Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “SWPF”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

Extraction, Scrub, and Strip Test Results for the IBC BOBCalix Solvent Samples

A second vendor for solvent extraction components has been chosen for use at the Salt Waste Processing Facility (SWPF). IBC Advanced Technologies (IBC) has provided samples of their BOBCalix, as well as complete solvent. These samples were tested for quality assurance purposes to ensure their use at SWPF is acceptable. Two Extraction, Scrub, and Strip (ESS) tests were performed on solvent samples from IBC. The purpose of testing these samples was to determine if the solvents are displaying the correct extraction and stripping behavior with cesium.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Uranium Solubility and Supernate Enrichment Testing for Accelerated Basin De-Inventory Discards to Concentration, Storage, and Transfer Facilities

After future Accelerated Basin De-inventory (ABD) enriched uranium discards into sludge batches (SB), portions of supernate decants during SB preparation will be blended into salt batches (StB) and the resulting feeds must meet the nuclear safety requirements for the Salt Waste Processing Facility (SWPF). During previous SB10 sampling and testing, which involved H-Canyon material containing enriched uranium being mixed with Tank 51 sludge shortly after the H-Canyon stream was neutralized, it was identified that the uranium isotopic enrichment in the supernate deviated from the uranium isotopic enrichment in the slurry. The higher uranium isotopic enrichment in the supernate introduced the risk of challenging the feed requirements of SWPF. The ABD material added to SB11 was isotopically diluted with depleted uranium, mitigating any downstream impacts. However, H-Canyon desires to eliminate or minimize future depleted uranium additions in order to meet the mission schedule.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Creating a Salt Batch: Challenges and Lessons Learned

CONCLUSION • The overall Salt Batch system has been honed through each iteration of the process • Increased communication across facilities and work groups has enabled the salt team to react swiftly to emergent items and identify improvement opportunities • Even the best plans require backup options – Emergent items can appear at any time during the process – Flexibility to adapt to the unexpected is a must-have team mindset • To date, every salt batch compiled has been qualified and approved as feed for SWPF – No feed break has occurred between the Tank Farm and SWPF

Goldblatt, Joshua B. [Savannah River National Labo↗

Characterization of Precipitate Reactor Feed Tank (PRFT) Batches 44 and 49 from the Defense Waste Processing Facility (DWPF)

The Savannah River Site (SRS) Defense Waste Processing Facility (DWPF) processes a Monosodium Titanate/Sludge Solids (MST/SS) waste stream received from the Salt Waste Processing Facility (SWPF) via the Precipitate Reactor Feed Tank (PRFT). During processing, DWPF is required to provide evidence of compliance with the Waste Acceptance Product Specifications (WAPS). Savannah River Mission Completion (SRMC) has requested Savannah River National Laboratory (SRNL) to analyze PRFT samples representing each SWPF salt batch for thirty-two radionuclides. Additionally, elemental analysis of PRFT slurry and MST/SS solids was performed to aid SRMC in further refinement of the inputs and assumptions used in future frit development and Material Tracking Program calculations. The analyses of PRFT Batches 44 and 49, which correspond to material from the processing of Salt Batches (StB) 12 and 11, respectively, are reported herein. The unwashed dried solids of the PRFT Batches 44 and 49 are predominately MST, ~63-59% MST. The two batches have a much higher amount of Fe, Mn, and Ni compared to all previous batches. For Batch 44 this appears to be due to the use of a sludge simulant filter aid during processing of StB 12 and for Batch 49, it is possibly due to the larger amount of insoluble solids for StB 11 in comparison to all previous salt batches. Like previous PRFT batches, a significant amount of the unwashed dried solids are alkaline earth metals. The total sulfate, in mg/kg of slurry, for PRFT Batches 44 and 49 is 119 and 139, respectively, which is well below the current sulfate concentration used in Material Tracking Program calculations and is in agreement with DWPF laboratory sulfate measurements.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

