Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Risk-Informed Approach”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

Development and Application of a Data-Driven Methodology for Validation of Risk-Informed Safety Margin Characterization Models

The document is the Final Technical Progress Report for the Nuclear Energy University Program’s Integrated Research Project (IRP) on “Development and Application of a Data-Driven Methodology for Validation of Risk-Informed Safety Margin Characterization Models” that supports the LWR Sustainability Program’s RISMC R&D Pathway. The project goal is to develop and demonstrate a data-driven methodology for validation of advanced computer models used in nuclear power plant safety analysis. Specifically, the advanced computer models are those in the toolkit developed to support risk-informed safety margin characterization (RISMC), an integrated deterministic/probabilistic safety analysis methodology developed in the Department of Energy’s Light Water Reactor Sustainability (LWR-S) program. The report reflects the progress made towards the project’s stated goal by contributions by researchers and graduate students from universities, with support from researchers from national laboratories and industry companies. The project organization, effort coordination and technical implementation are summarized, followed by discussion of main findings, issues, and path forward. Selected chapters provide a more detailed description of tasks, approaches and respective findings and recommendations. Noteworthy are contributions that serve as guidelines for methodology development. It is also noted that this report is complemented by other milestone reports (as stand-alone deliverables) that provide detailed discussion of the technical developments. The project results have been documented in a number (12) dissertations and these, 50+ peer-reviewed publications in technical journals and conference proceedings.

42 ENGINEERING↗

STOCHASTIC OPTIMIZATION FOR LONG TERM CAPITAL STRUCTURES, SYSTEMS, AND COMPONENTS REFURBISHMENT AND REPLACEMENT

As commercial nuclear power plants (NPPs) pursue extended plant operations in the form of Second License Renewals (SLRs), opportunities exist for these plants to provide capital investments to ensure long-term, safe, and economic performance. Several utilities have already announced their intention to pursue extended operations for one or more of their NPPs via SLR2. The goal of this research is to develop a riskinformed approach to evaluate and prioritize plant capital investments made in preparation for, and during the period of, extended plant operations to support decisions in NPP operations. In order to prioritize project selection via a riskinformed approach we developed a single decision-making tool that integrates safety/reliability, cost, and stochastic optimization models to provide users with data analysis capabilities to more cost effectively manage plant assets. Both stochastic analysis methods—such as Monte Carlo-based sampling strategies—and multi-stage stochastic optimization strategies are employed to provide priority lists to decisionmakers in support of risk-informed decisions. We applied the proposed method to a trial application of projected replacement/refurbishment expenditures for plant capital assets (i.e., Structures, Systems, and Components [SSCs]). The objective is to optimize the SSC replacement/refurbishment schedule in terms of economic constraints, data uncertainties, and SSC reliability data, as well to generate a priority list for maximizing returns on investment.

42 ENGINEERING↗

Markov Decision Processes for Intelligent, Risk-Informed Asset-Management Decision-Making

Advanced nuclear reactors are a promising option for aiding the world in achieving its net-zero carbon emission goals, however, there are significant challenges to attaining and maintaining economic competitiveness with other sources of electricity. To improve the economic competitiveness of advanced reactor designs, a project was initiated to explore the use of Markov Decision Processes (MDPs) to guide asset-management decision-making during advanced reactor operation. MDPs are a powerful tool for optimizing decision-making in complex environments and their application to advanced reactors can aid in planning maintenance and repair activities to minimize downtime and maximize generation. The described approach expands on previous work regarding the use of MDPs for operational decision-making through the direct incorporation of real-time plant information. The integral MDP analysis includes information from online component diagnostic tools and the plant’s real-time generation risk assessment (GRA) and probabilistic risk assessment (PRA), which evaluate plant risk from both an economic and safety perspective. The result is an asset-management optimization framework that is based on real-time data regarding plant component status and the current best-estimate of plant risk. The paper presents an overview of the theoretical framework to incorporate the different information pathways into an integral MDP analysis, along with example analyses.

Grabaskas, David↗

Modernization of Technical Requirements for Licensing of Advanced Non-Light Water Reactors: Probabilistic Risk Assessment Approach

This report, “Modernization of Technical Requirements for Licensing of Advanced Non-Light Water Reactors: Probabilistic Risk Assessment Approach,” represents a key element in the development of a methodology for the efficient licensing of advanced non-light water reactors (non-LWRs). It is the result of a Licensing Modernization Project (LMP) led by Southern Company and cost-shared by the U.S. Department of Energy (DOE). The LMP has developed detailed proposals for establishing licensing technical requirements to facilitate risk-informed and performance-based design and licensing of advanced non-LWRs. Such a methodology acknowledges enhancements in safety achievable with advanced designs and reflects more recent states of knowledge regarding safety and design innovation, creating an opportunity for reduced regulatory complexity with increased levels of safety. The project builds on best practices, as well as previous activities through DOE and industry-sponsored advanced reactor licensing initiatives.

