Enewetak Sign Ceremony

Enewetak became our partner in October 1947 when Norris Bradbury sent Darol Froman to the Marshall Islands to find a site on which to anchor the nation’s test program. Froman selected Enewetak because of its remote location and favorable weather. The people of Enewetak, numbering about 150, agreed to leave their ancestral home of over a thousand years, to make way for the X-Ray, Yoke, and Zebra tests of Operation Sandstone. They would not return until 1980. Enewetak and its people are little known today. Their sacrifice, made for our nation, also is little recognized or appreciated. The new sign being dedicated today is a show of respect for a people who have given so much to Los Alamos and to the nation.

99 GENERAL AND MISCELLANEOUS↗

Using FIPD and OPTD to Benchmark Metallic Fuel Performance

This report serves as an introduction, tutorial, and benchmark specification for out-of-pile tests on metallic fuel. It introduces a new user to the EBR-II legacy fuel performance test program and the fast reactor fuel performance databases built to preserve the records. It then details the information stored in each database and how to find it. A benchmark specification is included for a small set of out-of-pile tests on U-10Zr fuel to function as a tutorial demonstrating how the legacy fuel performance data sets stored in the FIPD and OPTD databases can be used together to benchmark fuel performance models for steady-state and transient performance.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Discriminating Underground Nuclear Explosions Leading To Late-Time Radionuclide Gas Seeps

Utilizing historical data from the U.S. nuclear test program and freely available barometric pressure data, we performed an analytical barometric-pumping efficiency analysis to determine factors resulting in late-time radionuclide gas seeps from underground nuclear explosions. In this work, we considered 16 underground nuclear explosions with similar geology and test setup, of which five resulted in the measurement of late-time radionuclide gas concentrations at the ground surface. Additionally, the factors we considered include barometric frequency and amplitude, depth of burial, air-filled porosity, intact-rock permeability, fracture aperture, and fracture spacing. The analysis indicates that the best discriminators of late-time radionuclide gas seeps for these explosions are barometric frequency and amplitude and air-filled porosity. While geologic information on fracture aperture and spacing is not available for these explosions, the sensitivity of barometric-pumping efficiency to fracture aperture indicates that it would likely also be a good discriminator.

58 GEOSCIENCES↗

Self-Lubricating Bushing Testing for John Day Dam Ka plan Turbine Replacement

The goal of this testing program is to find suitable self-lubricated alternatives to replace the in use oil lubricated grooved-bronze bushing in Kaplan runner hubs that are currently being utilized at John Day Dam operated by the U.S. Army Corps of Engineers (USACE). Scaled bushing testing utilizing a Pacific Northwest National Laboratory designed, fabricated, and operated Bushing Test Stand under the direction and funding from USACE determined that self-lubricated bushings tested appear capable of outperforming the current oil-lubricated bronze bushings. Performance tests are focused on durability which includes cyclic load bearing properties and articulations under various loading scenarios. This testing was performed at nominally 1/5 th scale. A scaling sensitivity analysis determined that scaled testing results apply to prototypic size. This report shows the direct comparison between the current baseline bronze bushing to self-lubricated bushings from various manufacturers. Bushing data like coefficient of friction and bushing material loss (associated with bushing wear) was determined. Self-lubricated bushings tested include products manufactured specifically for hydropower applications by the following companies: Trelleborg, Kamatics, Anonymous, and Tenneco/Deva.

42 ENGINEERING↗

Startup Physics Testing of Advanced Reactors

This report documents the startup physics testing from initial fuel loading through ascension to full power for past advanced reactor startup physics testing programs. The review includes an assessment of what nuclear physics data was measured, why this data was measured, how was the measurement made, and the agreement with predictive reactor performance calculations of that time. The purpose of this review is to establish historical precedence for test inclusion for future advanced reactors planned for demonstration at the National Reactor Innovation Center (NRIC). The historical review includes reactor designs considered to be significantly different from current light-water reactor designs, or use simplified, inherent, passive, or other innovative means to accomplish their safety functions.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Loss of Coolant High Burnup (LOC-HBu) Program

