A Retrospective Analysis of Distributed Solar Interconnection Timelines and Related State Mandates

Most distributed residential photovoltaic (PV) systems must secure an interconnection agreement prior to operation that ensures the local electrical system will operate safely within the broader electrical grid. PV installers generally submit an interconnection application to the local utility that provides all the necessary details the utility needs to evaluate the proposed system. To encourage timely execution of this process, many states’ utility commissions have established mandates that limit the maximum number of days allowed for utility review and approval of interconnection for certain small, often residential applications. In this paper, we derive the median and range of cycle times for the pre-installation approval phase of the interconnection process (i.e., from application submission to approval by the utility) across 24 U.S. states, using a data set of approximately 170,000 projects. We evaluate the percentage of projects that are approved within respective state-mandated timelines from 2017– 2019. We further evaluate how timelines have evolved since 2012 for a subset of five states: Arizona, California, Colorado, New Jersey, and New York. The analyses are divided into two size ranges: systems that are ≤10 kilowatts (kW), and systems that are 11–50 kW.

14 SOLAR ENERGY↗

Use of Operating Agreements and Energy Storage to Reduce Photovoltaic Interconnection Costs: Technical and Economic Analysis

This report presents an analytical methodology to identify alternative options to manage interconnection costs and streamline interconnection timelines for distribution system-connected photovoltaic (PV) systems not co-located with load. Specifically, the report details the methodology and results of an analysis that: 1. Identifies potential grid violations that would be induced by a PV system requesting interconnection to a distribution circuit; 2. Identifies multiple technically viable options for mitigating the potential violations, including infrastructure upgrades, downsizing the PV system size, curtailment of PV, and addition of battery energy storage; 3. Defines the required technical operating parameters of the system in order to mitigate all potential violations (the "Operating Envelope"); 4. Compares the economics of each option, from the PV developer's perspective. The analysis supports the ongoing evolution of interconnection standards for combined PV and energy storage systems by providing a methodology to define allowable maximum export limits during each hour. The methodology presented could be used by utilities as part of the interconnection study process, to inform negotiations with DER developers and the drafting of mutually acceptable interconnection agreements. The resulting technical operating parameters could be included as part of the interconnection service agreement (ISA) between the system owner and the utility company. The companion report to this analysis, Gill et al. (2022), details the envisioned framework for the implementation of the technical operating parameters.

14 SOLAR ENERGY↗

Photovoltaics as a terrestrial energy source. Volume 2: System value

Assumptions and techniques employed by the electric utility industry and other electricity planners to make estimates of the future value of photovoltaic (PV) systems interconnected with U.S. electric utilities were examined. Existing estimates of PV value and their interpretation and limitations are discussed. PV value is defined as the marginal private savings accruing to potential PV owners. For utility-owned PV systems, these values are shown to be the after-tax savings in conventional fuel and capacity displaced by the PV output. For non-utility-owned (distributed) systems, the utility's savings in fuel and capacity must first be translated through the electric rate structure (prices) to the potential PV system owner. Base-case estimates of the average value of PV systems to U.S. utilities are presented. The relationship of these results to the PV Program price goals and current energy policy is discussed; the usefulness of PV output quantity goals is also reviewed.

Smith, J. L.↗

Design, processing and testing of LSI arrays, hybrid microelectronics task

Mathematical cost models previously developed for hybrid microelectronic subsystems were refined and expanded. Rework terms related to substrate fabrication, nonrecurring developmental and manufacturing operations, and prototype production are included. Sample computer programs were written to demonstrate hybrid microelectric applications of these cost models. Computer programs were generated to calculate and analyze values for the total microelectronics costs. Large scale integrated (LST) chips utilizing tape chip carrier technology were studied. The feasibility of interconnecting arrays of LSU chips utilizing tape chip carrier and semiautomatic wire bonding technology was demonstrated.

Himmel, R. P.↗

Evaluating the Curtailment Risk of Non-Firm Utility-Scale Solar Photovoltaic Plants under a Novel Last-In First-Out Principle of Access Interconnection Agreement

With the increasing share of distributed energy resources on the electric grid, utility companies are facing significant decisions about infrastructure upgrades. An alternative to extensive and capital-intensive upgrades is to offer non-firm interconnection opportunities to distributed generators, via a coordinated operation of utility scale resources. This paper introduces a novel flexible interconnection option based on the last-in, first-out principles of access aimed at minimizing the unnecessary non-firm generation energy curtailment by balancing access rights and contribution to thermal overloads. Although we focus on solar photovoltaic (PV) plants in this work, the introduced flexible interconnection option applies to any distributed generation technology. The curtailment risk of individual non-firm PV units is evaluated across a range of PV penetration levels in a yearlong quasi-static time-series simulation on a real-world feeder. The results show the importance of the size of the curtailment zone in the curtailment risk distribution among flexible generation units as well as that of the “access right” defined by the order in which PV units connect to the grid. Case study results reveal that, with a proper selection of curtailment radius, utilities can reduce the total curtailment of flexible PV resources by up to more than 45%. Findings show that non-firm PV generators can effectively avoid all thermal limit-related upgrade costs.