42 ENGINEERING↗

Machine Learning and Economic Models to Enable Risk-Informed Condition Based Maintenance of a Nuclear Plant Asset

The primary objective of this research is to address challenges in the implementation of risk-informed, condition-based predictive maintenance (PdM), which reduces operating costs while still maintaining the safety and reliability of commercial nuclear power plants (NPPs). To achieve the objective, risk models are being developed by taking advantage of advancements in data analytics, deep learning, machine learning (ML), and artificial intelligence (AI). The notable outcomes presented in the report include ? Development of a ML models using heterogeneous plant process and vibration data collected at different spatial and temporal resolutions from the Salem?s CWS to diagnose a circulating water pump (CWP) failure based on salient fault signatures. The developed diagnostic models are extendable to other faults associated with CWPs and CWP motors given associated fault signatures. ? Development of a natural language processing (NLP) technique to automatically classify the WO data into different categories. The developed NLP technique was validated on independent WO data. This automates the tedious and time-consuming activity of mining and classifying WOs by subject matter experts. ? Estimation of mean time between downtime (i.e., time duration between time instances when 1 or more CWPs are not available) and developed an approach to establish reliability of CWS components using unstructured WO data along with CWS plant process data. ? Formulation of economic model based on Markov chain models. The parameters of associated with the transition rate between different states of Markov chain models were estimated using WO data. The economic model formulation and discussion captures both time-independent and time-dependent parameter variation, leading to risk-informed decision-making.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Developing a Process for Collaboration-Based Siting of a Federal Consolidated Interim Storage Facility in the United States: Learning from Communities Living with Legacy Waste

In June of 2023, the U.S. Department of Energy (DOE), Office of Nuclear Energy (NE) announced the selection of its Collaboration-Based Siting (CBS) Consortia, a group of 12 awardees, including the Consortium for Risk Evaluation with Stakeholder Participation (CRESP) (led by Vanderbilt University) to assist DOE-NE with the development of its process for siting a federal consolidated interim storage facility (FCISF) for spent nuclear fuel (SNF) storage. At this time, DOE NE is not soliciting interested host communities, rather the CBS Consortia are tasked with in-depth engagement, mutual learning, and capacity building to provide DOE NE with feedback on the CBS process. CRESP’s objective is to engage communities in two regions (the Pacific Northwest and the Southeast) with sites currently storing defense- and research-related SNF to foster learning concerning the best and worst practices in community participation in risk-informed decision making. This includes learning from existing structures for public input in radioactive waste management decision making [e.g. citizen advisory boards (CABs)] and other local parties about how to build and sustain trust among the parties. CRESP has been working to engage stakeholders and Tribes surrounding two DOE sites historically differing in receptiveness to engaging with DOE and trusting in DOE to accomplish its missions. CRESP’s approach to date has consisted of (1) engaging voluntarily members and former members of the DOE Office of Environmental Management’s CABs to develop a mutual understanding of their perspectives, values, and experiences related to risk and participatory decision making; (2) engaging members of those communities that would likely be part of any radioactive waste management discussions and who may provide valuable feedback for the development of the CBS process; and in the longer term, (3) engaging communities to foster knowledge sharing on understanding and definitions of risk and how risk is factored into community decision making. Our emphasis is to identify opportunities for improving risk communication frameworks, strategies, and decision making. The selection of a future FCISF site is likely to result in the creation of a structure similar to a CAB composed of members of the local community. We anticipate that these insights can help DOE NE learn from existing participatory risk communication structures in place at sites storing defenseor research-related SNF to understand best practices for fostering enduring and participatory relationships with future CABs. Within this paper, we (1) describe CRESP’s overall approach to assisting DOE NE with maturing the CBS process; (2) present a summary of preliminary phase 1 project results, including the development of a body of knowledge (describing available resources to support community engagement, risk communica tion, and participatory decision making) and community ecosystem information (leveraging demographic, social, economic, and environmental attribute mapping and advanced sentiment analysis of social media data); and (3) based on these results, provide observations for future research opportunities to support the development of CBS processes for radioactive waste management facilities, generally.

collaboration-based siting↗

Templates for Risk Informed Assurance with Curvature Embeddings (TRACE)