LOC-HBu is a joint experimental program (JEEP) operating within the Nuclear Energy Agency’s (NEA’s) framework for irradiation experiments II (FIDES-II). LOC-HBu is dedicated to the understanding of light water reactor (LWR) fuel performance at high burnup under loss of coolant accident (LOCA) conditions. LOC-HBu aims to support burnup extension needs by addressing identified R&D priorities to achieve an improved understanding of fuel fragmentation, relocation, and dispersal (FFRD) of HBu fuel during LOCA events. The need for such experiments was identified in the United States by the Fuel Performance Testing Technical Expert Group (FPTTEG) under the Electric Power Research Institute (EPRI)’s Collaborative Research on Advanced Fuel Technologies (CRAFT) framework. A combined in-pile and furnace testing program plan was developed by researchers at Idaho National Laboratory (INL) and Oak Ridge National Laboratory (ORNL) which was reviewed and approved by the FPTTEG Combined TREAT-LOC and SATS LOCA Experiment Plan. The first 4 tests identified in this plan are being put forward by the U.S. Department of Energy (U.S. DOE) and INL for inclusion in the FIDES-II second triannual work period. The data produced under this plan will be used to further validate and confirm existing models and inform future R&D and model development. The experimental program was specifically developed to address data gaps and opportunities identified via detailed review of the existing public knowledge base on LOCA FFRD, as well as reviewing specific experimental development activities regarding prototypic LOCA conditions for light-water reactor (LWR) systems. The program will systematically investigate the impacts of prototypic HBu fuel/cladding thermomechanical behaviors under postulated LWR LOCA conditions not yet fully investigated. These conditions correspond with prototypic decay-energy heatup (DEH) and stored-energy heatup (SEH) conditions.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Modeling and Analysis for Spent Nuclear Fuel Seismic Testing

Note: This is the final public release version of PNNL-31671 Draft, which was previously released to the sponsor for review. The intent is the public release version will be PNNL-31671. There are no significant changes from the earlier draft version. This unlimited distribution report is the deliverable for M3SF-21PN010202014: Modeling and Analysis for Spent Nuclear Fuel Seismic Testing. This report summarizes the modeling, analysis, and test plan support completed by Pacific Northwest National Laboratory for the spent nuclear fuel dry storage system seismic test plan through May of 2021. Test plan preparation is planned to continue until the seismic test is completed in July of 2022. This report covers preliminary structural dynamic model development and computer-aided design of test hardware. Based on preliminary modeling, the strongest earthquakes under consideration in this test program provide mechanical loading on the spent nuclear fuel that is comparable to the 30 cm cask drop scenario, although the loads do not appear to be strong enough to cause significant permanent deformation of the fuel assembly spacer grids. The potential for grid deformation during the test will be assessed when the proposed shake table motion becomes available. The weakest earthquakes considered in this test are expected to be comparable to the mechanical loads witnessed in the multimodal transportation test of 2017. The horizontal canister system is predicted to provide nearly-uniform loading condition on the fuel assemblies it contains, while the vertical cask system is predicted to cause non-uniform dynamic loads on the fuel assemblies. In the horizontal case, gravity keeps the fuel assemblies in contact with one basket wall surface unless the loads are strong enough to cause a separation. In the vertical case, the fuel assemblies are relatively long and slender, and seismic motion in the anticipated test range is predicted to cause the assemblies to lean, tilt, and impact the basket walls throughout the seismic event. These gap closures are a nonlinear force transmission condition, so the vertical system is expected to have more variation and variability than the horizontal system. While the horizontal system is expected to have a relatively more linear response than the vertical system, there is still the potential for nonlinear behavior in the horizontal system because the fuel assemblies are free to slide, bounce, and impact the basket walls if the seismic loads are strong enough. One major conclusion of this study is that the use of mixed fuel assemblies in the canister will be acceptable. There are differences in overall system response when the mass, center of gravity, or gaps are changed, but the changes in response are within the bounds of a system that contains completely homogeneous fuel assemblies. One important observation is that the loading for each individual fuel assembly within the vertical canister is expected to be different from that of the others because of nonlinearities in the system. The horizontal canister system is expected to have a more uniform and more predictable response than the vertical canister, making variations in fuel assembly characteristics easier to account for. One important recommendation that comes from this modeling work is to repeat some of the strongest shake tests at different angles, particularly for the vertical cask system. Modeling predicts that strong seismic motion will cause the fuel assemblies to close initial gaps and impact the fuel basket walls when the canister is in the vertical cask configuration. Each shake test will impose a pre-defined three-dimensional time history on the cask system.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

