Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “System Operations”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

ICE-RASSOR: Intelligent Capabilities Enhanced Regolith Advanced Surface Systems Operations Robot

NASA’s Regolith Advanced Surface Systems Operations Robot (RASSOR) is principally designed to mine and deliver regolith for In-Situ Resource Utilization (ISRU)processing. RASSOR’s design enables it to efficiently collect and deposit regolith, return collected material for processing, and myriad related ISRU activities. To reliably perform these operations on the lunar surface, RASSOR software and sensory systems need to be robust and maximize the information extracted from a reduced sensor payload. Herein, we present preliminary findings from the Intelligent Capabilities Enhanced RASSOR project. We apply supervised learning using real data to estimate the soil mass collected without the need for mass flow rate monitors or other explicate sensing techniques. We also create a reduced-order simulation environment to develop autonomous trenching controllers via reinforcement learning and prototype state estimation architectures. Our initial results suggest that excavated regolith mass can be inferred within 2.9% RMS error of full scale, and reinforcement learning for autonomous operations has learned viable trenching strategies and helped identify desirable sensing capabilities, arrangements, and considerations. Future work includes regolith mass estimation during dynamic operation, expanding our simulation to more complex environments, and transfer learning from simulation to hardware.

machine learning↗

ICE-RASSOR: Intelligent Capabilities Enhanced Regolith Advanced Surface Systems Operations Robot

NASA’s Regolith Advanced Surface Systems Operations Robot (RASSOR) is principally designed to mine and deliver regolith for In-Situ Resource Utilization (ISRU) processing. RASSOR’s design enables it to efficiently collect and deposit regolith, return collected material for processing, and myriad related ISRU activities. To reliably perform these operations on the lunar surface, RASSOR software and sensory systems need to be robust and maximize the information extracted from on-board sensory. Herein, we present preliminary findings from the Intelligent Capabilities Enhanced RASSOR project. We apply supervised learning using real data to estimate the soil mass collected without the need for mass flow rate monitors or other explicate sensing techniques. We also create a reduced-order simulation environment to develop autonomous trenching controllers via reinforcement learning and proto-type state estimation architectures. Our initial results suggest that excavated regolith mass can be inferred within 2.9% RMS error of full scale, and reinforcement learning for autonomous operations has learned viable trenching strategies and helped identify desirable sensing capabilities, arrangements, and considerations. Future work includes regolith mass estimation during dynamic operation, expanding our simulation to more complex environments, and transfer learning from simulation to hardware.

machine learning↗

Terminal-area STOL operating systems experiments program

Information which will aid in the choice by the U.S. Government and industry of system concepts, design criteria, operating procedures for STOL aircraft and STOL ports, STOL landing guidance systems, air traffic control systems, and airborne avionics and flight control systems. Ames has developed a terminal-area STOL operating systems experiments program which is a part of the joint DOT/NASA effort is discussed. The Ames operating systems experiments program, its objectives, the program approach, the program schedule, typical experiments, the research facilities to be used, and the program status are described.

Smith, D. W.↗

The HAL 9000 Space Operating System Real-Time Planning Engine Design and Operations Requirements

In support of future deep space manned missions, an autonomous/automated vehicle, providing crew autonomy and an autonomous response planning system, will be required due to the light time delays in communication. Vehicle capabilities as a whole must provide for tactical response to vehicle system failures and space environmental effects induced failures, for risk mitigation of permanent loss of communication with Earth, and for assured crew return capabilities. The complexity of human rated space systems and the limited crew sizes and crew skills mix drive the need for a robust autonomous capability on-board the vehicle. The HAL 9000 Space Operating System[2] designed for such missions and space craft includes the first distributed real-time planning / re-planning system. This paper will detail the software architecture of the multiple planning engine system, and the interface design for plan changes, approval and implementation that is performed autonomously. Operations scenarios will be defined for analysis of the planning engines operations and its requirements for nominal / off nominal activities. An assessment of the distributed realtime re-planning system, in the defined operations environment, will be provided as well as findings as it pertains to the vehicle, crew, and mission control requirements needed for implementation.

Stetson, Howard↗

The Spitzer science operations system : how well are we really doing?

This paper will describe how the SIRTF Science Operation System has performed since launch, and how the system has been adapted based upon in-flight performance. It will also discuss lessons learned which can be applied to future science operation systems. This work was performed at the California Institute of Technology under contract to the National Aeronautics and Space Administration.

Spitzer Space Telescope↗

Guidance system operations plan for manned CM earth orbital missions using program SKYLARK 1. Section 4: Operational modes

The operational modes for the guidance system operations plan for Program SKYLARK 1 are presented. The procedures control the guidance and navigation system interfaces with the flight crew and the mission control center. The guidance operational concept is designed to comprise a set of manually initiated programs and functions which may be arranged by the flight crew to implement a large class of flight plans. This concept will permit both a late flight plan definition and a capability for real time flight plan changes.

