Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “VENTILATION SYSTEMS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

What's in a Name? Developing a Standardized Taxonomy for HVAC System Faults

Faults occurring in heating, ventilation and air-conditioning (HVAC) systems have significantly negative impacts on building energy consumption, occupant comfort, and indoor air quality. In the past thirty years, extensive research has been conducted on fault detection and diagnostics (FDD) methods, and there are now dozens of commercially available FDD software tools. Growing adoption of FDD tools has the potential to generate a massive and useful data set on fault characteristics. However, the lack of a unifying taxonomy is a significant barrier to efficient analysis and evaluation of FDD outputs. Therefore, there is a strong need to develop a robust taxonomy which can better represent and interpret FDD output data. This paper documents the development of a unifying taxonomy for HVAC system faults in commercial buildings, with initial focus on air handling units, variable air volume terminal units, and roof top unit systems. The developed fault taxonomy employs both a physical hierarchy of HVAC equipment and a cause-effect relationship model as tools to better understand and support root cause analysis for HVAC faults. A variable air volume terminal unit is used as an example to demonstrate the application of the developed fault taxonomy. The taxonomy has short-term application in a major U.S. study on fault prevalence, and promises longer term benefits to FDD software developers and building operators by creating a foundation for improved approaches to identifying and resolving HVAC faults.

Chen, Yimin↗

A bi-level data-driven framework for fault-detection and diagnosis of HVAC systems

Long-term operation of heating, ventilation, and air conditioning (HVAC) systems will eventually lead to a range of HVAC system failures, resulting in excessive energy consumption and maintenance costs. Here, to avoid HVAC malfunctioning, fault detection diagnostic (FDD) is utilized as a common practice. Machine learning methods have lately received considerable interest for FDD analysis of HVAC systems due to their high detection accuracy. Meanwhile, HVAC malfunctions are regarded as rare occurrences, hence normal operating data samples are much more accessible than data samples in faulty and malfunctioning conditions. The dominating frequency of normal operation in HVAC datasets has also led to heavily biased classification algorithms within the literature. Moreover, the focus of previous literature has been on increasing the accuracy of the models which leads to a high number of false positives (misleading alarms) in the system. In order to enhance the performance of diagnostic procedures and fill the mentioned gaps, this study proposes a novel data-driven framework. A bi-level machine learning framework is developed for diagnosing faults in air handling units (AHUs) and rooftop units (RTUs) based on principal component analysis (PCA), time series anomaly detection, and random forest (RF). It is shown that PCA can reduce the dataset dimension with one principal component accounting for 95% of data variance. Also, the random forest could classify the faults with 89% precision for single-zone AHU, 85% precision for RTU, and 79% for multi-zone AHU. By proposing this framework, three persistent challenges are addressed: (I) minimizing false positives; (II) accounting for data imbalance; and (III) normal condition monitoring of equipment.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Maritime Fuel Cell Generator Project: 2018 – 2023

