Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Supernate”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

Chemical Characterization Results for Tank 40 Sludge Batch 10 Waste Acceptance Product Specifications (WAPS) Sample

A 3-L sample (HTF-40-23-24) obtained from Tank 40 following transfer of Tank 51 to achieve the final Sludge Batch 10 processing composition was received by Savannah River National Laboratory (SRNL). SRNL was tasked with characterization of the sample in accordance with requirements for reporting the Waste Acceptance Product Specifications. A representative subsample, approximately 500 mL, was prepared by continuously agitating the 3-L sample via a mixing blade inserted into the bottle. This subsample was then used for the chemical and physical characterization reported here. This characterization includes the following: (1) Supernate and slurry density; (2) Weight percent solids; (3) Mercury Analysis (supernate and slurry); (4) Anions; (5) Total Organic/Inorganic Carbon; (6) Free Hydroxide; (7) Other Base; (8) Elementals; (9) Volatile Organic Analysis and Semi-volatile Organic Analysis; and (10) Fissile Radionuclides and Uranium Enrichment. The results of this physical and chemical characterization of the sample are documented in this report.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Spent Crystalline Silicotitanate Storage Study

Washington River Protection Solutions is working to support initial production of immobilized low-activity waste (LAW) by feeding Hanford tank supernate from tank farms to the Hanford Waste Treatment and Immobilization Plant (WTP) LAW Facility. This goal incorporates the design of a Tank-Side Cesium Removal (TSCR) system, which filters tank waste supernate to remove suspended solids and then removes Cs by processing it through crystalline silicotitanate (CST) ion exchange media manufactured by Honeywell UOP, LLC. The 137 Cs-depleted product is intended to be sent to the WTP for vitrification. The Cs-loaded CST columns will be stored indefinitely, with a goal of eventual CST removal and treatment. Thus, the spent CST needs to be recoverable. The testing described herein looks to potential upset process conditions where CST storage may be required before various rinse steps are completed. This study evaluated upset conditions at three sequential processing steps envisioned for TSCR (feed, 0.1 M NaOH rinse, water rinse), and in-column drying with compressed air (normal end step) to assess impacts on the nature of the CST bed. Testing was conducted at the small scale (12-mL bed volume); simulated AP-105 tank waste was used as the feed. Following process disruption, the CST bed was dried in place at 70 °C. Post-dried CST bed physical properties (angle of repose, penetration depth, particle morphological changes) were measured to evaluate how CST moved and flowed. The testing is intended to provide a preliminary assessment of issues that may arise from desiccation of CST with the indicated salt solutions in place. Since these were small-scale tests, the processing conditions will not match full scale conditions exactly; however, the tests do provide insight into the impact of stopping processing at an earlier step than normal. Except for the feed that was dried in-place, all other process stop-conditions showed the CST bed flowed well after drying. At this small scale, CST beds would not present an issue for retrievability. The feed that was dried in place had solidified into a rock-hard monolith with no movement possible. Samples had to be chipped from the surface.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Ion Exchange Processing of AN-107 Hanford Tank Waste through Crystalline Silicotitanate in a Staged 2- then 3-Column System

The Hanford Site stores an estimated 56 million gallons of mixed radioactive and chemically hazardous waste in large underground tanks. In support of the Direct Feed Low-Activity Waste (DFLAW) Program for expediting Hanford tank waste supernate treatment, laboratory-scale ion exchange processing using prototypic unit operations was conducted on AN-107 tank waste at the Pacific Northwest National Laboratory Radiochemical Processing Laboratory. This report describes the small-scale ion exchange testing with 13.7 L of diluted and filtered supernate from Tank 241-AN-107 (hereafter referred to as AN-107) at 16 °C (62 °F). One of the waste acceptance criteria (WAC) for the Waste Treatment Plant (WTP) Low-Activity Waste Facility is that the waste must contain less than 3.18×10 -5 Ci 137 Cs per mole of Na. For the AN-107 tank waste to meet this criterion, only 0.147% of the influent 137 Cs concentration may be delivered to the WTP; this requires a Cs decontamination factor of 678. Testing with AN-107 matched current Tank Side Cesium Removal (TSCR) facility prototypic operations where a lead-lag configuration was used until the lag column reached the WAC limit, then a polish column was brought online for continued processing in a lead-lag-polish column configuration. Feed was processed at 1.9 bed volumes (BVs) per hour; the flowrate, in terms of contact time with the crystalline silicotitanate (CST) bed, matched the expected flowrate at TSCR. The Cs-decontaminated product was retained for vitrification testing (to be reported separately). The lead column reached 40% Cs breakthrough after processing ~1700 BVs of feed; the 50% Cs breakthrough was extrapolated from the breakthrough data to occur at 1873 BVs. Testing compared to previous AP-101 and AP-107 testing at 16 °C showed ~300 BV increases in volume processed to reach the WAC limit for both lead and lag columns. The increase in capacity was determined to be due to the significantly lower K concentration in the AN-107 compared to the other tank waste matrices. A comparison in breakthrough curves for the three tests indicated slightly slower kinetic behavior in the AN-107, with variations in feed matrices (high organic complexants) likely responsible for the deviation. The Cs effluent from the lag column reached the WAC limit after processing 1097 BVs. Anticipating this breakthrough point, the polish column was preemptively installed around 900 BVs. Cs breakthrough from the lag column began at 500 BVs, reaching 3.06×10 0 µCi/mL, or 2.6 % Cs breakthrough, after processing all 1700 BVs of feed. Table S.1 and Figure S.1 summarize the observed column performance and relevant Cs loading characteristics.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Cesium Removal from AP-106 Tank Waste Using Crystalline Silicotitanate

