Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Site”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

2015 Advanced Site Investigation and Monitoring Report Riverton, Wyoming, Processing Site September 2016

The U.S. Department of Energy conducted initial groundwater characterization of the Riverton, Wyoming, Processing Site in the 1990s. The characterization culminated in a Site Observational Work Plan in 1998 that recommended a natural flushing compliance strategy. Results of verification monitoring indicated that natural flushing was generally progressing as expected until June 2010, when significant increases in contaminant concentrations were measured in several monitoring wells downgradient of the site after the area flooded. In response to the unexpected results following the flood, an enhanced characterization of the surficial aquifer was conducted in 2012, which included installation of 103 boreholes along nine transects with a Geoprobe, collection of 103 water samples and 65 soil samples, laboratory tests on the soil samples, and additional groundwater modeling. This advanced site investigation report summarizes additional investigation in 2015 through the use of backhoe trenching, sonic drilling, multilevel monitoring wells, direct-push drilling, and temporary well points to collect soil and groundwater samples. Additional surface water measurements were made included the installation of a stilling well and the measurement of stream elevation along the Wind River to approximate upgradient groundwater heads. Groundwater sampling included the addition of geochemical constituents and isotopes that have not been sampled in the past to better understand post-flood conditions and the possibility of additional or ongoing contaminant sources. This sampling was performed to (1) better define the contaminant plumes, (2) verify the occurrence of persistent secondary contaminant sources, (3) better understand the reason for the contaminant spikes after a 2010 flood, and (4) assess contaminant plume stagnation near the Little Wind River. This report provides data analyses and interpretations for the 2015 site investigation that addresses these issues and provides recommendations for future efforts. Observations from trenches and sonic drilling indicate the general lithology of the shallow, unconsolidated sediments consists of a silt zone at the surface that ranges from 2.5 to 4.8 feet below ground surface, underlain by sand and gravel, underlain by the top of the weathered bedrock (Wind River Formation). Soil data from trenches and sonic drilling indicate (1) elevated concentrations of several constituents in the silt zone, likely due to the formation of evaporites, (2) uranium is the only measured element that appears to be concentrated in the silt over the groundwater contaminant plume, (3) in the former tailings impoundment area, there may be a thin unsaturated zone with elevated uranium in the native material just below the fill, (4) in the former tailings impoundment area, slightly higher uranium concentrations occur in the underlying saturated sand and gravel, and (5) several bedrock samples have a unique geochemical signature, generally related to a higher silt content. Assessment of groundwater flow included measuring river elevations along the Wind River and installing the temporary well points adjacent to the Little Wind River that provided additional data points to refine contours for water table elevations. These data confirm past interpretations of groundwater flow to the southeast across the site toward the Little Wind River. Hydraulic head elevations between paired surficial and semiconfined aquifer wells indicate variable vertical gradients across the site with the potential for upward and downward flow. Additional direct-push drilling and groundwater sampling confirmed the contaminant plume configuration, but it also revealed a low-sulfate-concentration zone at the edge of the former tailings impoundment. Temporary well points provided better definition of plume concentrations at the bank of the Little Wind River, and data from these wells indicate plume discharge to the river. Additional sampling in an area southwest of the plume that had elevated uranium groundwater concentrations in the past did not have any uranium concentrations above the U.S. Environmental Protection Agency maximum concentration limit for uranium. Results from multilevel monitoring wells indicate some geochemical differences with depth, but overall concentrations are similar to those in nearby conventional monitoring wells in the long-term monitoring program. Geochemistry data from these multilevel monitoring wells confirm the general increase in contaminant concentrations toward the river and toward the plume centerline for chloride, sulfate, and uranium but highlight geochemical controls on calcium. Iron data indicate slightly reducing conditions, especially near water table and bedrock surfaces, with more oxidizing conditions in the middle of the sand and gravel. Uranium activity ratios (234U/238U) confirm the uranium plume in the surficial aquifer as being mill related, and the area to the southwest outside the plume as natural, non-mill related. In the semiconfined aquifer, evidence of aquifer connection and impacts from the mill is inconclusive. Values of δD and δ 18 O suggest water is derived from different sources and tritium data confirm that the semiconfined aquifer water is generally older than the surficial aquifer water. However, these data do indicate some groundwater communication from the surficial aquifer into the semiconfined aquifer, which resulted in δD and δ 18 O and tritium values in the semiconfined aquifer that are more similar to those in the surficial aquifer. Values of δ 34 S sulfate in the semiconfined aquifer combined with sulfate concentrations indicate the potential for some mill- related sulfate in the semiconfined aquifer, albeit limited to an area near and beneath the former tailings impoundment. Uranium and molybdenum concentrations in the semiconfined aquifer are below groundwater standards in all wells. However, the elevated molybdenum concentrations at one semiconfined aquifer well underneath the former tailings impoundment suggests a mill- derived source for the uranium and molybdenum in that well. It is possible that aquifer cross- communication occurred when the tailings impoundment was active and created a higher head. Current cross-communication appears unlikely given the large differences in tritium values and an upward hydraulic head at this location. Nine domestic wells are located within the institutional control boundary (eight in the confined aquifer and one in the semiconfined aquifer). Uranium and molybdenum concentrations in all samples collected from these wells were one or two orders of magnitude below the groundwater standards. Surface water flow in the Little Wind River in September 2015 was low compared to historical averages for that time of year. As a result, the uranium concentration measured in the Little Wind River was at a historical maximum at the sampling location upstream of the site. However, the impact of uranium discharge from the groundwater plume into the Little Wind River was not measureable. Elevated sulfate concentrations were observed in an outfall ditch related to an active sulfuric acid plant. Uranium concentrations in the oxbow lake remain at concentrations above the groundwater standard. Plume contaminant concentrations had returned to levels found prior to the 2010 flood by the end of 2015. However, these concentrations still exceed model predictions for natural flushing, and the current data indicate that natural flushing to achieve remediation goals within the 100-year time period is not likely, especially with the high potential for additional floods in the update to the conceptual site model (CSM), soil data indicate additional contaminant sources, specifically uranium, in evaporites within the silt layer over the uranium plume and in naturally reduced zones (NRZs). Additional zones of slightly elevated uranium concentration are in the native sediments just above the water table but below the fill layer in the former tailings impoundment area. This area also has slightly elevated uranium in the sand and gravel below the water table. Mass balance calculations indicate that small amounts of dissolution in any of these zones with increased uranium in the solid phase can produce groundwater uranium concentrations above the groundwater standard and could account for the post-flood uranium spike. The additional uranium near the former tailings impoundment provides a mechanism for a continuing source for the uranium plume that was not considered in earlier natural flushing models. In addition, uranium released from the silt layer or the NRZs seasonally and during flooding may add uranium to the groundwater plume near the Little Wind River. These mechanisms provide a possible explanation for plume persistence, along with spikes in concentrations during floods, that creates the current plume configuration. Additional updates to the CSM include (1) chloride flushes more rapidly than uranium beneath the former mill site, (2) chloride in the silt layer provides a scenario in which chloride cannot be used as a conservative tracer (especially in areas prone to flooding), (3) uranium concentrations with depth can be variable (especially below NRZs), and (4) calcite and gypsum solubility limits appear to provide important geochemical controls on groundwater geochemistry. The conclusion of this study provides several recommendations for additional work to refine the CSM and continue assessment of the natural flushing compliance strategy. Recommendations for additional work include targeted soil and groundwater sampling to assess geochemical conditions, distribution of contaminants, and groundwater/surface water interaction; additional column tests to provide data for geochemical modeling; and development of an updated groundwater flow model, which will be used in conjunction with a geochemical model to assess the viability of the natural flushing compliance strategy.

