Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “accelerated beams”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

PARTICULATE STUDY OF NEG PUMPS IRRADIATED IN THE CEBAF TUNNEL

Non-evaporable getter (NEG) pumps are being used to maintain ultra-high vacuum in the beamline of superconducting radio-frequency (SRF) accelerators, such as the Continuous Electron Beam Accelerator Facility (CEBAF) at Jefferson Lab. Because of the sensitivity of the performance of SRF cavities to particulate contamination, it is important to evaluate the integrity of the NEG material after exposure to high radiation during beam operation. The particulate from two NEG pumps based on ZAO® getter alloy was measured with a particle counter in a clean-room. The pumps were assembled onto a hermetically sealed setup which was placed in the CEBAF tunnel. The setup was exposed to 24 h beam operation for ~ 230 days. The total gamma-rays dose measured on the test setup was ~ 1.6 Mrad. The total neutron dose measured at ~ 75 cm of the test setup was ~ 11 krad. The particulate count from the two pumps was measured again in the clean-room after irradiation. Whereas an increase of particulate counts was measured, compared to before irradiation, subsequent measurements indicate the absence of systematically loose particulate. The pumping speed of one of the irradiated pumps was also measured to be consistent with that of a non-irradiated one, corroborating the absence of significant damage to the ZAO® NEG material due to irradiation.

Ciovati, Gianluigi [Thomas Jefferson National Acce↗

Error and Correction Analysis for the FFA@CEBAF Energy Upgrade

An energy upgrade design for the Continuous Electron Beam Accelerator Facility (CEBAF) is under development, using fixed field alternating gradient (FFA) return arcs to recirculate electron beam up to an additional five times through the accelerating structures at CEBAF. A necessary component of any large accelerator is a beam steering and optical correction system. Small environmental changes and system errors can lower beam quality or even shut down the machine; and in pursuit of the scientific mission of JLab, high quality electron beams must be delivered to the experimental halls on a predictable schedule. Correction in the novel FFA arcs of the current upgrade design is complicated by several factors. These complexities inform the choice of correction algorithm structure and parameter values. A baseline algorithm in addition to diagnostic and correction hardware configuration is presented. The effect of this correction protocol is shown with respect to estimated errors, and several possible extensions of the algorithm are discussed. This work presents an important proof of concept for the FFA@CEBAF design effort, and provides a functional correction strategy which may be simply adjusted and optimized for future design changes.

Coxe, Alex [Old Dominion Univ., Norfolk, VA (Unite↗

Improved calibration of rf cavities for relativistic electron beams: Effects of secondary corrections and experimental verification

In the aspect of longitudinal beam bunching, the bunching strength can be controlled by the rf cavity phase and voltage. However, these machine parameters are different from those that interact with the beam itself. In order to gain control of the beam-cavity interaction, cavity calibration must be performed. Furthermore, it relies on fitting the beam energy gain versus cavity phase to a calibration function. Under the conventional assumption of relativistic beam conditions, the calibration function is a first harmonic sinusoidal function (a sinusoidal function with a period of 2π). However, this expression is insufficient for a high-voltage bunching cavity. Due to beam acceleration inside the cavity, an energy bias and a second harmonic function should be included to modify the conventional calibration function, even for a relativistic electron beam. In this paper, we will derive this modification and provide a comparison to both the Coherent Electron Cooling Experiment and the IMPACT T simulation, respectively.

43 PARTICLE ACCELERATORS↗

Resonant Emittance Mixing of Flat Beams in Plasma Accelerators

Linear colliders rely on high-quality flat beams to achieve the desired event rate while avoiding potentially deleterious beamstrahlung effects. Here, we show that flat beams in plasma accelerators can be subject to quality degradation due to emittance mixing. This effect occurs when the beam particles' betatron oscillations in a nonlinearly coupled wakefield become resonant in the horizontal and vertical planes. Emittance mixing can lead to a substantial decrease of the luminosity, the main quantity determining the event rate. In some cases, the use of laser drivers or flat particle beam drivers may decrease the fraction of resonant particles and, hence, mitigate emittance deterioration.

