Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Roadmapping”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

Used fuel disposition research and development roadmap - FY10 status.

Since 1987 the U.S. has focused research and development activities relevant to the disposal of commercial used nuclear fuel and U.S. Department of Energy (DOE) owned spent nuclear fuel and high level waste on the proposed repository at Yucca Mountain, Nevada. At the same time, the U.S. successfully deployed a deep geologic disposal facility for defense-related transuranic waste in bedded salt at the Waste Isolation Pilot Plant. In 2009 the DOE established the Used Fuel Disposition Campaign (UFDC) within the Office of Nuclear Energy. The Mission of the UFDC is to identify alternatives and conduct scientific research and technology development to enable storage, transportation and disposal of used nuclear fuel and wastes generated by existing and future nuclear fuel cycles. The U.S. national laboratories have participated on these programs and has conducted research and development related to these issues to a limited extent. However, a comprehensive research and development (R&D) program investigating a variety of geologic media has not been a part of the U.S. waste management program since the mid 1980s. Such a comprehensive R&D program is being developed in the UFDC with a goal of meeting the UFDC Grand Challenge to provide a sound technical basis for absolute confidence in the safety and security of long-term storage, transportation, and disposal of used nuclear fuel and wastes from the nuclear energy enterprise. The DOE has decided to no longer pursue the development of a repository at Yucca Mountain, Nevada. Since a repository site will ultimately have to be selected, sited, characterized, designed, and licensed, other disposal options must now be considered. In addition to the unsaturated volcanic tuff evaluated at Yucca Mountain, several different geologic media are under investigation internationally and preliminary assessments indicate that disposal of used nuclear fuel and high level waste in these media is feasible. Considerable progress has been made in the U.S. and other nations in understanding disposal concepts in different geologic media, but gaps in knowledge still exist. A principal aspect of concern to the UFDC as it considers the broad issues of siting a repository in different geologic media are the marked differences in the regulatory bases for assessing suitability and safety of a repository between the U.S. and other nations. Because the probability based - risked informed nature of the current U.S. regulations for high-level radioactive waste and spent nuclear fuel is sufficiently different from other regulations, information gained in previous studies, while useful, likely need to be supplemented to enable more convincing communication with the public, better defense of the numerical models, and stronger safety cases. Thus, it was recognized when the UFDC was established that there were readily identified disposal-related R&D opportunities to address knowledge gaps. An effort to document these research opportunities was a key component of Fiscal Year (FY) 2010 engineered system, natural system, and system-level modeling activities for a range of disposal environments. A principal contribution to identifying these gaps was a workshop held to gather perspectives from experts both within and external to the UFDC regarding R&D opportunities. In the planning for FY2010 it was expected that these activities would culminate with a UFDC research and development roadmap that would identify the knowledge gaps, discuss the R&D needed to fill these gaps, and prioritize the proposed R&D over both the near- and long-term. A number of knowledge gaps and needed R&D were identified and are discussed in this report. However, these preliminary R&D topics have not been evaluated in detail nor have they been prioritized to support future planning efforts. This will be completed in FY11 and the final UFDC Research and Development Roadmap will be completed. This report discusses proposed R&D topics in three areas related to repository siting, design, and performance: natural systems, engineered systems, and overall disposal system. The intent of this report is to consolidate the proposed R&D topics to support subsequent discussions among UFDC and external expertise to identify additional R&D needs and to prioritize these needs, leading to the development for the UFDC Research and Development Roadmap.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Fluoride Salt-Cooled High-Temperature Reactor Technology Development and Demonstration Roadmap

Fluoride salt-cooled High-temperature Reactors (FHRs) are an emerging reactor class with potentially advantageous performance characteristics, and fully passive safety. This roadmap describes the principal remaining FHR technology challenges and the development path needed to address the challenges. This roadmap also provides an integrated overview of the current status of the broad set of technologies necessary to design, evaluate, license, construct, operate, and maintain FHRs. First-generation FHRs will not require any technology breakthroughs, but do require significant concept development, system integration, and technology maturation. FHRs are currently entering early phase engineering development. As such, this roadmap is not as technically detailed or specific as would be the case for a more mature reactor class. The higher cost of fuel and coolant, the lack of an approved licensing framework, the lack of qualified, salt-compatible structural materials, and the potential for tritium release into the environment are the most obvious issues that remain to be resolved.