14 SOLAR ENERGY↗

Automating the Solar Interconnection Technical Evaluation Process: PREconfiguring and Controlling Inverter SEt-Points (PRECISE)

Utilities are receiving an increasing number of interconnection requests for distributed solar photovoltaic (PV) systems from their customers, requiring a solution to quickly and intelligently perform technical assessments of these requests and to manage these new renewable energy assets. In this paper, we present a stand-alone interconnection tool, PREconfiguring and Controlling Inverter SEt-points (PRECISETM), and how it overcomes the challenges of accelerating technical evaluations and leverages smart inverter functionality to provide local voltage support on an as-needed basis. The paper details the purpose and architecture of PRECISE, including tools, data source requirements, the model-based interconnection evaluation process, and technical results. PRECISE is an integrated software tool that customizes PV inverter settings for utilities by modeling and assessing impacts on local voltages and the need for advanced inverter functions (AIFs) (e.g., volt-VAR and volt-watt). PRECISE maximizes the use of readily available utility data sets to make fast online assessments of incoming PV interconnection requests and makes accept/reject recommendations along with custom settings for AIFs.

ENERGY PLANNING, POLICY, AND ECONOMY,SOLAR ENERGY↗

Interconnection Timelines and Costs for Distributed Energy Projects in the United States (2000-2025)

These slides summarize and explain empirical data on interconnection timelines and costs for distributed energy projects connected to U.S. utility distribution systems. The study explores how interconnection metrics vary across states, project sizes, technology types, and over time to indicate progress toward simple, fast, and affordable interconnection. Data encompasses 188 utilities in 24 states. Project types include biomass/biofuels, coal, hydropower, natural gas/oil, solar, storage, wind, hybrid, and

Chelminski, Kathryn↗

Selection of Ten (10) Cybersecurity Scenarios For Project Cybersecure Interconnection of Distributed Energy Resources

Utilities use state-of-the-art tools for reliable integration of Distributed Energy Resources (DER) within the power grid. These tools evaluate how power grid operations might be affected by various DER integration scenarios, and help the utility develop strategies to ensure reliability and safety of the power grid. These tools were developed in response to rapid wide-scale DER deployment, and are now in common use to aid the process of operating a grid with high penetration of DER. As power system technologies continually advance, these tools must also be advanced to assist the development of cyber-secure architectures for the new communication and control pathways that are being introduced with technologies such as smart inverters and local storage control.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Small Hydropower Interconnections: Analysis of Interconnection Processes

Small hydropower projects have faced the challenge of navigating the process to interconnect their generation source to electricity distribution and transmission grids. Small hydropower developers have found interconnection procedures to be opaque and ultimately result in unexpected cost surprises and long timelines. Noting these challenges, the U.S. Department of Energy Water Power Technologies Office enlisted Pacific Northwest National Laboratory (PNNL) and Oak Ridge National Laboratory (ORNL) to investigate the small hydropower interconnection landscape across the United States. After reviewing the status of small hydropower (“Small Hydropower Interconnections: Small Hydropower in the United States”) and the interconnection procedures across the United States (“Small Hydropower Interconnections: State Interconnection Processes”) in the first two white papers of this series, this paper uses recent data from small hydropower interconnection applications to benchmark the efficacy of the process. Using data from interconnection queues hosted by utilities, balancing authorities, independent system operators (ISOs), and regional transmission organizations (RTOs), this paper provides context for the costs, timelines, and types of upgrades required for small hydropower projects. Interconnection applications and study reports for small hydropower projects were analyzed to collect key pieces of information about the interconnection process, timeline, costs, and type of upgrades required for interconnection. Information sourced from the reports was entered into an Interconnection Benchmarking database (IBdb), which may be found in Appendix A.1. Information from this database was used to evaluate the performance and challenges associated with interconnecting small hydropower projects. This white paper presents a description of the sources contained in the interconnection database (Section 2.0), an analysis of the interconnection timeline (Section 3.0), an evaluation the cost of interconnection upgrades (Section 4.0), and a description of the types of infrastructure upgrades (Section 5.0). The final paper in this series (“Small Hydropower Interconnections: Best Practices”) will use the analysis described here to outline best practices for interconnection processes that will help overcome barriers to future small hydropower development.

