Corrective Action Investigation Plan for Corrective Action Unit 374: Area 20 Schooner Unit Crater Nevada Test Site, Nevada, Revision 0

Corrective Action Unit 374 is located in Areas 18 and 20 of the Nevada Test Site, which is approximately 65 miles northwest of Las Vegas, Nevada. Corrective Action Unit 374 comprises the five corrective action sites (CASs) listed below: • 18-22-05, Drum • 18-22-06, Drums (20) • 18-22-08, Drum • 18-23-01, Danny Boy Contamination Area • 20-45-03, U-20u Crater (Schooner) These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives (CAAs). Additional information will be obtained by conducting a corrective action investigation before evaluating CAAs and selecting the appropriate corrective action for each CAS. The results of the field investigation will support a defensible evaluation of viable CAAs that will be presented in the Corrective Action Decision Document. The sites will be investigated based on the data quality objectives (DQOs) developed on October 20, 2009, by representatives of the Nevada Division of Environmental Protection and the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office. The DQO process was used to identify and define the type, amount, and quality of data needed to develop and evaluate appropriate corrective actions for CAU 374.

54 ENVIRONMENTAL SCIENCES↗

Corrective Action Investigation Plan for Corrective Action Unit 367: Area 10 Sedan, Ess and Uncle Unit Craters Nevada Test Site, Nevada, Revision 0

Corrective Action Unit 367 is located in Area 10 of the Nevada Test Site, which is approximately 65 miles northwest of Las Vegas, Nevada. Corrective Action Unit 367 comprises the four corrective action sites (CASs) listed below: • 10-45-01, U-10h Crater (Sedan) • 10-45-02, Ess Crater Site • 10-09-03, Mud Pit • 10-45-03, Uncle Crater Site The CASs in CAU 367 are being investigated because hazardous and/or radioactive contaminants may be present in concentrations that exceed risk-based corrective action (RBCA) levels. Existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend CAAs for the CASs. Additional information will be generated by conducting a CAI before evaluating and selecting CAAs. The scope of the corrective action investigation for CAU 367 includes the following activities: • Move surface debris and/or materials, as needed, to facilitate sampling. • Conduct radiological surveys. • Collect and submit environmental samples for laboratory analysis to determine the area where TED at the site exceeds FALs (i.e., corrective action boundary). • Evaluate TED to potential receptors in areas along Mercury Highway that have been impacted by a release of radionuclides from the Sedan test. • Collect and submit environmental samples for laboratory analysis related to the drilling mud within CAS 10-09-03, Mud Pit, and any encountered stains or waste as necessary to determine whether COCs are present. • If COCs are present, collect additional step-out samples to define the extent of the contamination. • Collect samples of investigation-derived waste, as needed, for waste management purposes.

54 ENVIRONMENTAL SCIENCES↗

Corrective Action Investigation Plan for Corrective Action Unit 375: Area 30 Buggy Unit Craters, Nevada Test Site, Nevada