The Tank Side Cesium Removal (TSCR) system, currently operated by Washington River Protection Solutions, LLC, prepares Hanford waste tank supernate feeds for the Low-Activity Waste Facility at the Hanford Waste Treatment and Immobilization Plant (WTP). In addition to entrained solids removal from the supernate, the primary goal of TSCR is to remove cesium-137 ( 137 Cs) by ion exchange (IX), allowing contact handling of the liquid effluent product at the WTP as governed by a waste acceptance criterion (WAC). Specific to 137 Cs, this requirement is <3.18E-5 Ci 137 Cs/mole of Na. Crystalline silicotitanate (CST), manufactured by Honeywell UOP, LLC (product IONSIV R9140-B), was selected as the ion exchange media for TSCR.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Literature Review Investigating Historical Plutonium Solubility in SRS Tank Waste

The Savannah River Site (SRS) has designed the Accelerated Basin De-inventory (ABD) program to accelerate the de-inventory of L-Basin and accelerate the Spent Nuclear Fuel (SNF) disposition mission. Similarly, the H-Canyon facility at SRS is reestablishing the 6.3D electrolytic dissolver for dissolving unirradiated stainless-steel (SS) clad Fast Critical Assembly (FCA) fuel. In both discard types (ABD and FCA), plutonium is present and its complex solubility when composited to Concentration, Storage, and Transfer Facility (CSTF) sludge is being investigated as it may have downstream impacts to the liquid waste (LW) organization. This literature review aims to highlight and compile the existing literature on plutonium solubility in waste streams relevant to ABD and FCA discards, as well as discuss some considerations in analyzing solubility data of plutonium. This review serves to help define the analysis methods for future experiments involving plutonium (and other actinides) and in designing appropriate testing conditions surrounding these studies. This review is broken up into five parts and will discuss: (i) The possible effects of testing hold time and temperature on plutonium solubility, (ii) the influence of neutralization rate and particle size of freshly precipitated discards, (iii) the coprecipitation of plutonium with iron and uranium, (iv) predictive solubility modeling and the influence of supernate anions on solubility, and (v) the speciation of plutonium in solutionas a result of supernate anions.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Batch contact testing with variable Na AN-107 and AP-105

The Hanford Site stores an estimated 56 million gallons of mixed radioactive and chemically hazardous waste in large underground tanks. In support of the Direct Feed Low-Activity Waste (DFLAW) program for expediting Hanford tank waste supernate treatment, laboratory-scale ion exchange processing using prototypic unit operations was conducted on AW-105 tank waste at the Pacific Northwest National Laboratory Radiochemical Processing Laboratory. This report describes the batch contact testing for tanks AN-107 and AP-105 to help evaluate CST performance on tanks waste supernate after processing it in the ion exchange columns. Batch columns were performed with the wastes at six Na concentrations.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