This report summarizes activity in the Maritime Fuel Cell (MarFC) Generator Project from 2018 – 2023. FY 2018 saw the implementation of upgrades and repairs, making the unit more reliable and operator friendly. In FY2019 the team engaged the Scripps Institution of Oceanography (SIO) to use the MarFC to provide zero-emission shore power to the research vessel R/V Robert Gordon Sproul while in port at the Nimitz Marine Facility in San Diego, CA. In FY2020, the MarFC unit was shipped to San Diego, CA. A fueling contract with IGX was established to support MarFC operations at SIO, with renewable hydrogen provided by the California State University Los Angeles (CSULA) hydrogen station. The project team (Sandia, Cummins/Hydrogenics) provided training to SIO staff on the technical details of the MarFC, the safe use of hydrogen in general and the MarFC in particular. The first fueling of the unit at the SIO pier was successfully completed by IGX. The first powering of a vessel with fuel-cell shore power was conducted with the R/V Robert Gordon Sproul. While the mechanical systems (lights, AC, ventilation, hydraulics, pumps and cranes) were powered without incident, problems arose when powering the computer systems. Inspections carried out in FY2021 revealed the MarFC needed routine maintenance. Maintenance was performed and the unit was upgraded. The MarFC was turned on after the year pause, and initial test data on power levels and stability were collected. FY2022 was a year spent repairing, upgrading and testing the MarFC unit. Spikes in power and voltage were observed above 60 kW that could potentially extend below 60 kW with time. Such spikes could cause problems with the Sproul electrical systems. These age-related problems, the extended time for the Sproul spent in dry dock for scheduled upgrades, and the associated need to reschedule the vessel’s high-priority science missions made it no longer possible to deploy the unit at SIO. After due consideration, the decision was made by DOE, MARAD and the project team to cease the deployment, remove the MarFC from SIO, and not pursue further deployment activities. On December 2, 2022, the MarFC unit was removed from the Scripps Nimitz Marine Facility and shipped to Fridley, Michigan. The Cummins/Hydrogenics plan for the unit is to assess the condition of the MarFC subcomponents, and then use it as a training/learning system for technical employees new to hydrogen fuel-cell technology. After summarizing project activity from 2018 – 2023, this report provides a review of lessons learned. This report provides next steps in contemplating a follow-on project that would further advance the use of fuel-cell-based shore power in a marine setting. A comparison is made of the project results to the original objectives. This report ends with an accounting of presentations stemming from the project, and a list of references.

08 HYDROGEN↗

Evaluation of H-Canyon Ventilation Exhaust Tunnel Inspection at the Savannah River Site - 20052

The Department of Energy (DOE) H-Canyon Facility at the Savannah River Site (SRS) is operated by Savannah River Nuclear Solutions (SRNS). The Facility Structural Integrity Program [1] provides a process to inspect, evaluate, and document the conditions of passive safety related structural systems and components, their degradation mechanisms and their impact on the safety envelope. The Structural Integrity Program performs periodic visual inspections to confirm the systems and components can perform their safety function and recommend corrective actions before the function is compromised. The H-Canyon Exhaust Tunnel is part of the H-Canyon Ventilation System and is periodically inspected under the Structural Integrity Program. The Tunnel performs a Safety Class passive design feature function that is available 100% of the time. The underground reinforced concrete Tunnel directs Canyon process air from the Canyon to the Sand Filter System. The radiological and chemical airborne activity coupled with the physical configuration of the tunnel precludes a manned entry into the tunnel to perform the inspection. Unlike active systems that can be subjected to physical testing to confirm capability, qualification calculations, including modeling, is performed to assess passive design feature capabilities relative to operational, accident and natural phenomena hazards events. Input for these calculations come from knowledge of field conditions, design drawings and conservative assumptions. The knowledge of field conditions comes from concrete and soil testing activities as well as inspection data. The use of cameras on crawlers to obtain inspection data and how that data is used in qualification calculations is the focus of this discussion. Remote Tunnel inspections have been performed using cameras on a stick, referred to as pole cameras, prior to Calendar Year 2003 (CY2003). Since CY2003, six camera equipped crawlers have been used. Crawlers have evolved and improved by incorporating lessons learned from the previous inspections. The latest 2019 crawler successfully traveled the entire length of the tunnel between the Canyon and Sand Filter System and captured images that were previously unseen, thus providing key visual data for the Structural Integrity Program report [2]. The inspection data serves as 1) input to qualification calculations, 2) validates current conditions remain bounded by qualification calculations, and 3) documents a record of change over time. This data is vital for the effective evaluation of the tunnel structure and aids with predicting the life cycle service life safety envelope to protect the public, environment, and facility worker. The goal of the 2019 deployment was to use a more robust vehicle to ensure travel over obstacles, perform the inspection with higher resolution cameras, and have the ability to elevate the cameras to view surfaces previously obscured by abandon-in-place ducts in the tunnel. The inspection information will serve to strengthen the input basis for qualification calculations, versus using excessive conservative calculation assumptions. This 2019 inspection was compared with previous crawler visual evidence to identify change over time to project remaining service life and confirm field conditions remain bounded by qualification calculations. The results of the 2019 Exhaust Tunnel inspection continue to improve and provide a firm basis to make sound engineering judgements regarding tunnel capability and approaches in projecting remaining service life with an aging system and component. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Co-Simulation of Electric Power Distribution Systems and Buildings including Ultra-Fast HVAC Models and Optimal DER Control