MATRIX 2 RESULTS OF THE FY07 ENHANCED DOE HIGH-LEVEL WASTE MELTER THROUGHPUT STUDIES AT SRNL

High-level waste (HLW) throughput (i.e., the amount of waste processed per unit time) is a function of two critical parameters: waste loading (WL) and melt rate. For the Waste Treatment and Immobilization Plant (WTP) at the Hanford Site and the Defense Waste Processing Facility (DWPF) at the Savannah River Site (SRS), increasing HLW throughput would significantly reduce the overall mission life cycle costs for the Department of Energy (DOE). The objective of this study was to generate supplemental validation data that could be used to determine the applicability of the current liquidus temperature (TL) model to expanded DWPF glass composition regions of interest based on higher WLs. Two specific flowsheets were used in this study to provide such insight: (1) Higher WL glasses (45 and 50%) based on future sludge batches that have (and have not) undergone the Al-dissolution process. (2) Coupled operations supported by the Salt Waste Processing Facility (SWPF), which increase the TiO{sub 2} concentration in glass to greater than 2 wt%. Glasses were also selected to address technical issues associated with Al{sub 2}O{sub 3} solubility, nepheline formation, and homogeneity issues for coupled operations. A test matrix of 28 glass compositions was developed to provide insight into these issues. The glasses were fabricated and characterized using chemical composition analysis, X-ray Diffraction (XRD), TL measurement and the Product Consistency Test (PCT). The results of this study are summarized below: (1) TiO{sub 2} concentrations up to {approx} 3.5 wt% were retained in DWPF type glasses, where retention is defined as the absence of crystalline TiO{sub 2} (i.e., unreacted or undissolved) in the as-fabricated glasses. Although this TiO{sub 2} content does not bound the projected SWPF high output flowsheet (up to 6 wt% TiO{sub 2} may be required in glass), these data demonstrate the potential for increasing the TiO{sub 2} limit in glass above the current limit of 2 wt% (based strictly on retention or solubility). (2) For those study glasses that had very close compositional overlap with the model development and/or model validation ranges of the current DWPF TL model (except TiO{sub 2} and MgO concentrations), there was very little difference in the predicted and measured TL values. Even though the TiO{sub 2} concentrations were above the 2 wt% upper limit, the results indicate that the current T{sub L} model is applicable in this compositional region with TiO{sub 2} contents up to approximately 3.5 wt%. (3) As the target glass compositions diverge from the model development and validation ranges, the T{sub L} data suggest that the model under-predicted the measured values. These discrepancies imply that there are individual oxides or oxide combinations that need to be accounted for in the model. These oxides include B{sub 2}O{sub 3}, SiO{sub 2}, MnO, TiO{sub 2} and/or their combinations. More data would be required to fill in these anticipated DWPF compositional regions for higher WL glasses so that the model coefficients could be refit to account for these differences. (4) Based on PCT response of HWL-21 and HWL-22 (two glasses that were prone to nepheline formation) it appears that increasing the B{sub 2}O{sub 3} concentration in glass does not consistently suppress the formation of nepheline in glasses with higher Al{sub 2}O{sub 3} and/or Na{sub 2}O content. Although the chemical durabilities of the quenched versions of these glasses were very acceptable, the canister centerline cooled (ccc) glasses exhibited a considerable decrease in durability and were found to contain nepheline via XRD. In fact, one of the glasses had a release that was 5 times greater than that of the Environmental Assessment (EA) benchmark glass. These results suggest a need for a more fundamental understanding of the compositional and kinetic effects of nepheline formation in high WL glasses. (5) Data have been generated in support of the replacement of the homogeneity constraint with the Al{sub 2}O{sub 3} and/or sum of alkali constraints for coupled operations as previously completed for sludge-only operations. This strategy should be pursued for either the compositional region anticipated for coupled operations or as part of the variability study for each sludge batch. The PCT responses of the study glasses suggest a high probability that this strategy could be defended at some later date.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Decommissioning Lines-of-Inquiry for Design Review of New Nuclear Facilities

