Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Uncertainty management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

An air quality index-based multistage type-2-fuzzy interval-stochastic programming model for energy and environmental systems management under multiple uncertainties

Highlights: • A multistage type-2-fuzzy interval-stochastic programming (MTIP) method is developed. • Air quality index (AQI) is introduced to manage energy and environmental systems. • AQI-MTIP model is formulated and results for Tianjin's EES are generated. • Impacts of environmental requirements on energy systems is analyzed. • Results can provide support for making effective pollutant mitigation policy. In this study, a multistage type-2-fuzzy interval-stochastic programming (MTIP) method is developed, which extends upon the existing multistage stochastic programming (MSP) by allowing uncertainties expressed as probabilistic distributions, interval values and type-2 fuzzy sets to be effectively incorporated within the optimization framework. Through coupling air quality index (AQI) with MTIP, an AQI-MTIP model is formulated for energy and environmental systems (EES) management of Tianjin. A number of scenarios based on changed AQIs are examined to analyze the impacts of environmental requirements on the city's energy system. Results indicate that (i) with the improvement of environmental requirement, utilization of clean energies (especially natural gas) is provoked markedly; (ii) PM{sub 2.5} is the primary pollutant, 64.50% of which should be reduced each period to maintain the city's air quality at a health-safe level. These findings can help decision makers adjust energy structure, make effective mitigation strategy, and gain deep insight into the relationship between energy consumption and environmental requirement.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Adaptive Management of Water Resources in Light of Future Climate Uncertainty

Water resources managers have always had to make operational decisions in spite of a relatively high degree of uncertainty caused by changing climate, hydrologic, population, land use, socioeconomic, and other conditions. However, based on current climate change predictions and observations of current impacts of climate change or natural variability, the degree of uncertainty appears to be increasing drastically. By better understanding these uncertainties and their policy implications and by managing those uncertainties adaptively, water resources managers and policy makers can reduce the risk of not meeting their management goals and reduce the potential physical, biological and socioeconomic impacts associated with climate change/variation.

54 ENVIRONMENTAL SCIENCES↗

An Approach for Uncertainty Quantification and Management of Unmanned Aerial Vehicle Health

The increasing interest in low-altitude unmanned aerial vehicle (UAV) operations is bringing along safety concerns. Performance of small, low-cost UAVs drastically changes with type, size and controller of the vehicle. Their reliability is lower when compared to reliability of commercial aircrafts, and the availability of on-board sensors for health and state awareness is extremely limited due to their size and propulsion capabilities. Uncertainty plays a dominant role in such a scenario, where a variety of UAVs of different size, propulsion systems, dynamic performance and reliability enters the low-altitude airspace. Unexpected failures could have dangerous consequences for both equipment and humans within that same airspace. As a result, a number of research works and methodologies are being proposed in the area of UAV dynamic modeling, health and safety monitoring, but uncertainty quantification is rarely addressed. Thus, this paper pro- poses a perspective towards uncertainty quantification for autonomous systems, giving special emphasis to a UAV health monitoring application. A formal approach to classify uncertainty is presented; it is utilized to identify the uncertainty sources in UAVs health and operations, and then map uncertainty within a predictive process. To show the application of the methodology proposed here, the design of a model-based powertrain health monitoring algorithm for small-size UAVs is used as case study. The example illustrates how the uncertainty quantification approach can help the modeling strategy, as well as the assessment of diagnostic and prognostic performance.

Health Monitoring↗

Regulatory Decision-Making Process Using 'Weight of Evidence: An Evidence Integration Approach' by the State of Washington at the Hanford Site - 20163

Performance Assessment and Environmental Impact Statement Modeling, Human and Ecological Risk Assessments are the tools used by the Washington State Department of Ecology (Ecology) to make regulatory decisions for permitting and cleanup. These efforts all inherently have large amounts of uncertainty no matter how many alternative approaches are attempted. Professional feedback from tribal governments, stakeholders, federal and state regulators, the public and independent peer review groups are taken into account in this process of informed decision making. The process also includes full evaluation of the comments and the associated reviews made by the various peer review groups such as the Low -Level Waste Disposal Facility Federal Review Group (DOE order 435.1) and the Nuclear Regulatory Commission (NRC). The evolution of technology has produced quicker and more efficient fate and transport modeling tools with related quantification of uncertainties and their significance. Groundwater and vadose zone models have been expanded across the entire Hanford site. Many of the technical approaches identified in the Washington State Regulations are updated using current knowledge to better understand the complexities of the Hanford Site using the latest state of the art tools for risk assessment and modeling. More emphasis and time are directed on defining uncertainty and then managing the uncertainty. One added tool is to run sensitivity cases based on informed decision making. The weight of evidence approach considers all relevant information in an integrative assessment that takes into account the kinds of evidence available, the quality and quantity, the uncertainty and error associated with each type, and how they fit together. Evidence of integration involves looking at systematic reviews and evaluating their strengths and weaknesses. In conclusion, Ecology, Washington State's lead regulatory agency at the Hanford site, has had to modify its site closure approach compared to the rest of the state. A more holistic approach dealing with the Hanford site as an integrated system has evolved leading to a defensible informed approach for regulatory closure decisions. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Uncertainty Quantification and Management for Multi-scale Nuclear Materials Modeling