Dunbar, J. C.↗

Status of the Delco Systems Operations forward looking windshear detection program

Delco Systems Operations, a division of General Motors Hughes Electronics Corporation, is developing a Forward Looking Windshear Detection System based on the integration of infrared remote sensing and accelerometer reactive sensing technologies. The infrared sensor is a multi-spectral, scanning radiometer operating in the 8 to 14 micron region. A 2 x 5 detector array with parallel-serial scanning produces 60 degrees horizontal and 10 degrees vertical-fields of view. Using multiple wavelength signals, azimuth temperature gradients are analyzed for characteristic signatures of thermally induced windshear phenomena. Elevation temperature gradients are processed through an atmosphere model to continuously compute a stability index for arming microburst detection criteria. The atmosphere model and proprietary computer processing algorithms combine to generate coarse estimates of disturbance ranges based on multiple wavelength radiance data with different extinction coefficients. Computer outputs of atmospheric stability, disturbance intensity, and azimuth and range information provide a situation display capability. A ground operated, experimental radiometer has been developed and is being used to verify the detection and discrimination concepts at an atmospheric and simulated rain test facility in Milwaukee. A prototype airborne radiometer is being developed for flight test evaluation during the summer of 1989.

Gallagher, Brian J.↗

Terminal-area STOL operating systems experiments program

A system study to determine the application of short takeoff aircraft for a high speed, short haul air transportation service was conducted. The study focused on developing information which will aid in choosing system concepts, design criteria, operating procedures, landing guidance systems, air traffic control systems, and airborne avionics and flight control systems. A terminal area STOL operating system experiments program was developed. The objectives, program approach, program schedule, typical experiments, research facilities to be used, and program status are discussed.

Smith, D. W.↗

Datasets of a Multizone Office Building under Different HVAC System Operation Scenarios

Abstract This study provides an open-source dataset of the measured weather data, building indoor data, and system data under the different test settings. The test building is the two-story Flexible Research Platform building at the US Department of Energy’s Oak Ridge National Laboratory, in Oak Ridge, Tennessee. Four heating tests and three cooling tests were conducted. The 1-min interval of weather, building indoor data, and system data from each test setting are provided. Actual weather data were collected from a weather station installed on the roof. This paper describes information on the test building and installed sensors, data collection method, and data validation. The provided dataset can be employed to understand HVAC system conditions and building indoor conditions under different HVAC system operations and the performance of building envelope without HVAC system operation using free-floating test data. Additionally, it can be used for empirical validation of the building energy modelling engine.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

A cognitive operating system (COGNOSYS) for JPL's robot, phase 1 report

The most important software requirement for any robot development is the COGNitive Operating SYStem (COGNOSYS). This report describes the Stanford University Artificial Intelligence Laboratory's hand eye software system from the point of view of developing a cognitive operating system for JPL's robot. In this, the Phase 1 of the JPL robot COGNOSYS task the installation of a SAIL compiler and a FAIL assembler on Caltech's PDP-10 have been accomplished and guidelines have been prepared for the implementation of a Stanford University type hand eye software system on JPL-Caltech's computing facility. The alternatives offered by using RAND-USC's PDP-10 Tenex operating sytem are also considered.

Mathur, F. P.↗

Regolith Advanced Surface Systems Operations Robot Excavator

The Regolith Advanced Surface Systems Operations Robot (RASSOR) excavator robot is a teleoperated mobility platform with a space regolith excavation capability. This more compact, lightweight design (<50 kg) has counterrotating bucket drums, which results in a net-zero reaction horizontal force due to the self-cancellation of the symmetrical, equal but opposing, digging forces.

Mueller, Robert P.↗

The Value of SysML Modeling During System Operations: A Case Study

System models are often touted as engineering tools that promote better understanding of systems, but these models are typically created during system design. The Ground Data System (GDS) team for the Dawn spacecraft took on a case study to see if benefits could be achieved by starting a model of a system already in operations. This paper focuses on the four steps the team undertook in modeling the Dawn GDS: defining a model structure, populating model elements, verifying that the model represented reality, and using the model to answer system-level questions and simplify day-to-day tasks. Throughout this paper the team outlines our thought processes and the system insights the model provided.

