implemented to control clearance amidst engine transients during a normal mission. Simulation results show that the control system exhibits minimal variability in clearance control performance across the operating envelope. The final actuator design is sufficiently small to fit within the limited space outside the high-pressure turbine case and is shown to consume only small amounts of bleed air to adequately regulate temperature.

DeCastro, Jonathan↗

Toward Large-Area Sub-Arcsecond X-Ray Telescopes

The future of x-ray astronomy depends upon development of x-ray telescopes with larger aperture areas (approx. = 3 square meters) and fine angular resolution (approx. = 1 inch). Combined with the special requirements of nested grazing-incidence optics, the mass and envelope constraints of space-borne telescopes render such advances technologically and programmatically challenging. Achieving this goal will require precision fabrication, alignment, mounting, and assembly of large areas (approx. = 600 square meters) of lightweight (approx. = 1 kilogram/square meter areal density) high-quality mirrors at an acceptable cost (approx. = 1 million dollars/square meter of mirror surface area). This paper reviews relevant technological and programmatic issues, as well as possible approaches for addressing these issues-including active (in-space adjustable) alignment and figure correction.

ODell, Stephen L.↗

Space Shuttle Main Engine Low Pressure Oxidizer Turbo-Pump Inducer Dynamic Environment Characterization through Water Model and Hot-Fire Testing

The Low Pressure Oxidizer Turbopump (LPOTP) inducer on the Block II configuration Space Shuttle Main Engine (SSME) experienced blade leading edge ripples during hot firing. This undesirable condition led to a minor redesign of the inducer blades. This resulted in the need to evaluate the performance and the dynamic environment of the redesign, relative to the current configuration, as part of the design acceptance process. Sub-scale water model tests of the two inducer configurations were performed, with emphasis on the dynamic environment due to cavitation induced vibrations. Water model tests were performed over a wide range of inlet flow coefficient and pressure conditions, representative of the scaled operating envelope of the Block II SSME, both in flight and in ground hot-fire tests, including all power levels. The water test hardware, facility set-up, type and placement of instrumentation, the scope of the test program, specific test objectives, data evaluation process and water test results that characterize and compare the two SSME LPOTP inducers are discussed. In addition, dynamic characteristics of the two water models were compared to hot fire data from specially instrumented ground tests. In general, good agreement between the water model and hot fire data was found, which confirms the value of water model testing for dynamic characterization of rocket engine turbomachinery.