An independent review of the design of the Salt Waste Processing Facility (SWPF) at Savannah River included a requirement to address the ability to decommission the facility. This paper addresses the lines of inquiry (that were developed for the review and their use in future for reviews of other projects, referred to herein as 'DDLOI'. Decommissioning activities for almost any type of facility are well within the technological state-of-the-art. The major impacts for complications resulting from insufficient consideration during design of a new facility that involves radioactive processes and/or material is the cost of: a) gaining access to high radiation areas and b) dealing with high levels of contamination. For this reason, the DDLOI were developed as a way of raising the awareness of designers and design reviewers to design features that can impede or facilitate ultimate decommissioning. The intent is that this report can be used not only for review, but also by engineers in the early stages of design development when requirements are being assembled. The focus for the DDLOI is on types of facilities that contain nuclear and/or radioactive processes and materials. The level of detail is more specific than would be found in decommissioning plans prepared for regulatory purposes. In commencing this review, the author's could find no precedent for a systematic review of design for decommissioning that included results of a review. Therefore, it was decided to create a report that would provide detailed lines of inquiry along with the rationale for each. The resulting DDLOI report included 21 topical areas for design review. The DDLOI combined the authors' experience in developing baselines for facilities to be deactivated or demolished with prior publications by the U.S. Army and the International Atomic Energy Agency. These two references were found via an Internet search and were the only ones judged to be useful at a field application level. Most others addressed principles or methods but did not have specific recommendations at a detailed design level. The DDLOI not only recommended what reviewers should look for, but also provides the reason as to why each item is important. Overall, the 21 topical areas there are presented in four main sections, which are: - Yard and Exterior Spaces addresses yard areas, underground tunnels, vaults, roofs and siding. - Structures and Interior Spaces addresses interior spaces, use of hazardous materials, placement of large or heavy equipment, and walls and floors designed for shielding. - Systems and Equipment first addresses systems for deactivation, service and utility systems isolation, pipes and ducts, tanks, and crud traps. In addition, DDLOI for laboratories, gloveboxes, and hot cells are included. - Contamination Control addresses the design of, walls, floors, ceilings, sumps, and drains with regard to contamination control. The ability to decontaminate is also included. The final section of the report is a listing of the individual DDLOI topics in a table format, which is designed as a tool that for use as a review checklist. In applying the DDLOI, two cautions are advised: - Designing for the operational mission of the facility is a higher priority than accommodating ease of decommissioning. The recommendations should be considered as preferable design practices when they can be accommodated without compromising the primary design objectives. - The DDLOI should be considered as guidance and not design requirements; noting some will become requirements because they are incorporated in modern building codes. Applying the DDLOI to the SWPF resulted in an overall conclusion that the design for the most part was compatible with the ability to decommission the facility. The most significant recommendation was to completely line the walls of a hot cell with stainless steel that was originally designed with two of its sides as the concrete wall of the building. This recommendation was subsequently incorporated in the design. Future design reviews of nuclear or radioactively contaminated facilities, whether by independent parties or the designers themselves, can benefit from the lines-of-inquiry that are the subject of this paper. The DDLOI, with an example of their use, are in a public domain report, which is freely available from the authors.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Integrated Salt Waste Processing at the Savannah River Site - 17413

Treatment and disposition of salt waste is the critical path to completion of the Savannah River Site (SRS) Liquid Waste (LW) Disposition and Cleanup Program. The new Salt Waste Processing Facility (SWPF) is a critical link in the pre-treatment chain and will process high-curie salt waste removed from various SRS liquid waste storage tanks. Significant infrastructure modifications are underway throughout the existing LW facilities to integrate the SWPF into the LW system. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Integrated salt waste processing at the Savannah River Site - 15301

Treatment and disposition of salt waste is the critical path to completion of the Savannah River Site Liquid Waste (LW) Disposition and Cleanup Program. The new Salt Waste Processing Facility (SWPF) is a critical link in the pre-treatment chain and will process high curie salt waste removed from various SRS liquid waste storage tanks. Significant infrastructure modifications are needed in the existing LW facilities in order to integrate the SWPF into the LW system. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Saltstone Facility Operating Experience with Mega-Vault Disposal Units - 19497

The Saltstone Production Facility (SPF) has been treating low-level waste aqueous salt solution at the Savannah River Site (SRS) since 1990. Salt solutions are transferred from a large-volume, underground storage tank via underground waste transfer line into the SPF. The waste is received into one of two receipt tanks and then transferred to a twin-shaft mixer where dry feeds are introduced to create a fresh grout slurry. The grout exits the mixer into a hold tank, which has a residence time of approximately two minutes. The slurry is then pumped via peristaltic pump through a grout transfer line to one of several disposal units in the Saltstone Disposal Facility (SDF). The transfer line length varies from 0.4 km to 0.8 km depending on disposal location. With the salt disposal mission at SRS accelerating via the operation of the Modular Caustic Side Solvent Extraction (MCU) facility and the anticipated startup of the Salt Waste Processing Facility (SWPF), it is important that the SPF and SDF operate with minimal outage time and maximum facility availability. To this end, the design of the newest disposal units has incorporated the benefits of commercially available cylindrical concrete tank design on a very large scale to maximize economies of scale. This new design has been placed into radioactive service and the initial operational data will be compared with previous disposal operations along with an overview of how disposal unit design has significantly evolved since the initial construction in the early 1990's. Additionally, several processing facility modifications have either been implemented or developed in recent years to improve operating reliability and ensure facility availability once the SWPF becomes the primary waste generator providing feed for the SPF. These modifications, the issues driving their development, and an assessment of their effectiveness will also be discussed. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Alternative Treatment of Defense Waste Processing Facility Recycle via Reuse of Existing Liquid Waste Facilities - 20097