We investigate recovery of geometric structure from networks embedded in manifolds with spatially varying curvature, extending the constant-curvature framework of Lubold et al. (2023). Our work supports cascade risk assessment in critical infrastructure through the Templates for Risk-informed Assurance with Curvature Embeddings (TRACE) framework. Simulations on a bi-modal Gaussian surface show that constant-curvature methods yield weighted averages shaped by clique patterns, while hierarchical clustering identifies distinct regimes. Localized estimation, however, reveals boundary contamination in transitional regions. To address heterogeneity, we develop distance metrics for graphs with edge and node features, proving their metric validity, and validate them via deterministic graph generation from canonical tilings. We further propose a diffusion-based anomaly detection approach that treats networks as glued manifolds, using curvature discontinuities to detect structural anomalies. Employing the carré-du-champ operator and scalar curvature, we achieve robust anomaly discrimination, demonstrated on the Singapore Water Treatment (SWaT) dataset with joint network-traffic and sensor features. Integration with TRACE reveals how curvature shapes cascade dynamics: positive curvature impedes, while negative curvature accelerates propagation. This geometric perspective provides interpretable risk metrics and visualization tools for critical infrastructure managers. While full validation remains ongoing, our contributions establish a rigorous foundation for geometric analysis of network resilience and cascade vulnerability.

97 MATHEMATICS AND COMPUTING↗

Distributionally Robust Decentralized Volt-Var Control With Network Reconfiguration

Here, this paper presents a decentralized volt-var optimization (VVO) and network reconfiguration strategy to address the challenges arising from the growing integration of distributed energy resources, particularly photovoltaic (PV) generation units, in active distribution networks. To reconcile control measures with different time resolutions and empower local control centers to handle intermittency locally, the proposed approach leverages a two-stage distributionally robust optimization; decisions on slow-responding control measures and set points that link neighboring subnetworks are made in advance while considering all plausible distributions of uncertain PV outputs. We present a decomposition algorithm with an acceleration scheme for solving the proposed model. Numerical experiments on the IEEE 123 bus distribution system are given to demonstrate its outstanding out-of-sample performance and computational efficiency, which suggests that the proposed method can effectively localize uncertainty via risk-informed proactive timely decisions.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Flexible Siting Criteria and Staff Minimization for Micro-Reactors

The economic potential of micro-reactors is vast and underestimated. Commonly-emphasized applications include niche markets such as remote communities, mines and military bases. However, micro-reactors could be used as flexible energy generators also for larger markets, such as mobile and containerized agriculture and manufacturing facilities, district heating, micro-grids for data centers, sea ports, airports and hospitals. The implication is that micro-reactors may have to be deployed also in non-remote locations. Successful implementation of micro-reactors needs a navigable and predictable licensing process, technology-appropriate siting restrictions, risk-informed emergency and safety requirements, and practical operating and maintenance requirements. The primary goal of this project was to develop siting criteria that are tailored to micro-reactors deployable in densely-populated areas, e.g., urban environments. To achieve that goal, we compared the characteristics of the MIT research reactor (MITR) with those of leading micro-reactor concepts (e.g., eVinci, USNC, Aurora), and evaluated whether and how the MITR design basis (e.g., inherent safety features, engineered safety systems, source term, emergency planning and emergency operating procedures) and associated regulations may be applicable to these new micro-reactors as well. What makes MITR a unique analogue in this context is its small power rating (6 MWt) and physical size, mode of operations (24/7 with a somewhat more commercial flavor than typical university reactors), and especially its urban location. Of course significant differences exist, such as mission (power production vs. research) and the reactor design itself. Leveraging the MITR experience, this project was able to generate criteria that will allow micro-reactors to realize their full economic potential as flexible heat and electricity generators for a diverse portfolio of applications in non-remote locations. As such, the outcome of this project might encourage investment in and use of micro-reactors. A second goal of the project was to conceptualize a model of operations for micro-reactors that would minimize the staffing requirements, and thus reduce the cost of electricity and heat generated by these systems. Here too our approach was to systematically review the MITR experience and requirements, as well as survey the innovations in autonomous control technologies and monitoring (e.g., advanced sensors, drones, robotics, AI) that would permit a dramatic reduction in staffing at future micro-reactor installations. The scope of work was expanded after the start date to include also an evaluation of micro-reactor security, using the so-called consequence-based analysis, and the development of a methodology to perform dynamic risk assessment for micro-reactors, using system theory and modeling and simulation.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Risk assessment of wellbore leakage during underground hydrogen storage

