Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Resource Assessments”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

Analysis of Selected Publicly Available Geothermal Exploration Data Gaps

As part of a United States Department of Energy (DOE) supported retrospective analysis of DOE's Play Fairway Analysis (PFA) projects, the National Renewable Energy Laboratory (NREL) compiled and analyzed publicly available geothermal exploration datasets to identify and highlight data gaps in areas prospective for hosting geothermal resources. The analysis was intended to understand the existing geographic coverage of selected datasets commonly utilized both by the PFA projects and geothermal developers during resource assessments including geologic mapping, temperature gradient drilling, and aeromagnetic, gravimetric, and lidar surveys. Results indicate that broad areas of the western United States estimated to have geothermal potential lack sufficient geologic and geophysical coverage necessary for even regional resource exploration. The study directly informed the recent Geoscience Data Acquisition for Western Nevada, or GeoDAWN - which united DOE's Geothermal Technologies Office (GTO) with the U.S. Geological Survey (USGS) of the U.S. Department of the Interior to assist U.S. needs for energy and critical minerals. The study also has the potential to inform public investment in further data acquisition for characterization of the Earth both for geothermal and other natural resource assessments.

data↗

Factors Determining Commercially Optimal Development Strategies for CO 2 Storage With and Without CO 2 -EOR

This report is a draft white paper on the factors determining commercially optimal development strategies for CO 2 storage with and without CO 2 -EOR. The draft report provides a summary of accomplishments during the first budget period of the Southeast Offshore Storage Resource Assessment for the Gulf of Mexico (SECARB Offshore GOM) project. It also identifies “Next Steps” to be undertaken during Budget Period II. A final white paper will be prepared at the end of Budget Period II. The goal of this draft white paper is to expand the knowledge base required for commercially viable, secure, longterm, large-scale carbon dioxide (CO 2 ) subsea storage in the U.S. Gulf of Mexico (GOM), both with and without enhanced hydrocarbon recovery. This effort supports the U.S. Department of Energy’s (DOE) long-term objective of ensuring a comprehensive assessment of the potential for offshore CO 2 subsea storage in the GOM. The groundwork that has been completed in the draft white paper advanced by expanding the membership of the Southern States Energy Board’s (SSEB) existing Southeast Offshore Storage Resource Assessment (DE-FE0026082) GOM government-industry partnership during the next budget period. Further, the team plans to consult with U.S. federal and state agencies to develop recommendations to remove barriers and streamline the regulatory process to encourage subsea CO 2 storage with or without enhanced hydrocarbon recovery.

02 PETROLEUM↗

Acoustic Impedance Inversions for Offshore CO 2 Storage: South Georgia Embayment, United States

This study builds and expands on previous CO 2 storage resource assessment studies of the southeastern offshore Atlantic margin by providing a detailed evaluation on how rock porosities and permeabilities are distributed across the Upper Cretaceous strata restricted to the South Georgia Embayment (SGE). Using legacy industry two-dimensional seismic reflection and well data, this assessment is the first application of multiple seismic inversion techniques in this area. This workflow provides a reliable and repeatable model-based inversion which gives an improved image to discriminate lithology and predict porosity. The workflow is applicable to future CO 2 storage resource assessment studies elsewhere. The inversion results indicate that distinct porosity and permeability regimes are present and distributed in the Upper Cretaceous strata within the SGE. The impedance and porosity relationships show well-founded and reliable correlation. These relationships reveal low impedance coincident to the high porosity intervals which are proposed as potential reservoir intervals for CO 2 storage. In addition, the result shows that the Upper Cretaceous strata have two main potential reservoirs in the lower part. These are overlain by a thick impermeable interval, mostly shale, which has high impedance, low porosity, and low permeability and extends within the SGE. This result is in agreement with a previous study that also proposed two significant storage reservoirs for CO 2 in the Upper Cretaceous strata. Since porosity distribution is estimated using multiple methods, it follows the trends of seismic signature and structures of the Upper Cretaceous strata. The extracted values of porosity, ranging from 15 to 36%, and permeability, ranging from 1 to 100 mD, are close to the measured values from the well core data at the Upper Cretaceous strata interval.

54 ENVIRONMENTAL SCIENCES↗

Benchmarking Near-Surface Winds in the HRRR Analyses Using Multisource Observations over Complex Terrain in the Southeastern United States

Wind energy plays a crucial role in sustainable power generation, yet its full potential in the southeast United States (SEUS) remains underexplored. This study advances wind resource assessment in the SEUS using existing regional modeling and multisource observations. We find that terrain complexity, influenced by orography and forest canopy, significantly impacts the accuracy of modeled wind speed. While the High-Resolution Rapid Refresh (HRRR) model effectively simulates wind profiles over flat, nonforested terrain, larger errors are produced above forest canopies, and particularly for those stands in hilly and mountainous terrain where there are no observations aloft that could be used by HRRR’s data assimilation software. Seasonal variations, e.g., changes in the leaf area index, further complicate the relationship between terrain complexity and simulation errors. Here, our findings emphasize the critical need for comprehensive wind profile measurements, extending from below the canopy to height above the canopy and through the lower planetary boundary layer, to fully quantify model performance over and near forests, and for improving wind resource assessment, planning, and management. This study provides valuable insights not only for further model development but also for future field campaign deployment with the goal of further improving our understanding of wind resources in the region.