2015 Monitoring Riverton, WY↗

Nuclear Operations Application to Environmental Restoration at Corrective Action Unit 547, Miscellaneous Contaminated Waste Sites, at the Nevada National Security Site

The U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office has responsibility for environmental restoration at the Nevada National Security Site (formerly the Nevada Test Site). This includes remediation at locations where past testing activities have resulted in the release of plutonium to the environment. One of the current remediation efforts involves a site where an underground subcritical nuclear safety test was conducted in 1964. The underground test was vented through a steel pipe to the surface in a closed system where gas samples were obtained. The piping downstream of the gas-sampling apparatus was routed belowground to a location where it was allowed to vent into an existing radioactively contaminated borehole. The length of the pipe above the ground surface is approximately 200 meters. This pipe remained in place until remediation efforts began in 2007, at which time internal plutonium contamination was discovered. Following this discovery, an assessment was conducted to determine the quantity of plutonium present in the pipe. This site has been identified as Corrective Action Unit (CAU) 547, Miscellaneous Contaminated Waste Sites. The quantity of plutonium identified at CAU 547 exceeded the Hazard Category 3 threshold but was below the Hazard Category 2 threshold specified in DOE Standard DOE-STD-1027-92. This CAU, therefore, was initially categorized as a Hazard Category 3 environmental restoration site. A contaminated facility or site that is initially categorized as Hazard Category 3, however, may be downgraded to below Hazard Category 3 if it can be demonstrated through further analysis that the form of the material and the energy available for release support reducing the hazard category. This is an important consideration when performing hazard categorization of environmental restoration sites because energy sources available for release of material are generally fewer at an environmental restoration site than at an operating facility and environmental restoration activities may result in the complete removal of source material.