13 HYDRO ENERGY↗

Utility Solar Generation Valuation Methods

Tucson Electric Power (TEP) developed, tested and verified the results of a new and appropriate method for accurately evaluating the capacity credit of time variant solar generating sources and reviewed new methods to appropriately and fairly evaluate the value of solar generation to electric utilities. The project also reviewed general integrated approaches for adequately compensating owners of solar generation for their benefits to utilities. However, given the limited funding support and time duration of this project combined with the significant differences between utilities regarding rate structures, solar resource availability and coincidence of solar generation with peak load periods, it is well beyond the scope of this project to develop specific rate, rebate, and interconnection approaches to capture utility benefits for all possible utilities. The project developed computer software based evaluation method models to compare solar generation production data measured in very short term time increments called Sample Intervals over a typical utility Dispatch Cycle during an Evaluation Period against utility system load data. Ten second resolution generation production data from the SGSSS and actual one minute resolution TEP system load data for 2006 and 2007, along with data from the Pennington Street Garage 60 kW DC capacity solar unit installed in downtown Tucson will be applied to the model for testing and verification of the evaluation method. Data was provided by other utilities, but critical time periods of data were missing making results derived from that data inaccurate. The algorithms are based on previous analysis and review of specific 2005 and 2006 SGSSS production data. The model was built, tested and verified by in house TEP personnel. For this phase of the project, TEP communicated with, shared solar production data with and collaborated on the development of solar generation valuation tools with other utilities, including Arizona Public Service, Salt River Project, Xcel and Nevada Power Company as well as the Arizona electric cooperatives. In the second phase of the project, three years of 10 second power output data of the SGSSS was used to evaluate the effectiveness of frequency domain analysis, normal statistical distribution analysis and finally maximum/minimum differential output analysis to test the applicability of these mathematic methods in accurately modeling the output variations produced by clouds passing over the SGSSS array.

14 SOLAR ENERGY↗

Medium Voltage Energy Hub Based on Multilevel Cascaded H Bridge-Dual Active Bridge Back-to-Back Converter for Power Distribution Feeders Interconnection and Multiple Simultaneous Grid Services

This paper presents a medium voltage energy hub based on a modular design of a multilevel cascaded H bridge (CHB)-dual active bridge (DAB) converter. The energy hub composed of the two CHB-DAB modules with a back-to-back topology can be utilized as a grid interconnection component between distribution feeders. The energy hub can provide multiple simultaneous grid services such as voltage regulation, power factor correction, as well as active power flow control between the connected feeders, contributing to grid flexibility, efficiency, reliability, and resilience. Circuit structure and control schemes for the energy hub including both local controllers for each converter and outer loop controllers are proposed to enable simultaneous grid services with coordination to prevent the overloading of the hub. To validate the performance of the hub, the hub system is interconnected between two IEEE 4-bus feeders and provides voltage regulation for both feeders, while controlling active power flow between them. The system and the feeders are implemented in Real-Time Digital Simulator (RTDS) for real-time simulation verification.

Choi, Jongchan↗

Small Hydropower Interconnections: Best Practices

Small hydropower projects have been the predominant source of capacity growth of U.S. hydropower for more than a decade, and they present the most cost-effective and environmentally permissible avenues for hydropower growth (DOE 2016; Johnson et al. 2018). However, interconnection to electricity distribution and transmission grids is a persistent barrier due to cost surprises and schedule overruns. As a culmination to research into the status and requirements of small hydropower interconnection across the United States, this paper presents the best practices for setting interconnection standards that can improve the process for small hydropower developers. As part of the analysis, the interconnection costs are compared between small hydropower, solar, and wind. The analysis of the small hydropower interconnection landscape across the United States was carried out by Pacific Northwest National Laboratory (PNNL) and Oak Ridge National Laboratory (ORNL) with support from the U.S. Department of Energy Water Power Technologies Office. The research team was guided by a Technical Advisory Group (TAG) and gleaned data from publicly available sources, such as the HydroSource database (ORNL 2020) and interconnection queues hosted by utilities, balancing authorities, independent system operators (ISOs), and regional transmission organizations (RTOs). The results of this work are shared in a series of papers detailing the state of small hydropower in the United States (“Small Hydropower Interconnections: Small Hydropower in the United States”), the variety of state interconnection processes to connect power generators with the grid (“Small Hydropower Interconnections: State Interconnection Processes”), and an analysis of the interconnection processes (“Small Hydropower Interconnections: Analysis of Interconnection Processes”). In this, the final paper in the series, best practices for interconnection processes (“Small Hydropower Interconnections: Best Practices”) are identified from the solar energy and distributed wind energy industries that are transferrable to small hydropower development. This information will help overcome barriers to future small hydropower development.