The expansion of renewable energy sources would require large-scale energy storage options to overcome the intermittent nature of these sources. Underground hydrogen storage (UHS) in depleted hydrocarbon reservoirs offers a scalable and practical energy storage solution. These reservoirs are chosen for their availability and large capacity, but the unique properties of hydrogen raise concerns about potential leakage pathways, particularly through wellbores. In this study, we develop and apply, for the first time, reduced-order models (ROMs) specifically designed for efficient leakage risk prediction in UHS systems operating in depleted hydrocarbon reservoirs. Using 3,000 high-fidelity simulation scenarios, we examine the influence of 11 key parameters, including reservoir and aquifer depths, wellbore permeability and porosity, initial saturations of water, oil and gas fractions (hydrogen, light, intermediate, and heavy hydrocarbons), reservoir pressure multiplier, and the aquifer-to-reservoir volume ratio, to simulate leakage behavior over a 1,000-year timescale. We train ROMs using a two-step classification-regression approach, achieving R 2 values exceeding 99 % across all targets. These ROMs effectively capture the leakage evolution and identify critical controls of leakage, guiding the design of mitigation strategies. Results indicate that gas leakage occurs in about 27 % of scenarios as early as five years post-operation, reaching volumes of up to 106 ft3. Oil leakage is less frequent (~17 %) and typically begins decades later. Our findings also show that hydrogen often migrates first, owing to its smaller molecular size and higher buoyancy, followed by heavier hydrocarbons. Over time, these heavier components contribute significantly to the total leaked volume, reinforcing the need for targeted monitoring and remediation strategies. Our analysis highlights that deeper storage reservoirs, shallower aquifers, and low-permeability wellbores significantly reduce leakage risks. In conclusion, this work offers a robust framework for risk-informed UHS deployment, supporting energy security through reliable large-scale hydrogen storage while safeguarding environmental integrity.

08 HYDROGEN↗

Development of Dry Cask Risk Tools

The Nuclear Regulatory Commission (NRC) has repeatedly expressed a desire to increase the use of risk in its decision-making. The Probabilistic Risk Assessment (PRA) Policy Statement published in 1995 formalized the Commission’s commitment to risk-informed regulation through the expanded use of PRA. While a great deal of work has been done to incorporate risk insights into the regulatory framework for at-power nuclear reactors. Far less progress has been made to risk inform the dry-casks and nuclear waste transportation areas of the nuclear fuel cycle. INL was tasked with incorporating the information from the two completed dry cask PRAs as well as any additional available information into a tool that helps the NRC use those insights to identify levels of risk at various stages in the nuclear waste cycle. The first task was to address the License Amendment Request (LAR) Process for Dry Cask storage, the second task is for the incorporate transportation into the tool, and the third and final task will be incorporate any additional regulatory applications for dry cask storage. This report covers the first task of the tool and will eventually incorporate the remaining two tasks may be completed in the future and built off the model described here. Task 1 specifically asked to incorporate the risk insights into the process for determining and prioritizing review of license amendment changes related to storage applications by outlining a resource allocation strategy and defining recommendations of for the depth and breadth of the LAR review. It was requested that the tool be similar in design to the SDP notebooks/worksheets and contain quantitative, qualitative, or semi-quantitative approaches to assessing the risk of the change. The final tool that was selected by INL to be developed was a flowchart and associated rationale document that allows the reviewer to quickly assess potential LAR changes and their associated risks as well as the rationale behind the risk categorization. This risk categorization will lead to specific actionable recommendations to expect from a change of that specific category. This allows for a more consistent review process as well as improving the overall efficiency of the review itself.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