Holcomb, David Eugene↗

Windows and Building Envelope Research and Development: A Roadmap for Emerging Technologies

This Building Technologies Office (BTO) Research and Development (R&D) Roadmap identifies priority windows and building envelope R&D areas of interest. Cost and performance targets are identified for each key R&D area. The roadmap describes the technical and market challenges to be overcome, R&D activities and milestones, key stakeholders, and potential energy savings that could result if cost and performance targets are met. Methods for improving technology performance and specific strategies for reducing installed costs and mitigating any other market barriers, which would increase the likelihood of mass-market technology adoption, are identified. This roadmap is a useful resource for public and private decision makers evaluating and pursuing high-impact R&D focused on advancing next-generation energy efficient windows and building envelope technologies.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

EV Charging Infrastructure Roadmap

As highlighted in the U.S. Department of Energy’s EV Everywhere Grand Challenge, vehicle technology is advancing toward an objective to “… produce plug-in electric vehicles that are as affordable and convenient for the average American family as today’s gasoline-powered vehicles …” [1] by developing more efficient drivetrains, greater battery energy storage per dollar, and lighter-weight vehicle components and construction. With this technology advancement and improved vehicle performance, the objective for charging infrastructure is to promote vehicle adoption and maximize the number of electric miles driven. The EV Everywhere Charging Infrastructure Roadmap (hereafter referred to as Roadmap) looks forward and assumes that the technical challenges and vehicle performance improvements set forth in the EV Everywhere Grand Challenge will be met. The Roadmap identifies and prioritizes deployment of charging infrastructure in support of this charging infrastructure objective for the EV Everywhere Grand Challenge

33 ADVANCED PROPULSION SYSTEMS↗

Carbon Dioxide Utilization (CO2U) ICEF Roadmap 2.0. Draft October 2017

Last year, experts from CO 2 Sciences, Columbia University and Valence Strategic came together to develop a roadmap. That document, Carbon Dioxide Utilization ICEF Roadmap 1.0, released at the UNFCCC Marrakesh Climate Change Conference in 2016, surveyed the commercial and technical landscape of CO 2 conversion and use. The document provided extensive background and analysis and has helped to provide a foundation for additional studies, including this one.This roadmap is meant to complement and expand upon the work of its predecessor. Based in part on a workshop at Columbia University’s Center on Global Energy Policy in July 2017, it explores three distinct categories of CO 2 -based products, the technologies that can be harnessed to convert CO2 to these products, and the associated research and development needs. It also explores the complicated topic of life cycle analysis—critically important when considering the climate impacts of CO 2 conversion and use—as well as policy tools that could be used to promote CO 2 -based products.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

River Protection Project Technology and Innovation Roadmap.

The Technology and Innovation Roadmap is a planning tool for WRPS management, DOE ORP, DOE EM, and others to understand the risks and technology gaps associated with the RPP mission. The roadmap identifies and prioritizes technical areas that require technology solutions and underscores where timely and appropriate technology development can have the greatest impact to reduce those risks and uncertainties. The roadmap also serves as a tool for determining allocation of resources.

54 ENVIRONMENTAL SCIENCES↗

Wind Vision Detailed Roadmap Actions: 2017 Update

In March 2015, the U.S. Department of Energy (DOE) released Wind Vision: A New Era for Wind Power in the United States, which explores and quantifies the economic and environmental costs and benefits of a scenario in which wind provides 10% of U.S. electrical demand in 2020, 20% in 2030, and 35% in 2050. The Wind Vision report also includes a Roadmap that describes actions stakeholders can pursue to achieve the vision and its underlying wind deployment scenario. The Wind Vision and its Roadmap were compiled by representatives from DOE and its national laboratories in consultation with the wind industry, trade associations, academia, environmental organizations, and other stakeholders. When the Wind Vision was released in 2015, DOE announced its intention to engage the wind community from time to time to track progress and update the Roadmap periodically.

17 WIND ENERGY↗

Transactive Energy Systems Research, Development and Deployment Roadmap

The GWAC transactive energy roadmap outlines a vision and path forward to achieve deployment of transactive energy systems at scale as an operational element of the electric power system to facilitate the integration of distributed energy resources and dynamic end-uses such as connected buildings. It also considers the application of transactive energy systems for the coordination and control for end-uses, for example, in managing energy in buildings and campuses. The roadmap considers drivers of change, triggers for transactive energy system deployment, and required infrastructure for deployment at scale. Gaps in technology and infrastructure that may require investment are identified. The roadmap captures potential changes over time (Stages) and organizes them by business and technical Tracks. Within each Track it also groups potential changes into Swim Lanes that identify what it is that we hope to see, what it takes for this to occur, what we see as a result, and what these features do to add value.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Technology and Innovation Roadmap

This Technology and Innovation Roadmap (Roadmap) presents a comprehensive, integrated assessment of the technology elements related to maintaining the River Protection Project baseline, reducing risk, and providing opportunity for improvement. These elements contribute to achieving successful completion of the Hanford Site tank waste cleanup mission. Key near-term U.S. Department of Energy (DOE), Office of River Protection (ORP) River Protection Project (RPP) mission needs with respect to the next 10 years are identified and prioritized. This Roadmap is used to assist with planning near-term scope to address technology development priorities in fiscal year 2021.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Technology and Innovation Roadmap

