Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “SYMPOSIA”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

Remote Dismantling and Packaging of the RPV and Thermal Shield at the Obrigheim NPP - 16073

The Obrigheim Nuclear Power Plant (KWO) is located in the Federal State of Baden- Wuerttemberg in Germany and was operated by the EnKK-KWO. The Nuclear Power Plant - a light water pressurized water reactor with 357 MW of electrical power - was operated from 1968 to 2005. In June 2009 the Energiewerke Nord GmbH (EWN) was charged with the dismantling planning and dismantling of the reactor. According to the German nuclear and radiation protection law, several licenses will be required for the realisation of this task. This also applies to the disposal of the waste produced by dismantling, which must finally be stored in the German final repository for low and medium-radioactive waste (underground repository 'Konrad'). In spring 2010 EWN completed all application documents for the dismantling of the reactor pressure vessel (RPV) and the RPV internals and EnKK-KWO delivered them to the responsible Environmental Ministry of Baden-Wuerttemberg. Since then it has been worked intensively on the design, construction and manufacturing of the facilities for dismantling. With a separate notification of amendment, it was applied for the license to install and commission the facilities for the dismantling of the RPV and the RPV internals at the Environmental Ministry of Baden-Wuerttemberg in October 2010. This notification of amendment was confirmed in summer 2012. In September 2011 the work process and test plan and the technical information about the campaign for the removal of the radioactive waste resulting from the RPV with internals, peripheral components and secondary waste with the aim of final disposal in the Federal Repository 'Konrad' was submitted to the Federal Office for Radiation Protection. The evaluation and assessment of the work process and test plan was concluded in August 2013, when it was audited by TUV Nord EnSys without any further measures and indications. On September 10 the work process and test plan was released by the Federal Office for radiation protection. The dismantling of the RPV internals upper core and lower core structure started in September 2013 in the wet cutting area in room 01.106/306 and were finished in October 2014. In the presentation 'Dismantling of the Obrigheim NPP Reactor and Waste Management' held on the WM Symposia in Phoenix, 2014, an overview about the remote cutting and packaging of the upper and lower core structure was given. In today's presentation the subsequent dismantling activities will be outlined and evaluated. The presentation will start with the short description of the basic frame conditions for the nuclear licensing procedure, important procedural principles, and necessary plant-specific conditions. After the remote cutting and packing of the reactor internals of the upper and lower core structure was completed, the wet cutting area 'reactor room 01.106/306' was cleaned and the reactor room rebuilt into a cutting area for peripheral components. After the peripheral components were dismantled, all preconditions were set to lift the RPV from its mounting position and to arrange it in the upper reactor room 01.306. After these activities were completed, the lifting of the RPV was prepared and the cutting area 'Dismantling of the RPV insulation in the reactor room 01.106/306' was set up. To carry out this task, a strand jack unit with connection block was installed on the bridge of the reactor building crane. The opening created by the dismantling of the pool plate was closed with a flap door. The manipulators used for the wet cutting of the RPV internals were also used for the remote dismantling of the RPV insulation and mounted in the cutting area. The remote facilities were handled from a control centre and/or control stand. The air-technical housing which has already been used for the remote dismantling of the RPV internals was designed for the dismantling of the RPV insulation and was extended for this dismantling scope with appropriate ventilation systems. A special feature is the fixation of the RPV insulation at the RPV corpus. The RPV insulation consists of insulation wool, wire mesh and metal-sheet insulation. This 'Sandwich Construction' is detached with a steel corset at the RPV corpus and partly tightened. The insulation of the RPV bottom dome is tightened at the supporting frame. Due to the activation of the material in the core area and the resulting high ambient dose rate the RPV insulation can only be dismantled remotely. Additionally, as asbestos fibers are expected to be found in the insulation the dismantling has to be performed according to the Technical Rules for hazardous substances. The demolition, restoration or maintenance works have to be performed remotely according to the Technical Rules for hazardous substances when the RPV is located in the cutting area. But in case of dismantling of a power reactor no such experience can be found. Beginning with the explanation of the technical, radiological and substantial boundary conditions this presentation will not only impart knowledge about the dismantling of the RPV insulation but also about the remote controlled packaging of the metal sheet insulation and the manual conditioning of the RPV insulation. Subsequently, reports on the remotely controlled cutting and packaging of the RDB are given. Here is particularly interesting that cutting methods have been used and how the activity determination of the segments was carried out. On the basis of the evaluation of the realisation the subsequent dismantling activities will be lined out. In parallel to the dismantling tasks, the waste package documentation for the final repository was issued, checked and confirmed for the containers loaded with parts of the RDB internals. The most important stages are exemplified in this presentation. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Brexit, Euratom and Nuclear Liabilities - 18643