54 ENVIRONMENTAL SCIENCES↗

Corrective Action Investigation Plan for Corrective Action Unit 567: Miscellaneous Soil Sites, Nevada National Security Site, Nevada, with ROTC 1 Revision 0

Corrective Action Unit (CAU) 567 is located in Areas 1, 3, 5, 20, and 25 of the Nevada National Security Site, which is approximately 65 miles northwest of Las Vegas, Nevada. CAU 567 is a grouping of sites where there has been a suspected release of contamination associated with nuclear testing. This document describes the planned investigation of CAU 567, which comprises the following corrective action sites (CASs): • 01-23-03, Atmospheric Test Site T-1 • 03-23-25, Seaweed E Contamination Area • 05-23-07, A5b RMA • 20-23-08, Colby Mud Spill • 25-23-23, J-11 Soil RMA These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives (CAAs). Additional information will be obtained by conducting a corrective action investigation before evaluating CAAs and selecting the appropriate corrective action for each CAS. The results of the field investigation will support a defensible evaluation of viable CAAs that will be presented in the investigation report. The sites will be investigated based on the data quality objectives (DQOs) developed on May 6, 2013, by representatives of the Nevada Division of Environmental Protection and the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Field Office. The DQO process was used to identify and define the type, amount, and quality of data needed to develop and evaluate appropriate corrective actions for CAU 567. The site investigation process will also be conducted in accordance with the Soils Activity Quality Assurance Plan, which establishes requirements, technical planning, and general quality practices to be applied to this activity. The potential contamination sources associated with CAU 567 releases are nuclear test operations and other NNSS operations. The DQO process resulted in an assumption that total effective dose (TED) within a default contamination boundary at Atmospheric Test Site T-1 exceeds the final action level (FAL) and requires corrective action. The presence and nature of contamination outside the default contamination boundary at Atmospheric Test Site T-1 and all other CAU 567 CASs will be evaluated based on information collected from a field investigation. Radiological contamination will be evaluated based on a comparison of the TED at sample locations to the dose-based FAL. The TED will be calculated as the total of separate estimates of internal and external dose. Results from the analysis of soil samples will be used to calculate internal radiological dose. Thermoluminescent dosimeters placed at the center of each sample location will be used to measure external radiological dose. Appendix A provides a detailed discussion of the DQO methodology and the DQOs specific to each CAS.

54 ENVIRONMENTAL SCIENCES↗

Corrective Action Decision Document/Closure Report for Corrective Action Unit 105: Area 2 Yucca Flat Atmospheric Test Sites, Nevada National Security Site, Nevada

This Corrective Action Decision Document/Closure Report presents information supporting the closure of Corrective Action Unit (CAU) 105: Area 2 Yucca Flat Atmospheric Test Sites, Nevada National Security Site, Nevada. CAU 105 comprises the following five corrective action sites (CASs): -02-23-04 Atmospheric Test Site - Whitney Closure In Place -02-23-05 Atmospheric Test Site T-2A Closure In Place -02-23-06 Atmospheric Test Site T-2B Clean Closure -02-23-08 Atmospheric Test Site T-2 Closure In Place -02-23-09 Atmospheric Test Site - Turk Closure In Place. The purpose of this Corrective Action Decision Document/Closure Report is to provide justification and documentation supporting the recommendation that no further corrective action is needed for CAU 105 based on the implementation of the corrective actions. Corrective action investigation (CAI) activities were performed from October 22, 2012, through May 23, 2013, as set forth in the Corrective Action Investigation Plan for Corrective Action Unit 105: Area 2 Yucca Flat Atmospheric Test Sites; and in accordance with the Soils Activity Quality Assurance Plan, which establishes requirements, technical planning, and general quality practices.