IMPACT OF SB4 TANK 40 DECANT AND ARP/MCU ADDITIONS WITH/WITHOUT ADDED CAUSTIC ON DWPF CPC PERFORMANCE

The Savannah River National Laboratory (SRNL) was requested to investigate the impact of decanting supernate from the Sludge Batch four (SB4) feed in Tank 40. The specific questions concerned the potential impact on the stoichiometric acid window determined for SB4 with respect to overall hydrogen generation rates, nitrite destruction in the Sludge Receipt and Adjustment Tank (SRAT) and the rheology of the sludge, SRAT product, and Slurry Mix Evaporator (SME) product slurries. The scope included considering an addition of sodium hydroxide to Tank 40 to partially offset the sodium lost during decanting as well as considering the impact of bounding quantities of Actinide Removal Process (ARP) feed and Modular Caustic-Side Solvent Extraction Unit (MCU) feed on these same parameters. Simulated SB4 waste was first adjusted to match the dilution that has occurred in Tank 40 during the initial period of SB4 operations in the DWPF. The adjusted simulant was decanted an equivalent of 100,000 gallons relative to 413,740 gallons projected supernate volume. The decanted simulant was divided into two equal parts. One part received an addition of sodium hydroxide to increase the Na{sub 2}O content of the calcined sludge solids by about 3%. The baseline decanted simulant and caustic adjusted simulant were each tested in three pairs of DWPF process simulations of the SRAT and SME cycles. The simulations were at the nominal SB4 acid stoichiometry of 130% with and without bounding ARP/MCU additions and at 170% of acid without ARP/MCU. The 170% case without ARP/MCU was considered bounding relative to 170% with ARP/MCU based on calculated acid requirements. No significant negative impacts on the proposed acid operating window for the SRAT and SME cycles were noted in the simulations. Nitrite was successfully destroyed and mercury reduced in all six SRAT cycles. Hydrogen was produced in all six SRAT and SME cycles, but the levels were below the DWPF SRAT and SME cycle limits in all cases. Relatively insignificant rheological changes were noted other than the previously established thinning from higher acid additions. SRAT and SME processing at 130% acid stoichiometry with and without ARP/MCU additions were very similar. MCU nitric acid content, however, shifted the normal acid addition prior to boiling toward more formic acid and less nitric acid than without MCU. SRNL found no technical issues processing the proposed Tank 40 decant (with or without added NaOH) from the standpoint of the impact on the DWPF SRAT and SME cycles subject to the inherent uncertainties in modeling the ARP noble metal concentrations. The noble metals in the ARP were set to the same weight percents in the total solids that they were measured at in the SB4 waste, which was considered likely to be bounding on the actual noble metal content of the ARP transfer to DWPF. Assumptions for formate loss and nitrite to nitrate conversion can be left at the current levels.

08 HYDROGEN↗

CHARACTERIZATION OF TANK 11H AND TANK 51H POST ALUMINUM DISSOLUTION PROCESS SAMPLES

A dip sample of the liquid phase from Tank 11H and a 3-L slurry sample from Tank 51H were obtained and sent to Savannah River National Laboratory for characterization. These samples provide data to verify the amount of aluminum dissolved from the sludge as a result of the low temperature aluminum dissolution process conducted in Tank 51H. The characterization results for the as-received Tank 11H and Tank 51H supernate samples and the total dried solids of the Tank 51H sludge slurry sample appear quite good with respect to the precision of the sample replicates and minimal contamination present in the blank. The two supernate samples show similar concentrations for the major components as expected.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