High Solids Performance Testing in a Scaled TSCR System

The Tank Side Cesium Removal (TSCR) project is a technology demonstration that will pretreat Hanford tank waste supernatant in support of the Direct Feed Low-Activity Waste (DFLAW) mission. The TSCR system employs two key separation technologies: dead-end filtration (DEF) and ion exchange (IX) using crystalline silicotitanate (CST) media. DEF will be used to remove undissolved solids from tank waste to protect the functionality of the IX columns and the IX system will remove Cs-137 from tank waste. The separation technologies (DEF and IX) used in TSCR are technically mature and have also been successfully deployed at the Savannah River site in a similar facility known as the Tank Closure Cesium Removal (TCCR) system. While testing with simulants and real waste has been successfully performed under conditions expected during the initial operation of TSCR, test data is absent for assessing off normal high solids loading that may be in the TSCR waste feed. Normal TSCR treatment operations are expected to handle wastes with solids content on the order of 200 ppm, and off normal solids loading could be much larger than the nominal level. The testing program described in this report was conducted to understand the consequence of operating the TSCR system at elevated solids loadings up to the high-solids limit of 15,000 ppm [i.e., 1.5-wt%] identified in the TSCR design basis. Although the system is not required to make throughput above the nominal solids loading, the testing was intended to provide important information related to potential off normal operations. At off normal levels near the high-solids limit, there are potential implications for TSCR performance in the areas of throughput, DEF pressure drop, filter backflush frequency, and IX column pressure drop. In addition, intrusion of solids into the IX column was postulated to impact the Cs-137 loading behavior by promoting channeling or flow maldistribution in the column; since the magnitude of the postulated effect was unknown, assessing it was also of interest. The testing was performed using representative waste simulants and a prototypic, integrated TSCR system designed and assembled specifically to conduct the high solids performance assessment. Overall, the scaled TSCR testing demonstrated that full-scale unit operations can succeed in fulfilling their processing objectives in the presence of solids up to 3,000 ppm, but there are potential performance challenges to filtration operations at solids loadings as low as ~500 ppm. The severity of the challenge is likely to be dependent on the type and size distribution of solids, of which the current testing only examined a single type and size distribution. To provide some flexibility for future full-scale operations, the results of the testing suggest two possible risk reduction strategies that can be implemented without any changes in TSCR design or configuration. One option would be to enact an administrative limit on the solids loading to protect TSCR from feeds that are likely to require a high DEF swap frequency. Another option is to permit operation of the DEFs at differential pressures greater than 2 psid before swapping filters. The selection of a higher differential pressure target is not anticipated to adversely impact DEF backflushing efficacy and would reduce both swap frequency and the amount of waste sent to AP-108.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Mechanical Loads on Spent Nuclear Fuel in the General 30 cm Package Drop Scenario