The Defense Waste Processing Facility (DWPF) at Savannah River Site (SRS) has been immobilizing high level waste since 1996. The chemical process within DWPF generates a large volume of condensate, which is recycled to the SRS H-Area Tank Farm. The recycle stream includes a small quantity of sludge solids, as well as soluble cesium that is volatilized during melter operation. The recycle waste is currently received into a large, underground waste tank that separates insoluble solids via decanting. The supernate is treated by an evaporator with a concentrate stream that is stored for future processing. The evaporator overheads are collected and sent to the Effluent Treatment Project (ETP) for final polishing and testing prior to discharge to local surface water. Recycle storage and treatment as described above complicates the overall mission within the tank farms, which are primarily engaged in waste retrieval and preparation activities that support sludge and salt disposition, as well as tank characterization and closure. The need to devote a portion of available storage space to recycle treatment limits operational flexibility, and ultimately the DWPF recycle stream must be diverted to fully close all the SRS waste tanks. An alternative treatment process is being explored to decouple the recycle stream from the tank farm. The proposed treatment process will accomplish solids separation via crossflow filtration and will utilize a wiped film evaporator to volume-reduce the filtrate stream. Evaporator overheads will continue to be further processed in ETP while the solids stream and evaporator concentrate stream will be returned for reprocessing with the DWPF and Salt Waste Processing Facility (SWPF). This process will utilize existing facilities within DWPF and the tank farm that were previously dedicated to Interim Salt Disposition (ISD), but no longer have an identified mission with the startup of SWPF. The reuse of these facilities will remove several constraints from the current Liquid Waste (LW) System Plan without expanding the current footprint of Department of Energy Environmental Management (EM) infrastructure within LW. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Utilizing Commercial Submersible Mixer Pumps for Sludge Removal in Savannah River Site's Tank 26 - 20289