Patrick Arellano↗

Advanced Energy Efficient Roof System

Energy consumption in buildings represents 40 percent of primary U.S. energy consumption, split almost equally between residential (22%) and commercial (18%) buildings.1 Space heating (31%) and cooling (12%) account for approximately 9 quadrillion Btu. Improvements in the building envelope can have a significant impact on reducing energy consumption. Thermal losses (or gains) from the roof make up 14 percent of the building component energy load. Infiltration through the building envelope, including the roof, accounts for an additional 28 percent of the heating loads and 16 percent of the cooling loads. These figures provide a strong incentive to develop and implement more energy efficient roof systems. The roof is perhaps the most challenging component of the building envelope to change for many reasons. The engineered roof truss, which has been around since 1956, is relatively low cost and is the industry standard. The roof has multiple functions. A typical wood frame home lasts a long time. Building codes vary across the country. Customer and trade acceptance of new building products and materials may impede market penetration. The energy savings of a new roof system must be balanced with other requirements such as first and life-cycle costs, durability, appearance, and ease of construction. Conventional residential roof construction utilizes closely spaced roof trusses supporting a layer of sheathing and roofing materials. Gypsum board is typically attached to the lower chord of the trusses forming the finished ceiling for the occupied space. Often in warmer climates, the HVAC system and ducts are placed in the unconditioned and otherwise unusable attic. High temperature differentials and leaky ducts result in thermal losses. Penetrations through the ceilings are notoriously difficult to seal and lead to moisture and air infiltration. These issues all contribute to greater energy use and have led builders to consider construction of a conditioned attic. The options considered to date are not ideal. One approach is to insulate between the trusses at the roof plane. The construction process is time consuming and costs more than conventional attic construction. Moreover, the problems of air infiltration and thermal bridges across the insulation remain. Another approach is to use structurally insulated panels (SIPs), but conventional SIPs are unlikely to be the ultimate solution because an additional underlying support structure is required except for short spans. In addition, wood spline and metal locking joints can result in thermal bridges and gaps in the foam. This study undertook a more innovative approach to roof construction. The goal was to design and evaluate a modular energy efficient panelized roof system with the following attributes: (1) a conditioned and clear attic space for HVAC equipment and additional finished area in the attic; (2) manufactured panels that provide structure, insulation, and accommodate a variety of roofing materials; (3) panels that require support only at the ends; (4) optimal energy performance by minimizing thermal bridging and air infiltration; (5) minimal risk of moisture problems; (6) minimum 50-year life; (7) applicable to a range of house styles, climates and conditions; (8) easy erection in the field; (9) the option to incorporate factory-installed solar systems into the panel; and (10) lowest possible cost. A nationwide market study shows there is a defined market opportunity for such a panelized roof system with production and semi-custom builders in the United States. Senior personnel at top builders expressed interest in the performance attributes and indicate long-term opportunity exists if the system can deliver a clear value proposition. Specifically, builders are interested in (1) reducing construction cycle time (cost) and (2) offering increased energy efficiency to the homebuyer. Additional living space under the roof panels is another low-cost asset identified as part of the study. The market potential is enhanced through construction activity levels in target markets. Southern markets, from Florida to Texas account for 50 percent of the total new construction angled-roof volume. California contributes an additional 13 percent share of market volume. These states account for 28 to 30 million squares (2.8 to 3 billion square feet) of new construction angled roof opportunity. The major risk to implementation is the uncertainty of incorporating new design and construction elements into the construction process. By coordinating efforts to enhance the drivers for adoption and minimize the barriers, the panelized roof system stands to capitalize on a growing market demand for energy efficient building alternatives and create a compelling case for market adoption.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Power console development for NASA's electric propulsion outreach program

NASA LeRC is developing a 30 cm diameter xenon ion thruster for auxiliary and primary propulsion applications. To maximize expectations for user-acceptance of ion propulsion technology, NASA LeRC, through their Electric Propulsion Outreach Program, is providing sectors of industry with portable power consoles for operation of 5 KW-class xenon ion thrusters. This power console provides all necessary functions to permit thruster operations over a 0.5-5 KW envelope under both manual and automated control. These functions include the following: discharge, cathode heater, neutralizer keeper, and neutralizer heater currents, screen and accelerator voltages, and a gas feed system to regulate and control propellant flow to the thruster. An electronic circuit monitors screen and accelerator currents and controls arcing events. The power console was successfully integrated with the NASA 30 cm thruster.

Pinero, Luis R.↗

Load and stability measurements on a soft-inplane rotor system incorporating elastomeric lead-lag dampers

An experimental investigation was conducted of the dynamic response and inplane stability associated with a new soft-inplane helicopter rotor. The unique feature of this rotor was the use of an internal elastomeric damper to restrain the blade inplane motion about the lead-lag hinge. The properties of the elastomer were selected to provide both a nominal first inplane frequency ratio of 0.65 and sufficient damping to eliminate the need for additional external damping sources to prevent ground resonance on a typical fuselage structure. For this investigation a 1/5-scale aeroelastic model was used to represent the rotor. The four-blade model had a diameter of 3.05 m (10 ft) and a solidity of 0.103. The first out-of-plane frequency ratio was 1.06. The model was tested in hover and in forward flight up to an advance ratio of 0.45. At each forward speed the rotor lift was varied up to simulated maneuver conditions. The measured rotor loads and response were within acceptable limits, and no adverse response qualities were observed. Moderate out-of-plane hub moments were measured, even for zero lift, to indicate the beneficial control power available for this design. Blade inplane stability testing indicated that the rotor system damping remained at moderate levels throughout the operating envelope.