The outcome of the UK referendum on withdrawal from the European Union has resulted in a UK government decision that the UK must withdraw from Euratom. As at the date of the Waste Management Symposia, half of the 2-year programme for agreeing the terms of exit and putting in place replacement arrangements will have passed. If no agreement is reached by 29 March 2019 and no extension of that deadline is agreed the UK will automatically exit Euratom on that date. Aside from potential trade tariffs, Euratom exit will create binary questions on acceptability of nuclear trade and collaboration with the UK, reflecting current reliance on the UK's status as a Euratom member in establishing and implementing acceptable safeguarding requirements, ensuring inclusion of the UK within the scope of existing Euratom nuclear cooperation agreements, and as a basis for current UK bilateral nuclear cooperation agreements. This in turn risks disruption of international nuclear cooperation and trade, including provision of resources and know-how in support of the UK waste and decommissioning effort and international movement of waste for treatment. The paper will consider the current status of negotiations for UK withdrawal from Euratom, development of replacement safeguarding arrangements and replacement of international nuclear cooperation agreements essential to future nuclear cooperation and trade with the UK, taking into account: - the current and future legal basis of UK safeguarding obligations, including potential changes to the UK's Voluntary Offer Safeguards Agreement under the Non-Proliferation Treaty and likely acceptability of replacement arrangements to key nuclear trading partners; - practical arrangements for meeting those obligations post Euratom reliance via independent safeguarding arrangements; and - the need for and challenges in replacement of the UK's current reliance on its status as a Euratom member in taking the benefit of the existing US / Euratom s123 Agreement and other Euratom nuclear cooperation agreements. The paper will also provide a brief update on recent developments in international nuclear liabilities. The last 2 years have seen significant changes, with the Convention on Supplementary Compensation finally entering into force on 15 April 2015 and significant progress towards ratification of the 2004 Protocols to the Paris and Brussels Conventions. These changes are to be welcomed as beneficial to international cooperation, but also bring changes to liabilities risks associated with international movement of nuclear materials. Despite clear advances nuclear liabilities risks remain a significant consideration in negotiation of international nuclear contracts, recognising beneficial changes as well as on-going areas of risk and uncertainty. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Summary of the the 11th Symposium of the International Society of Root Research

11th Symposium of the International Society of Root Research (ISRR11) and the 9th International Symposium on Root Development (Rooting2021) - Root Biology Never Sleeps virtual meeting May 24 - 28. These meetings are generally held in separate years. However, because of travel restrictions imposed by the COVID-19 pandemic, the organizing committees of both symposia decided to host the two meetings as a fully-joint and virtual-only conference. Various time zones were considered when developing the schedule, as live interactions was an important focus. Scientific sessions were held from 3 a.m. to 10 p.m. US Central Daylight Time (CDT) to meet the international demand. More than 700 participants from 52 countries virtually attend both events which featured 74 talks in 16 sessions including: 10 plenary lectures, 16 keynote speakers and 48 selected talks. Additionally, nearly 300 posters were presented in nine poster sessions. The meeting also featured an Ambassador Program with 21 ambassadors from 10 countries. These ambassadors organized a half-day pre-symposium workshop and produced a review of the meeting for “New Phytologist”. The meeting also awarded a Lifetime Award to Dr. Wendy Silk (Prof. Emerita University of California, Davis). Committee Members: • Bob Sharp (Chair) – University of Missouri • Felix Fritschi (Chair, Int’l Program Committee) – University of Missouri • David Braun – University of Missouri • Vicki Bryan – University of Missouri • Rich Ferrieri – University of Missouri • Laura Greeley – University of Missouri (postdoctoral representative) • Ali Housh – University of Missouri (graduate student representative) • Allison Miller – Donald Danforth Plant Science Center and St Louis University • Mel Oliver – University of Missouri • Jonathan Stemmle – University of Missouri • Gus Thies – University of Missouri & Donald Danforth Plant Science Center (graduate student representative) • Chris Topp - Donald Danforth Plant Science Center