54 ENVIRONMENTAL SCIENCES↗

Addendum to the Streamlined Approach for Environmental Restoration Closure Report for Corrective Action Unit 452: Historical Underground Storage Tank Release Sites, Nevada Test Site, Nevada, Revision 0

This document constitutes an addendum to the Streamlined Approach for Environmental Restoration Closure Report for Corrective Action Unit 452: Historical Underground Storage Tank Release Sites, Nevada Test Site, Nevada, April 1998 as described in the document Supplemental Investigation Report for FFACO Use Restrictions, Nevada Test Site, Nevada (SIR) dated November 2008. The SIR document was approved by NDEP on December 5, 2008. The approval of the SIR document constituted approval of each of the recommended UR removals. In conformance with the SIR document, this addendum consists of: • This page that refers the reader to the SIR document for additional information • The cover, title, and signature pages of the SIR document • The NDEP approval letter • The corresponding section of the SIR document This addendum provides the documentation justifying the cancellation of the URs for CASs: • 25-25-09, Spill H940825C (from UST 25-3101-1) • 25-25-14, Spill H940314E (from UST 25-3102-3) • 25-25-15, Spill H941020E (from UST 25-3152-1) These URs were established as part of Federal Facility Agreement and Consent Order (FFACO) corrective actions and were based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996). Since these URs were established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, these URs were re-evaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006). This re-evaluation consisted of comparing the original data (used to define the need for the URs) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove these URs because contamination is not present at these sites above the risk-based FALs. Requirements for inspecting and maintaining these URs will be canceled, and the postings and signage at each site will be removed. Fencing and posting may be present at these sites that are unrelated to the FFACO URs such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at these sites.

54 ENVIRONMENTAL SCIENCES↗

Addendum 2 to the Streamlined Approach for Environmental Restoration Closure Report for Corrective Action Unit 454: Historical Underground Storage Tank Release Sites, Nevada Test Site, Nevada, Revision 0

This document constitutes an addendum to the Streamlined Approach for Environmental Restoration Closure Report for Corrective Action Unit 454: Historical Underground Storage Tank Release Sites, Nevada Test Site, Nevada, April 1998 as described in the document Supplemental Investigation Report for FFACO Use Restrictions, Nevada Test Site, Nevada (SIR) dated November 2008. The SIR document was approved by NDEP on December 5, 2008. The approval of the SIR document constituted approval of each of the recommended UR removals. In conformance with the SIR document, this addendum consists of: • This page that refers the reader to the SIR document for additional information • The cover, title, and signature pages of the SIR document • The NDEP approval letter • The corresponding section of the SIR document This addendum provides the documentation justifying the cancellation of the URs for CASs: • 12-25-08, Spill H950524F (from UST 12-B-1) • 12-25-10, Spill H950919A (from UST 12-COMM-1) These URs were established as part of Federal Facility Agreement and Consent Order (FFACO) corrective actions and were based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996). Since these URs were established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, these URs were re-evaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006). This re-evaluation consisted of comparing the original data (used to define the need for the URs) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove these URs because contamination is not present at these sites above the risk-based FALs. Requirements for inspecting and maintaining these URs will be canceled, and the postings and signage at each site will be removed. Fencing and posting may be present at these sites that are unrelated to the FFACO URs such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at these sites.

54 ENVIRONMENTAL SCIENCES↗

Addendum to the Closure Report for Corrective Action Unit 326: Areas 6 and 27 Release Sites, Nevada Test Site, Nevada, Revision 1

This document constitutes an addendum to the Closure Report for Corrective Action Unit 326: Areas 6 and 27 Release Sites, Nevada Test Site, Nevada (Revision 1), December 2002 as described in the document Supplemental Investigation Report for FFACO Use Restrictions, Nevada Test Site, Nevada (SIR) dated November 2008. The SIR document was approved by NDEP on December 5, 2008. The approval of the SIR document constituted approval of each of the recommended UR removals. In conformance with the SIR document, this addendum consists of: • This page that refers the reader to the SIR document for additional information • The cover, title, and signature pages of the SIR document • The NDEP approval letter • The corresponding section of the SIR document This addendum provides the documentation justifying the cancellation of the UR for CAS 06-25-01, CP-1 Heating Oil Release. This UR was established as part of a Federal Facility Agreement and Consent Order (FFACO) corrective action and is based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996). Since this UR was established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, this UR was reevaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006). This re-evaluation consisted of comparing the original data (used to define the need for the UR) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove the UR because contamination is not present at the site above the risk-based FALs. Requirements for inspecting and maintaining this UR will be canceled, and the postings and signage at this site will be removed. Fencing and posting may be present at this site that are unrelated to the FFACO UR such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at this site.