The Savannah River Site (SRS) Liquid Waste System (LWS) safely manages, stores, treats, and dispositions liquid radioactive waste. The LWS consists of 51 underground waste storage tanks (eight of which are operationally closed and filled with grout), waste evaporators, treatment facilities, and solidification facilities, known as the Defense Waste Processing Facility (DWPF) and Saltstone Production Facility (SPF). One of the waste storage tanks, Tank 26, was placed into service in 1980 as an F Tank Farm (FTF) Evaporator Feed Tank. From 1980 to 2013, Tank 26 received F Canyon receipts and dilute supernate that was then transferred to the 242-16F FTF Evaporator for volume reduction. In 2013, the steam tube bundle failed in the FTF Evaporator, and the decision was made not to repair/resume evaporator operation. During operation of Tank 26, solids built up to a level of 2.03 m in the tank with a volume of 1062.9 kL. Due to the evaporator failure and subsequent shutdown, the solids in Tank 26 were selected to feed Sludge Batch 10, which is collected and prepped prior to being sent to DWPF for final disposition. To accomplish solids removal, Commercial Submersible Mixer Pumps (CSMPs) were selected to slurry the solids in preparation to be sent to Tank 51. Four CSMPs were installed in Tank 26 with each one installed in a separate quadrant of Tank 26. This work would mark the first deployment of CSMPs in an SRS waste tank. The CSMPs were developed in response to operational issues from previous mixing pumps and budgetary constraints. The CSMPs use the concept of modifying commercially available equipment for nuclear waste applications. The CSMPs consist of a 230-horsepower submersible mixing pump (manufactured by GPM, Inc.) joined to a mast fabricated at SRS. For this application, Savannah River Remediation (SRR) design services was challenged to provide a mast design that required no steel superstructure support system on top of Tank 26. Also, SRR design services provided a simplified Tank 26 riser interface that did not require extensive machine parts to adjust height of the suction screen of the CSMP within the tank. Other design improvements include no requirements for tank top radiation monitors and no requirements for flushing of the CSMPs during startup/shutdown operations. The CSMPs were operated at an initial height of 2.29 m above the Tank 26 bottom for 10 days. After sludge sounding, the CSMPs were lowered to a height of 1.52 m with no issues due to proper work planning and the simplified riser interface. With the CSMPs lowered to a level of 1.52 meters above the tank bottom, the CSMPs were operated for 12 days and another sounding was performed. The sounding level came back matching the disturbance depth results of the first pump run. Chemistry samples were analyzed while the tank was left to settle. The analysis revealed enough weight percent solids to provide good feed to Sludge Batch 10. Also, the results revealed the supernate within the mixture would provide good salt solution feed to Salt Waste Processing Facility (SWPF) Salt Batch 3. So, the plan was modified to let the disturbed solids settle and decant the salt solution for addition to SWPF Salt Batch 3. Then water will be added back to Tank 26, and the CSMPs run in order to wash the solids to decrease settling time prior to being sent to Tank 51 for Sludge Batch 10. Utilizing CSMPs for waste removal in an SRS Tank has provided a cost-effective means for further waste removal efforts. In addition, the CSMPs are easier to operate by utilizing a robust and simplified design. The CSMPs performed quite well with no process shutdown or delays during operation. As a result, CSMPs are integral to the future of removing radioactive waste from storage tanks at SRS. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Evaluating Liquid Waste Transfers and their Impacts to the SRS Tank Farm to Support Operations and Closure

The Liquid Waste (LW) contractor at the Savannah River Site, Savannah River Mission Completion (SRMC), supports the storage, processing, and safe disposition of legacy, radioactive liquid waste. The LW Tank Farms contain approximately 127 million liters (33.5 million gallons) of liquid waste within 43 active, underground waste tanks. To meet mission critical milestones for the closure of waste tanks and processing of 34 million liters (9 million gallons) of salt waste per year by the LW Salt Waste Processing Facility (SWPF), an increase in Tank Farm operations, including waste tank transfers, is required. Waste is compiled in salt and sludge batches in the Tank Farms and transferred to SWPF and the Defense Waste Processing Facility (DWPF) for treatment. All waste tank transfers, such as waste removal and batch compilation transfers, must be pre-evaluated to ensure Documented Safety Analysis (DSA) requirements are met via Evaluated Transfer Approval Forms (ETAFs). Facility conditions and configurations may change as a result of a waste transfer. These changes must be reflected in the Tank Farms Emergency Response Datasheet (ERD), which contains data utilized for operation and emergency situations.

Peterson, Shelby R.↗

Submersible Blend Pump Mixing Evaluation

Savannah River Remediation (SRR) requested Savannah River National Laboratory (SRNL) to perform an engineering analysis to investigate the mixing behavior in feed blend tanks for the Salt Waste Processing Facility (SWPF). The baseline for mixing the feed blend tanks is a U 0 D of 5.1 ft 2 /s, a pump nozzle elevation of 165.86 inches above the sludge layer and 174 inches above the tank bottom, a liquid level 174.28 inches above the pump nozzle, and a blend time of 10.63 hours. The current Salt Batch Plan identifies Tanks 21, 26, 41, and 42 as the designated blend tanks. This supplemental study only addresses Type IIIA tanks (i.e., Tanks 26, 41, and 42). Using the Tank 41 current configuration as the baseline, the analysis considers the impact on blending if: 1) the distance between the pump discharge nozzle and the liquid surface increases above the baseline, 2) the distance between the pump discharge nozzle and the liquid surface decreases below the baseline, 3) the distance between the pump discharge nozzle and the sludge layer at the bottom of the tank increases above the baseline, or 4) the distance between the pump discharge nozzle and the sludge layer at the bottom of the tank decreases below the baseline, each while maintaining the minimum U 0 D of 5.1 ft 2 /s. Per subsequent direction from SRR, the minimum distance between the pump discharge nozzle and the sludge will be 165.86 inches. Hence, distances less than 165.86 inches between the pump discharge nozzle and the sludge were not included in the analysis. In addition, SRR requested SRNL to evaluate the impact of the abandoned in place, failed slurry pumps in Tank 42 on liquid blending.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Results of the Supplementary Analyses of Salt Batch 10 and 11 Samples