Corrective Action Unit (CAU) 375 is located in Areas 25 and 30 of the Nevada Test Site, which is approximately 65 miles northwest of Las Vegas, Nevada. Corrective Action Unit 375 comprises the two corrective action sites (CASs) listed below: • 25-23-22, Contaminated Soils Site • 30-45-01, U-30a, b, c, d, e Craters Existing information on the nature and extent of potential contamination present at the CAU 375 CASs is insufficient to evaluate and recommend corrective action alternatives (CAAs). This document details an investigation plan that will provide for the gathering of sufficient information to evaluate and recommend CAAs. Corrective Action Site 25-23-22 is composed of the releases associated with nuclear rocket testing at Test Cell A (TCA). Test Cell A was used to test and develop nuclear rocket motors as part of the Nuclear Rocket Development Station from its construction in 1958 until 1966, when rocket testing began being conducted at Test Cell C. The rocket motors were built with an unshielded nuclear reactor that produced as much as 1,100 kilowatts (at full power) to heat liquid hydrogen to 4,000 degrees Fahrenheit, at which time the expanded gases were focused out a nozzle to produce thrust. The fuel rods in the reactor were not clad and were designed to release fission fragments to the atmosphere, but due to vibrations and loss of cooling during some operational tests, fuel fragments in excess of planned releases became entrained in the exhaust and spread in the immediate surrounding area. Cleanup efforts have been undertaken at times to collect the fuel rod fragments and other contamination. Previous environmental investigations in the TCA area have resulted in the creation of a number of use restrictions. The industrial area of TCA is encompassed by a fence and is currently posted as a radioactive material area. Corrective Action Site 30-45-01 (releases associated with the Buggy Plowshare test) is located in Area 30 on Chukar Mesa. It was a Plowshare test where five nuclear devices were buried 140 feet (ft) deep in a row at 150-ft intervals. These devices were detonated on March 12, 1968, to produce a trench 254 ft wide, 865 ft long, and 70 ft deep. The mesa where the test was conducted is surrounded on three sides by ravines, and the entire end of the mesa is fenced and posted as a contamination area. These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend CAAs. Additional information will be obtained by conducting a corrective action investigation before evaluating CAAs and selecting the appropriate corrective action for each CAS. The results of the field investigation will support a defensible evaluation of viable CAAs that will be presented in the Corrective Action Decision Document. The sites will be investigated based on the data quality objectives (DQOs) developed on December 2, 2009, by representatives of the Nevada Division of Environmental Protection and the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office. The DQO process was used to identify and define the type, amount, and quality of data needed to develop and evaluate appropriate corrective actions for CAU 375.

54 ENVIRONMENTAL SCIENCES↗

Simulations for Full Unit-memory and Partial Unit-memory Convolutional Codes with Real-time Minimal-byte-error Probability Decoding Algorithm

A program which was written to simulate Real Time Minimal-Byte-Error Probability (RTMBEP) decoding of full unit-memory (FUM) convolutional codes on a 3-bit quantized AWGN channel is described. This program was used to compute the symbol-error probability of FUM codes and to determine the signal to noise (SNR) required to achieve a bit error rate (BER) of 10 to the minus 6th power for corresponding concatenated systems. A (6,6/30) FUM code, 6-bit Reed-Solomon code combination was found to achieve the required BER at a SNR of 1.886 dB. The RTMBEP algorithm was then modified for decoding partial unit-memory (PUM) convolutional codes. A simulation program was also written to simulate the symbol-error probability of these codes.

Vo, Q. D.↗

Itegrated Test and Evaluation of a 4-Bed Molecular Sieve (4BMS) Carbon Dioxide Removtal System (CDRA), Mechanical Compressor Engineering Development Unit (EDU), and Sabitier Engineering Development Unit (EDU)

Currently on the International Space Station s (ISS) U.S. Segment, carbon dioxide (CO2) scrubbed from the cabin by a 4-Bed Molecular Sieve (4BMS) Carbon Dioxide Removal Assembly (CDRA) is vented overboard as a waste product. Likewise, the product hydrogen (H2) that will be generated by the Oxygen Generation Assembly (OGA) planned for installation will also be vented. A flight experiment has been proposed that will take the waste CO2 removed from the cabin, and via the catalytic Sabatier process, reduce it with waste H2 to generate water and methane. The water produced may provide cost and logistics savings for ISS by reducing the amount of water periodically re-supplied to orbit. To make this concept viable, a mechanical piston compressor and accumulator were developed for collecting and storing the CO2 from the CDRA. The compressor, accumulator and Sabatier system would be packaged together as one unit and referred to as the Carbon Dioxide Reduction Assembly (CRA). Testing was required to evaluate the performance of a 4BMS CDRA, compressor, accumulator, and Sabatier performance along with their operating rules when integrated together. This had been numerically modeled and simulated; however, testing was necessary to verify the results from the engineering analyses. Testing also allowed a better understanding of the practical inefficiencies and control issues involved in a fully integrated system versus the theoretical ideals in the model. This paper presents and discusses the results of an integrated engineering development unit test.