54 ENVIRONMENTAL SCIENCES↗

Corrective Action Investigation Plan for Corrective Action Unit 106: Areas 5, 11 Frenchman Flat Atmospheric Sites, Nevada Test Site, Nevada, Revision 0

Corrective Action Unit (CAU) 106 is located in Area 5 of the Nevada Test Site, which is approximately 65 miles northwest of Las Vegas, Nevada. Corrective Action Unit 106 comprises the five corrective action sites (CASs) listed below: •05-23-02, GMX Alpha Contaminated Area •05-23-05, Atmospheric Test Site - Able •05-45-01, Atmospheric Test Site - Hamilton •05-45-04, 306 GZ Rad Contaminated Area •05-45-05, 307 GZ Rad Contaminated Area These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives (CAAs). Additional information will be obtained by conducting a corrective action investigation before evaluating CAAs and selecting the appropriate corrective action for each CAS. The results of the field investigation will support a defensible evaluation of viable CAAs that will be presented in the Corrective Action Decision Document. The sites will be investigated based on the data quality objectives (DQOs) developed on January 19, 2010, by representatives of the Nevada Division of Environmental Protection and the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office. The DQO process was used to identify and define the type, amount, and quality of data needed to develop and evaluate appropriate corrective actions for CAU 106. The presence and nature of contamination at CAU 106 will be evaluated based on information collected from a field investigation. The CAU includes land areas impacted by the release of radionuclides from a weapons-effect tower test (CAS 05-45-01), a weapons-related airdrop test (CAS 05-23-05), “equation of state” experiments (CAS 05-23-02), and unknown support activities at two sites (CAS 05-45-04 and CAS 05-45-05). Surface-deposited radiological contamination will be evaluated based on a comparison of the total effective dose (TED) at sample plot locations to the dose-based final action level. The TED will be calculated as the total of separate estimates of internal and external doses. Results from the analysis of soil samples collected from sample plots will be used to calculate internal radiological dose. Thermoluminescent dosimeters placed at the center of each sample plot will be used to measure external radiological dose. The presence and nature of contamination from other types of releases (such as migration and excavation as well as any potential releases discovered during the investigation) will be evaluated using soil samples collected from the locations most likely containing contamination, if present. Appendix A provides a detailed discussion of the DQO methodology and the DQOs specific to each CAS. The scope of the corrective action investigation for CAU 106 includes the following activities: •Conduct radiological surveys. •Collect and submit environmental samples for laboratory analysis to determine internal dose rates and the presence of contaminants of concern. •If contaminants of concern are present, collect additional samples to define the extent of the contamination and determine the area where TED at the site exceeds final action levels (i.e., corrective action boundary). •Collect samples of investigation-derived waste, as needed, for waste management purposes.

54 ENVIRONMENTAL SCIENCES↗

Expanding the Cage of 2D Bromide Perovskites by Large A-Site Cations

Two-dimensional (2D) halide perovskites have outstanding optoelectronic properties, and they feature a variety of organic cation spacers and cage A-site cations that can be incorporated into their structures. It has recently been reported that the Goldschmidt tolerance factor can be relaxed and expanded in iodide 2D perovskites. Bromide 2D perovskites, whose multilayer structures and optical properties are much less studied, provide a great platform for studying structure-property relationships for 2D perovskites with large Asite cations. Herein, we report the synthesis and structure of three new 2D bromide perovskites-(BA)(2)(MHy)(2)Pb3Br10 (BA, butylammonium; MHy, methylhydrazinium), (BA)(2)(EA)(2)Pb3Br10 (EA is ethylammonium), and (BA)(2)(DMA)Pb2Br7 (DMA is dimethylammonium). We compared them with other 2D perovskites with different A-site cations but with the same spacer and layer thickness. Single-crystal structures show that the Pb-Br bonds are elongated to accommodate the large A-site cations. Additionally, the octahedra in (BA)(2)(MHy)(2)Pb3Br10 and (BA)(2)(EA)(2)Pb3Br10 are highly distorted, and their different stacking patterns of the inner and outer layers lead to the formation of the n = 3 phases. Density functional theory calculations show that 2D perovskites with larger A-site cations (e.g., DMA, MHy, and EA) have smaller band dispersions and larger effective masses than those with Cs+ and MA. (BA)(2)(MHy)(2)Pb3Br10 also exhibits one of the largest Rashba splittings in the literature. Structures with large cage cations also exhibit high band gaps within the same n number and short photoluminescence (PL) lifetimes. Temperature- and power-dependent PL measurements reveal that the broad shoulder in the PL peak originates from the trap states.

