Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Upgrade”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

Current status of biogas upgrading for direct biomethane use: A review

Anaerobic digestion produces biogas, a mixture of CH 4 and CO 2 , where CH 4 is a low cost, environmentally friendly, and renewable energy source. The application of biogas production is increasing rapidly as a means of reducing the pollution impact of organic biomasses. However, biogas contains unwanted elements such as hydrogen sulfide, carbon monoxide, siloxanes, and carbon dioxide. To remove these elements, several biogas upgrading technologies like water scrubbing, amine scrubbing, pressure swing adsorption, and membrane separation have been developed and are being used at various commercial scales. Problems with these methods are high energy consumption, the use of expensive chemicals, and high operating cost. Therefore, a major effort is currently underway to improve the design of existing methods as well as developing innovative new upgrading technologies such as cryogenic separation and biological upgrading. Here, this review intends to provide a comprehensive overview of the limitations with the existing upgrading technologies along with recent advances in physical, chemical, and biological biogas upgrading technologies (e.g., pressure swing adsorption, membrane separation, biochar adsorption and CO 2 conversion by biological organisms) and further into possible future solutions, such as hybrid systems. Comparative studies of process complexities and associated economic concerns are also provided, and future perspectives that may facilitate research into sustainable biogas upgrading technologies are discussed, focusing in particular on cryogenic separation, novel biological techniques, biochar based upgrading and hybrid technologies incorporating two or more different methods seamlessly integrated.

09 BIOMASS FUELS↗

A poloidal section neutron camera for MAST upgrade

The Mega Ampere Spherical Tokamak Upgrade (MAST Upgrade) is intended as a demonstration of the physics viability of the Spherical Tokamak (ST) concept and as a platform for contributing to ITER/DEMO physics. Concerning physics exploitation, MAST Upgrade plasma scenarios can contribute to the ITER Tokamak physics particularly in the field of fast particle behavior and current drive studies. At present, MAST is equipped with a prototype neutron camera (NC). On the basis of the experience and results from previous experimental campaigns using the NC, the conceptual design of a neutron camera upgrade (NC Upgrade) is being developed. As part of the MAST Upgrade, the NC Upgrade is considered a high priority diagnostic since it would allow studies in the field of fast ions and current drive with good temporal and spatial resolution. In this paper, we explore an optional design with the camera array viewing the poloidal section of the plasma from different directions.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

The Jefferson Lab 12 GeV Upgrade

Construction of the 12 GeV upgrade to the Continuous Electron Beam Accelerator Facility (CEBAF) at the Thomas Jefferson National Accelerator Facility is presently underway. This upgrade includes doubling the energy of the electron beam to 12 GeV, the addition of a new fourth experimental hall, and the construction of upgraded detector hardware. An overview of this upgrade project is presented, along with highlights of the anticipated experimental program. The 12 GeV upgrade project at Jefferson Lab will enable a powerful new experimental program that will advance our understanding of the quark/gluon structure of hadronic matter, the nature of Quantum Chromodynamics, and the properties of a new extended standard model of particle interactions. Commissioning of the upgraded beam will be begin in 2013, and the full complement of upgraded experimental equipment will be completed in 2015. This unique facility will provide many opportunities for exploration and discovery for a large international community of nuclear scientists.

43 PARTICLE ACCELERATORS↗

TU-G-BRD-02: Automated Systematic Quality Assurance Program for Radiation Oncology Information System Upgrades

Purpose: To: (1) describe an independent, automated, systematic software-based protocol for verifying clinical data accuracy/integrity for mitigation of data corruption/loss risks following radiation oncology information system (ROIS) upgrades; and (2) report on application of this approach in an academic/community practice environment. Methods: We propose a robust approach to perform quality assurance on the ROIS after an upgrade, targeting four data sources: (1) ROIS relational database; (2) ROIS DICOM interface; (3) ROIS treatment machine data configuration; and (4) ROIS-generated clinical reports. We investigated the database schema for differences between pre-/post-upgrade states. Paired DICOM data streams for the same object (such as RT-Plan/Treatment Record) were compared between pre-/post-upgrade states for data corruption. We examined machine configuration and related commissioning data files for changes and corruption. ROIS-generated treatment appointment and treatment parameter reports were compared to ensure patient encounter and treatment plan accuracy. This protocol was supplemented by an end-to-end clinical workflow test to verify essential ROI functionality and integrity of components interfaced during patient care chain of activities. We describe the implementation of this protocol during a Varian ARIA system upgrade at our clinic. Results: We verified 1,638 data tables with 2.4 billion data records. For 222 under-treatment patients, 605 DICOM RT plans and 13,480 DICOM treatment records retrieved from the ROIS DICOM interface were compared, with no differences in fractions, doses delivered, or treatment parameters. We identified 82 new data tables and 78 amended/deleted tables consistent with the upgrade. Reports for 5,073 patient encounters over a 2-week horizon were compared and were identical to those before the upgrade. Content in 12,237 xml machine files was compared, with no differences identified. Conclusion: An independent QA/validation approach for ROIS upgrades was developed and implemented at our clinic. The success of this approach ensures a robust QA of ROIS upgrades without manual paper/electronic checks and associated intensive labor.