Weller, W. H.↗

Modernization and Activation of the NASA Ames 11- by 11-Foot Transonic Wind Tunnel

The Unitary Plan Wind Tunnel (UPWT) was modernized to improve performance, capability, productivity, and reliability. Automation systems were installed in all three UPWT tunnel legs and the Auxiliaries facility. Major improvements were made to the four control rooms, model support systems, main drive motors, and main drive speed control. Pressure vessel repairs and refurbishment to the electrical distribution system were also completed. Significant changes were made to improve test section flow quality in the 11-by 11-Foot Transonic leg. After the completion of the construction phase of the project, acceptance and checkout testing was performed to demonstrate the capabilities of the modernized facility. A pneumatic test of the tunnel circuit was performed to verify the structural integrity of the pressure vessel before wind-on operations. Test section turbulence, flow angularity, and acoustic parameters were measured throughout the tunnel envelope to determine the effects of the tunnel flow quality improvements. The new control system processes were thoroughly checked during wind-off and wind-on operations. Manual subsystem modes and automated supervisory modes of tunnel operation were validated. The aerodynamic and structural performance of both the new composite compressor rotor blades and the old aluminum rotor blades was measured. The entire subsonic and supersonic envelope of the 11-by 11-Foot Transonic leg was defined up to the maximum total pressure.

Kmak, Frank J.↗

Report on Lessons Learned from the NP 2010 Early Site Permit Program FINAL REPORT

This report provides a summary of lessons learned from the demonstration of the licensing process for three Early Site Permit (ESP) applications supported as part of the Department of Energy’s (DOE) Nuclear Power 2010 (NP 2010) program. The ESP process was established by the Nuclear Regulatory Commission (NRC) to enable completion of the site evaluation component of nuclear power plant licensing under 10 CFR Part 52 before a utility makes a decision to build a plant. Early Site Permits are valid for 10 to 20 years and can be renewed for an additional 10 to 20 years. NRC review of an ESP application addresses site safety issues, environmental protection issues, and plans for coping with emergencies. Successful completion of the ESP process will establish that a site is suitable for possible future construction and operation of a nuclear power plant. Most importantly, an ESP resolves significant site-related safety and environmental issues early in the decision process and helps achieve acceptance by the public. DOE competitively selected Dominion Nuclear Energy North Anna, LLC (Dominion); System Energy Resources, Inc. (an Entergy subsidiary); and Exelon Generation Company, LLC (Exelon) in 2002 to demonstrate the ESP process and provided cost-shared support through the NP 2010 program. Dominion pursued an ESP for the North Anna site in Virginia; System Energy Resources, Inc. pursued an ESP for the Grand Gulf site in Mississippi; and Exelon pursued an ESP for the Clinton site in Illinois. After successfully demonstrating the process, the NRC issued an ESP for Clinton on March 17, 2007; Grand Gulf on April 5, 2007; and North Anna on November 27, 2007. As with all successful projects, there are lessons to be learned from the NP 2010 early site permitting demonstration that can help improve future implementation guidance documents and regulatory review standards. In general, these lessons pertain to the effectiveness of the regulatory process, experience related to guidance for developing and reviewing ESP applications, issues involving ESP plant parameters, and suggestions for future ESP applicants. The development, submittal, and issuance of these first ESPs under DOE’s NP 2010 program started the momentum to exercise NRC’s new 10 CFR Part 52 licensing process. Several key questions that define critical issues regarding the effectiveness of regulations pertaining to ESPs have been identified and summarized in this report. However, the final resolution of whether the ESP component of the Part 52 process significantly contributes to the predictability in nuclear power plant licensing requires more experience and time, such as the completion of the ongoing combined Construction and Operating License (COL) process for the North Anna and Grand Gulf sites. The three ESP project participants prepared and submitted to DOE lessons learned reports from their experience in developing, submitting, and receiving an ESP. This document summarizes these reports, which are appended hereto. The Nuclear Energy Institute (http://www.nei.org/) and NRC (http://www.nrc.gov/) have also prepared reports regarding their perspectives on lessons learned during the ESP process. Their documents can be accessed on their respective web sites. Following is a summary of the lessons learned from the NP 2010 ESP projects. Effectiveness of the ESP Process: In general, the ESP process is expected (subject to demonstration of the ESP finality provisions in the North Anna and Grand Gulf ESPs) to provide high value for applicants as a site banking and risk mitigation strategy. However, several aspects of the initial process, such as NRC hearings and determining an acceptable approach to the NRC’s Emergency Planning requirements, proved challenging for the applicants. Project Execution: Initial regulatory and industry guidance for planning and executing an ESP application program proved to be insufficient to address NRC’s document review expectations. However, continuous communication between NRC and the applicants helped establish an acceptable framework for the applications and resulted in the successful issuance of three ESPs. Still, formal guidance from both NRC and industry is needed for issues involving merchant plants; data collection issues; and interactions between NRC, the public, and the applicants. Specific Plant Parameter Issues: The use of the Plant Parameter Envelope (PPE) approach, when the applicant has not yet chosen a reactor technology, proved to be a major source of confusion between applicants and NRC. This issue had also been a topic of discussion during the NRC ESP hearings. Based upon North Anna and Grand Gulf COLA experiences, the need should be evaluated for future NRC guidance pertaining to the PPE approach to clarify these issues. In addition, NRC, applicants, and industry spent considerable time and resources deciding how to employ new seismic analysis approaches. Future guidance in this area would also be very useful. Best Project Practices: A variety of good practices were identified, such as using specific project tracking and milestone items, handling very large documents electronically, employing a formal and rigorous document review process, and sharing large files across organizational sites. This report also includes a set of general recommendations to assist future ESP applicants. Several recommendations highlight the need for NRC and industry to continue to work together to improve the ESP process.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Toward Large-Area Sub-Arcsecond X-Ray Telescopes II