FLOWSHEET FOR ALUMINUM REMOVAL FROM SLUDGE BATCH 6

Samples of Tank 12 sludge slurry show a substantially larger fraction of aluminum than originally identified in sludge batch planning. The Liquid Waste Organization (LWO) plans to formulate Sludge Batch 6 (SB6) with about one half of the sludge slurry in Tank 12 and one half of the sludge slurry in Tank 4. LWO identified aluminum dissolution as a method to mitigate the effect of having about 50% more solids in High Level Waste (HLW) sludge than previously planned. Previous aluminum dissolution performed in a HLW tank in 1982 was performed at approximately 85 C for 5 days and dissolved nearly 80% of the aluminum in the sludge slurry. In 2008, LWO successfully dissolved 64% of the aluminum at approximately 60 C in 46 days with minimal tank modifications and using only slurry pumps as a heat source. This report establishes the technical basis and flowsheet for performing an aluminum removal process in Tank 51 for SB6 that incorporates the lessons learned from previous aluminum dissolution evolutions. For SB6, aluminum dissolution process temperature will be held at a minimum of 65 C for at least 24 days, but as long as practical or until as much as 80% of the aluminum is dissolved. As planned, an aluminum removal process can reduce the aluminum in SB6 from about 84,500 kg to as little as 17,900 kg with a corresponding reduction of total insoluble solids in the batch from 246,000 kg to 131,000 kg. The extent of the reduction may be limited by the time available to maintain Tank 51 at dissolution temperature. The range of dissolution in four weeks based on the known variability in dissolution kinetics can range from 44 to more than 80%. At 44% of the aluminum dissolved, the mass reduction is approximately 1/2 of the mass noted above, i.e., 33,300 kg of aluminum instead of 66,600 kg. Planning to reach 80% of the aluminum dissolved should allow a maximum of 81 days for dissolution and reduce the allowance if test data shows faster kinetics. 47,800 kg of the dissolved aluminum will be stored in Tank 8 and 21,000 kg will be stored in saltcake via evaporation. Up to 77% of the total aluminum planned for SB6 may be removed via aluminum dissolution. Storage of the aluminum-laden supernate in Tank 8 will require routine evaluation of the free hydroxide concentration in order to maintain aluminum in solution. Periodic evaluation will be established on concurrent frequency with corrosion program samples as previously established for aluminum-laden supernate from SB5 that is stored in Tank 11.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

TANK 40 FINAL SB5 CHEMICAL CHARACTERIZATION RESULTS PRIOR TO NP ADDITION

A sample of Sludge Batch 5 (SB5) was pulled from Tank 40 in order to obtain radionuclide inventory analyses necessary for compliance with the Waste Acceptance Product Specifications (WAPS). This sample was also analyzed for chemical composition including noble metals. Prior to radionuclide inventory analyses, a final sample of the H-canyon Np stream will be added to bound the Np addition anticipated for Tank 40. These analyses along with the WAPS radionuclide analyses will help define the composition of the sludge in Tank 40 that is currently being fed to DWPF as SB5. At the Savannah River National Laboratory (SRNL) the 3-L Tank 40 SB5 sample was transferred from the shipping container into a 4-L high density polyethylene vessel and solids allowed to settle overnight. Supernate was then siphoned off and circulated through the shipping container to complete the transfer of the sample. Following thorough mixing of the 3-L sample, a 239 g sub-sample was removed. This sub-sample was then utilized for all subsequent analytical samples. Eight separate aliquots of the slurry were digested, four with HNO{sub 3}/HCl (aqua regia) in sealed Teflon{reg_sign} vessels and four in Na{sub 2}O{sub 2} (alkali or peroxide fusion) using Zr crucibles. Due to the use of Zr crucibles and Na in the peroxide fusions, Na and Zr cannot be determined from this preparation. Additionally, other alkali metals, such as Li and K that may be contaminants in the Na{sub 2}O{sub 2} are not determined from this preparation. Three Analytical Reference Glass-1 (ARG-1) standards were digested along with a blank for each preparation. The ARG-1 glass allows for an assessment of the completeness of each digestion. Each aqua regia digestion and blank was diluted to 1:100 mL with deionized water and submitted to Analytical Development (AD) for inductively coupled plasma--atomic emission spectroscopy (ICPAES) analysis, inductively coupled plasma--mass spectrometry (ICP-MS) analysis of masses 81-209 and 230-252, and cold vapor atomic absorption (CV-AA) analysis for Hg. Equivalent dilutions of the peroxide fusion digestions and blank were submitted to AD for ICP-AES analysis. Tank 40 SB5 supernate was collected from a mixed slurry sample in the SRNL Shielded Cells and submitted to AD for ICP-AES. Weighted dilutions of slurry were submitted for ion chromatography (IC), total inorganic carbon/total organic carbon (TIC/TOC), and total base analyses. The following conclusions were drawn from the analytical results reported here: (1) The elemental ratios of the major elements for the SB5 WAPS sample, whose major Tank 51 Qualification sample component underwent Al dissolution, are similar to those measured for the SB4 WAPS sample. (2) The elemental composition of this sample and the analyses conducted here are reasonable and consistent with DWPF batch data measurements in light of DWPF pre-sample concentration and SRAT product heel contributions to the DWPF SRAT receipt analyses. (3) Fifty percent of the sulfur in the SB5 WAPS sample is insoluble, and this represents a significantly larger fraction than that observed in previous sludge batches. (4) The noble metal and Ag concentrations predicted from the measured values for the Tank 51 Confirmation sample and Tank 40 SB4 WAPS sample using a two-thirds Tank 51, one-third Tank 40 heel blend ratio used to arrive at the final SB5 composition, agree with the values for the Tank 40 SB5 WAPS sample measured for this report.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