The U.S. Department of Energy Office of Nuclear Energy (DOE-NE) Spent Fuel and Waste Science & Technology (SFWST) research program is guided by the high-level goal of closing prioritized knowledge gaps related to spent nuclear fuel (SNF) storage and transportation, which are summarized by Saltzstein et al. (2020). One of the high-priority knowledge gaps is the identification and quantification of mechanical loads that are expected to affect SNF during normal conditions of transportation and storage to inform the range of physical SNF test programs. This report uses modeling and analysis methods to estimate the mechanical loads on spent nuclear fuel (SNF) in the general 30 cm package drop scenario. The drop scenario assumes impact limiters are in place in the transportation configuration and the impact surface is perfectly rigid. The goal of this analysis is to consider the universe of potential mechanical loading conditions that can happen to SNF and present the results in a manner that is useful for materials testing, decision making, and regulatory rule making purposes. This study uses validated finite element models and methods to perform a broad parametric study of key variables that can affect the mechanical loads on SNF during a hypothetical package free drop scenario. Physical drop test data from a cask and fuel assembly drop test campaign is the basis for model validation. Additionally, the results of the parametric study are used to inform a damage model, which uses multiple nonlinear regression to estimate the relationships between input variables and output response. The parametric finite element analyses consider thousands of input variable combinations, while the damage model estimates millions of combinations. The breadth of this study provides confidence that the potential range of mechanical loads that SNF might experience during the general 30 cm package drop scenario are characterized well enough to consider this knowledge gap closed. While this report documents the overall peak values calculated in this study, the 95 th percentile values, the histograms, and the observed trends are equally important. This study covered a large range of SNF temperatures, room temperature to 300°C, and burnups, 10 GWd/MTU to 62 GWd/MTU. Each temperature and burnup combination has a different cladding yield strain, so it is more meaningful to summarize the calculated cladding strain response as its factor of safety, which is defined relative to the yield strain. The factor of safety is calculated as the yield strain divided by the peak cladding strain. A factor of safety greater than unity indicates that the cladding remains below yield, whereas a value less than unity is indicative of plastic deformation. In all cases of this study a safety factor over 1.0 was calculated, although in the most limiting case at 300°C the safety factor was only 1.01, which suggests that yielding could occur when additional loads like rod internal pressure are included. When the temperature is restricted to 200°C the limiting safety factor increases to 1.28, which has significant margin to accommodate internal pressure and potential local cladding defects that could cause a local stress concentration. An important trend in the calculated fuel rod mechanical loads is that the 2 nd highest loaded fuel rod in an assembly tends to be significantly lower than the highest loaded rod. The implication is that even if one rod in an assembly experiences a failure the loads would have to be significantly higher to cause two or more rods to fail.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Novel Algae Technology to Utilize CO 2 for Value Added Products

The Helios-NRG technology for converting coal-based flue CO 2 into valuable products has been successfully validated through a series of rigorous test programs. The key component, the MSC (Multi Stage Continuous System), played a pivotal role in this process. The MSC's various stages were seamlessly integrated and controlled by a second-generation automated system, surpassing project goals in terms of both algal productivity and capture efficiency. Notably, the MSC's operational duration improved while maintaining healthy cultures. The integrated system was rigorously tested under real outdoor conditions with varying sunlight levels and template flue gas. The final MSC test, conducted at the NCCC, successfully met project objectives.

01 COAL, LIGNITE, AND PEAT↗

Coal Fired Power Plant Configuration and Operation Impact on Plant Effluent Contaminants and Conditions

The primary objective of this project is to characterize coal contaminants in coal-fired power plant wastewater as a function of coal type, unit configurations, and unit operation profile with uncertainty analysis. This project was in response to the U.S. Department of Energy (DOE) Solicitation DE-FOA-0001842. The project duration was between September 01, 2018, and December 31, 2021 (no-cost extension filed, due to the Covid-19 pandemic restrictions, and approved). Field and lab test program was conducted with the main goal to characterize coal contaminants in coal-fired power plant wastewater as a function of coal type, unit configurations, and unit operation profile with uncertainty analysis. In this project, the team of Lehigh University (prime recipient) and Western Kentucky University identified two suitable Thermoelectric Power Plants (TTPs) firing bituminous and sub-bituminous coals respectively, designed test plans, and performed sample collection. Sampling included coal from each TTPs power generation units, Wet Flue Gas Desulfurization (WFGD) slurry material and waste-water samples taken from the outlet of the water treatment tank prior to discharge and other pertinent locations. Coal samples are dried, crushed, and pulverized according to the American Society for Testing and Materials (ASTM) methods. The prepared coal samples are analyzed for normal proximate and ultimate analysis tests in addition to the toxic metals and anions according to ASTM methods. The FGD slurry materials are analyzed for toxic metals and anions according to Electric Power Research Institute (EPRI) or Environmental Protection Agency (EPA) methods, as appropriate. The wastewater samples from the water treatment tank outlet are analyzed for toxic metals and anions according to EPA methods. The effluent species analyzed include mercury, arsenic, selenium, nitrate/nitrite, bromide, and chlorine. This project provided results of effluent conditions as a function of coal type, unit configuration, and unit operation profile, and identified the levels of uncertainty in the effluent results.