Understanding and improving microstructural mechanical stability in metals and alloys is central to the development of high strength and high ductility materials for cladding and cores structures in advanced fast reactors. Design and enhancement of radiation-induced damage tolerant alloys are facilitated by better understanding the connection of various unit processes to collective responses in a multiscale model chain, including: dislocation nucleation, absorption and desorption at interfaces; vacancy production, radiation-induced segregation of Cr and Ni at defect clusters (point defect sinks) in BCC Fe-Cr ferritic/martensitic steels; investigation of interaction of interstitials and vacancies with impurities (V, Nb, Ta, Mo, W, Al, Si, P, S); time evolution of swelling (cluster growth) phenomena of irradiated materials; and energetics and kinetics of dislocation bypass of defects formed by interstitial clustering and formation of prismatic loops, informing statistical models of continuum character with regard to processes of dislocation glide, vacancy agglomeration and swelling, climb and cross slip.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Managing Action Duration Uncertainty with Just-In-Case Scheduling

Some applications involve automatic generation and execution of schedules that contain actions with uncertain durations. Such uncertainty can cause schedules to break during execution. This paper presents a technique, called Just-In-Case scheduling or JIC, for building robust schedules that tend not to break. The technique implements the common sense idea of being prepared for likely errors, just in case they should occur. The JIC algorithm analyzes a given schedule, determines where it is likely to break, reinvokes the scheduler to generate a contingent schedule for each highly probable break case, and produces a "multiply contingent" schedule. The technique was developed for a real telescope scheduling problem, and the paper presents empirical results showing that Just-In-Case scheduling performs extremely well for this problem.

Bresina, John↗

Multifidelity Analysis and Optimization for Supersonic Design

Supersonic aircraft design is a computationally expensive optimization problem and multifidelity approaches over a significant opportunity to reduce design time and computational cost. This report presents tools developed to improve supersonic aircraft design capabilities including: aerodynamic tools for supersonic aircraft configurations; a systematic way to manage model uncertainty; and multifidelity model management concepts that incorporate uncertainty. The aerodynamic analysis tools developed are appropriate for use in a multifidelity optimization framework, and include four analysis routines to estimate the lift and drag of a supersonic airfoil, a multifidelity supersonic drag code that estimates the drag of aircraft configurations with three different methods: an area rule method, a panel method, and an Euler solver. In addition, five multifidelity optimization methods are developed, which include local and global methods as well as gradient-based and gradient-free techniques.

Kroo, Ilan↗

From Resilient and Ready to Used and Useful: Managing Temporal and Locational Uncertainty in Electrification, DER Adoption, and Climate Adaptation

Grid planning decisions involve weighing risks against benefits. The best decisions will facilitate development of electrical infrastructure that minimizes risk and maximizes benefits. With the rapidly evolving energy landscape, today's planner must discern new loads and demand cycles; embrace the operational complexity of climate risk; revise settled standards; and anticipate and manage the system impacts of distributed energy resource (DER) adoption. Only by managing the combined uncertainty of these dynamic processes can a planner hope to make effective decisions. Our analysis focuses on the management of temporal and locational uncertainty, and particularly on the risks presented to customers by the mismanagement of the factors that are the sources of these uncertainties.

climate↗

Uncertainty Analysis of Consequence Management Data Products

An interlaboratory effort has developed a probabilistic framework to characterize uncertainty in data products that are developed by the US Department of Energy Consequence Management Program in support of the Federal Radiological Monitoring and Assessment Center. The purpose of this paper is to provide an overview of the probability distributions of input variables and the statistical methods used to propagate and quantify the overall uncertainty of the derived response levels that are used as contours on data products due to the uncertainty in input parameters. Uncertainty analysis results are also presented for several study scenarios. This paper includes an example data product to illustrate the potential real-world implications of incorporating uncertainty analysis results into data products that inform protective action decisions. Data product contours that indicate areas where public protection actions may be warranted can be customized to an acceptable level of uncertainty. Finally, the investigators seek feedback from decision makers and the radiological emergency response community to determine how uncertainty information can be used to support the protective action decision-making process and how it can be presented on data products.