TANK 40 FINAL SB5 CHEMICAL CHARACTERIZATION RESULTS PRIOR TO NP ADDITION

A sample of Sludge Batch 5 (SB5) was pulled from Tank 40 in order to obtain radionuclide inventory analyses necessary for compliance with the Waste Acceptance Product Specifications (WAPS). This sample was also analyzed for chemical composition including noble metals. Prior to radionuclide inventory analyses, a final sample of the H-canyon Np stream will be added to bound the Np addition anticipated for Tank 40. These analyses along with the WAPS radionuclide analyses will help define the composition of the sludge in Tank 40 that is currently being fed to DWPF as SB5. At the Savannah River National Laboratory (SRNL) the 3-L Tank 40 SB5 sample was transferred from the shipping container into a 4-L high density polyethylene vessel and solids allowed to settle overnight. Supernate was then siphoned off and circulated through the shipping container to complete the transfer of the sample. Following thorough mixing of the 3-L sample, a 239 g sub-sample was removed. This sub-sample was then utilized for all subsequent analytical samples. Eight separate aliquots of the slurry were digested, four with HNO{sub 3}/HCl (aqua regia) in sealed Teflon{reg_sign} vessels and four in Na{sub 2}O{sub 2} (alkali or peroxide fusion) using Zr crucibles. Due to the use of Zr crucibles and Na in the peroxide fusions, Na and Zr cannot be determined from this preparation. Additionally, other alkali metals, such as Li and K that may be contaminants in the Na{sub 2}O{sub 2} are not determined from this preparation. Three Analytical Reference Glass - 14 (ARG-1) standards were digested along with a blank for each preparation. The ARG-1 glass allows for an assessment of the completeness of each digestion. Each aqua regia digestion and blank was diluted to 1:100 mL with deionized water and submitted to Analytical Development (AD) for inductively coupled plasma - atomic emission spectroscopy (ICPAES) analysis, inductively coupled plasma - mass spectrometry (ICP-MS) analysis of masses 81-209 and 230-252, and cold vapor atomic absorption (CV-AA) analysis for Hg. Equivalent dilutions of the peroxide fusion digestions and blank were submitted to AD for ICP-AES analysis. Tank 40 SB5 supernate was collected from a mixed slurry sample in the SRNL Shielded Cells and submitted to AD for ICP-AES. Weighted dilutions of slurry were submitted for ion chromatography (IC), total inorganic carbon/total organic carbon (TIC/TOC), and total base analyses. The following conclusions were drawn from the analytical results reported here: (1) The elemental ratios of the major elements for the SB5 WAPS sample, whose major Tank 51 Qualification sample component underwent Al dissolution, are similar to those measured for the SB4 WAPS sample. (2) The elemental composition of this sample and the analyses conducted here are reasonable and consistent with DWPF batch data measurements in light of DWPF pre-sample concentration and SRAT product heel contributions to the DWPF SRAT receipt analyses. (3) Fifty percent of the sulfur in the SB5 WAPS sample is insoluble, and this represents a significantly larger fraction than that observed in previous sludge batches. (4) The noble metal and Ag concentrations predicted from the measured values for the Tank 51 Confirmation sample and Tank 40 SB4 WAPS sample using a two-thirds Tank 51, one-third Tank 40 heel blend ratio used to arrive at the final SB5 composition, agree with the values for the Tank 40 SB5 WAPS sample measured for this report.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