Smart homes and virtual power plant (VPP) controls are growing fields of research with potential for improved electric power grid operation. A novel testbed for the co-simulation of electric power distribution systems and distributed energy resources (DERs) is employed to evaluate VPP scenarios and propose an optimization procedure. DERs of specific interest include behind-the-meter (BTM) solar photovoltaic (PV) systems as well as heating, ventilation, and air-conditioning (HVAC) systems. The simulation of HVAC systems is enabled by a machine learning procedure that produces ultra-fast models for electric power and indoor temperature of associated buildings that are up to 133 times faster than typical white-box implementations. Hundreds of these models, each with different properties, are randomly populated into a modified IEEE 123-bus test system to represent a typical U.S. community. Advanced VPP controls are developed based on the Consumer Technology Association (CTA) 2045 standard to leverage HVAC systems as generalized energy storage (GES) such that BTM solar PV is better utilized locally and occurrences of distribution system power peaks are reduced, while also maintaining occupant thermal comfort. An optimization is performed to determine the best control settings for targeted peak power and total daily energy increase minimization with example peak load reductions of 25+%.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Accuracy of HVAC Load Predictions: Validation of EnergyPlus and DOE-2 using FLEXLAB Measurements

The aim of the project reported here was to better understand the level of accuracy of three building energy simulation (BES) engines (‘engines’) — EnergyPlus™, DOE-2.1e, and DOE-2.2 — by identifying and investigating significant deviations between the performance predicted by these engines and actual performance as measured in the FLEXLAB® test facility at Lawrence Berkeley National Laboratory (LBNL). The specific test conditions included some of those prescribed in ANSI/ASHRAE Standard 140 - Standard Method of Test for the Evaluation of Building Energy Analysis Computer Programs. Detailed measurements of FLEXLAB performance, including indoor temperatures and heat fluxes and air-flow and water flow rates and temperatures in the Heating, Ventilating and Air Conditioning (HVAC) system, together with hourly weather data, were recorded and used in analyzing the simulation results from EnergyPlus v8.8, DOE-2.2 v3.65 and DOE-2.1e v127. These engines are commonly used in the United States for building energy code compliance, federal, state, and utility incentives programs, as well as energy efficient design of new buildings and energy retrofit of existing buildings. Seven conventional overhead mixing ventilation scenarios were tested and each engine was found to have a similar level of agreement with the measurements of space-level heating and sensible cooling loads. These results provide useful information regarding the accuracy of these engines in predicting the cooling and heating load elements of whole building energy performance. This information is intended for practitioners who are concerned about transitioning between simulation tools with different engines and for managers of utility programs leveraging these tools for evaluating and/or projecting measure savings to be incentivized under their programs. The results of the comparisons of simulated and measured performance indicate that the predictions from all three engines are not significantly different. The 24-hour average value of the absolute mean bias indicates the likely magnitude of the error in any particular case. The average mean bias is reduced by cancelation of overprediction in one case by underprediction in another. The daytime absolute mean biases, which may be more important for both energy performance and occupant comfort, are ~6%, presumably because of the greater complexity involved in simulating in the presence of solar radiation. EnergyPlus typically overpredicts the cooling load and/or underpredicts the heating load by ~1.5% and the DOE-2 engines typically underpredict the cooling load by approximately the same amount. The Root Mean Square Error is relatively more sensitive to shorter term variations in the difference between predicted and measured loads; the three engines have similar values, ~10%, suggesting that the uncertainties in their predictions of peak loads may also be similar in magnitude. The implication of these results is that users, both designers and program analysts, can use EnergyPlus, DOE-2.1e, or DOE-2.2 to model conventional commercial buildings equipped with overhead mixing ventilation with a similar level of confidence. Further work is required to better understand the variability in the level of agreement between the engine predictions and FLEXLAB measurements, where a particular engine will agree well with FLEXLAB in some cases and not so well in others and another engine will agree or disagree in different cases. As the sources of this variability are identified and eliminated or reduced significantly, it is recommended that the experimental capabilities and methods developed in the study reported here should be applied to validating heating and cooling load calculations for spaces with different types of furniture and miscellaneous loads. These methods should then be applied to low energy space conditioning systems in EnergyPlus including, in particular, radiant slab and radiant ceiling panel cooling and heating systems and ‘mixed mode’ systems that combine mechanical cooling and natural ventilation systems, focusing on controls, including control of thermal mass. The work reported here addresses the conventional method of heating and cooling occupied spaces; other methods, such as the use of radiant heating and cooling systems have the potential to provide equivalent occupant comfort, or better, with lower energy consumption. These systems are addressed more explicitly in EnergyPlus but there is a need for empirical validation to give users the same level of confidence in modeling these systems that they have, or should have, in modeling conventional systems, based on the results presented here.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Numerical Investigation of High Delta T Sensible Storage Integrated CO2 Heat Pump: Preprint