60 APPLIED LIFE SCIENCES↗

Case Studies of Residential Façade Upgrades in Four Climate Zones

This paper reports on a project that explored the viability of insulation and window upgrades during siding retrofits in four case studies across the United States. Thousands of homes are re-sided every year, but only a fraction of consumers add insulation and upgrade the windows at the same time, even though a siding replacement is the ideal time to update the thermal performance of building enclosures. To better understand why more siding retrofits do not include insulation and window upgrades, research staff from several organizations collaborated with the U.S. Department of Energy on a multi-faceted research project that included a cost analysis, workforce analysis, market assessment, and contractor assessment. This paper will review four in-field case studies conducted with contractors actively engaged in home re-siding projects that agreed to add rigid insulation and window upgrades as part of their projects. Findings from the case studies will be presented including contractor perspectives, cost, and technical approaches on projects, located in multiple climate zones including Bellingham WA, Jackson MS, Kalamazoo MI, and Phoenix AZ. All projects involved adding continuous rigid insulation on the exterior walls and installation of new cladding. Cladding types varied from wood and metal to fiber cement, vinyl, and traditional stucco. All homes also received a window upgrade, although upgrades varied depending on the original condition of the windows and climate; upgrades included triple-pane windows, low-e storm windows, and exterior shading. Key findings including technical approaches, opportunities, barriers, and project cost will be presented.

re-siding, insulation, rigid insulation, exterior ↗

Screening and evaluation of biomass upgrading strategies for sustainable transportation fuel production with biomass-derived volatile fatty acids

Biomass conversion to fuels and chemicals is crucial to decarbonization, but choosing an advantageous upgrading pathway out of many options is challenging. Rigorously evaluating all candidate pathways (process simulation, product property testing) requires a prohibitive amount of research effort; even simple upgrading schemes have hundreds of possible permutations. We present a method enabling high-throughput screening by approximating upgrading unit operations and drop-in compatibility of products (e.g., fuel properties) and apply it to volatile fatty acid (VFA) conversion to liquid transportation fuels via a MATLAB script, VFA Upgrading to Liquid Transportation fUels Refinery Estimation (VULTURE). VULTURE selects upgrading configurations that maximize fuel blend bio-derived content. We validate VULTURE's approximations through surrogate fuel property testing and process simulation. Techno-economic and life cycle analyses suggest that VFA upgrading processes down-selected by VULTURE are profitable and have low carbon intensities, demonstrating the potential for the strategy to accelerate process development timelines at decreased costs.

09 BIOMASS FUELS↗

Fermilab's Horizontal Test Stand Upgrade Overview and Commissioning

Cryo-assemblies with the Nb 3 Sn MQXFA low-beta quadrupoles for the High Luminosity LHC (HL-LHC) upgrade will be tested at Fermilab's magnet test facility. A total of 10 cryo-assemblies will be delivered to CERN within the US HL-LHC Accelerator Upgrade Project (AUP). The horizontal test stand at Fermilab already has been used for testing the existing LHC inner-triplet quadrupoles, but the stand and corresponding electrical and cryogenic sub-systems were not operational for more than a decade. In order to restore the test stand functions and meet the design and test requirements for the HL-LHC magnets, the existing horizontal test facility at Fermilab underwent a significant refurbishment of the cryogenic and mechanical components. Most of the upgrades were completed and verified during so called zero-magnet test by late 2020, and then final commissioning of the upgraded horizontal test stand was completed during the first cryo-assembly test in 2023. These tests verified the major cryo-mechanical installations, as well as the basic test stand operations, including controlled cooldown and operation at 1.9 K, magnet protection and process controls. Here, in this paper, overview of the Fermilab's horizontal test facility upgrade and commissioning of these upgrades are presented.