43 PARTICLE ACCELERATORS↗

Demonstration of cooling by the Muon Ionization Cooling Experiment

The use of accelerated beams of electrons, protons or ions has furthered the development of nearly every scientific discipline. However, high-energy muon beams of equivalent quality have not yet been delivered. Muon beams can be created through the decay of pions produced by the interaction of a proton beam with a target. Such ‘tertiary’ beams have much lower brightness than those created by accelerating electrons, protons or ions. High-brightness muon beams comparable to those produced by state-of-the-art electron, proton and ion accelerators could facilitate the study of lepton–antilepton collisions at extremely high energies and provide well characterized neutrino beams. Such muon beams could be realized using ionization cooling, which has been proposed to increase muon-beam brightness. Here we report the realization of ionization cooling, which was confirmed by the observation of an increased number of low-amplitude muons after passage of the muon beam through an absorber, as well as an increase in the corresponding phase-space density. The simulated performance of the ionization cooling system is consistent with the measured data, validating designs of the ionization cooling channel in which the cooling process is repeated to produce a substantial cooling effect. The results presented here are an important step towards achieving the muon-beam quality required to search for phenomena at energy scales beyond the reach of the Large Hadron Collider at a facility of equivalent or reduced footprint.

43 PARTICLE ACCELERATORS↗

Accelerator-Based Neutrino Beams

Over the past six decades, accelerator-based neutrino beams have revolutionized particle physics. Neutrinos created with accelerators have been used to discover the muon neutrino and tau neutrinos was discovered and to confirm the existence of neutrino oscillations. More recently, long-baseline experiments have offered the first experimental hint of CP violation in the neutrino sector. Building and operating such beams is an enormous technical challenge, yet they remain our most versatile tool for studying neutrinos. With new experiments such as DUNE and Hyper-Kamiokande, and ideas such as neutrino factories, the next generation of beams will address open questions about neutrino mass ordering, CP violation, and possible physics beyond the standard model.

Fields, Laura [Notre Dame U.] (ORCID:0000000182813↗

Imposing strong correlated energy spread on relativistic bunches with transverse deflecting cavities

We demonstrate a novel scheme for imposing or removing large energy chirp on relativistic electron bunches. This method relies on the transverse-to-longitudinal mixing accomplished with a set of transverse deflecting cavities. The working principles of the new concept are explained using the first-order matrix formalism in the approximation of the linear single-particle dynamics. The scheme demonstrates versatility regarding the average beam energy and, hence, positioning along the accelerator beam line. The performance of the scheme is numerically investigated with the elegant particle-tracking code. It is shown that the associated nonlinear effects causing emittance deterioration for the extreme quantities of the total energy spread can be effectively compensated by optimization of the Twiss parameters while relying on the eigenemittance analysis. The impact of the longitudinal space charge effects on the beam dynamics in the proposed scheme is also investigated.

43 PARTICLE ACCELERATORS↗

The science case for an intermediate energy advanced and novel accelerator linear collider facility

It is widely accepted that the next lepton collider beyond a Higgs factory would require center-of-mass energy of the order of up to 15 TeV. Since, given reasonable space and cost restrictions, conventional accelerator technology reaches its limits near this energy, high-gradient advanced acceleration concepts are attractive. Advanced and novel accelerators (ANAs) are leading candidates due to their ability to produce acceleration gradients on the order of 1–100 GV/m, leading to compact acceleration facilities. However, intermediate energy facilities (IEF) are required to test the critical technology elements on the way towards multi-TeV-class colliders. Here a science case for a 20–100 GeV center-of-mass energy ANA-based lepton collider that can be a candidate for an intermediate energy facility is presented. The IEF can provide numerous opportunities for high energy physics studies including precision Quantum Chromodynamics and Beyond the Standard Model physics measurements, investigation of charged particle interactions with extreme electromagnetic fields, and exploring muon and proton beam acceleration. Possible applications of this collider include the studies of γγ and electron beam-fixed target/beamdump collider designs. Thus, the goal of the proposed IEF is to both carry out particle physics measurements in the 20-100 GeV ranges as well as to serve as an ANA demonstrator facility.