13 HYDRO ENERGY↗

A neural network with modular hierarchical learning

This invention provides a new hierarchical approach for supervised neural learning of time dependent trajectories. The modular hierarchical methodology leads to architectures which are more structured than fully interconnected networks. The networks utilize a general feedforward flow of information and sparse recurrent connections to achieve dynamic effects. The advantages include the sparsity of units and connections, the modular organization. A further advantage is that the learning is much more circumscribed learning than in fully interconnected systems. The present invention is embodied by a neural network including a plurality of neural modules each having a pre-established performance capability wherein each neural module has an output outputting present results of the performance capability and an input for changing the present results of the performance capabilitiy. For pattern recognition applications, the performance capability may be an oscillation capability producing a repeating wave pattern as the present results. In the preferred embodiment, each of the plurality of neural modules includes a pre-established capability portion and a performance adjustment portion connected to control the pre-established capability portion.

Baldi, Pierre F.↗

Scaling Decarbonization Development Innovation with Emerging Community-Based Developers: Preprint

The building real estate development industry is being asked to lead in delivering building decarbonization solutions across the United States. However, creating decarbonized best practices and development innovation while increasing developer diversity and community ownership is often not a primary focus of this sector. To address these issues, we have created an incubator and support ecosystem specifically for the innovation scaling we have found in a leading group of emerging, small-scale developers. These leaders are not just working at the forefront of decarbonized development but addressing diversity and bolstering community generational wealth. We have found that small development firms are the ones who often take risks to innovate and demonstrate despite lacking a specific set of resources or support ecosystems focused on emerging decarbonization developers. Those with the fewest resources are being asked to lead our decarbonization innovation efforts. This paper documents the necessity of a cohort and incubator program to provide a decarbonization-specific ecosystem to support small developers and scale innovation. The incubator creates connections, fosters innovative strategies to access incentives and alternative funding, and assembles resources for small and emerging minority developers with the goal of sustainability and affordability. For instance, collaborative efforts with leading developers and utilities can enable the seamless integration of distributed energy resources through optimal metering and interconnection and significantly reduce the utility cost of electrification, benefiting the utility, the developer, and the tenant economically. The process described in this paper will result in case studies and how-to resources to provide tangible examples of innovation within the emerging development field.

carbon↗

Hybrid Systems to Enable High Penetration PV

A model for PV plus energy storage and fuel cells was developed in the System Advisor Model (SAM). This model was used to evaluate the ramp rate and interconnection capacity factor for a hypothetical utility-scale plant for several configuration options. For PV only, the plant experienced 3345 violations of a 10%/minute ramp up limitation and a interconnection capacity factor of 17.6%. Adding a battery reduced the violations to 154 per year and the magnitude of the average violation to 2%. Adding a fuel cell to the PV system increased the capacity factor to 78% without improving ramp violations. Using a combined PV plus storage plus fuel cell arrangement maintained the improved capacity factor while reducing ramp up violations to 23, illustrating the potential to operate a hybrid system both to enable grid integration requirements and increase utilization of the interconnection.

14 SOLAR ENERGY↗

Hybrid Systems to Enable High Penetration PV: Preprint

A model for PV plus energy storage and fuel cells was developed in the System Advisor Model (SAM). This model was used to evaluate the ramp rate and interconnection capacity factor for a hypothetical utility-scale plant for several configuration options. For PV only, the plant experienced 3345 violations of a 10%/minute ramp up limitation and a interconnection capacity factor of 17.6%. Adding a battery reduced the violations to 154 per year and the magnitude of the average violation to 2%. Adding a fuel cell to the PV system increased the capacity factor to 78% without improving ramp violations. Using a combined PV plus storage plus fuel cell arrangement maintained the improved capacity factor while reducing ramp up violations to 23, illustrating the potential to operate a hybrid system both to enable grid integration requirements and increase utilization of the interconnection.

14 SOLAR ENERGY↗

Advanced Inverter Technology for High Penetration Levels of PV Generation in Distribution Systems

This subcontract report was completed under the auspices of the NREL/SCE High-Penetration Photovoltaic (PV) Integration Project, which is co-funded by the U.S. Department of Energy (DOE) Office of Energy Efficiency and Renewable Energy (EERE) and the California Solar Initiative (CSI) Research, Development, Demonstration, and Deployment (RD&D) program funded by the California Public Utility Commission (CPUC) and managed by Itron. This project is focused on modeling, quantifying, and mitigating the impacts of large utility-scale PV systems (generally 1-5 MW in size) that are interconnected to the distribution system. This report discusses the concerns utilities have when interconnecting large PV systems that interconnect using PV inverters (a specific application of frequency converters). Additionally, a number of capabilities of PV inverters are described that could be implemented to mitigate the distribution system-level impacts of high-penetration PV integration. Finally, the main issues that need to be addressed to ease the interconnection of large PV systems to the distribution system are presented.

14 SOLAR ENERGY↗