01 COAL, LIGNITE, AND PEAT↗

Mitigation for roof alterations to building 06-cp-65 at the area 6 control point, nevada national security site, nye county, nevada

Building 06-CP-65 has been determined to be a contributing element to the Area 6 Control Point Historic District (O’Neill et al. 2021; Reed 2022). It contributes to the significance of the historic district under Criterion A as one of the principal buildings that supported timing and firing operations for nuclear testing on the NNSS from 1966 to 1992. As such, the building served as a major warehouse with office space within the district. It was used by both REECo, a long-time general contractor at the NNSS, as well as EG&G, which provided technical support to the national laboratories and the DOD. The building served as an important staging area and electrical power supply point for the NNSS diagnostic trailer fleet and its unique location immediately along Mercury Highway allowed easy accessibility to the forward areas of the NNSS. The building also contributes to the historic district under Criterion C as it is one of the large, unadorned, precast concrete buildings at the Control Point. These types of buildings were the prominent elements of the compound that convey the district’s overall utilitarian, military-industrial character. Building 06-CP-65 retains all aspects of integrity to a high degree and easily conveys its significance as a warehouse that supported Control Point operations. Building 06-CP-65 is not recommended eligible for listing in the NRHP as an individual resource. While it served an important support function as part of the Control Point Historic District, an archival and literature review did not reveal information linking it to any specific test, series of tests, programs, or for any specific role on the NNSS other than as a warehouse (Criterion A). It has no direct association with any important individual (Criterion B). It also is not architecturally significant in its own right beyond reflecting the overall aesthetic of the Control Point Historic District (Criterion C), and it does not have potential to yield information important to the history of nuclear testing beyond what can be learned from historic texts, drawings, and other documents (Criterion D).

54 ENVIRONMENTAL SCIENCES↗

Pilot-Scale Testing of an Integrated Circuit for the Extraction of Rare Earth Minerals and Elements from Coal and Coal Byproducts Using Advanced Separation Technologies