This Technology and Innovation Roadmap (Roadmap) presents a comprehensive and integrated assessment of the technology elements related to maintaining the River Protection Project (RPP) baseline, reducing risk, and providing opportunity for improvement. These elements contribute to achieving successful completion of the Hanford Site tank waste cleanup mission. Key near-term U.S. Department of Energy (DOE), Office of River Protection (ORP) RPP mission needs with respect to the next 5 years are identified and prioritized. This Roadmap is used to assist with planning near-term scope to address technology development priorities in fiscal year 2023 (FY23).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

National Reactor Innovation Center (NRIC) Grid Connection Roadmap

In an effort to define the roadmap for establishing the necessary electrical infrastructure at the Idaho National Laboratory to fully support connection of NRIC reactors, this roadmap serves to identify the current forecasted reactors planned for installation at INL and provide a consolidated list of the identified infrastructure improvements that will be necessary to support testing of NRIC reactors. Additionally, the roadmap will leverage this information to establish an integrated timeline to support detailed planning and execution of system improvements. To drive this planning, requirements, as derived from authoritative sources, will be identified. A clear definition of impacted stakeholders will be established, as well as a list of risks that will need to be managed as the program moves forward.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Interoperability Maturity Roadmap Methodology, V1.3

The Interoperability Roadmap Methodology document supports the U.S. Department of Energy (DOE) Grid Modernization Laboratory Consortium (GMLC) Interoperability Project’s efforts to advance interoperability as an essential component for the successful and more seamless integration of intelligent, communicating technologies into the electric power system. This proposed methodology supports the strategic approach to advance interoperability described in the GMLC Interoperability Project’s Interoperability Strategic Vision: Enabling an Interactive Grid. That document proposes engaging an ecosystem of businesses interested in integrating smart technology with the electric power system to develop an interoperability roadmap using a methodical approach. This roadmap methodology is to be applied to technology integration ecosystems (e.g., electric vehicles, photovoltaic inverters, or automated buildings), using tools that measure the state of interoperability today, to identify the gaps and challenges that can be overcome to improve interoperability, and thereby, simplify the integration process.

24 POWER TRANSMISSION AND DISTRIBUTION↗

National Reactor Innovation Center (NRIC) Grid Connection Roadmap (Rev. 1)

In an effort to define the roadmap for establishing the necessary electrical infrastructure at the Idaho National Laboratory to fully support connection of NRIC reactors, this roadmap serves to identify the current forecasted reactors planned for installation at INL and provide a consolidated list of the identified infrastructure improvements that will be necessary to support testing of NRIC reactors. Additionally, the roadmap will leverage this information to establish an integrated timeline to support detailed planning and execution of system improvements. To drive this planning, requirements, as derived from authoritative sources, will be identified. A clear definition of impacted stakeholders will be established, as well as a list of risks that will need to be managed as the program moves forward.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Roadmap for IES Modeling and Simulation Activities: Update 2023

Since inception of the DOE-NE Integrated Energy Systems (IES) program, several program and modeling visions and roadmaps have been published. In 2020, a last comprehensive roadmap for the DOE-NE Integrated Energy Systems program was published. In 2017, a separate modeling and simulation capability development plan was published that was extensively updated in 2022. The current report incrementally updates the 2022 modeling and simulation capability roadmap. This is not a new report, but individual sections have been updated to reflect recent accomplishments and new directions of the program. The role of modeling and simulation within IES is to support the demonstration of new coupled integrated technologies along every step of the technology maturation from the strategic analysis of preferred system architecture to preliminary design, to laboratory testing, up to full commercial testing and integration. To achieve this role, modeling and simulation must be able to assess the technical performance and the economic viability of potential IES. Also, modeling and simulation must provide support for experimental evaluations (i.e., support component design and real-time operations of experimental demonstration systems). Finally, modeling and simulation can help scale-up experimental systems to the final commercial systems. This report details the current state of the modeling and simulation efforts within IES for the above-mentioned areas, provides a gap analysis, and proposes next steps for a time horizon over the next years.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Transmission Interconnection Roadmap: Transforming Bulk Transmission Interconnection by 2035