In order to advance significantly scientific objectives, future x-ray astronomy missions will likely call for x-ray telescopes with large aperture areas (approx. = 3 sq m) and fine angular resolution (approx. = 1"). Achieving such performance is programmatically and technologically challenging due to the mass and envelope constraints of space-borne telescopes and to the need for densely nested grazing-incidence optics. Such an x-ray telescope will require precision fabrication, alignment, mounting, and assembly of large areas (approx. = 600 sq m) of lightweight (approx. = 2 kg/sq m areal density) high-quality mirrors, at an acceptable cost (approx. = 1 M$/sq m of mirror surface area). This paper reviews relevant programmatic and technological issues, as well as possible approaches for addressing these issues-including direct fabrication of monocrystalline silicon mirrors, active (in-space adjustable) figure correction of replicated mirrors, static post-fabrication correction using ion implantation, differential erosion or deposition, and coating-stress manipulation of thin substrates.

Shi Ye↗

Integrated resource scheduling in a distributed scheduling environment

The Space Station era presents a highly-complex multi-mission planning and scheduling environment exercised over a highly distributed system. In order to automate the scheduling process, customers require a mechanism for communicating their scheduling requirements to NASA. A request language that a remotely-located customer can use to specify his scheduling requirements to a NASA scheduler, thus automating the customer-scheduler interface, is described. This notation, Flexible Envelope-Request Notation (FERN), allows the user to completely specify his scheduling requirements such as resource usage, temporal constraints, and scheduling preferences and options. The FERN also contains mechanisms for representing schedule and resource availability information, which are used in the inter-scheduler inconsistency resolution process. Additionally, a scheduler is described that can accept these requests, process them, generate schedules, and return schedule and resource availability information to the requester. The Request-Oriented Scheduling Engine (ROSE) was designed to function either as an independent scheduler or as a scheduling element in a network of schedulers. When used in a network of schedulers, each ROSE communicates schedule and resource usage information to other schedulers via the FERN notation, enabling inconsistencies to be resolved between schedulers. Individual ROSE schedules are created by viewing the problem as a constraint satisfaction problem with a heuristically guided search strategy.