The primary objective of this project was to develop and demonstrate an integrated pilot-scale circuitry for recovering high-value rare earth elements (REEs) from coal and coal byproducts. The target performance was to produce a mixed REE product with content of at least two percent by weight on a dry mass basis in a cost-effective and environmentally benign manner. During the first nine months of the project period (Phase 2 Budget Period 2), pilot plant construction was completed including all field site startup activities such as permitting, engineering design, procurement/bidding, unit fabrication, site construction, equipment installation, module assembly, safety training, and circuit shakedown. During the remaining 21 months of project period (Phase 2 Budget Period 3), detailed field-testing activities were performed including feedstock sample collection and preparation, exploratory testing, circuit modification, detailed parametric study, and performance optimization. A detailed techno-economic analysis was performed based on the pilot plant testing findings which provided various scenarios for REE production. The project successfully accomplished the proposed target performance by producing mixed rare earth oxide (REO) with greater than 90% purity by weight in a continuous pilot scale operation from two distinctly different coarse refuse materials (i.e., West Kentucky No. 13 and Fire Clay coal seams), and at least three secondary sources (i.e., heap leach process and naturally formed acid mine drainage system). Project partners included the University of Kentucky, Virginia Tech, West Virginia University, Alliance Coal, Blackhawk Mining, Mineral Refining Company, and Mineral Separation Technologies. The pilot scale test facility was constructed at a former mining complex owned by Alliance Natural Resource Partners (Alliance Coal). The site was rehabilitated to accommodate the equipment installation, construction and fabrication, electrical power requirement, water line management and containment. The process units constructed and installed included X-ray sorting unit, crushing and grinding unit, physical separation unit, acid leaching unit, solvent extraction unit, and wastewater management unit. A rare earth mineral concentration unit was constructed as a standalone unit for flexible operation. A detailed environmental assessment and control plan was carried out to identify and quantify any potential impacts of the pilot-scale processing circuitry on the human and eco-system health and well-being. Corresponding mitigation strategies and control measures were provided. A conceptual flowsheet was developed to effectively remove thorium and uranium from high purity rare earth oxide mix or any potential radionuclide enriched stream. The two distinct feedstock materials were secured from the Blackhawk Mining Complex in eastern Kentucky where the Fire Clay (Hazard No. 4) seam is processed. The West Kentucky No. 13 (Baker) coarse refuse material was collected from an active process stream at an Alliance coal preparation plant located in western Kentucky. Characterization analysis indicated that both of feed materials generated from the two sources contained >300 ppm of TREEs on a dry whole mass basis which met the requirements for a qualified feed stock. The two feedstocks were further upgraded using a dual x-ray sorter to prepare the feed material for hydrometallurgical circuit. Thermal treatment on feed material prior to leaching was found to: 1) improve the leaching recovery of REEs, 2) increase the leaching kinetics, and 3) allow the leaching reaction to occur at lower acidity. Roasting at 600°C was selected as the pre-treatment condition for both West Kentucky No. 13 and Fire Clay coarse refuse material. Over 40% of leaching recovery was achieved by roasting West Kentucky No. 13 material having a top particle size of 3 mm in the pilot scale operation using 1.2M sulfuric acid leaching at 75OC. Initial pilot scale testing involved continuous operation of the pilot plant for 94 hours. The leaching unit was operated at solid-to-liquid ratio of 1 to 10 (w/v) using 0.5M sulfuric acid solution at a temperature of 75°C. The continuous solvent extraction circuit utilized rougher and cleaner units with DEHPA and TBP as the extractants. An innovative stripping circuit was developed to accumulate the REE concentration in the stripping solution to a level above 600 ppm. A bleed stream from the recycled strip solution was treated using oxalic acid precipitation which produced a high grade rare earth oxalate. The oxalate product was roasted to remove the oxalate which produced a rare earth oxide product having a purity greater 90%. Due to high concentrations of contaminant ions in the pregnant leach solution (PLS), a modified flowsheet was developed that involved pre-concentration of the REEs using multiple stages of precipitation and redissolution. The advantage of this process was improved removal of contamination before the downstream purification process and a significant cost reduction relative to the circuit that utilized the solvent extraction process. The modified circuitry included processes involving leaching, multistage precipitation, redissolution, and oxalate