To assist building heating electrification, this paper numerically investigates a load flexible heat pump system for commercial buildings. The system consists of a CO2 vapor compression cycle, a sensible thermal storage tank, and an air handling unit. The thermal storage medium is inexpensive, non-toxic and stable anti-freeze solution (30% potassium acetate). The air handing unit has an indoor coil and a ventilation coil. The system can be used to manage building electric load. During peak hours, the heat pump is off and the hot solution water is discharged from the tank to heat up the indoor air and ventilation air. During the hour of charge, the heat pump delivers hot solution water to the tank and to the air. The tank can also stand by while the heat pump provides space heating directly. We selected a medium sized office building located in Minnesota as the representative building and used EnergyPlus to obtain its 24 hour load data. We designed three storage tank volumes assuming 50 degrees C, 65 degrees C and 80 degrees C tank temperatures to independently provide the building load for 4 hours in the morning. The higher the tank temperature, the smaller the required volume, and thus higher energy density. The effective energy density is 78 with an 80 degrees C tank, and 40 kWhth/m3 with 50 degrees C. We simulated the tank integrated heat pump performance subjected to the 24-hour building load profile and ambient data. The baseline is the same system without storage tank. There was a trade-off between the storage energy density and the charging COP. The charge hour COP was 2.77 to charge the tank to 80 degrees C, and 3.01 to 50 degrees C. The proposed system could shift building load from the peak hours (8:00 - 12:00) to off-business hour (23:00 - 7:00+1). It eliminated 100% compressor electricity use during the peak hours, and avoided a peak electric power of 34 kW. The 65 degrees C tank saved 9.5 kWhe (4%) considering all day operation, which was the best balance between energy density and the system operation efficiency among the three options.

CO2 heat pump↗

Connecting the Dots: An Assessment of Cyber-risks in Networked Building and Municipal Infrastructure Systems

The buildings and city streets we walk down are changing. Driven by various data-driven use cases, there is increased interest in networking and integrating lighting and other building systems (e.g., heating, ventilation, and air conditioning (HVAC), security, scheduling) that were previously not internet-facing, and equipping them with sensors that collect information about their environment and the people that inhabit it. These data-enabled systems can potentially deliver improved occupant and resident experiences and help meet the U.S. Department of Energy (DOE) national energy and carbon reduction goals. Deploying connected devices new to being networked, however, is not without its challenges. This paper explores tools available to system designers and integrators that facilitate a cybersecurity landscape assessment – or more specifically the identification of threats, vulnerabilities, and adversarial behaviors that could be used against these networked systems. These assessments can help stakeholders shift security prioritization proactively toward the beginning of the development process.

cyber-risk assesment, adversarial behavior, MITRE ↗

End-Use Savings Shapes Measure Documentation: Variable Refrigerant Flow With 25% Upsizing Allowance for Heating