Root Biology↗

Validation Testing for Molten Chloride Reactor Experiment Equipment Removal and Disposal Techniques

The Molten Chloride Reactor Experiment (MCRE) will be the first reactor featuring a fast-spectrum molten chloride circulating nuclear fuel system in the world. Planning for equipment removal and disposal (ERD) of MCRE has identified several technology gaps due to the unique environment of this nuclear experiment. Some of the gaps arise from the application of existing disassembly and/or sizing methods to novel material forms or in novel configurations. Others arise from unknown material behavior. This paper summarizes proposed test plans for ERD validation experiments to address these complicated or unknown equipment removal procedures. At the Waste Management Symposia in 2024, the Idaho National Laboratory (INL) MCRE ERD team presented the challenges associated with hosting multiple nuclear experiments in series with only brief transition periods between systems. Such difficulties include higher dose rates, the presence of radioisotopes infrequently encountered in reactor decommissioning and radioactive waste management, lack of intrinsic remote-operations infrastructure in the test bed, space constraints in the test bed, and contamination minimization requirements. To address these challenges, remote or semi-remote technologies are planned to be implemented in a non-hot cell environment with limited space availability. The team also discussed how a systems engineering approach is being used for conceptual development and design of equipment removal systems to address these challenges. For example, to reduce constraints for the removal of more difficult components, non-activated, noncontaminated elements are planned to be taken out first where possible. Still, there are complexities associated with the remaining components. In this work, the operational framework for MCRE ERD was reviewed for technical gaps and open questions, and test plans were drafted to address these areas. The tests plans were written for the following categories: vision systems, pipe cutting, drill/grout/filler, flush salt, and miscellaneous, with the miscellaneous group consisting of tests like techniques for removing bearings and reflector bricks. The test plans explore material, infrastructure, and staffing requirements needed for test execution. The test plans additionally focus on the evaluation of success. Determining the outcome of a test is imperative - as these explorative actions have the potential to rearrange or re-scope planned ERD activities. Success criteria identified thus far include required tool output, required area(s), debris production and mitigation, and repeatability. Test plans are an essential aspect of the systems engineering approach to MCRE ERD. They are used as the beginning steps in defining use cases for the ERD system. Performance of the validation tests is expected to begin in the summer of 2025 and will take approximately 9 to 12 months to complete. Execution of these plans will be expedited by specifying test needs ahead of time, facilitating efficient interactions with any subcontractors tasked with running the requested tests. Evaluating the outcomes of these tests will inform MCRE ERD procedures and timing and will also identify additional technical constraints for the MCRE ERD System. This upfront process optimization effort will help the project save time and resources at the end of the experiment.

21 - SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLAN↗

Daytime Water Detection by Fusing Multiple Cues for Autonomous Off-Road Navigation

Detecting water hazards is a significant challenge to unmanned ground vehicle autonomous off-road navigation. This paper focuses on detecting the presence of water during the daytime using color cameras. A multi-cue approach is taken. Evidence of the presence of water is generated from color, texture, and the detection of reflections in stereo range data. A rule base for fusing water cues was developed by evaluating detection results from an extensive archive of data collection imagery containing water. This software has been implemented into a run-time passive perception subsystem and tested thus far under Linux on a Pentium based processor.