precipitation followed by roasting of the oxalate product. The circuit produced a mixed REO that was 92.96% pure from the initial test. A detailed parametric test plan was carried out which involved varying key parameters including solids feed rate, acid flowrate, acid concentration, multistage precipitation pH, redissolution pH, oxalate precipitation dosage and pH. The response variables included REE recovery, contaminant recovery, REO product grade and overall chemical consumption. Test results indicated that the acid-to-solid ratio is the key parameter to leaching efficiency as performance deteriorated with an increase in solids concentration. The optimal pH determined for REE precipitation and redissolution was 6.5 and 2.5, respectively. Additional tests were conducted to further improve the flowsheet. Recirculating a portion of the PLS to the feed of the leach tanks improved the leaching performance by lowering the pH of the leaching system and reducing the contamination recovery by shortening the residence time. Moreover, the removal of Al prior to REE precipitation significantly reduced the oxalic acid consumption in the oxalate precipitation circuit. The modified circuit produced over 90% grade REO by weight from both West Kentucky No. 13 and Fire Clay coarse refuse material in pilot scale continuous test programs. A case analysis model was developed to project the REE and major contaminants concentration in each PLS stream based on the leaching condition, pH cut point, and oxalic acid dosage. A correlation was established using empirical and semi-empirical models. Using the models, chemical consumption required for each stage was predicted based on the projected performance of the hydrometallurgy circuit. After identifying the optimum conditions, validation tests were carried out for the treatment of both West Kentucky No. 13 and Fire Clay coarse refuse materials in the pilot plant. The actual circuit performance and chemical consumptions were very close to the model predictions. Other than the two coarse refuse sources, several secondary feedstocks were also tested in the pilot plant facility. A “heap leach” system was constructed using the coarse refuse material generated from cleaning the West Kentucky No. 13 seam coal. Using the two stage SX rougher and cleaner circuit, a concentrate with a grade >90% REO was produced while recovering >97% of the REEs from the heap leach PLS. Naturally generated acid mine drainage (AMD) from West Kentucky No.13 mine was processed using the multistage precipitation circuit in the pilot plant in a test conducted for a period of 32 hours. The final grade of the mix RE oxide produced from the AMD was 90.84% with an overall circuit recovery of 64%. The primary source of REE was the selective precipitation steps involving iron and aluminum rejection. The hydrophobic-hydrophilic separation (HHS) process was proven to effectively recover coal from fine waste materials. For REM recovery, the HHS process was able to produce concentrates at grades of approximately 1.8% REE on an ash basis; however, recovery values were typically low, <10%, under the optimal conditions determined in the laboratory-scale testing. Staged testing of the pilot-scale HHS process for coal recovery and semi-continuous laboratory testing for REM testing showed that a total concentration ratio of more than 15x was observed for the REM recovery process. A circuit simulation package was developed for REE extraction and purification using a spreadsheet-based platform (Microsoft Excel). The REESim circuit simulation package is configured to track the mass and volume flows of components passing through a series of unit operations specified and configured by the user. The mass rates can then be utilized by the user to determine important performance indicators such as product mass yields, concentrate purity levels, element-by-element recoveries, and so forth. The techno-economic analysis showed that the roasting and leaching operations were the most expensive capital items, each contributing approximately 30% to the total capital cost. One notable contributor to the high production costs was the low REE recovery observed in the pilot scale trials. The product basket price was shown to have a strong influence on the economic viability of the scenarios, with the scandium price being the most significant influencer. Operating cost was shown to be extremely sensitive to REE recovery, REE feed grade, and leaching acid consumption. An analysis of ten different scenarios for a 500 t/h commercial operation revealed that three were economically favorable, producing internal rates of return varying from 27.7% to 33.1% and payback periods of 4 to 5 years. The project successfully developed and demonstrated a process to recover REEs from coal and coal byproducts in a pilot-plant operation which consistently produced over 90% grade REO mix from varies types of feedstocks. Commercialization analysis showed that the technology readiness level successfully achieved TRL 6 at the end of the project and demonstrated the need and the potential for scaling the process to further advance the technologies toward the goal of providing a domestic supply of REEs at a commercial scale.