The U.S. electricity system is amid a rapidly occurring and widespread energy transition. Regional, Tribal, state, and customer demand for new energy resources, combined with favorable policies, is driving a rapid rise of interconnection requests. Interconnection processes will need to evolve to handle this larger number of requests today and into the future, as policy and economic drivers continue to motivate significant resource development. This roadmap identifies and organizes nearer- and longer-term solutions to enable transmission interconnection processes to meet this expected demand, and it is intended for a diverse audience of stakeholders participating within transmission interconnection processes. The roadmap is a result of the Interconnection Innovation e-Xchange (i2X) program launched by the U.S. Department of Energy (DOE) in June 2022 to convene stakeholders and address interconnection challenges. The roadmap is organized into four primary goal areas, each important to the overall i2X mission to enable a simpler, faster, and fairer interconnection of clean energy resources while enhancing the reliability, resiliency, and security of our electric grid. The first goal aims to improve interconnection data transparency, to aid interconnection customers’ ability to screen and site potential projects, better enable third-party modeling, facilitate more process automation, enhance competition while ensuring equitable outcomes, and enable benchmarking, tracking, and auditing of interconnection processes and reforms. The second goal covers solutions to improve queue management practices, affected system studies, fair processes, and workforce development. The third goal incorporates solutions that aim to improve cost allocation, reduce costs to electricity consumers, enhance the coordination between transmission planning and the interconnection process, and optimize the rightsizing of transmission investment through improvements in interconnection studies. The fourth and final goal aims to reduce the performance issues not identified during interconnection studies by updating technical requirements within interconnection studies, models, and tools while also improving industry interconnection standards.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Technology and Innovation Roadmap

This Technology and Innovation Roadmap outlines the Hanford Tank Waste Operations & Closure, LLC (H2C) strategic approach for advancing the Hanford Tank Waste Treatment Mission (HTWTM) through technology development. Our focus is on addressing technology needs that address risks, enhance efficiency, ensure worker safety, and uphold environmental standards. This Roadmap identifies key technology initiatives essential for the successful completion of the Hanford Site tank waste cleanup. Updated annually, it incorporates insights from the U.S. Department of Energy (DOE), the Integrated Tank Disposition Contractor (ITDC) H2C, recognized national lab experts, and fieldwork specialists. The Roadmap includes approximately 100 technology elements, each detailed in Technology Element Description Summaries (TEDS) and summarized in catalog sheets. These elements are crucial for aligning technology development activities with mission objectives across the HTWTM. With the initiation of the Direct-Feed Low-Activity Waste (DFLAW) program and the operation of the Tank Side Cesium Removal (TSCR) system, our focus now shifts to the support of scaled up production in East Area; applying similar and exploring new treatment alternatives to West Area Tank Waste; and advancing retrieval, delivery and treatment technologies for waste managed as high-level waste (HLW) across the Hanford tank farms. This transition is reflected in the technology and maturation (TM&E) charts, which highlight the evolving technology priorities. This document serves as a guide for navigating the challenges and opportunities in technology development at the Hanford Site.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Toward Trustworthy Autonomous Science: A Two-Year Community Roadmap

One year ago, the AISLE roadmap argued that autonomous laboratories operated as isolated islands and proposed a grassroots network organized around five critical dimensions. The field has since moved faster than that roadmap anticipated: multi-agent systems have produced experimentally validated hypotheses, self-driving laboratories have grown more interoperable and orchestrated, reasoning-trained and domain foundation models have raised the capability ceiling, and the Genesis Mission has placed autonomous experimentation at the center of U.S. federal science strategy, with industry emerging as a primary actor. Progress has met a sobering counter-current, including a corrected flagship discovery result, benchmarks showing that agents which rival experts on closed-ended questions still complete only a fraction of open-ended research, and fabricated citations surfacing at leading venues. We read this as the defining tension of the field: producing a candidate discovery is no longer the hard part, but verifying it is, and this asymmetry now limits autonomous science more than raw model capability. Accordingly, we update the roadmap around seven dimensions, revisiting the original five and elevating two former cross-cutting concerns, trust, verification, and reproducibility, and safety, security, and governance, to first-class status. We assess the original milestones (M1 through M14) as achieved, partially achieved, reframed, or open, add four new milestones (M15 through M18) for the elevated dimensions, and scope the path forward to a two-year horizon, with the first year concentrating on interfaces, protocol adoption, and the scaffolding of verification, and the second targeting federation, zero-trust coordination, and governance. Throughout, we position the grassroots network as the interoperability fabric that lets national programs, international initiatives, and commercial platforms connect rather than re-silo.

99 GENERAL AND MISCELLANEOUS↗

Roadmap for warm dense matter physics

This roadmap presents the state-of-the-art, current challenges and near future developments anticipated in the thriving field of warm dense matter physics. Originating from strongly coupled plasma physics, high pressure physics and high energy density science, the warm dense matter physics community has recently taken a giant leap forward. This is due to spectacular developments in laser technology, diagnostic capabilities, and computer simulation techniques. Only in the last decade has it become possible to perform accurate enough simulations \& experiments to truly verify theoretical results as well as to reliably design experiments based on predictions. Consequently, this roadmap discusses recent developments and contemporary challenges that are faced by theoretical methods, and experimental techniques needed to create and diagnose warm dense matter. A large part of this roadmap is dedicated to specific warm dense matter systems and applications in astrophysics, inertial confinement fusion and novel material synthesis.

FOS: Physical sciences↗