Supplementary analyses of material from the Interim Salt Disposition Project (ISDP) Salt Batch (SB) 10 and Salt Batch 11 (SB11) samples were analyzed beyond what is described in previous reports. These additional analyses are required to verify these materials meet Salt Waste Processing Facility (SWPF) Waste Acceptance Criteria (WAC) feed requirements. The stored SB10 and SB11 samples have been analyzed without filtering and the results found to be very similar to the previous filtered analyses performed for SB10 and SB11. The only result of significant difference is the wt% insoluble solids result for the SB11 sample. It would appear the newer method of analyzing larger volumes gives more accurate measurements for solutions with low quantities of solids.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Analysis and Testing of Parsons NGS Solvent Formulation

Three drums containing solvent used during the Next Generation Solvent Test (NGST) conducted by Parsons in 2014-2015 were received at SRNL. After homogenization, samples from each drum were removed, and a composite sample prepared. This composite was analyzed to determine current SRNL characterization method efficacy, and to determine if the 1,3-dicyclohexyl-2- (isotridecyl) guanidine (DCiTG) suppressor could be selectively removed. The results of this work indicate that the titration analytical method currently employed at SRNL is effective at quantitating the DCiTG. The nuclear magnetic resonance (NMR) method at SRNL can detect the DCiTG, as well its amine and urea decomposition products. However, further development work will be required to allow the 1 H NMR method to quantitate these species. A series of three washing tests were performed on composite samples of the solvent. The results show that up to 67% of the DCiTG was removed from the solvent by simple washing, at multiple ratios of solvent: aqueous phase. This may indicate that a simple pathway exists to wash out the DCiTG and reclaim the solvent (~150 gallons) for future use at the Salt Waste Processing Facility (SWPF).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Results of the Short-Term Analyses of the Salt (Macro) Batch 5 Tank 41H Qualification Sample (Resample)

Savannah River National Laboratory (SRNL) analyzed samples from Tank 41H in November 2021 in support of qualification of Salt Waste Processing Facility (SWPF) Salt Batch 5. This document reports the short-term results of the analyses of samples of Tank 41H. Analysis of the Tank 41H Salt Batch 5 sample indicates that the material does not display any unusual characteristics or observations, such as floating solids, the presence of large amounts of solids, or unusual colors. Further sample results will be reported in a future document. This report satisfies part of Deliverable 3 of the Technical Task Request (TTR). After a data review it was found that the original results reported in the revision 0 of this document were actually from Salt Batch 4 (Tank 21H). A new set of samples was sent for analysis to satisfy deliverable 3 of the TTR. The results from the original analyses have been replaced with the recent analyses of the actual Salt Batch 5 sample.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Results of Long-Term Analyses of the Salt (Macro) Batch 5 Tank 41h Qualification Sample (Resample)

Savannah River National Laboratory (SRNL) analyzed samples from Tank 41H in support of qualification of Salt Water Processing Facility (SWPF) Salt Batch 5. This document reports the long-term results of the analyses of samples of Tank 41H. Analysis of the Tank 41H Salt Batch 5 sample indicated that the material does not display any unusual characteristics or observations, such as floating solids, the presence of large amounts of solids, or unusual colors. This memo satisfies Deliverable 3 of the Technical Task Request (TTR). After a data review it was found that the original results reports in the revision 0 of this document were actually from Salt Batch 4 (Tank 21H). A new set of samples was sent for analysis to satisfy Deliverable 3 of the TTR. The results from the original analyses have been replaced with the recent analyses of the actual Salt Batch 5 sample.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Results of the Analyses of the SRNL Solvent Components

At the request of the Savannah River Mission Completion (SRMC), personnel at Savannah River Site (SRS) performed analyses on the remaining solvent components that are being stored at the Savannah River National Laboratory (SRNL). This was done to determine if the remaining stock of materials were still suitable for use for the Salt Waste processing Facility (SWPF). Two drums of Modifier, two drums BOBCalix, four drums of MAXCalix, and four jars of TiDG*HCl were analyzed. All were found to be of acceptable purity for use.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