Emission↗

Bioinjection Performance Review for the Building 100 Area and 4.5 Acre Site at the Pinellas County, Florida, Site

This document provides a summary of a review of the performance of bioinjection activities at the Building 100 Area and the 4.5 Acre Site at the Pinellas County, Florida, Site since 2010, determines how best to optimize future injection events, and identifies the approach for the bioinjection event in 2016 at (1) the 4.5 Acre Site and (2) the Essentra property at the Building 100 Area. Because this document describes the next bioinjection event at the 4.5 Acre Site, it also serves as an addendum to the Interim Remedial Action Plan for Emulsified Edible Oil Injection at the 4.5 Acre Site (DOE 2013). In addition, this document revises the injection layout and injection intervals for the Essentra property that were originally described in the Interim Corrective Measure Work Plan for Source and Plume Treatment at the Building 100 Area (DOE 2014), and is a de facto update of that document. Bioinjection consists of injection of emulsified vegetable oil (EVO) and the microorganism Dehalococcoides mccartyi (DHM; formerly known as Dehalococcoides ethenogenes) into the subsurface to enhance biodegradation of trichloroethene (TCE), dichloroethene (DCE), and vinyl chloride (VC). VC is the only contaminant that exceeds its maximum contaminant level (10 micrograms per liter onsite and 1 microgram per liter onsite) on the 4.5 Acre Site and the Essentra property. Bioinjection was conducted at the 4.5 Acre Site in 2010 and 2013. Approximately 49,900 gallons of EVO and DHM were injected at 95 injection points in February 2010, and approximately 22,900 gallons of EVO and DHM were injected at 46 injection points in July 2013. The injection locations are shown on Figure 1. The goal of bioinjection at the 4.5 Acre Site is to decrease contaminant concentrations to maximum contaminant levels along the west and southwest property boundaries (to meet risk–based corrective action requirements) and to minimize the extent of the contaminant plume in the interior of the site. Bioinjection was conducted at the Building 100 Area in 3 phases from October 2014 through November 2015 (Figures 2–4). Approximately 32,850 gallons of EVO and DHM were injected using 62 temporary injection points in the onsite plumes in October and November 2014, 16,500 gallons were injected using 33 temporary injection points in the offsite plumes in February 2015, and 51,000 gallons were injected beneath the building using 8 horizontal wells in November 2015. The goal of bioinjection at the Building 100 Area is to enhance contaminant biodegradation to stabilize or shrink the contaminant plumes.

54 ENVIRONMENTAL SCIENCES↗

Hanford Site Composite Analysis Special Analysis: Inventory and Solid Waste Release Modeling for the LLBG Sensitivity Case - UCAQ-22-01 Inventory Discrepancies for 218-E-12B, 218-W-3A, and 218-W-3AE in the Hanford Site Composite Analysis

This environmental calculation file (ECF) documents the methodologies, assumptions, and results of four sensitivity analyses that reevaluate the representativeness of solid-waste radionuclide inventory and release rate from three solid waste sites included in the recently completed Hanford Site Composite Analysis (CA) (DOE-RL-2019-52, Composite Analysis for Low-Level Waste Disposal in the Hanford Site Central Plateau (FY 2020), Rev. 1) (hereinafter called the CA Update). Specifically, this ECF reevaluates the representativeness of the base case inventory and radionuclide waste release rates from three solid waste sites (i.e., 218-E-12B, 218-W-3A, and 218-W-3AE) and two radionuclides (i.e., carbon-14 [C-14] and technetium-99 [Tc-99]). These three waste sites and two radionuclides were identified as being the most significant contributors to groundwater contamination and dose in the CA Update for the Inner Area boundary at times periods after the compliance period. This ECF first evaluates the representativeness of the C-14 and Tc-99 inventory and second, radionuclide release rates for the three waste sites1. If the inventory and release rates assumed in the CA Update are determined to be not representative, as hypothesized in the CA Update, then this ECF evaluates the impact of more representative inventories and release rates on the transfer of radionuclides to the vadose zone. The four analyses described in this ECF are as follows: 1) 218-E-12B C-14 Inventory and Release Rate Sensitivity Case – Determine the representativeness of the C-14 inventory and associated waste release rate from the 218-E-12B waste site assumed in the CA Update. If the inventory and associated waste release are more appropriately characterized as being different from the assumptions in the CA Update, then update the predicted C-14 release rate and compare the results to the results presented in the CA Update (DOE/RL-2019-52); 2) 218-W-3A C-14 Inventory and Release Rate Sensitivity Case – Determine the representativeness of the C-14 inventory and associated waste release rate from the 218-W-3A waste site assumed in the CA Update. If the inventory and associated waste release are more appropriately characterized as being different from the assumptions in the CA Update, then update the predicted C-14 release rate and compare the results to the results presented in the CA Update (DOE/RL-2019-52); 3) 218-W-3AE Tc-99 Release Rate Sensitivity Case – Determine the representativeness of the Tc-99 inventory and associated waste release rate from the 218-W-3AE waste site assumed in the CA Update. If the inventory and associated waste release are more appropriately characterized as being different from the assumptions in the CA Update, then update the predicted Tc-99 release rate and compare the results to the results presented in the CA Update (DOE/RL-2019-52); 4) 218-W-3AE Tc-99 Release Footprint Sensitivity Case – Determine the representativeness of the Tc-99 waste area footprint for the 218-W-3AE waste site assumed in the CA Update. If the footprint of the waste is more appropriately characterized as being different from the assumptions in the CA Update, then update the predicted Tc-99 release rate and compare the results to the result presented in the CA Update (DOE/RL-2019-52).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Enhancing Site Screening for Underground Hydrogen Storage: Qualitative Site Quality Assessment - SHASTA: Subsurface Hydrogen Assessment, Storage, and Technology Acceleration Project