Knox, James C.↗

Designing and Implementing an OVERFLOW Reader for ParaView and Comparing Performance Between Central Processing Units and Graphical Processing Units

In the Applied Aerosciences and CFD branch at Johnson Space Center, computational simulations are run that face many challenges. Two of which are the ability to customize software for specialized needs and the need to run simulations as fast as possible. There are many different tools that are used for running these simulations and each one has its own pros and cons. Once these simulations are run, there needs to be software capable of visualizing the results in an appealing manner. Some of this software is called open source, meaning that anyone can edit the source code to make modifications and distribute it to all other users in a future release. This is very useful, especially in this branch where many different tools are being used. File readers can be written to load any file format into a program, to ease the bridging from one tool to another. Programming such a reader requires knowledge of the file format that is being read as well as the equations necessary to obtain the derived values after loading. When running these CFD simulations, extremely large files are being loaded and having values being calculated. These simulations usually take a few hours to complete, even on the fastest machines. Graphics processing units (GPUs) are usually used to load the graphics for computers; however, in recent years, GPUs are being used for more generic applications because of the speed of these processors. Applications run on GPUs have been known to run up to forty times faster than they would on normal central processing units (CPUs). If these CFD programs are extended to run on GPUs, the amount of time they would require to complete would be much less. This would allow more simulations to be run in the same amount of time and possibly perform more complex computations.

Chawner, David M.↗

Training program to prepare the U.S. DOE laboratories for the entry into force of the protocol additional to the agreement between the United States of America and the International Atomic Energy Agency for the application of safeguards in the United

In 2008, a joint team from Brookhaven National Laboratory (BNL) and Los Alamos National Laboratory (LANL) consisting of specialists in training IAEA inspectors in the use of complementary access activities formulated a training program to prepare the U.S DOE laboratories for the entry into force of the U.S. Additional Protocol. Since the U.S. Additional Protocol would allow for IAEA access to the DOE laboratories under the aegis of complementary access activities, the DOE laboratories would need to prepare for such visits. The goal of the training was to ensure that the DOE laboratories would successfully host an IAEA complementary access. In doing so, the labs must be able to provide the IAEA with the information that the IAEA would need to resolve its questions about the U.S. Declaration and declared activities at the lab, and also protect certain equities, as provided under the U.S. Additional Protocol Article 1.b and c. which set forth a 'National Security Exclusion.' This 'NSE' states that the AP provisions apply within the United States 'excluding only instances where its application would result in access by the Agency to activities with direct national security significance to the United States or to location or information associated with such activities.' These activities are referred to collectively as DNSS-direct national security significance. Furthermore, the U.S. has a specific right to employ managed access, without prejudice to the right under Article 1.b, in connection with activities of DNSS. The provisions in Articles 1.b and 1.c are unique to the U.S. AP, and are additional to the more general right, under Article 7, to use managed access to protect from disclosure proprietary and/or proliferation-sensitive information, and to meet safety and security requirements, that is incorporated directly from the Model Additional Protocol. The BNL-LANL team performed training at Lawrence Livermore National Laboratory, Idaho National Laboratory, and Oak Ridge National Laboratory to cover the situations that these labs, which respectively represent nuclear weapons labs, nuclear energy labs, and science labs and environmental management sites, would encounter during a complementary access. Each of the three labs hosted a mock complementary access activity, which included mock inspectors from the BNL-LANL team. In addition to reviewing the draft declarations from each of the host labs, the BNL-LANL team conducted open source research in a manner similar to what IAEA inspectors would do to research the activities at a location and prepare questions for the location to answer and that would be the focus of a complementary access. The host labs and other labs attending the training found the training to be extremely useful and helpful in making sure that each lab's Additional Protocol team had made correct declarations of nuclear activities, had properly trained staff ready to host and answer IAEA inquiries, and would implement managed access during a complementary access that would provide access by the IAEA team to resolve questions or inconsistencies about a particular declaration and still protect the information addressed by Articles 1 and 7 of the U.S. AP.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

DOE Zero Energy Ready Home Case Study: United Way of Long Island, United Veterans Beacon House

United Way of Long Island’s Housing Development Corporation built this 3,719-ft2 two–story, 5-bedroom home in Huntington Station, New York, to the rigorous performance requirements of the U.S. Department of Energy’s Zero Energy Ready Home Program. The home is packed with high-performance features like LED lighting and ENERGY STAR appliances. The asymmetrical, optimally angled roof provides plenty of space for roof-mounted solar panels for electric generation and hot water.