43 PARTICLE ACCELERATORS↗

Hydrothermal Liquefaction and Upgrading of Municipal Wastewater Treatment Plant Sludge: A Preliminary Techno-Economic Analysis

A preliminary process model and techno-economic analysis (TEA) was completed for fuel produced from hydrothermal liquefaction (HTL) of sludge waste from a municipal wastewater treatment plant (WWTP) and subsequent biocrude upgrading. The model is adapted from previous work by Jones et al. (2014) for algae HTL, using experimental data generated in fiscal year 2015 (FY15) bench-scale HTL testing of sludge waste streams. Testing was performed on sludge samples received from MetroVancouver’s Annacis Island WWTP (Vancouver, B.C.) as part of a collaborative project with the Water Environment and Reuse Foundation (WERF). The full set of sludge HTL testing data from this effort will be documented in a separate report to be issued by WERF. This analysis is based on limited testing data and therefore should be considered preliminary. Future refinements are necessary to improve the robustness of the model, including a cross-check of modeled biocrude components with the experimental GCMS data and investigation of equipment costs most appropriate at the smaller scales used here. Environmental sustainability metrics analysis is also needed to understand the broader impact of this technology pathway. The base case scenario for the analysis consists of 10 HTL plants, each processing 100 dry U.S. ton/day (92.4 ton/day on a dry, ash-free basis) of sludge waste and producing 234 barrel per stream day (BPSD) biocrude, feeding into a centralized biocrude upgrading facility that produces 2,020 barrel per standard day of final fuel. This scale was chosen based upon initial wastewater treatment plant data collected by the resource assessment team from the EPA’s Clean Watersheds Needs Survey database (EPA 2015a) and a rough estimate of what the potential sludge availability might be within a 100-mile radius. In addition, we received valuable feedback from the wastewater treatment industry as part of the WERF collaboration that helped form the basis for the selected HTL and upgrading plant scales and feedstock credit (current cost of disposal). It is assumed that the sludge is currently disposed of at $16.20/wet ton ($46/dry ton at 35% solids; $50/ton dry, ash-free basis) and this is included as a feedstock credit in the operating costs. The base case assumptions result in a minimum biocrude selling price of $3.8/gge and a minimum final upgraded fuel selling price of $4.9/gge. Several areas of process improvement and refinements to the analysis have the potential to significantly improve economics relative to the base case: • Optimization of HTL sludge feed solids content • Optimization of HTL biocrude yield • Optimization of HTL reactor liquid hourly space velocity (LHSV) • Optimization of fuel yield from hydrotreating • Combined large and small HTL scales specific to regions (e.g., metropolitan and suburban plants) Combined improvements believed to be achievable in these areas can potentially reduce the minimum selling price of biocrude and final upgraded fuel by about 50%. Further improvements may be possible through recovery of higher value components from the HTL aqueous phase, as being investigated under separate PNNL projects. Upgrading the biocrude at an existing petroleum refinery could also reduce the MFSP, although this option requires further testing to ensure compatibility and mitigate risks to a refinery. And finally, recycling the HTL aqueous phase product stream back to the headworks of the WWTP (with no catalytic hydrothermal gasification treatment) can significantly reduce cost. This option is uniquely appropriate for application at a water treatment facility but also requires further investigation to determine any technical and economic challenges related to the extra chemical oxygen demand (COD) associated with the recycled water.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Hydrothermal Liquefaction and Upgrading of Municipal Wastewater Treatment Plant Sludge: A Preliminary Techno-Economic Analysis, Rev.1