43 PARTICLE ACCELERATORS↗

FFA BEAM TRANSPORT DEMONSTRATION DEVELOPMENT FOR THE CEBAF 22 GeV UPGRADE

Jefferson Lab is planning an upgrade of the Continuous Electron Beam Accelerator Facility (CEBAF) to deliver highly polarized electron beams up to 22 GeV using Fixed- Field Alternating-gradient (FFA) magnets. As the application of FFA technology in the 10–22 GeV energy range is unprecedented, experimental validation is required prior to full-scale implementation. To support this effort, a dedicated FFA test insert is proposed within the existing CEBAF infrastructure, with candidate locations in the Beam Switchyard (BSY) dump line or the Hall C beamline. The testbed will consist of a half or full FFA cell using combined-function permanent magnets and will enable systematic studies of beam transport, field quality, alignment, and magnet performance under realistic conditions. Operation with polarized beams in the 5–11 GeV range will closely replicate the energy scaling of the full upgrade. This paper presents the current design status and layout options for the proposed FFA beam transport test line.

Ogur, S. [Thomas Jefferson National Accelerator Fa↗

Exploratory splitter bend system designs for FFA@CEBAF

An upgrade to the Continuous Electron Beam Accelerator Facility (CEBAF) at the Thomas Jefferson National Accelerator Facility (JLAB) is anticipated to provide an electron beam of over 20 GeV using the existing superconducting-RF linear accelerator and new fixed-field alternating (FFA) gradient recirculation arcs made up of Halbach-style permanent magnets. In the current design, the FFA arcs will carry six beams with energies of approximately 11, 13, 16, 18, 20, and 22 GeV which will require horizontal splitter lines to match the beam from the preceding linac. In this paper, we describe two alternative splitter beamline designs that are tuned to match the beam's Twiss parameters, R56, time-of-flight, bend-plane offset, and dispersion into the FFA cells.

Accelerator Physics↗

Development of a direct-sampling RF receiver for precision beam charge measurements in the MOLLER experiment

Here, we have developed and tested a direct-sampling RF receiver capable of measuring the amplitude of a 1497 MHz sinusoidal beam signal in 0.5 ms integration windows with a relative uncertainty of better than 10 parts per million. The receiver is intended for measuring signals from beam current monitoring cavities on the beamline of the Continuous Electron Beam Accelerator Facility (CEBAF) at Jefferson Lab. The beam signal strength, frequency, and integration window fulfill the thus far unmet requirements of the upcoming MOLLER experiment to measure the beam charge for different helicity states.

47 OTHER INSTRUMENTATION↗

Design and calculations for HWR Strongback

The PIP-II Superconductive Linac is a linear accelerator that provides the first stage of beam acceleration. The velocity increase is achieved through a sequence of different cryomodules, where all the cavities are aligned to form a continuous string. The cryomodule team is currently developing a spare for the HWR cryomodule. This spare will not be an exact replica of the existing one, but rather will be based on the SSR f650 cryomodule design created for PIP-II . Each cavity , magnet , and coupler form a unit, with a total of eight units per string. These components, together with additional equipment (such as piping , the thermal shield , and beamline interconnections ), are supported by the Strongback . The aim of this project is to develop a brand-new Strongback design for HWR cavities, and to perform the related analyses and calculations in order to meet the required specifications.

43 PARTICLE ACCELERATORS↗

Status of Error Correction Studies in Support of FFA@CEBAF

In pursuit of higher energy at the Continuous Electron Beam Accelerator Facility (CEBAF), the FFA@CEBAF energy upgrade study is considering the implementation of a novel technology to recirculate electron beam through the accelerating gradient of the machine more times. The technology in question is Fixed-Field Alternating-gradient (FFA) bending accelerator arcs: these arcs may replace the present highest energy electromagnetic (EM) arcs, and due to a much wider energy acceptance allow several more passes. The survey and beam error tolerance of the FFA arcs need to be well understood prior to commissioning, in addition to the limits of planned correction magnets and diagnostics. This work explores the current state of error tolerance and correction studies in FFA arcs at CEBAF.