Dutenhoffer, Chelsea↗

Autonomous Operations System: Development and Application

Autonomous control systems provides the ability of self-governance beyond the conventional control system. As the complexity of mechanical and electrical systems increases, there develops a natural drive for developing robust control systems to manage complicated operations. By closing the bridge between conventional automated systems to knowledge based self-awareness systems, nominal control of operations can evolve into relying on safe critical mitigation processes to support any off-nominal behavior. Current research and development efforts lead by the Autonomous Propellant Loading (APL) group at NASA Kennedy Space Center aims to improve cryogenic propellant transfer operations by developing an automated control and health monitoring system. As an integrated systems, the center aims to produce an Autonomous Operations System (AOS) capable of integrating health management operations with automated control to produce a fully autonomous system.

Autonomous Control Systems↗

An Operations System for a Planetary Rover Prototype

A distributed operations system, the Web Interface for Telescience (WITS), is being developed for use in future planetary lander and rover mission operations.

Ground operations manipulator control Internet pla↗

A Scenario-Based Process for Requirements Development: Application to Mission Operations Systems

The notion of using operational scenarios as part of requirements development during mission formulation (Phases A & B) is widely accepted as good system engineering practice. In the context of developing a Mission Operations System (MOS), there are numerous practical challenges to translating that notion into the cost-effective development of a useful set of requirements. These challenges can include such issues as a lack of Project-level focus on operations issues, insufficient or improper flowdown of requirements, flowdown of immature or poor-quality requirements from Project level, and MOS resource constraints (personnel expertise and/or dollars). System engineering theory must be translated into a practice that provides enough structure and standards to serve as guidance, but that retains sufficient flexibility to be tailored to the needs and constraints of a particular MOS or Project. We describe a detailed, scenario-based process for requirements development. Identifying a set of attributes for high quality requirements, we show how the portions of the process address many of those attributes. We also find that the basic process steps are robust, and can be effective even in challenging Project environments.

MOS↗

Re-Engineering the Mission Operations System (MOS) for the Prime and Extended Mission

One of the most challenging tasks in a space science mission is designing the Mission Operations System (MOS). Whereas the focus of the project is getting the spacecraft built and tested for launch, the mission operations engineers must build a system to carry out the science objectives. The completed MOS design is then formally assessed in the many reviews. Once a mission has completed the reviews, the Mission Operation System (MOS) design has been validated to the Functional Requirements and is ready for operations. The design was built based on heritage processes, new technology, and lessons learned from past experience. Furthermore, our operational concepts must be properly mapped to the mission design and science objectives. However, during the course of implementing the science objective in the operations phase after launch, the MOS experiences an evolutional change to adapt for actual performance characteristics. This drives the re-engineering of the MOS, because the MOS includes the flight and ground segments. Using the Spitzer mission as an example we demonstrate how the MOS design evolved for both the prime and extended mission to enhance the overall efficiency for science return. In our re-engineering process, we ensured that no requirements were violated or mission objectives compromised. In most cases, optimized performance across the MOS, including gains in science return as well as savings in the budget profile was achieved. Finally, we suggest a need to better categorize the Operations Phase (Phase E) in the NASA Life-Cycle Phases of Formulation and Implementation

Extended Mission↗

Distribution System Operator with Transactive (DSO+T) Study: Volume 1 (Main Report)

The Distribution System Operator with Transactive (DSO+T) study investigates the engineering and economic performance of a transactive energy retail market coordinating a high penetration of customer-side flexible energy assets. The study seeks to answer whether such an implementation is cost effective for customers, recovers sufficient revenue for DSOs, and is equally applicable and beneficial to a range of flexible asset types, renewable generation scenarios, and market assumptions. Using a highly interdisciplinary co-simulation and valuation framework, this assessment encompasses the entire electrical delivery system from bulk system generation and transmission, through the distribution system, to the modeling of individual customer buildings and flexible assets (including heating, ventilation, and air conditioning [HVAC] units, water heaters, batteries, and electric vehicles). The study exercises a transactive energy retail market coordination scheme designed to integrate with an existing day-ahead and real-time competitive wholesale electricity market. Software decision-making agents are designed for the retail market operator as well as various price-responsive flexible assets. The engineering and economic performance of the transactive energy scheme is studied for two separate flexible asset deployments: flexible loads (HVAC units and residential water heaters) and behind-the-meter batteries. The results of each transactive case are compared to a business-as-usual case. These cases are subject to two different renewable generation scenarios, a moderate renewable generation scenario, representative of current levels of renewable generation deployment, and a future high renewables scenario, including the increased deployment of rooftop solar photovoltaic and electric vehicles. The transactive coordination scheme is shown to produce effective and stable control and decrease peak loads 9–15%. The resulting annual demand flexibility provides net economic savings of $3.3–5.0B per year for a region the size of Texas. Detailed analysis shows that net benefits were seen for a range of distribution system operator, customer, and flexible asset types. Both participating customer (with transactive flexible assets) and nonparticipating customers (with nonflexible assets) see reductions in annual utility bills and net annual energy expenses in the range of 10–16%.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