A preliminary process model and techno-economic analysis (TEA) was completed for fuel produced from hydrothermal liquefaction (HTL) of sludge waste from a municipal wastewater treatment plant (WWTP) and subsequent biocrude upgrading. The model is adapted from previous work by Jones et al. (2014) for algae HTL, using experimental data generated in fiscal year 2015 (FY15) bench-scale HTL testing of sludge waste streams. Testing was performed on sludge samples received from Metro Vancouver’s Annacis Island WWTP (Vancouver, B.C.) as part of a collaborative project with the Water Environment and Reuse Foundation (WERF). The full set of sludge HTL testing data from this effort will be documented in a separate report to be issued by WERF. This analysis is based on limited testing data and therefore should be considered preliminary. In addition, the testing was conducted with the goal of successful operation, and therefore does not represent an optimized process. Future refinements are necessary to improve the robustness of the model, including a cross-check of modeled biocrude components with the experimental GCMS data and investigation of equipment costs most appropriate at the relatively small scales used here. Environmental sustainability metrics analysis is also needed to understand the broader impact of this technology pathway. The base case scenario for the analysis consists of 10 HTL plants, each processing 100 dry U.S. ton/day (92.4 ton/day on a dry, ash-free basis) of sludge waste and producing 234 barrel per stream day (BPSD) biocrude, feeding into a centralized biocrude upgrading facility that produces 2,020 barrel per standard day of final fuel. This scale was chosen based upon initial wastewater treatment plant data collected by PNNL’s resource assessment team from the EPA’s Clean Watersheds Needs Survey database (EPA 2015a) and a rough estimate of what the potential sludge availability might be within a 100-mile radius. In addition, we received valuable feedback from the wastewater treatment industry as part of the WERF collaboration that helped form the basis for the selected HTL and upgrading plant scales and feedstock credit (current cost of disposal). It is assumed that the sludge is currently disposed of at $16.20/wet ton ($46/dry ton at 35% solids; $50/ton dry, ash-free basis) and this is included as a feedstock credit in the operating costs. The base case assumptions result in a minimum biocrude selling price of $3.8/gge and a minimum final upgraded fuel selling price of $4.9/gge. Several areas of process improvement and refinements to the analysis have the potential to significantly improve economics relative to the base case: •Optimization of HTL sludge feed solids content •Optimization of HTL biocrude yield •Optimization of HTL reactor liquid hourly space velocity (LHSV) •Optimization of fuel yield from hydrotreating •Combined large and small HTL scales specific to regions (e.g., metropolitan and suburban plants) Combined improvements believed to be achievable in these areas can potentially reduce the minimum selling price of biocrude and final upgraded fuel by about 50%. Further improvements may be possible through recovery of higher value components from the HTL aqueous phase, as being investigated under separate PNNL projects. Upgrading the biocrude at an existing petroleum refinery could also reduce the MFSP, although this option requires further testing to ensure compatibility and mitigation of risks to a refinery. And finally, recycling the HTL aqueous phase product stream back to the headworks of the WWTP (with no catalytic hydrothermal gasification treatment) can significantly reduce cost. This option is uniquely appropriate for application at a water treatment facility but also requires further investigation to determine any technical and economic challenges related to the extra chemical oxygen demand (COD) associated with the recycled water.

09 BIOMASS FUELS↗

Simulation and Optimization of Volatile Fatty Acid Upgrading Strategies for Sustainable Transportation Fuel Production

Underutilized wet waste is a promising feedstock for production of carbon-neutral or carbon-negative liquid transportation fuels. Arrested methanogenesis of wet wastes by microbes, which produces mixtures of C2-C8 carboxylic acids (volatile fatty acids, VFAs), is practiced industrially at a pilot scale and the VFA products can be catalytically upgraded to molecules suitable for use as transportation fuels (alcohols and alkanes) via sequential ketonization and hydrogenation, both steps of which have been demonstrated with high (>90%) yield at the lab scale. We present in this work a simulation-based decision-making framework which evaluates upgrading strategies of VFAs to alcohol- and hydrocarbon-based neat and blended diesel, jet, and gasoline fuels. The processes utilize sequential upgrading steps (ketonization and hydrogenation) accompanied by one distillation step (either separating VFAs before ketonization or alcohols after ketone hydrogenation) to form two liquid streams: a light alcohol stream best suited as a light-duty fuel and a heavy alcohol or hydrocarbon stream best suited as a diesel or jet fuel. Suitability of the liquid products as transportation fuels and maximum blending levels with petrofuels comes from simulation of critical fuel properties (boiling point, flash point, lower heating value, viscosity, melting point, water solubility, and cetane/octane number). Catalytic upgrading steps and fuel property mixing models used by the simulation are experimentally validated. We demonstrate the flexibility of the decision-making algorithm by evaluating processing scenarios for experimentally-observed VFA profiles with varied carbon chain length distributions. Processing scenarios are optimized for either maximum total renewable carbon utilization or production of heavy-duty (jet or diesel) fuels. We evaluate the economic viability and CO2 emissions of each proposed upgrading scenario using techno-economic and life cycle analyses. The decision-making framework developed in this work can also be used to down-select promising strategies for upgrading of other bio-based feedstocks to sustainable fuels and chemicals.

aviation fuel↗

Network upgrade exploiting multi band: S- or E-band?