Zoch, David↗

Experimental space weathering of regolith material

Significant advances in the understanding of space weathering processes were recently reported. Submicroscopic iron blebs were produced in lunar simulant glass and natural terrestrial minerals by high-temperature reduction in controlled atmosphere furnaces. These experiments altered the samples' optical properties and microtextures so that they resembled those of extremely mature lunar soil. The results contributed to a revised model for natural reduction in the regolith. Subsequently, supporting results were obtained by reduction of lunar samples. Research to date has focused on reduction of three lunar surface components: basalt, pyroclastic glass, and mare soil. An extensive set of H reduction experiments with simulants has led to a detailed understanding of reaction mechanisms and kinetics. Reduction experiments using lunar basalt were recently conducted by Carbotek. Reduced samples from these test were analyzed. Reduction experiments on lunar glass 74220 were run at temperatures of 900-1100 C. Reduction efficiency of volcanic glass proved to be a function of the sample's FeO abundance and reaction temperature. We also reduced mare soil 75061 at temperatures of 900-1050 C. Partial reduction of FeO in olivine and pyroxene occurred, but was slower and less complete than reduction of ilmenite. Our experiments on simulants and lunar samples have indicated that the most readily reduced phases in the regolith are ilmenite and glass. Based on initial tests with simulants we proposed refinements to the accepted model for space weathering of the regolith. The impact of a micrometeoroid flash heats and melts and ejects from the impact point a small volume of soil that contains trapped solar wind H and C. Reduction occurs rapidly, while the melt volume is still in motion. When a droplet encounters unmelted soil, it envelopes cold mineral grains. The melt is chilled rapidly. Our analyses of experimentally reduced lunar basalt, glass, and mare soil support the proposed model for space weathering.

Mckay, D. S.↗

FRACTIONAL CRYSTALLIZATION FEED ENVELOPE

Laboratory work was completed on a set of evaporation tests designed to establish a feed envelope for the fractional crystallization process. The feed envelope defines chemical concentration limits within which the process can be operated successfully. All 38 runs in the half-factorial design matrix were completed successfully, based on the qualitative definition of success. There is no feed composition likely to be derived from saltcake dissolution that would cause the fractional crystallization process to not meet acceptable performance requirements. However, some compositions clearly would provide more successful operation than other compositions.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Managing Risk to Ensure a Successful Cassini/Huygens Saturn Orbit Insertion (SOI)

I. Design: a) S/C designed to be largely single fault tolerant; b) Operate in flight demonstrated envelope, with margin; and c) Strict compliance with requirements & flight rules. II. Test: a) Baseline, fault & stress testing using flight system testbeds (H/W & S/W); b) In-flight checkout & demos to remove first time events. III. Failure Analysis: a) Critical event driven fault tree analysis; b) Risk mitigation & development of contingencies. IV) Residual Risks: a) Accepted pre-launch waivers to Single Point Failures; b) Unavoidable risks (e.g. natural disaster). V) Mission Assurance: a) Strict process for characterization of variances (ISAs, PFRs & Waivers; b) Full time Mission Assurance Manager reports to Program Manager: 1) Independent assessment of compliance with institutional standards; 2) Oversight & risk assessment of ISAs, PFRs & Waivers etc.; and 3) Risk Management Process facilitator.

risk managment↗

Benefits to the Simulation Training Community of a New ANSI Standard for the Exchange of Aero Simulation Models

The American Institute of Aeronautics Astronautics (AIAA) Modeling and Simulation Technical Committee is in final preparation of a new standard for the exchange of flight dynamics models. The standard will become an ANSI standard and is under consideration for submission to ISO for acceptance by the international community. The standard has some a spects that should provide benefits to the simulation training community. Use of the new standard by the training simulation community will reduce development, maintenance and technical refresh investment on each device. Furthermore, it will significantly lower the cost of performing model updates to improve fidelity or expand the envelope of the training device. Higher flight fidelity should result in better transfer of training, a direct benefit to the pilots under instruction. Costs of adopting the standard are minimal and should be paid back within the cost of the first use for that training device. The standard achie ves these advantages by making it easier to update the aerodynamic model. It provides a standard format for the model in a custom eXtensible Markup Language (XML) grammar, the Dynamic Aerospace Vehicle Exchange Markup Language (DAVE-ML). It employs an existing XML grammar, MathML, to describe the aerodynamic model in an input data file, eliminating the requirement for actual software compilation. The major components of the aero model become simply an input data file, and updates are simply new XML input files. It includes naming and axis system conventions to further simplify the exchange of information.