This documentation focuses on a single end-use savings shape upgrade - a variable refrigerant flow with heat recovery (VRF HR) heating and cooling system coupled with a dedicated outdoor air system (DOAS) for ventilation and where 25% upsizing (or 125% of the original size) is allowed for heating in colder climates (i.e., heating dominant regions). This document will primarily discuss the additional changes to the sizing algorithm and modeling approach, while a comprehensive overview of the fundamental modeling methodology and background of the VRF HR DOAS upgrade, including applicability and other key assumptions can be found in the original documentation: Variable Refrigerant Flow with Heat Recovery and Dedicated Outdoor Air System. To provide more context on the 25% upsizing algorithm, if the building is a cooling dominant (e.g., design cooling load higher than design heating load ), then the outdoor unit capacity of the VRF heat pump is sized based on the design cooling load. However, if the building is heating dominant, then this building is a candidate for the 25% upsizing allowance. Once the 25% upsizing is allowed, if the 25% upsized capacity (or 125% from the original size) represented with design condition exceeds the design heating load, then the design heating load is used for calculating the rated capacity of the outdoor unit. And if the 25% upsized capacity represented with the design condition does not exceed the design heating load, then the 25% upsized capacity represented with rated condition is used for the capacity of the outdoor unit while the remaining heating load is handled with the supplemental/backup electric resistance coil.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Cloud-based implementation of white-box model predictive control for a GEOTABS office building: A field test demonstration

Model predictive control (MPC) has been proven in simulations and pilot case studies to be a superior control strategy for large buildings. MPC can utilize the weather and occupancy schedule forecasts, together with the system model, to predict the future thermal behavior of the building and minimize the overall energy use and maximize thermal comfort. However, these advantages come with the cost of increased modeling effort, computational demands, communication infrastructure, and commissioning efforts. Thus a typical approach is to, often rapidly, simplify the building modeling and MPC optimization problem while paying a price of not reaching the full performance potential. It has been shown that by employing accurate physics-based models, MPC performance can be notably increased closer to its theoretical performance bound. However, implementation of such high-fidelity MPC in real buildings remains a challenge, resulting in a lack of successful field test studies. This work presents the methodology and field test demonstration of a computationally efficient implementation of the white-box MPC in an office building in Belgium. The detailed model of the building is based on first-principle physical equations. The deployment and supervision of MPC operation in a practical setting are supported by an automated cloud-based communication infrastructure. The motivating factor behind the cloud-based architecture is its compatibility with a commercially appealing control as a service concept. The building is equipped with a ground source heat pump (GSHP) and thermally activated building structures (TABS), where the combination of both is also known as GEOTABS. From a control perspective, GEOTABS buildings are particularly challenging systems due to large scale, complex heating, ventilation and air conditioning (HVAC) system, and slow dynamics with time delays. On the other hand, there is an increased potential for energy savings due to the high thermal mass, which acts as thermal storage. The MPC operation is demonstrated during the challenging transient seasons (switching between heating and cooling), and its performance is compared to a traditional rule-based controller (RBC). We provide a proof of concept of real MPC operation for the most difficult seasons with notable GSHP energy use savings equal to 53.5% and thermal comfort improvement by 36.9%. Other MPC applications found in the literature describe tests for only cooling or only heating, and up to now only for a black-box or a grey-box approach.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Building Performance Standards and Energy Code Alignment: Technical Brief

Building energy codes focus on building design, construction and renovation and have significantly increased building efficiency since the first national energy code was published in 1975. Most jurisdictions have energy codes based on ANSI/ASHRAE/IES Standard 90.1 (hereto referred to as Standard 90.1) and the International Energy Conservation Code (IECC). Compliance options available in these model energy codes include a prescriptive path, whole building performance paths – including IECC Total Building Performance (TBP), Standard 90.1 Energy Cost Budget (ECB) method and Performance Rating Method (PRM) – and system performance paths for envelope and heating, ventilation, and air-conditioning systems. Building performance standard (BPS) policies are an emerging policy tool used by jurisdictions to reduce the operational energy use or greenhouse gas (GHG) emissions of the existing commercial building stock. BPS policies vary widely between jurisdictions and are tailored to each location’s climate and energy goals. Intuitively, projects that met a recent edition of the energy code should comply with the BPS targets.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Building Performance Standards and Energy Code Alignment - Technical Brief