Application of Point Precipitation Frequency Estimates to Watersheds

This report documents work sponsored by the U.S. Nuclear Regulatory Commission (NRC) at the Oak Ridge National Laboratory (ORNL) as part of the RES project, “Application of Point Precipitation Frequency Estimates to Watersheds.” This project was implemented as part of the Probabilistic Flood Hazard Assessment (PFHA) Research Program. The objective of the PFHA Research Program is to develop tools and guidance on the use of PFHA methods to risk-inform NRC’s licensing of new facilities as well as licensing and oversight of currently operating facilities as they relate to flooding hazards. Many nuclear power plants (NPPs) are located on or near rivers so riverine flooding hazards need to be considered in their design and operation. Probabilistic riverine flood models are important tools for realistic assessment of flooding risks. However, these models require areal estimates of the depth, duration, and frequency of rainfall distributed over the watershed, which are not often available. Point precipitation frequency estimates are more widely available. For example, the National Oceanic and Atmospheric Administration (NOAA) has published NOAA Atlas 14, which provides point precipitation frequency estimates for 5-minute through 60-day durations at average recurrence intervals of 1-year through 1,000-year. The research documented in this report addresses areal reduction factors (ARFs), which can be used to convert the widely available point precipitation frequency estimates, to estimates of areal precipitation frequency over a watershed. The most widely used ARF source is Technical Paper 29 (TP-29) published by the then U.S. Weather Bureau in 1958. However, both the methods and the underlying precipitation data used to produce TP-29 are seriously out of date. For example, due to the small gauge network available at the time of TP-29’s compilation, ARF estimates developed are only for watersheds smaller than about 400 square miles. Due to the relatively short record lengths of precipitation data available, frequency considerations could not be accurately determined. Other factors such as regional climate and seasonality were not addressed. Several newer methods have been published since TP-29 was developed and both the type and quantity of precipitation data have increased significantly, along with computational resources and analytical tools such as geographic information systems. This report reviewed and assessed the available precipitation products and methods for conducting ARF analysis. The work applied up-to-date precipitation data products and analysis methods with a novel watershed-based approach to investigate how ARF estimates vary across different methods, data sources, geographical locations, return periods, and seasons. The overall findings reported here regarding basic ARF trends are in line with other recent studies showing that ARFs decrease with increasing area, increase with increasing duration, and decrease with increasing return period. This study found significant differences among the available ARF methods. This work also found a strong geographical variability across different US hydrologic regions, suggesting that the ARF are specific to regional climate patterns and geographical characteristics and should not be applied arbitrarily to other locations. The results also reveal the importance of data record length, especially for high return level ARFs. The work reported in NUREG/CR-7271 will assist NRC staff in assessing different classes of ARF methods in conjunction with available rainfall data sets. It will also support the development of guidance for application of point precipitation data in PFHAs. It should be noted that the ARF values presented in this report for any location or region were developed for the purposes of comparing methods and investigating the factors that influence ARFs. They should not be considered official and should not be used in leu of a site-specific analysis.

54 ENVIRONMENTAL SCIENCES↗

Technical Specification Surveillance Interval Extension Using Self-Diagnostics

As part of the Light Water Reactor Sustainability program, an ongoing research effort is being conducted on technical specifications surveillance interval extension of digital equipment in nuclear power plants. The research team is led by Idaho National Laboratory and includes Pacific Northwest National Laboratory, Technology Resources, and Oak Ridge National Laboratory. This research focuses on developing methods for applying the U.S. Nuclear Regulatory Commission (NRC)–approved guidance to implement a licensee-controlled, risk-informed surveillance frequency change program in digital instrumentation and control (I&C) systems that include self-diagnostics and online monitoring (OLM) capabilities. Although approved methods exist for extending technical specifications (TS) surveillance test intervals (STIs) for general equipment, including analog I&C equipment, gaps remain in technology and guidance on crediting newer digital equipment’s internal self-diagnostics and OLM characteristics. Previous research described a general methodology for crediting internal self-diagnostics for extending surveillance test intervals. The methodology used self-diagnostics to detect—and credited recovery from—failure. Self-diagnostics were also applied for performance monitoring during the extended surveillance interval. This report discusses the status of recent activities to evaluate the previously developed methodology using a pilot study. Although both a utility partner for a pilot study and a specific digital asset were identified in FY2020, delays in obtaining proprietary information resulted in a limited ability to fully evaluate the methodology, and further interactions were complicated by the COVID pandemic. Therefore, at that time, the use of public-domain information—along with current processes for surveillance interval extension through a surveillance frequency control program—identified the need to fully assess diagnostic coverage as part of the pilot study. Furthermore, self-diagnostics were also identified as a potential option to replace the drift analyses conducted as part of current STI extension procedures. In FY2022, the project was reconstituted with the industry partner, and information and data were made available by the industry partner to the research team for review. The shared information included failure event descriptions and data for a digital I&C system since its implementation, as well as recent STI extension interval reports developed by the utility partner on that digital I&C system. This report presents an evaluation of this information and data and describes an application of the proposed methodology cited above. The methodology seeks to take advantage of the self-diagnostics and OLM capabilities to reduce risk or reduce the level of qualitative monitoring assessment needed to perform a risk-informed STI extension using existing NRC approved guidance or both. Addressing these issues of STI extension by crediting self-diagnostics is likely to result in benefits for current and future nuclear power plant (NPP) operations, including lowering the barriers to adoption of digital I&C systems and increasing cost savings by deferring or eliminating unneeded preventive maintenance (tasks or checks or activities). Specifically, self-diagnostic and OLM capabilities of newer digital equipment being installed in non-safety and safety applications are designed to detect failures, provide early warning of potential failures, and notify plant operators to take appropriate action to reduce out of service (OOS) time thus protecting safety margins. Moreover, the equipment is expected to provide information that time-related operational degradation is identified early to ensure timely and planned corrective actions instead of a reactive and unplanned approach ahead of an extended-surveillance interval.