TANK 7 CHARACTERIZATION AND WASHING STUDIES

A 3-L PUREX sludge sample from Tank 7 was characterized and then processed through a series of inhibited water washes to remove oxalate, sodium, and other soluble ions. Current plans use Tank 7 as one of the feed sources for Sludge Batch 7 (SB7). Tank 7 is high in oxalate due to the oxalic acid cleaning of the sludge heels from Tanks 5 and 6 and subsequent transfer to Tank 7. Ten decant and nine wash cycles were performed over a 47 day period at ambient temperature. Initially, seven decants and seven washes were completed based on preliminary estimates of the number of wash cycles required to remove the oxalate in the sludge. After reviewing the composition data, SRNL recommended the completion of 2 or 3 more decant/wash cycles to ensure all of the sodium oxalate had redissolved. In the first 7 washes, the slurry oxalate concentration was 12,300 mg/kg (69.6% oxalate removal compared to 96.1% removal of the other soluble ions). After all ten decants were complete, the slurry oxalate concentration was 3,080 mg/kg (89.2% oxalate removal compared to 99.0% of the other soluble ions). The rate of dissolution of oxalate increased significantly with subsequent washes until all of the sodium oxalate had been redissolved after seven decant/wash cycles. The measured oxalate concentrations agreed very well with LWO predictions for washing of the Tank 7 sample. Highlights of the analysis and washing of the Tank 7 sample include: (1) Sodium oxalate was detected in the as-received filtered solids. 95% of the oxalate was insoluble (undissolved) in the as-received slurry. (2) No sodium oxalate was detected in the post-wash filtered solids. (3) Sodium oxalate is the last soluble species that redissolves during washing with inhibited water. In order to significantly reduce the sodium oxalate concentration, the sludge must be highly washed, leaving the other soluble anions and cations (including sodium) very low in concentration. (4) The post-wash slurry had 1% of the soluble anions and cations remaining, with the exception of sodium and oxalate, for which the percentages were 2.8% and 10.8% respectively. The post-wash sodium concentration was 9.25 wt% slurry total solids basis and 0.15 M supernate. (5) The settling rate of slurry was very fast allowing the completion of one decant/wash cycle each day. (6) The measured yield stress of as-received (6.42 wt% undissolved solids) and post-wash (7.77 wt% undissolved solids) slurry was <1 Pa. For rapidly settling slurries, it can be hard to measure the yield stress of the slurry so this result may be closer to the supernate result than the slurry. The recommended strategy for developing the oxalate target for sludge preparation for Sludge Batch 7 includes the following steps: (1) CPC simulant testing to determine the percent oxalate destruction and acid mix needed to produce a predicted redox of approximately 0.2 Fe{sup +2}/{Sigma}Fe in a SME product while meeting all DWPF processing constraints. (2) Perform a DWPF melter flammability assessment to ensure that the additional carbon in the oxalate together with other carbon sources will not lead to a flammability issue. (3) Perform a DWPF glass paper assessment to ensure the glass produced will meet all DWPF glass limits due to the sodium concentration in the sludge batch. The testing would need to be repeated if a significant CPC processing change, such as an alternative reductant to formic acid, is implemented.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

MODELING RESULTS FROM CESIUM ION EXCHANGE PROCESSING WITH SPHERICAL RESINS

Ion exchange modeling was conducted at the Savannah River National Laboratory to compare the performance of two organic resins in support of Small Column Ion Exchange (SCIX). In-tank ion exchange (IX) columns are being considered for cesium removal at Hanford and the Savannah River Site (SRS). The spherical forms of resorcinol formaldehyde ion exchange resin (sRF) as well as a hypothetical spherical SuperLig{reg_sign} 644 (SL644) are evaluated for decontamination of dissolved saltcake wastes (supernates). Both SuperLig{reg_sign} and resorcinol formaldehyde resin beds can exhibit hydraulic problems in their granular (nonspherical) forms. SRS waste is generally lower in potassium and organic components than Hanford waste. Using VERSE-LC Version 7.8 along with the cesium Freundlich/Langmuir isotherms to simulate the waste decontamination in ion exchange columns, spherical SL644 was found to reduce column cycling by 50% for high-potassium supernates, but sRF performed equally well for the lowest-potassium feeds. Reduced cycling results in reduction of nitric acid (resin elution) and sodium addition (resin regeneration), therefore, significantly reducing life-cycle operational costs. These findings motivate the development of a spherical form of SL644. This work demonstrates the versatility of the ion exchange modeling to study the effects of resin characteristics on processing cycles, rates, and cold chemical consumption. The value of a resin with increased selectivity for cesium over potassium can be assessed for further development.