Nowadays, the fiber spectrum is only partially exploited, i.e., mainly in the C-band and more recently in the C + L-band, where the fiber attenuation profile experiences the minimum. Thus, fiber communications technology—amplifiers, switching, transceivers, etc.—and networking solutions are mature for those spectrum bands. However, the continuous increase in traffic means that capacity saturation of the current infrastructure is looming. Taking advantage of the unused portions of the spectrum (e.g., the S- and E-bands) may be an efficient solution to accommodate an increase in traffic without installing new fibers. Research is thus investigating multi-band transmission and networking to evaluate and enable such network upgrades. Some issues need to be solved or taken into account, from the enabling technology (e.g., amplifiers in the S- or E-band are still under development) to physical layer effects previously neglected, such as stimulated Raman scattering (SRS). SRS affects wideband transmission, potentially degrading active channels. The contribution of this paper is the investigation of network upgrades for C + L-band systems. In particular, upgrades exploiting the E- and S-bands are compared taking into account each band capacity and the effects of SRS on both new and already deployed channels (in both the C- and L-bands). A detailed analysis of the physical layer is provided also in the presence of guard bands between previously exploited bands and the bands used for upgrade. By leveraging the physical layer assessment, a networking analysis is carried out to evaluate the supported traffic increase and also the signal quality degradation due to SRS on active channels. Overall, the results suggest that upgrades to the E- and S-bands support a comparable increase in traffic. However, the exploitation of the E-band with 14 THz of guard band between the C- and E-bands may avoid detrimental effects to already active channels in the C + L-band, suggesting this upgrade strategy can be the most effective of the two.

47 OTHER INSTRUMENTATION↗

Understanding the Costs and Barriers of Residential Electrical Panel and Service Upgrades

Upgrading electrical panels and services in U.S. homes represents a significant barrier to building modernization, imposing considerable costs, delays, and procedural uncertainties on homeowners, contractors, utilities, and building departments. Although cost databases document individual infrastructure activities, they rarely capture the integrated, whole-project perspective required to understand how electrical upgrades are planned, executed, and regulated. Existing research is often geographically constrained, narrowly scoped, or derived from limited samples, leaving significant knowledge gaps unaddressed. This study examines the timelines and costs associated with residential electrical panel and service upgrades using data from a national cross- sectional survey conducted in summer 2025. The survey captured responses from 140 stakeholders across 34 states, including building industry professionals, utility staff, and building department staff. Findings indicate that project duration and cost increase substantially with building size though patterns vary by infrastructure type. Most single-family and small multifamily projects were completed within 30 days, whereas medium and large multifamily buildings show longer and less predictable timelines. Service rating increases modestly extend project duration, but building type and size were the primary determinants of delays. Cost patterns were similar: customer-side equipment and panel replacements scale predictably with building size, while utility-side costs are highly variable, often triggered by threshold-driven infrastructure upgrades such as transformer replacements. Permit fees vary considerably between jurisdictions but generally represent a minor proportion of total project costs. These findings identify electrical upgrades as a significant barrier to residential building costs and highlight the need for improved stakeholder coordination, streamlined permitting, and strategies that reduce upgrade requirements while maintaining safety and code compliance.

Casquero-Modrego, Nuria↗

Floodplain Assessment for the Proposed Outdoor Fire Range Upgrades at TA-72 in Lower Sandia Canyon, Los Alamos National Laboratory

Los Alamos National Laboratory (LANL) is preparing to implement actions in Sandia Canyon at Technical Area (TA) 72. Los Alamos National Security (LANS) biologists conducted a floodplain determination and this project is partially located within a 100-year floodplain. The proposed project is to upgrade the existing outdoor shooting range facilities at TA-72. These upgrades will result in increased safety and efficiencies in the training for Protective Force personnel. In order to remain current on training requirements, the firing ranges at TA-72 will be upgraded which will result in increased safety and efficiencies in the training for Protective Force personnel (Figure 1). These upgrades will allow for an increase in class size and more people to be qualified at the ranges. Some of these upgrades will be built within the 100-year floodplain. The upgrades include: concrete pads for turning target systems and shooting positions, new lighting to illuminate the firing range for night fire, a new speaker system for range operations, canopies at two locations, an impact berm at the far end of the 300-yard mark, and a block wall for road protection.