Building energy codes focus on building design, construction and renovation and have significantly increased building efficiency since the first national energy code was published in 1975. Most jurisdictions have energy codes based on ANSI/ASHRAE/IES Standard 90.1 (hereto referred to as Standard 90.1) and the International Energy Conservation Code (IECC). Compliance options available in these model energy codes include a prescriptive path, whole building performance paths – including IECC Total Building Performance (TBP), Standard 90.1 Energy Cost Budget (ECB) method and Performance Rating Method (PRM) – and system performance paths for envelope and heating, ventilation, and air-conditioning systems. Building performance standard (BPS) policies are an emerging policy tool used by jurisdictions to reduce the operational energy use or greenhouse gas (GHG) emissions of the existing commercial building stock. BPS policies vary widely between jurisdictions and are tailored to each location’s climate and energy goals. Intuitively, projects that met a recent edition of the energy code should comply with the BPS targets. However, some new buildings may struggle with meeting the BPS for the following reasons: 1. Energy codes focus on the design of the building and its projected ability to perform efficiently, while BPS compliance is dependent on the actual ongoing performance of the building, considering variables like occupancy, operation, and maintenance. 2. There are significant differences in the methodologies used to determine BPS compliance versus code compliance, including how each handles compliance metrics, handling of building amenities, and renewable energy generation. 3. The prescriptive compliance path in the energy code is based on performance of individual building components, as opposed to the performance compliance path which accounts for holistic building design strategies and interdependent building systems. This can result in a significant variability in post-occupancy performance for buildings built using the prescriptive path. Designs on the lower end of the permitted efficiency range may struggle with meeting the BPS.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Integration of a Smart Outlet-Based Plug Load Management System with a Building Automation System

The growth of and reliance on renewable energy necessitate a multi-pronged approach to achieve grid reliability and economics. As they represent a notable portion of U.S. energy consumption, commercial buildings must play an active role in this effort. Conserving energy and responding to grid conditions through demand flexibility can be achieved through the integration of major building systems. Integration of plug and process loads with lighting and heating, ventilation, and air conditioning systems maximizes the effectiveness of integrated building energy management. In this research, we demonstrate the integration of smart outlets into a building automation system. We cover the installation process as well as the architecture required for smart outlets to communicate data to the building automation system and to receive commands back. After recording power measurements for one week as a baseline, we configured the building automation system to turn the smart outlets on and off according to a set schedule. This resulted in energy savings of 66% during 1 week on 25 plug loads. This work demonstrates that grid-interactive efficient buildings are achievable through building system integration.

building automation system↗

Protocol for Determining Actual Flow Rate in FTWC Duct Systems

This paper is intended to document the theory and methods to determine the actual flow rate in the exhaust system used to ventilate the Flanged Tritium Waste Containers based on realtime instrument readings. Section 1 provides introductory and background material; Section 2 details the various correction factors used to adjust flow readings for ambient air pressure and temperature and other operational parameters. Section 3 provides guidance on implementing this process during venting operations, and Section 4 provides supporting documentation and also a field checklist that can be used by personnel during venting. For Revision 1, a summary of editorial changes made to the paper was added as Section 4.4, as well as a section documenting peer review (Section 4.5).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Impact of Behind-the-Meter Heterogeneous Distributed Energy Resources on Distribution Grids: Preprint

The increasing integration of distributed energy resources (DERs) on the electric grid brings new challenges and opportunities for utility grid operations. With the rapid deployment of DERs, there is emerging interest in integrating these controllable devices with utility operations at all levels for monitoring and management. Different types of DERs such as Photovoltaics (PV), energy storage, electric vehicles (EVs), etc. have varying effects on the grid based on how and where they are deployed. Again, the DER deployment and its impact are network-dependent, while the traditional electric grids were not designed to host DERs. To understand the challenges with increasing behind-the-meter (BTM) DERs and to identify the needs in deploying advanced controls, a comprehensive grid impact study is indispensable. This paper investigates the impacts of integrating a mix of DERs in the utility distribution network in Colorado, U.S. Firstly, BTM DERs at the residential scale including distributed PV; battery energy storage systems (BESS); heating, ventilation, and air-conditioning (HVAC) load; electric water heater (EWH) load; and EVs are modeled. The impacts of integrating these resources on the distribution network are evaluated by conducting time-series simulations for different scenarios considering different days to capture the worst-case conditions. Monte Carlo simulations are conducted to generate the realistic EV charging profile. The voltage issues, substation transformer loadings, and critical nodes in the network are identified with the incorporation of uncoordinated EV charging loads and other DER in the network. This analysis helps visualize the DER impact on the grid, identify the challenges, and provides an insight into the new distribution management and control needs to enable reliable and resilient distribution grid operations. Additionally, further analysis is performed to estimate the daily residential electricity cost with the inclusion of DERs under time-of-use tariffs. The result shows the daily residential electricity cost reduced by 20:7% on average with DERs compared to the case without DERs.