42 ENGINEERING↗

Idaho National Laboratory Integrated Multisite SSHAC Level 3: Probabilistic Volcanic Hazards Assessment

The Idaho National Laboratory (INL) resides on the eastern Snake River Plain (ESRP), part of the Snake River Plain (SRP) with a complex origin and geologic history of volcanism. Much of the Quaternary (last 2.58 million years) volcanism within 400 km of INL is genetically associated with a major thermal anomaly referred to as the Yellowstone hotspot, which is currently located more than 180 km northeast of INL. Near INL, local volcanic sources include silicic domes near its southern border, and numerous dike-fed basaltic vents of the ESRP, some of which are near or within the INL boundaries. Quantitative probabilistic assessments of screened-in volcanic hazardous phenomena for nine different facility complexes at the INL are presented for a Senior Seismic Hazard Analysis Committee (SSHAC) Level 3 (SL3) study. The comprehensive, integrated multisite SSHAC study consists of a single regional Probabilistic Volcanic Hazards Assessment (PVHA) that pertains to all nine INL facility complexes, with site-specific information developed at each respective area of interest (AOI), referred to as the "INL facility AOI" (Figure ES-1). Hazard products are generated for specified INL facility AOIs for use by multiple stakeholders from different agencies in risk-informed decision-making regarding site selection, operations, and design of nuclear facilities at INL, consistent with U.S. Department of Energy (DOE) and U.S. Nuclear Regulatory Commission (NRC) regulatory guidance. The study also serves as the basis for future periodic safety assessments required for existing DOE facilities, such as 10-year evaluations of natural-phenomena hazards. Elements of the INL PVHA including initial characterization, screening, quantitative assessments of eruption and hazard potential, and consideration of facility needs are conducted using the three phases of the SSHAC process: evaluation, integration, and documentation. As per regulatory guidance, the SSHAC framework provided the necessary processes and procedures for the PVHA Technical Integration (TI) team, at three workshops, five formal working meetings and many TI team remote meetings, to conduct initial characterization, screen the volcanic hazards, create PVHA model inputs, exercise those models in the PVHA, consider facility-specific volcanic hazard needs, and perform final hazard calculations. The Participatory Peer Review Panel (PPRP) provided independent oversight and performed process and technical reviews of the PVHA throughout its duration. The study included an extensive New Data Collection and Analyses (NDCA) program developed by the PVHA TI team to reduce uncertainties in hazard-significant elements in the PVHA model. NDCA activities generated 20 reports providing important contributory datasets and results to the project database for characterizing the ESRP. For example, a report compiling the dimensions of ESRP shield volcanoes and lava fields was used to construct volcanic footprints (areas of impact), was compared with data from INL subsurface cores, and was used to validate the results of lava-flow inundation modeling on the contemporary terrain. Another example is the acquisition of aeromagnetic data over INL and its surrounding area, with maps of buried magmatic features (e.g., subsurface volcanoes and swarms of feeder dikes) that informed the PVHA conceptual model of volcanism. The SSHAC evaluation process was used to conduct all elements of the PVHA including initial characterization and screening. Existing data and NDCA activities provided the foundation to develop the tectonomagmatic conceptual model of volcanism for the region of geographical interest in the SRP and Yellowstone hotspot volcanic system, and for considering volcanoes in the western US. Considering Quaternary volcanic sources active during this period, the screening approach identified and evaluated magma compositions, types of eruptive and intrusive phenomena, types of hazardous phenomena, and proximity of sources to INL. The PVHA TI team evaluated 18 types of magmatic sources in terms of 20 potentially hazardous phenomena, resulting in 360 screening decisions. The screening process resulted in 140 screened-in hazardous volcanic phenomena for Quaternary volcanic sources 1) proximal to INL facility complexes in the ESRP (64 basaltic and 54 silicic), 2) regional sources associated with the Yellowstone caldera system and Blackfoot Reservoir volcanic field (7), and 3) more distal sources from thirteen Cascade volcanoes and two volcanoes at Long Valley caldera (CA).