36 MATERIALS SCIENCE↗

MIXING MODELING ANALYSIS FOR SRS SALT WASTE DISPOSITION

Nuclear waste at Savannah River Site (SRS) waste tanks consists of three different types of waste forms. They are the lighter salt solutions referred to as supernate, the precipitated salts as salt cake, and heavier fine solids as sludge. The sludge is settled on the tank floor. About half of the residual waste radioactivity is contained in the sludge, which is only about 8 percentage of the total waste volume. Mixing study to be evaluated here for the Salt Disposition Integration (SDI) project focuses on supernate preparations in waste tanks prior to transfer to the Salt Waste Processing Facility (SWPF) feed tank. The methods to mix and blend the contents of the SRS blend tanks were evalutaed to ensure that the contents are properly blended before they are transferred from the blend tank such as Tank 50H to the SWPF feed tank. The work consists of two principal objectives to investigate two different pumps. One objective is to identify a suitable pumping arrangement that will adequately blend/mix two miscible liquids to obtain a uniform composition in the tank with a minimum level of sludge solid particulate in suspension. The other is to estimate the elevation in the tank at which the transfer pump inlet should be located where the solid concentration of the entrained fluid remains below the acceptance criterion (0.09 wt% or 1200 mg/liter) during transfer operation to the SWPF. Tank 50H is a Waste Tank that will be used to prepare batches of salt feed for SWPF. The salt feed must be a homogeneous solution satisfying the acceptance criterion of the solids entrainment during transfer operation. The work described here consists of two modeling areas. They are the mixing modeling analysis during miscible liquid blending operation, and the flow pattern analysis during transfer operation of the blended liquid. The modeling results will provide quantitative design and operation information during the mixing/blending process and the transfer operation of the blended liquid in the Salt Disposition Integration (SDI) facility. The results will also help validate the anticipated performance of the pump vendor's design.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Direct Feed Options for Hanford High Level Waste Vitrification - 17318

In the high level waste (HLW) direct feed (DF) option that is under consideration for early operations of the Hanford Tank Waste Treatment and Immobilization Plant (WTP), the pretreatment facility would be bypassed in order to support an earlier start-up of the HLW vitrification facility. For HLW, this would mean that the ultrafiltration and caustic leaching operations that would otherwise have been performed in the pretreatment facility would either not be performed or would be replaced by an interim pretreatment function (in-tank washing and settling, for example). These changes could result in higher aluminum contents, higher chromium contents, a higher fraction of supernate in the HLW feed, and lower solids contents. This would likely affect glass formulations and waste loadings and have impacts on the downstream vitrification operations. In the present work, new high waste loading glass formulations have been developed and characterized for the DF HLW option. A series of scaled melter tests was then conducted to assess the impacts of increased supernate content resulting from less effective washing on wastes from candidate source tanks for the direct feed option. The melter tests were conducted at solids contents extending below the current WTP baseline, which are likely for the direct feed option. The effects on glass production rate, melter operations, and off-gas carryover were determined, as was the ability of increased bubbling to compensate for the increased evaporative load. A series of waste compositions were investigated that span the range of in-tank washing efficiencies between the baseline WTP full-wash case and the no-wash case. The tests included wastes from tank AY-102 as well as high plutonium wastes from tank A-104. The results from this work provide the initial basis for assessments of the relative merits of progressively more intensive pretreatment in HLW direct feed options versus the practical benefits of minimal pretreatment. Together, these results illustrate that the optimum washing strategy will depend on the specific tank waste composition and will need to be evaluated on a tank-by-tank basis. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Discovering Challenges and Opportunities During Sludge Removal in Savannah River Site's Tank 15 - 18415

Tank 15 is one of 43 active underground waste storage tanks in the Liquid Waste System at SRS. After receiving and storing waste containing insoluble solids (sludge), receipts stopped, and the free supernate evaporated beginning in the 1980's. Tank 15 remained a dry sludge tank for almost 30 years. In 2015, the Tank 15 sludge was rehydrated as the first step of waste removal. Submersible Mixer Pumps (SMPs) were then installed in four risers, as well as other equipment upgrades, to facilitate sludge solids removal. SMPs were successfully used in prior waste removal campaigns, but this was the first deployment of four in a tank. Automated controls were also added to better monitor and protect the SMPs during operation in the more challenging H-area sludge. Waste removal plans consisted of multiple campaigns where sludge was suspended, transferred to Tank 13 and supernate decanted back to Tank 15 for reuse after allowing solids to settle. During the first campaign, sludge solids did not settle at an adequate rate to support the operating plan, and flammability evaluations were impacted. The SMPs also experienced operational challenges. New control logic for the SMPs was useful for early identification of issues; however, some equipment failures still occurred. These challenges were overcome using a combination of additional analyses, operating plan and procedure changes, and tank mapping techniques resulting in the successful removal of the bulk of the sludge from Tank 15. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Utilizing Commercial Submersible Mixer Pumps for Sludge Removal in Savannah River Site's Tank 26 - 20289