01 COAL, LIGNITE, AND PEAT↗

Thermal Neutron Scattering Law Evaluations for Zirconium Carbide and Critical Mass Calculations [Slides]

Zirconium Carbide (ZrC) is a refractory material currently being investigated for high temperature reactor applications. ZrC was studied as a base of (U,Zr)C solid solution and UC 2 composite fuels for NERVA-type cores during the Rover program. Testing of the material was performed at Nuclear Furnace 1 (NF-1) located at Los Alamos. Thermal Scattering Law (TSL) evaluations generated with FLASSH are a new contribution to ENDF/B-VIII.1.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Office of Nuclear Verification FY 2023 Quarterly Report TSVT Q1

This project encompasses the continued development and training of a U.S. operational team, the Test Site Verification Team (TSVT), supporting verification of nuclear testing activities. TSVT builds on decades of U.S. nuclear testing history and nuclear explosion monitoring experience. The Team maintains readiness to deploy internationally on short notice to provide field-based support of verification of declared or undeclared nuclear testing and associated activities, as well as follow-on activities including monitoring and capability disablement and dismantlement, as established by negotiated agreement or treaty. The roles and structure of the TSVT are integrated with other NA-243 deployable verification teams and the interagency. FY23 TSVT activities focus on continued capability buildup within the team, including Team trainings and exercises with a focus on missions in confined spaces (e.g., tunnels, mines, other underground facilities), increased familiarity with foreign nuclear weapons testing programs, demonstration of Team capacity to deploy, train, and practice sustained OPSEC in non-western locations, establishment of sustainable storage and maintenance of equipment, specification and procurement of additional equipment to support field observations, further evolution of concepts of operation documents (CONOPs), and mission coordination with Headquarters and associated Stakeholders. Activities will culminate with a full-scale domestic team exercise at the end of FY23 focusing on underground activities signatures/observations and safety including advanced outdoor safety and familiarity in working around explosive test environments. In addition, we will be further articulating approaches and capacity relevant to the identification of nuclear tests, as well as monitoring of nuclear testing activities and/or dismantlement of nuclear test sites and anticipate developing additional equipment requests in support of this evolution. The TSVT Team Leads will also coordinate with its Senior Advisor, the TSVT Logistics and Readiness (L&R) Training Lead, and NNSA Headquarters to draft a five-year TSVT training and exercise plan, that strategically and incrementally builds capacity and expertise in key areas of significance for the continuum of nuclear and nuclear-related testing activities that fall within the team’s mission space.

42 ENGINEERING↗

Developing Separate Effects Transient Test Experiments Using an Out-of-Pile Flowing Water Loop

In 2017 the Transient Reactor Test Facility was restarted after being placed in a standby state since 1994. This Test Reactor’s restart has since enabled the progressive development of new nuclear technologies within the U.S. that were previously required to outsource to other countries. While the reactor’s restart was a large feat worthy of recognition, the experimental use of its characteristics has required the further development of in-pile experimental infrastructure sufficient to support programmatic needs. This hardware have taken the form of capsule designs (compact and elongated) as well as loop concepts representing the phenomena of interest for a subset of separate effects tests desire for each respective testing campaign. The Transient Testing Program has a large-integrated effort that aligns with the U.S. Department of Energy’s current needs. This study compliments those programmatic elements by developing, fabricating and demonstrating a full-scale flowing water loop in an out-of-pile environment. The goal of this effort is to develop a pragmatic understanding of the engineering capabilities and limitations associated with geometric form-factors, metering technology, and controls logic under representative thermal hydraulic conditions that would be experienced within the TREAT reactor during an in-pile reactivity initiated accident test. The outcomes of this study result in an evaluation of the conceptual design of a comprehensive flowing water loop including objective figures of merit (FoMs) for comparing unique instrumentation and the basis for their selection during operations. These efforts directly contribute to and are required for the further advancement of transient testing capabilities within the U.S.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Waste Shielded Casks Transfer by Funicular from the Surface to Disposal Level in Cigeo - 20007

Andra is completing the detailed engineering phase of Cigeo - the French HLW and ILW-LL DGR. A funicular system is dedicated to the transfer of the waste disposal containers from the surface to the underground infrastructures down the nuclear access ramp. This paper explains the rationale having led to the choice of a funicular and presents the advantages of this system. Main technical components and mechanical performance of the funicular system are then detailed. Lastly, the ongoing two stages qualification testing program managed by Andra (in order to reach a level 6 on the international Technology Readiness Level scale) is discussed. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Field study of group effects on the pullout capacity of “deep” helical piles in sand

This paper presents the results of a field load test program used to investigate group effects on the pullout capacity of single-helix “deep” helical piles/anchors in sand. The high tensile capacity and silent installation of helical piles has given them serious consideration as an alternative to conventional deep foundations and anchors for offshore renewable energy structures. New offshore applications may consider the use of groups of helical piles to resist structural loads. Group interaction effects are known to occur in helical piles, but there is a scarcity of field data on groups in sands under tensile loading. This study involved the installation and load testing of single-helix 152mm diameter round shaft piles and pile groups embedded in sand to depths of 12 and 18 helix diameters below the ground surface. The study was designed to explore the effects of close pile spacing, group configuration (i.e., number of piles), and soil strength (i.e., friction angle) as interpreted from cone penetration test (CPT) resistance. The results showed group efficiencies ranging from about 0.6 to 1.0 at a horizontal spacing of 2 to 3 times the helix diameter in sands with friction angles of about 39° to 44°. The data from this study may also be useful for validation of numerical models for analysis of helical pile group interactions.

Engineering↗