Basic Biological Sciences(59)↗

Canted Undulator Upgrade for GeoSoilEnviroCARS Sector 13 at the Advanced Photon Source

Support for the beamline component of the canted undulator upgrade of Sector 13 (GeoSoilEnviroCARS; managed and operated by the University of Chicago) at the Advanced Photon Source (APS; Argonne National Laboratory) was received from three agencies (equally divided): NASA-SRLIDAP (now LARS), NSF-EAR-IF (ARRA) and DOE-Single Investigator Small Group (SISGR). The associated accelerator components (undulators, canted front end) were provided by the APS using DOE-ARRA funding. The intellectual merit of the research enabled by the upgrade lies in advancing our knowledge of the composition, structure and properties of earth materials; the processes they control; and the processes that produce them. The upgrade will facilitate scientific advances in the following areas: high pressure mineral physics and chemistry, non-crystalline and nano-crystalline materials at high pressure, chemistry of hydrothermal fluids, reactions at mineral-water interfaces, biogeochemistry, oxidation states of magmas, flow dynamics of fluids and solids, and cosmochemistry. The upgrade, allowing the microprobe to operate 100% of the time and the high pressure and surface scattering and spectroscopy instruments to receive beam time increases, will facilitate much more efficient use of the substantial investment in these instruments. The broad scientific community will benefit by the increase in the number of scientists who conduct cutting-edge research at GSECARS. The user program in stations 13ID-C (interface scattering) and 13ID-D (laser heated diamond anvil cell and large volume press) recommenced in June 2012. The operation of the 13ID-E microprobe station began in the Fall 2012 cycle (Oct.-Dec 2012). The upgraded canted beamlines double the amount of undulator beam time at Sector 13 and provide new capabilities including extended operations of the X-ray microprobe down to the sulfur K edge and enhanced brightness at high energy. The availability of the upgraded beamlines will advance the research being conducted at Sector 13.

47 OTHER INSTRUMENTATION↗

The Use of TaBoRR as a Heavy Oil Upgrader

Preliminary testing has shown that Western Research Institute's (WRI) Tank Bottom Recovery and Remediation (TaBoRR{reg_sign}) technology shows promise for heavy oil upgrading. Approximately 70 to 75 wt% of a Canadian Cold Lake bitumen feed was converted to a partially upgraded overhead product that could be transported directly by pipeline or blended with the parent bitumen to produce transportable crude. TaBoRR{reg_sign} was originally developed to remediate tank bottom wastes by producing a distillate product and solid waste. TaBoRR{reg_sign}'s processing steps include breaking a water-oil emulsion, recovering a light hydrocarbon fraction by distillation in a stripper unit, and pyrolyzing the residua reducing it to additional overhead and a benign coke for disposal. Cold Lake bitumen was tested in WRI's bench-scale equipment to evaluate the potential use of TaBoRR{reg_sign} technology for heavy oil upgrading to produce a stable, partially (or fully) upgraded product that will allow diluent-reduced or diluent-free transportation of bitumen or ultra-heavy crudes to market. Runs were conducted at temperatures of low, intermediate and high severity in the stripper to produce stripper overhead and bottoms. The bottoms from each of these runs were processed further in a 6-inch screw pyrolyzer to produce pyrolyzer overhead for blending with the corresponding stripper overheads. Proceeding in this fashion yielded three partially upgraded crudes. The products from TaBoRR{reg_sign} processing, the parent bitumen, and bitumen blends were subjected to stability and compatibility testing at the National Centre for Upgrading Technology (NCUT). Chemical analyses of the overhead product blends have met pipeline specifications for viscosity and density; however the bromine number does not, which might indicate the need for mild hydrotreating. Storage stability tests showed the blends to be stable. The blends were also soluble and compatible with most other Alberta crudes.