COMPONENT REPORTS↗

Initial Kernel Timing Using a Simple PIM Performance Model

This presentation will describe some initial results of paper-and-pencil studies of 4 or 5 application kernels applied to a processor-in-memory (PIM) system roughly similar to the Cascade Lightweight Processor (LWP). The application kernels are: * Linked list traversal * Sun of leaf nodes on a tree * Bitonic sort * Vector sum * Gaussian elimination The intent of this work is to guide and validate work on the Cascade project in the areas of compilers, simulators, and languages. We will first discuss the generic PIM structure. Then, we will explain the concepts needed to program a parallel PIM system (locality, threads, parcels). Next, we will present a simple PIM performance model that will be used in the remainder of the presentation. For each kernel, we will then present a set of codes, including codes for a single PIM node, and codes for multiple PIM nodes that move data to threads and move threads to data. These codes are written at a fairly low level, between assembly and C, but much closer to C than to assembly. For each code, we will present some hand-drafted timing forecasts, based on the simple PIM performance model. Finally, we will conclude by discussing what we have learned from this work, including what programming styles seem to work best, from the point-of-view of both expressiveness and performance.

BRIEFING CHARTS↗

Rapid Protein Separations in Microfluidic Devices

This paper describes fabrication of glass and plastic microfluidic devices for protein separations. Although the long-term goal is to develop a microfluidic device for two-dimensional gel electrophoresis, this paper focuses on the first dimension-isoelectric focusing (IEF). A laser-induced fluorescence (LIF) imaging system has been built for imaging an entire channel in an IEF device. The whole-channel imaging eliminates the need to migrate focused protein bands, which is required if a single-point detector is used. Using the devices and the imaging system, we are able to perform IEF separations of proteins within minutes rather than hours in traditional bench-top instruments.

MICROFLUIDICS↗

The Effect of Companions on the SIM Reference Frame

The Space Interferometry Mission (SIM) is a 10-m Michelson space-based optical interferometer designed for precision astrometry (4 microarcseconds, 3 microarcseconds/year) with better accuracy than before over a narrow field of view. One of the primary objectives of the SIM instrument is to determine accurately the directions to a grid of stars, together with their proper motions and parallax, improving a priori knowledge by nearly three orders of magnitude over Hipparcos and one order of magnitude over FAME's planned accuracy (Johnston, 2000). The instrument does not measure directly the angular separation between stars, but rather it measures the projection of each star's direction vector onto the interferometer baseline vector by measuring the pathlength delay of starlight as it passes through the two arms of the interferometer. The accuracy and stability of SIM's celestial reference frame is subject to degradation over the 5-year mission from the reflex motion induced by massive companions of the objects used to construct the celestial reference frame. The authors present the results of simulations that show the sensitivity of reference frame accuracy to companions as a function of mass and period. They assume that pre-launch ground surveys will eliminate all objects with RMS radial velocity greater than 10 m/s. They further assume that the standard astrometric parameters of position, parallax, and proper motion plus acceleration terms in right ascension and declination will be allowed to absorb reflex motion.

ASTROMETRY↗

Observational Model for Precision Astrometry with the Space Interferometry Mission

The Space Interferometry Mission (SIM) is a space-based 10-m baseline Michelson optical interferometer operating in the visible waveband that is designed to achieve astrometric accuracy in the single digits of the microarcsecond domain. Over a narrow field of view SIM is expected to achieve a mission accuracy of 1 microarcsecond. In this mode SIM will search for planetary companions to nearby stars by detecting the astrometric "wobble" relative to a nearby reference star. In its wide-angle mode, SIM will provide 4 microarcsecond precision absolute position measurements of stars, with parallaxes to comparable accuracy, at the end of its 5-year mission. The expected proper motion accuracy is around 3 microarcsecond/year, corresponding to a transverse velocity of 10 m/ s at a distance of 1 kpc. The basic astrometric observable of the SIM instrument is the pathlength delay. This measurement is made by a combination of internal metrology measurements that determine the distance the starlight travels through the two arms of the interferometer, and a measurement of the white light stellar fringe to find the point of equal pathlength. Because this operation requires a non-negligible integration time, the interferometer baseline vector is not stationary over this time period, as its absolute length and orientation are time varying. This paper addresses how the time varying baseline can be "regularized" so that it may act as a single baseline vector for multiple stars, as required for the solution of the astrometric equations.