The Savannah River Site (SRS) Liquid Waste System (LWS) safely manages, stores, treats, and dispositions liquid radioactive waste. The LWS consists of 51 underground waste storage tanks (eight of which are operationally closed and filled with grout), waste evaporators, treatment facilities, and solidification facilities, known as the Defense Waste Processing Facility (DWPF) and Saltstone Production Facility (SPF). One of the waste storage tanks, Tank 26, was placed into service in 1980 as an F Tank Farm (FTF) Evaporator Feed Tank. From 1980 to 2013, Tank 26 received F Canyon receipts and dilute supernate that was then transferred to the 242-16F FTF Evaporator for volume reduction. In 2013, the steam tube bundle failed in the FTF Evaporator, and the decision was made not to repair/resume evaporator operation. During operation of Tank 26, solids built up to a level of 2.03 m in the tank with a volume of 1062.9 kL. Due to the evaporator failure and subsequent shutdown, the solids in Tank 26 were selected to feed Sludge Batch 10, which is collected and prepped prior to being sent to DWPF for final disposition. To accomplish solids removal, Commercial Submersible Mixer Pumps (CSMPs) were selected to slurry the solids in preparation to be sent to Tank 51. Four CSMPs were installed in Tank 26 with each one installed in a separate quadrant of Tank 26. This work would mark the first deployment of CSMPs in an SRS waste tank. The CSMPs were developed in response to operational issues from previous mixing pumps and budgetary constraints. The CSMPs use the concept of modifying commercially available equipment for nuclear waste applications. The CSMPs consist of a 230-horsepower submersible mixing pump (manufactured by GPM, Inc.) joined to a mast fabricated at SRS. For this application, Savannah River Remediation (SRR) design services was challenged to provide a mast design that required no steel superstructure support system on top of Tank 26. Also, SRR design services provided a simplified Tank 26 riser interface that did not require extensive machine parts to adjust height of the suction screen of the CSMP within the tank. Other design improvements include no requirements for tank top radiation monitors and no requirements for flushing of the CSMPs during startup/shutdown operations. The CSMPs were operated at an initial height of 2.29 m above the Tank 26 bottom for 10 days. After sludge sounding, the CSMPs were lowered to a height of 1.52 m with no issues due to proper work planning and the simplified riser interface. With the CSMPs lowered to a level of 1.52 meters above the tank bottom, the CSMPs were operated for 12 days and another sounding was performed. The sounding level came back matching the disturbance depth results of the first pump run. Chemistry samples were analyzed while the tank was left to settle. The analysis revealed enough weight percent solids to provide good feed to Sludge Batch 10. Also, the results revealed the supernate within the mixture would provide good salt solution feed to Salt Waste Processing Facility (SWPF) Salt Batch 3. So, the plan was modified to let the disturbed solids settle and decant the salt solution for addition to SWPF Salt Batch 3. Then water will be added back to Tank 26, and the CSMPs run in order to wash the solids to decrease settling time prior to being sent to Tank 51 for Sludge Batch 10. Utilizing CSMPs for waste removal in an SRS Tank has provided a cost-effective means for further waste removal efforts. In addition, the CSMPs are easier to operate by utilizing a robust and simplified design. The CSMPs performed quite well with no process shutdown or delays during operation. As a result, CSMPs are integral to the future of removing radioactive waste from storage tanks at SRS. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Tank Side Cesium Removal for Hanford Tank Waste - Actual Waste Demonstrations - 20467

The US DOE and its contractors are evaluating several options for treating Hanford tank supernate streams to provide feed for the Low-Activity Waste Facility at the Hanford Waste Treatment and Immobilization Plant. At this time, the intent is to deploy a Tank-Side Cesium Removal system. The key unit operations for this process are filtration and cesium removal by ion exchange. To assess the anticipated performance of the system, tests with actual waste were performed with samples from Hanford tanks AW-102 and AP-107 to provide basis data regarding the performance of the system in treating these materials. The decanted supernate waste samples from tanks AW-102 and AP-107 were received directly by the Radiochemical Processing Laboratory at Pacific Northwest National Laboratory. These samples were then filtered to provide data on dead-end filtration with a Mott{sup TM} filter media grade 5. Subsequently, the samples were run through 10-milliliter ion exchange columns containing crystalline silicotitanate to assess the dynamic ion exchange performance of these feeds. Test results demonstrated that the planned TSCR operations should meet process performance expectations. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