01 COAL, LIGNITE, AND PEAT↗

Commissioning results from the recently upgraded RHIC LLRF system

During RHIC Run 10, the first phase of the LLRF Upgrade was successfully completed. This involved replacing the aging VME based system with a modern digital system based on the recently developed RHIC LLRF Upgrade Platform, and commissioning the system as part of the normal RHIC start up process. At the start of Run 11, the second phase of the upgrade is underway, involving a significant expansion of both hardware and functionality. This paper will review the commissioning effort and provide examples of improvements in system performance, flexibility and scalability afforded by the new platform. The RHIC LLRF upgrade is based on the recently developed RHIC LLRF Upgrade Platform. The major design goals of the platform are: (1) Design a stand alone, generic, digital, modular control architecture which can be configured to satisfy all of the application demands we currently have, and which will be supportable and upgradeable into the foreseeable future; and (2) It should integrate seamlessly into existing controls infrastructure, be easy to deploy, provide access to all relevant control parameters (eliminate knobs), provide vastly improved diagnostic data capabilities, and permit remote reconfiguration. Although the system is still in its infancy, we think the initial commissioning results from RHIC indicate that these goals have been achieved, and that we've only begun to realize the benefits the platform provides.

43 PARTICLE ACCELERATORS↗

Simulation and Optimization of Volatile Fatty Acid Upgrading Strategies for Sustainable Transportation Fuel Production

The multicomponent nature of and variability of biomass makes chemical upgrading via a single process stream to a single end use infeasible for most feedstocks. A more promising approach is to identify upgrading strategies (encompassing bioprocessing, catalysis, and separations) which valorize varied biomass fractions to distinct products to which each is best suited. A robust procedure to carry out this goal should incorporate comparison of various upgrading procedures as well as suitability of products to a slate of identified end uses. We applied this strategy to one biomass-derived feedstock, volatile fatty acids (VFAs) derived from wet waste arrested anaerobic digestion, by developing a computer program, VFA Upgrading to Liquid Transportation fUels Refinery Estimation (VULTURE) which evaluates VFA catalytic upgrading to liquid transportation fuels. VULTURE considers multiple separations, catalysis (ketonization, hydrogenation), and fuel application options, generating hundreds of candidate scenarios for a given VFA stream, then selects several promising strategies that optimize bio-content of products with properties best suited for target fuel types. We find that VFAs are upgraded most efficiently when separate light alcohol (C3-6) and heavy hydrocarbon or alcohol (C7-13) fractions are targeted to create gasoline and heavy-duty (diesel or jet) fuels or fuel blends. Surrogate property testing of VULTURE-recommended fuels reveals that most predictive models employed are robust, while rigorous process simulation shows that the simple unit operation assumptions used in VULTURE are largely accurate, especially for heavy-duty fuel synthesis. Techno-economic and life-cycle analyses show that VFA-derived fuels are profitable and have dramatically (=57%) lower carbon intensities than fossil analogs.

BIOMASS FUELS↗

Early implementation of digital upgrades on simulators - 347

An important aspect of successful Nuclear Power Plant (NPP) digital control system upgrade projects is to upgrade the Operator Training Simulator (OTS) or a related Engineering Simulator (ES), prior to installation of the Distributed Control System (DCS) on the plant allowing for early testing of the digital controls/HMI and for early training of the plant operators while maintaining OTS configuration management (i.e. OTS in sync with the plant's current design). Experience has shown that early implementation of digital upgrades on the OTS and/or an ES can reduce plant startup duration (related to digital systems commissioning) and ensure operators are proficient with the new digital systems to ensure safe and reliable plant operation. Including simulators in the design process offers many benefits including early identification of design deficiencies, testing deficiency fixes, developing and validating plant procedures and supporting human factors engineering, to name a few. Implementing digital upgrades on the OTS is also a regulatory requirement driven by the ANSI/ANS-3.5-2009 standard (Nuclear Power Plant Simulators for Use in Operator Training and Examination) if the new DCS affects actions to be taken by the plant operator in the main control room. This paper presents the benefits of implementing digital upgrades on the OTS and/or ES prior to plant implementation. The various simulator implementation strategies (stimulation, emulation, simulation or a hybrid solution) and selection factors are discussed. The paper also covers four (4) case studies demonstrating how digital upgrades can be implemented on simulators. The first case study covers the implementation of a Siemens offgas Programmable Logic Controller (PLC) system on the Enrico Fermi OTS (Michigan). The second case study covers the implementation of a GE main generator excitation system on the Cernavoda OTS (Romania). The third case study covers the implementation of a Siemens main feedwater control system on the Callaway OTS and ES (Missouri). The final case study covers the implementation of the non-safety related and safety related DCS on the Nuclear New Build (NNB) Hongyanhe Phase I dual-purpose OTS/ES (China). (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