Building America↗

Rooftop unit comparison calculator: a framework for comparing performance of rooftop units with building energy simulation

The applications of building energy simulation (BES) in designing heating, ventilation, and air conditioning (HVAC) systems are limited by the high costs of developing simulation models and the lack of references for determining the model parameters. This paper presents a software framework for selecting designs for rooftop unit HVAC (RTU) systems with BES. Specifically, this framework reduces the cost of using BES by automating the generation of EnergyPlus models. It also employs a systematic method for determining model parameters based on well-accepted datasets. We applied this framework in a comprehensive assessment of an advanced design of RTU systems in which 478 EnergyPlus models were developed without human involvement. The assessment reveals that replacing a constant-speed fan/coil with a multiple-speed fan/coil may not guarantee better overall performance. In conclusion, it also suggests the benefits of replacing furnace coils with heat pumps are subject to utility cost, weather conditions, and heating load profiles.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Estimating the electric vehicle charging demand of multi-unit dwelling residents in the United States

Abstract Early battery electric vehicle (EV) adopters can access home chargers for reliable charging. As the EV market grows, residents of multi-unit dwellings (MUDs) may face barriers in owning EVs and charging them without garage or parking availability. To investigate the mechanisms that can bridge existing disparities in home charging and station deployment, we characterized the travel behavior of MUD residents and estimated their EV residential charging demand. This study classifies the travel patterns of MUD residents by fusing trip diary data from the National Household Travel Survey and housing features from the American Housing Survey. A hierarchical agglomerative clustering method was used to cluster apartment complex residents’ travel profiles, considering attributes such as dwell time, daily vehicle miles traveled (VMT), income, and their residences’ US census division. We propose a charging decision model to determine the charging station placement demand in MUDs and the charging energy volume expected to be consumed, assuming that MUD drivers universally operate EVs in urban communities. Numerical experiments were conducted to gain insight into the charging demand of MUD residents in the US. We found that charging availability is indispensable for households that set out to meet 80% state of charge by the end of the day. When maintaining a 20% comfortable state of charge the entire day, the higher the VMT are, the greater the share of charging demand and the greater the energy use in MUD chargers. The upper-income group requires a greater share of MUD charging and greater daily kWh charged because of more VMT.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Algorithm for Screening Phasor Measurement Unit Data for Power System Events and Categories and Common Characteristics for Events Seen in Phasor Measurement Unit Relative Phase-Angle Differences and Frequency Signals

A network of multiple phasor measurement units (PMU) was created, set up, and maintained at the University of Texas at Austin to obtain actual power system measurements for power system analysis. Power system analysis in this report covers a variety of time ranges, such as short- term analysis for power system disturbances and their effects on power system behavior and long- term power system behavior using modal analysis. The first objective of this report is to screen the PMU data for events. The second objective of the report is to identify and describe common characteristics extracted from power system events as measured by PMUs. The numerical characteristics for each category and how these characteristics are used to create selection rules for the algorithm are also described. Trends in PMU data related to different levels and fluctuations in wind power output are also examined.

17 WIND ENERGY↗

Rooftop Unit Replacement: Target's Rooftop Unit Replacement Program

This case study describes how Target developed an optimized, re-engineered process that integrates several energy-efficiency measures such as reduced lighting loads, improved roof insulation, optimized ventilation, and more accurate load calculations through its rooftop unit (RTU) replacement program. Target's approach achieved ongoing energy reduction, operations and maintenance reduction, and improved heating, ventilating, and air-conditioning (HVAC) performance by reducing equipment cycling.

HVAC, Rooftop Unit, RTU, commercial, retail, air c↗