Hildreth, Bruce L.↗

Assessment of the Effect of Prototypic High-Burnup Operating Conditions of Fuel Fragmentation, Relocation, and Dispersal Susceptibility

The US nuclear energy industry is investigating strategies that further reduce the cost of energy production by using its existing fleet of nuclear generating stations. Most nuclear power plant operating costs are associated with purchasing fresh fuel assemblies or the efficiency of the reactor core design. Material costs are typically beyond the operator’s control; however, the core design optimizations offer potential operational savings. The core design envelope available to operators is constrained by two primary regulatory criteria: an enrichment limit of 5% 235 U and a burnup limit of 62 GWD/tU. These constraints have resulted in renewed efforts by the nuclear industry to pursue extending the peak rod-average burnup beyond 62 GWd/tU. This effort will likely require additional safety analyses beyond what is currently accepted by the US Nuclear Regulatory Commission. The purpose of this work is to demonstrate a best estimate plus uncertainty pin-by-pin high-burnup loss of coolant accident analysis technique to assess full-core high-burnup fuel fragmentation, relocation, and dispersal (FFRD) and identify approaches for minimizing or potentially mitigating FFRD through core design optimizations.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Cleanup under Airlock of an Old Uranium Foundry - 13273

Since 2004, AREVA's subsidiary SICN has been conducting the cleanup and dismantling of an old uranium foundry located in the town of Annecy (France). The first operations consisted in the removal of the foundry's production equipment, producing more than 300 metric tons (MT) of waste. The second step consisted in performing the radiological characterization of the 1,600 m{sup 2} (17,200 ft{sup 2}) building, including underground trenches and galleries. The building was precisely inventoried, based on operations records and direct measurements. All sub-surfaces, which needed to be cleaned up were characterized, and a determination of the contamination migration was established, in particular with trenches and galleries. The wall thicknesses to be treated were empirically justified, knowing that the maximal migration depth inside concrete is 5 mm for a liquid transfer vector. All singularities such as cracks, anchoring points, etc. were spotted for a complete and systematic treatment. Building structures not laying directly on the soil, such as floor slabs, were not cleaned up but directly deconstructed and disposed of as waste. The facility was located within the town of Annecy. Therefore, in order to avoid the risk of dusts dispersion and public exposure during the building deconstruction and the soil treatment, a third of the building's surface was confined in a sliding airlock built from a metal structure capable of resisting to wind and snow, which are frequent in this area. This particular structure provided a static confinement over the half of the building which was covered and a dynamic confinement using a ventilation and high efficiency air filtration system, sized to provide 2.5 air changes per hour. The enclosure and its metallic structure is 33 m long (108 feet), 25 m wide (82 feet), and 13 m high (42 feet), for a volume of 10,000 m{sup 3} (353,000 ft{sup 3}). It was made up of a double skin envelope, allowing the recycling of its structure and outside envelope. After cleaning up and dismantling the first portion of the building, the enclosure was repositioned on the second and the last third of the building, by sliding it on support pads. Almost 7,000 m{sup 2} of concrete surface has been treated with no dust dispersion outside the enclosure. After treatment, all the remaining surfaces were controlled by an independent entity to verify their acceptability with regards to residual contamination (less than 0.4 Bq/cm{sup 2} (24 DPM) for alpha contamination and less than 1 Bq/g of total uranium). Approximately 1,900 MT of equipment and waste were generated in batches of 1m{sup 3}, in order to be staged on site, and then characterized and packaged in 20 foot containers for shipment to the final ANDRA repository. The package certification included the verification of the physical and chemical characteristics and the radiological characteristics (mass activity, dose rate, and residual outside surface contamination). Finally, after cleanup and dismantling of the foundry, a concrete slab was poured on the free surface as a clean base for implementation of new activities. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