The global shift towards renewable energy sources to mitigate fossil fuel dependency and meet carbon emission targets by 2050 has underscored the importance of innovative solutions to address energy supply-demand imbalances. Underground Hydrogen Storage (UHS) has emerged as a promising strategy to store excess renewable energy in subsurface formations for future retrieval and utilization. This report focuses on enhancing the site screening process for UHS facilities. By drawing on insights from prior research to identify key criteria influencing site suitability, our objective is to present a comprehensive set of sixteen specific criteria essential for refining the selection of UHS sites. These criteria cover various aspects such as reservoir performance, legal access, regulatory compliance, economic viability, public acceptance, and safety and security considerations. Our proposed methodology allows users to evaluate potential sites using binary responses, transitioning from isolated factors to broader considerations that facilitate a qualitative assessment of site suitability. This method enables comparative analysis and informed decision-making, supporting stakeholders in the site selection process. Our approach is designed as a guiding framework rather than a rigid template for site screening, emphasizing the importance of customizing approaches to individual circumstances. As UHS site development project evolves, adopting a comprehensive selection methodology that integrates holistic evaluations will be essential for ensuring efficient and effective site screening processes tailored to specific project needs.

08 HYDROGEN↗

Enhancing Site Screening for Underground Hydrogen Storage: Qualitative Site Quality Assessment - SHASTA: Subsurface Hydrogen Assessment, Storage, and Technology Acceleration Project

The global shift towards renewable energy sources to mitigate fossil fuel dependency and meet carbon emission targets by 2050 has underscored the importance of innovative solutions to address energy supply-demand imbalances. Underground Hydrogen Storage (UHS) has emerged as a promising strategy to store excess renewable energy in subsurface formations for future retrieval and utilization. This report focuses on enhancing the site screening process for UHS facilities. By drawing on insights from prior research to identify key criteria influencing site suitability, our objective is to present a comprehensive set of sixteen specific criteria essential for refining the selection of UHS sites. These criteria cover various aspects such as reservoir performance, legal access, regulatory compliance, economic viability, public acceptance, and safety and security considerations. Our proposed methodology allows users to evaluate potential sites using binary responses, transitioning from isolated factors to broader considerations that facilitate a qualitative assessment of site suitability. This method enables comparative analysis and informed decision-making, supporting stakeholders in the site selection process. Our approach is designed as a guiding framework rather than a rigid template for site screening, emphasizing the importance of customizing approaches to individual circumstances. As UHS site development project evolves, adopting a comprehensive selection methodology that integrates holistic evaluations will be essential for ensuring efficient and effective site screening processes tailored to specific project needs.