Benesch, J.↗

Diamagnetic Loop Testing on DARHT-I

Diamagnetic loops (DML) can be used as a noninvasive method for measurements of beam size in electron beam accelerators that use solenoidal magnetic transport. The loop fundamentally measures the magnetic flux excluded by a diamagnetic object. A comprehensive theory relates the rms beam radius to the excluded flux measured by the DML. We have built, and calibrated a DML apparatus. Recently, this DML has been used to measure the size of the electron beam near the final focus of the DARHT-I flash-radiography accelerator. Results are in agreement with beam transport code predictions. In this article, we review and summarize the construction, calibration, and electron-beam testing of this DML.

43 PARTICLE ACCELERATORS↗

Suppression of Deflecting Forces in Planar-Symmetric Dielectric Wakefield Accelerating Structures with Elliptical Bunches

Wakefield based accelerators capable of accelerating gradients two orders of magnitude higher than present accelerators offer a path to compact high energy physics instruments and light sources. However, for high gradient accelerators, beam instabilities driven by commensurately high transverse wakefields limit beam quality. It has been previously theoretically shown that transverse wakefields can be reduced by elliptically shaping the transverse sizes of beams in dielectric structures with planar symmetry. We report here experimental measurements that demonstrate reduced transverse wakefields for elliptical beams in planar symmetric structures which are consistent with theoretical models. Furthermore, these results may enable the design of gigavolt-per-meter gradient wakefield based accelerators that produce and stably accelerate high quality beams.

47 OTHER INSTRUMENTATION↗

2D Simulations of Diamagnetic Loop Calibrations

Diamagnetic loops can be used as a non-invasive method for measurements of beam size in electron beam accelerators that use solenoidal magnetic transport. A comprehensive theory for interpreting data from a diamagnetic loop relates the rms beam radius to the excluded flux measured by the loop and the beam current. Thus, primary calibration of the loop must relate the loop signal directly to the exclude d flux. We have simulated these calibrations with a 2D field solver in order to identify possible sources of uncertainty in our calibration technique.

43 PARTICLE ACCELERATORS↗

Optimization of a buncher for High Energy H- Beam Transport [Slides]

Accelerators and beam transport systems typically contain numerous beamline devices, diagnostics, system study, and upgrade. Routinely TRACE, MADX and TRANSPORT codes are used for the beam envelope prediction and optimization. Unknown problems of accelerators and beam-transport are addressed based on R&D, such as LFB voltage variation effect study. A nominal diagnostic have used in non-traditional beam transport path to address scientific question (such as use of a BPM in the air). High energy beam operation is a methodical process and routine R&D is required to maintain high standards to deliver beam.

43 PARTICLE ACCELERATORS↗

Polarized electron injector for positron production at CEBAF

As a part of the effort to expand the capabilities of CE-BAF 12 GeV (Continuous Electron Beam Accelerator Facility) at Jefferson Lab, the addition of a polarized positron source is considered. This capability would provide acceleration of high duty-cycle polarized posi-trons, with spin >60% polarization, through the same main CEBAF accelerator machine with appropriate mag-net field reversals and linac phasing to the four CEBAF experimental halls. To produce this positron beam, a high average current (3-10 mA) highly polarized electron beam with energy of 100 ? 150 MeV is required at the positron source target. The focus of this paper is the de-sign of that polarized electron beam injector. We will describe the production and delivery of a >3 mA highly polarized electron beam. We will discuss different aspects of the design, the photocathode gun, beam dynamics simulation results, spin manipulation, bunching and accelerating process and final electron beam parameters.

Kazimi, R.↗