27 ARPA - Advanced Research Projects Agency-Energy↗

The De-Icing Comparison Experiment (D-ICE): a study of broadband radiometric measurements under icing conditions in the Arctic

Abstract. Surface-based measurements of broadband shortwave (solar) and longwave (infrared) radiative fluxes using thermopile radiometers are made regularly around the globe for scientific and operational environmental monitoring. The occurrence of ice on sensor windows in cold environments – whether snow, rime, or frost – is a common problem that is difficult to prevent as well as difficult to correct in post-processing. The Baseline Surface Radiation Network (BSRN) community recognizes radiometer icing as a major outstanding measurement uncertainty. Towards constraining this uncertainty, the De-Icing Comparison Experiment (D-ICE) was carried out at the NOAA Atmospheric Baseline Observatory in Utqiaġvik (formerly Barrow), Alaska, from August 2017 to July 2018. The purpose of D-ICE was to evaluate existing ventilation and heating technologies developed to mitigate radiometer icing. D-ICE consisted of 20 pyranometers and 5 pyrgeometers operating in various ventilator housings alongside operational systems that are part of NOAA's Barrow BSRN station and the US Department of Energy Atmospheric Radiation Measurement (ARM) program North Slope of Alaska and Oliktok Point observatories. To detect icing, radiometers were monitored continuously using cameras, with a total of more than 1 million images of radiometer domes archived. Ventilator and ventilator–heater performance overall was skillful with the average of the systems mitigating ice formation 77 % (many >90 %) of the time during which icing conditions were present. Ventilators without heating elements were also effective and capable of providing heat through roughly equal contributions of waste energy from the ventilator fan and adiabatic heating downstream of the fan. This provided ∼0.6 ∘C of warming, enough to subsaturate the air up to a relative humidity (with respect to ice) of ∼105 %. Because the mitigation technologies performed well, a near complete record of verified ice-free radiometric fluxes was assembled for the duration of the campaign. This well-characterized data set is suitable for model evaluation, in particular for the Year of Polar Prediction (YOPP) first Special Observing Period (SOP1). We used the data set to calculate short- and long-term biases in iced sensors, finding that biases can be up to +60 W m−2 (longwave) and −211 to +188 W m−2 (shortwave). However, because of the frequency of icing, mitigation of ice by ventilators, cloud conditions, and the timing of icing relative to available sunlight, the biases in the monthly means were generally less than the aggregate uncertainty attributed to other conventional sources in both the shortwave and longwave.

54 ENVIRONMENTAL SCIENCES↗

Stochastic Home Energy Management Systems with Varying Controllable Resources

This paper studies the performance of a model predictive control (MPC) algorithm in a home energy management system (HEMS) as the set of controllable resources varies and under both a constant and a time-of-use (TOU) electricity price structure. The set of controllable resources includes residentially-owned photovoltaic (PV) panels, a home battery system (HBS), an electric vehicle (EV), and a home heating, ventilation, and air conditioning (HVAC) system. The HEMS optimally schedules the set of controllable resources given user preferences such as indoor thermal comfort and electricity cost sensitivity. The home energy management system is built on a chance constrained, MPC-based algorithm, where the chance constraint ensures the indoor thermal comfort is satisfied with a high probability given uncertainty in the outdoor temperature and solar irradiance forecasts. Simulation results for varying sets of controllable resources under two different electricity price structures demonstrate the variation in the HEMS control with respect to HBS operation, electricity cost, and grid power usage.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