58 GEOSCIENCES↗

ARCADE Analysis Methods & Validation Pathway

The Advanced Reactor Cyber Analysis and Development Environment (ARCADE) provides an automated analysis system which supports risk-informed performance based (RIPB) evaluations of nuclear control systems. Every possible cyber threat which could lead to consequence is identified by simulating the unsafe control action sequences which transform digital harm into physical harm. Eliminating the simulation of complex digital cyber attack chains cuts out unnecessary computational overhead and focuses directly on the physics of cyber-physical attacks. This focus enables designers to make informed decisions which can entirely eliminate categories of cyber threats against advanced reactors through the physical nature of the plant design. This narrowing of cyber threat against nuclear power plants through the physics of the system is intended to make any remaining threat management and cost efficient. This is the goal of the Tiered Cyber Analysis (TCA) outlined in NRC Draft Regulation Guide (RG) 5.96, which provides a RIPB cybersecurity approach for new reactors. ARCADE has been custom developed to meet the demands of the rigorous analysis required in Tier 1 of the TCA, which forms the foundation of the TCA process. Currently, ARCADE is still under development, but has made significant leaps in capability. A pilot analysis on the opensource Asherah simulator was performed which demonstrated key functionality goals. The next stage of ARCADE development involves improvements to the applications which support the analysis system, and enabling the analysis system to utilize the full suite of unsafe control action simulations. Since the analysis method’s core functions are complete, validation of the analysis method will be started concurrent to the next development stages. The automated analysis ARCADE will provide can radically change the cybersecurity design process for advanced reactors, reducing the cost of security implementation while enhancing cyber resilience. The pathway for ARCADE’s development to this goal has become much clearer. The majority of technical hurdles have been cleared, and the remaining development needs have been solidified. ARCADE is now capable of assisting the advanced reactor design process and directly support advanced reactor industry RIPB practices.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Hydrogen Component Leak Rate Quantification for System Risk and Reliability Assessment through QRA and PHM Frameworks: Preprint

The National Renewable Energy Laboratory's (NREL) Hydrogen Safety Research and Development (HSR&D) program in collaboration with the University of Maryland's Systems Risk and Reliability Analysis Laboratory (SyRRA) are working to improve reliability and reduce risk in hydrogen systems. This approach strives to use quantitative data on component leaks and failures, together with Prognosis and Health Management (PHM), and Quantitative Risk Assessment (QRA) to identify at-risk components, reduce component failures and downtime, and predict when components require maintenance. Hydrogen component failures increase facility maintenance cost, facility downtime, and reduce public acceptance of hydrogen technologies, ultimately increasing facility size and cost because of potentially overly conservative requirements. Leaks are a predominant failure mode for hydrogen components. However, uncertainties in the amount of hydrogen emitted from leaking components and the frequency of those failure events limit the understanding of the risks that they present under real-world operational conditions. NREL has deployed a test fixture, the Leak Rate Quantification Apparatus (LRQA), to quantify the mass flow rate of leaking gases from medium and high-pressure components that have failed while in service. Quantitative hydrogen leak rate data from this system could ultimately be used to better inform risk assessment and Regulation Codes and Standards (RCS). Parallel activity explores the use of PHM and QRA techniques to assess and reduce risk, thereby improving safety and reliability of hydrogen systems. The results of QRAs could further provide a systematic and science-based foundation for the design and implementation of RCS, as in the latest versions of the NFPA 2 code for gaseous hydrogen stations. Alternatively, data-driven techniques of PHM could provide new damage diagnosis and health-state prognosis tools. This research will help end users, station owners and operators, and regulatory bodies move towards risk-informed preventative maintenance versus emergency corrective maintenance, reducing cost and improving reliability. Predictive modelling of failures could improve safety and affect RCS requirements such as setback distances at liquid refuelling sites. The combination of leak rate quantification research, PHM, and QRA can lead to better informed models enabling data-based decision to be made for hydrogen system safety improvements.

codes and standards↗

Quantitative Risk Analysis of High Safety Significant Safety-related Digital Instrumentation and Control Systems in Nuclear Power Plants using IRADIC Technology