61 RADIATION PROTECTION AND DOSIMETRY↗

Southeast Regional CO 2 Utilization and Storage Acceleration Partnership (SECARB-USA): Preliminary Regional Assessment of Potential Storage Complexes, Including Capacities and Costs, Based on Application of NRAP and SCO2T (Deliverable 3.3) Storage Complexes

The Recipient will assist with the field validation of one or more risk assessment toolsets through: 1) collaborative research; 2) sharing of relevant datasets, information, and technical insights from field efforts; and 3) other modeling and simulation toolsets as they are developed. Collaborative research could include, but is not limited to: 1) demonstrating use of field data for improved leakage pathway characterization, uncertainty reduction, and risk management and uncertainty workflows; 2) testing and validation of a specific National Risk Assessment Partnership (NRAP) tool using site specific data; and 3) improved modeling or reduced-order modeling of geophysical monitoring.

42 ENGINEERING↗

Application of Banking Scoring and Rating for Coherent Risk Measures in Electricity Systems ABSCORES

This project developed a framework for asset and system risk management that can be incorporated into current electricity system operations to improve economic efficiency and establish an Electric Assets Risk Bureau. We leveraged scoring and ratings from banking and financial institutions alongside current optimization methods in dispatching power systems to help system operators and electricity markets schedule resources. This approach is based on the observation that there are major discrepancies between the power scheduled by a system operator and the actual power generated/consumed. These discrepancies—exacerbated by unplanned contingencies (e.g., natural disasters)—are caused by multiple factors, including the different financial, environmental and risk preferences of power producers, consumers, and aggregators. We developed a framework that counteracts two failures in electricity system operations: imperfect information and missing markets for products. The technical approach included five tasks. Tasks 1 and 2 supported the development of risk scores at the asset level with historical data collected for this project. Tasks 3, 4, and 5 incorporated scoring into decision-making at the system level. The proposed effort achieved PERFORM's Program Objectives because the proposed outputs and algorithms do not exist in the electricity industry and are an innovative approach to managing risk. Since the acknowledged need to better assess and act upon risk profiles for grid assets has not been met by the industry, this project will also impact ARPA-E's Mission Areas, including improving energy efficiency and giving the U.S. a technological lead in advanced energy technologies.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Planning: Management of predictability and uncertainty and keeping abreast of developments

The purpose of this study is to propose method to set up and control of a space mission plan such as that of the HERMES spaceplane. The interest of this subject, other than its complexity, is due to the need to manage imprecision and uncertainty during a mission, as well as changes in between missions. Under these conditions, the set up and control of a flight plan require certain special attention and this has led us to define a certain number of qualities: mastery of complexity in order to resolve conflicts between activities: configuration, resource and time management; consideration of various criteria such as risk minimization or the attainment of mission objectives; robustness and flexibility to allow for hazards and deviations from the norm during operation without having to draw up new plans; aptness for replanning by making changes to the plan without having to set up the whole plan again; and memorization and explanation facility in order to manage developments between missions.

Bastien-Thiry, Christophe↗

Uncertainty Analysis of Consequence Management (CM) Data Products.

The goal of this project is to develop and execute methods for characterizing uncertainty in data products that are deve loped and distributed by the DOE Consequence Management (CM) Program. A global approach to this problem is necessary because multiple sources of error and uncertainty from across the CM skill sets contribute to the ultimate p roduction of CM data products. This report presents the methods used to develop a probabilistic framework to characterize this uncertainty and provides results for an uncertainty analysis for a study scenario analyzed using this framework.

97 MATHEMATICS AND COMPUTING↗

Uncertainty Analysis of Consequence Management (CM) Data Products: Extended Analyses.

The goal of this project, started in FY17, is to develop and execute methods of characterizing uncertainty in data products that are developed and distributed by the DOE Consequence Management (CM) Program. This report presents the results of uncertainty analyses performed in FY18 for additional scenarios of increased complexity, including different time phases and radionuclide source terms.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

DeepGrid: Robust Deep Reinforcement Learning-based Contingency Management

Increasing uncertainty raised by the integration of renewable energy resources requires an enormous number of simulations to be carried out for the security assessment of the power grid. However, it is challenging to assess the steady-state and dynamic security indices for different system contingency events by doing an exhaustive analysis in real-time due to the computational and communication constraints. One promising solution is using data-driven techniques along with the system models to train an intelligent contingency management framework to better handle the contingencies in real-time. Nevertheless, implementing a data-driven technique to obtain the best remedial actions necessitates to account for the effect of the measurement noise on the performance of the contingency management. To tackle these challenges, we leverage a robust deep reinforcement learning (DRL) algorithm called Double Deep Q-Network (DDQN) to design a recommender system capable of prescribing optimal control actions with the help of the real-time digital simulator (RTDS). The use of RTDS system in combination with the advanced DRL algorithm allows to explore a wide variety of system contingencies in order to derive better remedial actions. The performance of the proposed algorithm is evaluated in IEEE 9-bus system under different loading conditions, and different network configurations in presence of noisy measurements.

Ghasemkhani, Amir↗