08 HYDROGEN↗

Site Identity and Importance in Cosubstituted Bixbyite In2O3

The bixbyite structure of In2O3 has two nonequivalent, 6-coordinate cation sites and, when Sn is doped into In2O3, the Sn prefers the “b-site” and produces a highly conductive material. When divalent/tetravalent cation pairs are cosubstituted into In2O3, however, the conductivity increases to a lesser extent and the site occupancy is less understood. We examine the site occupancy in the MgxIn2−2xSnxO3 and ZnxIn2−2xSnxO3 systems with high resolution X-ray and neutron diffraction and density functional theory computations, respectively. In these sample cases and those that are previously reported in the MxIn2−2xSnxO3 (M = Cu, Ni, or Zn) systems, the solubility limit is greater than 25%, ensuring that the b-site cannot be the exclusively preferred site as it is in Sn:In2O3. Prior to this saturation point, we report that the M2+ cation always has at least a partial occupancy on the d-site and the Sn4+ cation has at least a partial occupancy on the b-site. The energies of formation for these configurations are highly favored, and prefer that the divalent and tetravalent substitutes are adjacent in the crystal lattice, which suggests short range ordering. Diffuse reflectance and 4-point probe measurements of MgxIn2−xSnxO3 demonstrate that it can maintain an optical band gap >2.8 eV while surpassing 1000 S/cm in conductivity. Understanding how multiple constituents occupy the two nonequivalent cation sites can provide information on how to optimize cosubstituted systems to increase Sn solubility while maintaining its dopant nature, achieving maximum conductivity.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

Nevada National Security Site Environmental Remediation Progress Toward Closure of Contaminated Sites

The Environmental Restoration activities at the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office assess the environmental impacts that resulted from atmospheric and underground nuclear tests conducted from 1951 to 1992 on the Nevada National Security Site and Nevada Test and Training Range (which includes the Tonopah Test Range). The goal is to protect public health and the environment through investigations and corrective actions. The Federal Facility Agreement and Consent Order (FFACO), established in 1996 between the State of Nevada Division of Environmental Protection (NDEP), DOE, and the U.S. Department of Defense, serves as the cleanup agreement for the Environmental Restoration activities and provides the framework for identifying, prioritizing, investigating, remediating, and monitoring contaminated sites. This agreement satisfies the corrective action requirements of the Resource Conservation and Recovery Act. To ensure efficiency in managing these corrective actions, the sites are grouped according to location, physical and geological characteristics, and/or contaminants. These groups, called corrective action units, are prioritized based on potential risk to workers and the public, available technology, future land use, agency and stakeholder concerns, and other criteria. Environmental Restoration activities include: Industrial Sites, Soils, and Underground Test Area. Nearly 15 years have passed since the FFACO was established, and during this time, more than 3,000 sites have been identified as requiring investigation or corrective actions. To date, approximately 1,945 sites have been investigated and closed through no further action, clean closure, or closure in place. Another 985 sites are currently being investigated or are in the remediation phase, leaving approximately 80 contaminated sites yet to be addressed.

54 ENVIRONMENTAL SCIENCES↗

Application of an AREVA Mobile Evaporator Design Used Successfully at NRC Licensed U.S. Commercial Nuclear Sites to Support Hanford Site Operations - 18134

The U.S. Department of Energy (DOE), Office of River Protection (ORP), manages the River Protection Project at the Hanford site in the South Eastern corner of Washington State in the Pacific Northwest of the United States. The mission of the River Protection Project is to retrieve and treat Hanford's tank waste and close the tank farms to protect the Columbia River. The Site Tank Operations Contractor (Washington River Protection Solutions (WRPS)) via its site operations teams creates additional space in the Double Shell Tanks (DSTs) using the site's only remaining operational evaporator - 242-A. The current 242-A Evaporator has long been identified as a potential single point of failure that in the event of a major breakdown, could significantly impact retrieval operations at the Hanford Site. Areva has experience both on the Hanford site as an integrated subcontractor to the mission and in the design, procurement and construction of a mobile forced circulation evaporator unit designed to be used on Nuclear Regulatory Commission commercial nuclear utility sites. The mobile unit has been used at the following nuclear power plants: SONGS, Salem, Davis Besse, Waterford and Palo Verde. It was designed to take spent Water-EDTA based chemical cleaning solvent and evaporate water off to reduce the volume of waste required to go through downstream processes. It was further designed to fit inside ISO shipping containers. A multi-step approach will be used to: 1. review lessons learned from the previous DOE study for deploying a mobile evaporator on the Hanford sit, 2. evaluate the proposed waste streams and the required throughput and waste arising, sizing the evaporator appropriately, 3. develop a concept design requirements document for the use of a customized evaporator to meet the Hanford need 4. Design, and build a mobile evaporator and 5. Test, install and commission at a site to be agreed with WRPS/DOE. With an overall budget for the approach described of around $35 m, an operational evaporator could be delivered to site in 18-24 months from the approval of a detailed design package. Potential befits include the elimination of the 242-A evaporator as a single point failure, the creation of additional DST tank space and the elimination of the need to stage waste at the 242-A evaporator by moving the mobile unit to a location where is could be deployed at or close to the tank such as in 200W. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