This report documents the activities performed by Idaho National Laboratory (INL) during fiscal year (FY) 2021 for the U.S. Department of Energy (DOE) Light Water Reactor Sustainability (LWRS) Program, Risk Informed Systems Analysis (RISA) Pathway, digital instrumentation and control (DI&C) Risk Assessment project. In FY-2019, the RISA Pathway initiated a project to develop a risk assessment strategy for delivering a strong technical basis to support effective, licensable, and secure DI&C technologies for digital upgrades/designs. An integrated risk assessment technology for the DI&C systems (IRADIC technology) was proposed for this strategy, which aims to (1) provide a best-estimate risk-informed capability to quantitatively and accurately estimate the safety margin obtained from plant modernization, especially for the High Safety Significant Safety-related (HSSSR) DI&C systems, (2) develop an advanced risk assessment technology to support transition from analog to DI&C technologies for nuclear industry, (3) assure the long-term safety and reliability of vital HSSSR DI&C systems, (4) reduce uncertainty in costs and support integration of DI&C systems in the plant. To achieve these technical goals and deal with the expensive licensing justifications from regulatory insights, the IRADIC technology is instructive for nuclear vendors and utilities to effectively lower the costs associated with digital compliance and speed industry advances by: (1) defining an integrated risk-informed analysis process for DI&C upgrade, including hazard analysis, reliability analysis, and consequence analysis, (2) applying systematic and risk-informed tools to address common cause failures (CCFs) and quantify responding failure probabilities for DI&C technologies, particularly software CCFs, (3) evaluating the impact of digital failures at the individual level, system level, and plant level, (4) providing insights and suggestions on designs to manage the risks; thus, to support the development, licensing, and deployment of advanced DI&C technologies on nuclear power plant (NPPs). In this report, an approach for performing software CCF analysis, given limited data, is developed and demonstrated using a case study of a highly redundant digital reactor trip system. Consequence analysis is also performed based on different accident scenarios. Results indicate that plant modernization including the improvement of HSSSR DI&C systems will make great benefits to plant safety by providing more safety margins to accident management. In addition, a novel approach is proposed in this report for the quantification of software hazards when sufficient operational and testing data available. The method incorporates software development quality as well as strong analysis techniques to identify and link software defects to potential failure modes. The approach includes both semantic and test-based analysis to detect failures that can exist in different stages of the software development life cycle. This method is applied to an advanced human system interface relevant to reactor trip safety developed from the APR 1400 design.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Accelerated Materials Deployment in Advanced Nuclear Power Plants

The purpose of this report is to begin the development of a maximally efficient process for licensing and deploying new materials in Advanced Non-Light-Water Reactors (ANLWRs). Some new materials that are to be used in some new plants are seen as possibly introducing risks, because our understanding of those new materials’ behavior in the conditions generated by some novel plant designs is less complete than our understanding of the behavior of materials with long use histories in existing designs. In these cases, an approved code/standard or a code case to support the use of these materials in the novel design’s safety case may not exist for the regulator to utilize as part of the licensing determination. This circumstance creates the potential for an extremely long licensing process for new designs using new materials. The present strategy is to show how to manage these risks proactively, in such a way as to permit licensing decisions to be made in a timely manner, based on this risk management process. The present report outlines the gaps in the current codes to support deployment and use of novel materials and begins the development of the necessary risk management framework that is focused on the subject materials issues; it is based on risk-informed in-service surveillance practices, carried out in such a way as to compensate for current limitations in our state of knowledge. This development will enable licensing and deployment of the subject materials, conditional on the proactive surveillance process to be established. While this report is occasioned by limitations in our knowledge of certain materials issues that may arise in advanced designs, in-service surveillance is always done in order to compensate for a lack of knowledge: if we knew that components were not already failed and not trending toward failure, we would not perform surveillance, even in current-generation plants (except that prescriptive requirements would force us to do so). What is different about the surveillance program discussed here is that the issues are newer and the relevant experience base is less complete, so the surveillance presently contemplated may need to measure new things and/or measure them more often than has been traditional for surveillance coupons. The present report is devoted to the risk management framework and applies American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI, Division [1] to establish the structure of a protocol for carrying out the necessary surveillance. These documents are generic: they do not tell us how often to surveille, or what to surveille, or what to measure, but rather how to determine those things, given certain technical inputs. The Regulatory Development R&D Program [2] is currently developing the companion supporting technical basis for the materials surveillance technology that, when completed and validated, can be used by owner/operator and NRC to implement a materials degradation management program for ANLWRs. This report also outlines salient points of discussion, positive potential outcomes, and potential concerns from industry and the USNRC. These aspects of the report intend to inform future work to develop a proposed technical process for adoption by the industry and endorsement by the USNRC to allow developers to propose a risk informed and conservative approach for the use of materials where operating experience/data and codes and standards may not exist for use of a novel material in an operating reactor environment. Additionally, such a technology could be leveraged to potentially reduce part of the upfront materials data requirements from ongoing long-term materials testing so that early action on license application could be undertaken by NRC, in parallel with the continuation of long-term data collection. This could accelerate the schedule for a first-of-a-kind ANLWR deployment or a nth-of-a-kind new materials insertion for established ANLWR designs.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