TILE OBSERVATIONS↗

Estimation of EOP From VLBI: Direct Approach

The currently adopted strategy of Earth Orientation Parameters (EOP) estimation from Very Long Baseline Interferometry (VLBI) is to estimate six parameters: Universal Time 1 (UT1), UT1 rate, pole positions, and nutation offsets for each 24-hour session independently. Then the resulting time series of raw EOP are filtered and a regression analysis is performed to obtain nutation coefficients, polhode of the pole, and other physical parameters. Thus, the latter parameters are obtained indirectly in two stages. An alternative approach of direct estimation of the final EOP is presented. Pole coordinates and UT1 are considered as a sum of three components: the low-period component that is modeled by a cubic spline, the harmonic component that includes forced nutation, precession and sub-daily variations of EOP, and the stochastic component that is modeled by a linear spline with segment length 1-2 hours. All parameters are obtained in a single LSQ solution using all available data.

POLAR MOTION↗

Dynamical Reference Frame: Current Relevance and Future Prospects

Planetary and lunar ephemerides are no longer used for the determination of inertial space. Instead, the new fundamental reference frame, the International Celestial Reference Frame (ICRF), is inherently less susceptible to extraneous, non-inertial rotations than a dynamical reference frame determined by the ephemerides would be. Consequently, the ephemerides are now adjusted onto the ICRF, and they are fit to two modern, accurate observational data types: ranging (radar, lunar laser, spacecraft) and Very Long Baseline Interferometry (VLBI) (of spacecraft near planets). The uncertainties remaining in the inner planet ephemerides are on the order of 1 kilometer, both in relative positions between the bodies and in the orientation of the inner system as a whole. The predictive capabilities of the inner planet ephemerides are limited by the uncertainties in the masses of many asteroids. For this reason, future improvements to the ephemerides must await determinations of many asteroid masses. Until then, it will be necessary to constantly update the ephemerides with a continuous supply of observational data.

VLBI (VERY LONG BASELINE INTERFEROMETRY)↗

Evaluation of Decision Trees for Cloud Detection from AVHRR Data

Automated cloud detection and tracking is an important step in assessing changes in radiation budgets associated with global climate change via remote sensing. Data products based on satellite imagery are available to the scientific community for studying trends in the Earth's atmosphere. The data products include pixel-based cloud masks that assign cloud-cover classifications to pixels. Many cloud-mask algorithms have the form of decision trees. The decision trees employ sequential tests that scientists designed based on empirical astrophysics studies and simulations. Limitations of existing cloud masks restrict our ability to accurately track changes in cloud patterns over time. In a previous study we compared automatically learned decision trees to cloud masks included in Advanced Very High Resolution Radiometer (AVHRR) data products from the year 2000. In this paper we report the replication of the study for five-year data, and for a gold standard based on surface observations performed by scientists at weather stations in the British Islands. For our sample data, the accuracy of automatically learned decision trees was greater than the accuracy of the cloud masks p < 0.001.

AVHRR (ADVANCED VERY HIGH RESOLUTION RADIOMETER)↗

Algorithm Science to Operations for the National Polar-orbiting Operational Environmental Satellite System (NPOESS) Visible/Infrared Imager/Radiometer Suite (VIIRS)

The VIIRS sensor provides measurements for 22 Environmental Data Records (EDRs) addressing the atmosphere, ocean surface temperature, ocean color, land parameters, aerosols, imaging for clouds and ice, and more. That is, the VIIRS collects visible and infrared radiometric data of the Earth's atmosphere, ocean, and land surfaces. Data types include atmospheric, clouds, Earth radiation budget, land/water and sea surface temperature, ocean color, and low light imagery. This wide scope of measurements calls for the preparation of a multiplicity of Algorithm Theoretical Basis Documents (ATBDs), and, additionally, for intermediate products such as cloud mask, et al. Furthermore, the VIIRS interacts with three or more other sensors. This paper addresses selected and crucial elements of the process being used to convert and test an immense volume of a maturing and changing science code to the initial operational source code in preparation for launch of NPP. The integrity of the original science code is maintained and enhanced via baseline comparisons when re-hosted, in addition to multiple planned code performance reviews.

NPOESS (NATIONAL POLAR-ORBITING OPERATIONAL ENVIRO↗

Impact of the Sun on Remote Sensing of Sea Surface Salinity from Space

The sun is a sufficiently strong source of radiation at L-band to be an important source of interference for radiometers on future satellite missions such as SMOS, Aquarius, and Hydros designed to monitor soil moisture and sea surface salinity. Radiation from the sun can impact passive remote sensing systems in several ways, including line-of-sight radiation that comes directly from the sun and enters through antenna side lobes and radiation that is reflected from the surface to the radiometer. Examples are presented in the case of Aquarius, a pushbroom radiometer with three beams designed to monitor sea surface salinity. Near solar minimum, solar contamination is not a problem unless the sun enters near the main beam. But near solar maximum, contamination from the sun equivalent to a change of salinity on the order of 0.1 psu can occur even when the signal enters in sidelobes far from the main beam.

COMPONENT REPORTS↗

Status of the MODIS Level 1B Algorithms and Calibration Tables

The Moderate Resolution Imaging Spectroradiometer (MODIS) makes observations using 36 spectral bands with wavelengths from 0.41 to 14.4 m and nadir spatial resolutions of 0.25km, 0.5km, and 1km. It is currently operating onboard the NASA Earth Observing System (EOS) Terra and Aqua satellites, launched in December 1999 and May 2002, respectively. The MODIS Level 1B (L1B) program converts the sensor's on-orbit responses in digital numbers to radiometrically calibrated and geo-located data products for the duration of each mission. Its primary data products are top of the atmosphere (TOA) reflectance factors for the sensor's reflective solar bands (RSB) and TOA spectral radiances for the thermal emissive bands (TEB). The L1B algorithms perform the TEB calibration on a scan-by-scan basis using the sensor's response to the on-board blackbody (BB) and other parameters which are stored in Lookup Tables (LUTs). The RSB calibration coefficients are processed offline and regularly updated through LUTs. In this paper we provide a brief description of the MODIS L1B calibration algorithms and associated LUTs with emphasis on their recent improvements and updates developed for the MODIS collection 5 processing. We will also discuss sensor on-orbit calibration and performance issues that are critical to maintaining L1B data product quality, such as changes in the sensor's response versus scan-angle.

MODIS LEVEL 1B ALGORITHMS↗

NASA's Global Precipitation Mission Ground Validation Segment

NASA is designing a Ground Validation Segment (GVS) as one of its contributions to the Global Precipitation Measurement (GPM) mission. The GPM GVS provides an independent means for evaluation, diagnosis, and ultimately improvement of the GPM spaceborne measurements and precipitation products. NASA's GPM GVS concept calls for a combination of direct observations executed within a Multidimensional Observing Volume (MOV) and model-based analyses executed by a Satellite Simulator Model (SSM). The MOV consists of ground-based instruments that measure local surface and atmospheric properties required for GPM validation. The SSM utilizes MOV measurements in a forward numerical model. The goal of the SSM forward modeling is calculation of the following properties: top-of-atmosphere microwave radiative quantities to within sensor noise of those measured by the GPM Core Satellite, precipitation quantities identical to those generated by the standard GPM precipitation retrieval algorithms, and quantitative/objective error estimates of both sets of quantities. At present, the GVS is in the early design stage and various scenarios have been generated to assess how it will be used in the GPM era. The GPM GVS will be operational in the year prior to the launch of the GPM core satellite, which has a launch date scheduled for December 2010.

GVS (GROUND VALIDATION SEGMENT)↗