Complex terrain↗

Hydropower Geotechnical Foundations: Current Practice and Innovation Opportunities for Low-Head Applications

Hydropower is a renewable energy resource that produces electricity from flowing water under pressure. Engineered hydropower structures, such as dams, are used to create a hydraulic head, enabling a turbinegenerator unit to convert pressurized flow into electricity. While hydropower has been a source of renewable energy since antiquity, new development in the United States has slowed in recent decades. Based on recent resource assessments, the largest opportunity to expand hydropower in the United States is from new stream-reach development (i.e., new hydropower development along stream-reaches that do not currently have hydroelectric facilities or other forms of infrastructure, such as dams). Roughly 75% of identified new stream-reach development potential is from low-head sites (less than 30 ft of head), which typically suffer from smaller power densities and higher normalized costs, given economies of scale. Hydropower developers and other stakeholders are thus interested in strategies to reduce initial capital costs while practicing sustainable development to maximize environmental compatibility with minimal disruption to natural aquatic life, sediment, and water flows. Historically, civil works have represented a significant cost driver for new hydropower development, with the foundation system representing a major cost component and source of uncertainty. The foundation system is the collection of engineered structural features (e.g. cutoff trenches, walls, grouting, anchors) constructed at or below the preconstruction ground surface that interfaces between the overlying structures (superstructures) and the bed material below (subsurface). Development of a hydropower foundation system must consider the various characteristics of the surrounding stream environment and subsurface while adhering to the engineering requirements of the superstructure that it supports. The care of water, excavation, and other construction activities are important features of foundation design and construction. The design and construction cost of the foundation system is largely dependent on the site geology and riverbed composition and is influenced by the level of geotechnical assessment required and conducted. Thus, a hydropower facility’s geotechnical foundation is often highly site-specific, with proper site selection and assessment being important to project success. The foundation system is designed to provide structural stability (of the foundation and dam), limit seepage, ensure public safety, and maintain functionality for the project life, during both construction and facility operations. Inadequate foundation or dam design can result in dam failure and the uncontrolled release of significant volumes of water, which could cause a high number of casualties and extensive property damage downstream of the failure. According to the Association of State Dam Safety Officials, approximately 30% of all historical dam failures in the United States are attributed to foundation or abutment defects, and another 20% are attributed to piping or seepage through the embankment, foundation, or abutment. To ameliorate these safety considerations, foundations often require massive amounts of construction material (e.g., grout, concrete, engineered dam fill) and long construction times. Foundation design also requires significant analysis prior to construction because the initial in-stream and abutment subsurface conditions are site-specific, and sufficient data for them often are lacking. Current practice requires on-site assessment, using expensive drilling and invasive and non-invasive investigation methods, to determine the expected cost of foundation material and treatment. Additionally, foundation construction often requires site dewatering (and other care of water activities), which involves constructing temporary diversion structures upstream and often downstream, called cofferdams, and water diversion systems that route water around the construction site. Cofferdams and water diversion systems can drastically increase construction costs and contribute to environmental disruption, including modification of flow patterns and benthic habitats. Given the technical, economic, and environmental challenges associated with hydropower foundations, opportunities exist to improve the current state of practice and to develop new and innovative solutions to Hydropower is a renewable energy resource that produces electricity from flowing water under pressure. Engineered hydropower structures, such as dams, are used to create a hydraulic head, enabling a turbinegenerator unit to convert pressurized flow into electricity. While hydropower has been a source of renewable energy since antiquity, new development in the United States has slowed in recent decades. Based on recent resource assessments, the largest opportunity to expand hydropower in the United States is from new stream-reach development (i.e., new hydropower development along stream-reaches that do not currently have hydroelectric facilities or other forms of infrastructure, such as dams). Roughly 75% of identified new stream-reach development potential is from low-head sites (less than 30 ft of head), which typically suffer from smaller power densities and higher normalized costs, given economies of scale. Hydropower developers and other stakeholders are thus interested in strategies to reduce initial capital costs while practicing sustainable development to maximize environmental compatibility with minimal disruption to natural aquatic life, sediment, and water flows. Historically, civil works have represented a significant cost driver for new hydropower development, with the foundation system representing a major cost component and source of uncertainty. The foundation system is the collection of engineered structural features (e.g. cutoff trenches, walls, grouting, anchors) constructed at or below the preconstruction ground surface that interfaces between the overlying structures (superstructures) and the bed material below (subsurface). Development of a hydropower foundation system must consider the various characteristics of the surrounding stream environment and subsurface while adhering to the engineering requirements of the superstructure that it supports. The care of water, excavation, and other construction activities are important features of foundation design and construction. The design and construction cost of the foundation system is largely dependent on the site geology and riverbed composition and is influenced by the level of geotechnical assessment required and conducted. Thus, a hydropower facility’s geotechnical foundation is often highly site-specific, with proper site selection and assessment being important to project success. The foundation system is designed to provide structural stability (of the foundation and dam), limit seepage, ensure public safety, and maintain functionality for the project life, during both construction and facility operations. Inadequate foundation or dam design can result in dam failure and the uncontrolled release of significant volumes of water, which could cause a high number of casualties and extensive property damage downstream of the failure. According to the Association of State Dam Safety Officials, approximately 30% of all historical dam failures in the United States are attributed to foundation or abutment defects, and another 20% are attributed to piping or seepage through the embankment, foundation, or abutment. To ameliorate these safety considerations, foundations often require massive amounts of construction material (e.g., grout, concrete, engineered dam fill) and long construction times. Foundation design also requires significant analysis prior to construction because the initial in-stream and abutment subsurface conditions are site-specific, and sufficient data for them often are lacking. Current practice requires on-site assessment, using expensive drilling and invasive and non-invasive investigation methods, to determine the expected cost of foundation material and treatment. Additionally, foundation construction often requires site dewatering (and other care of water activities), which involves constructing temporary diversion structures upstream and often downstream, called cofferdams, and water diversion systems that route water around the construction site. Cofferdams and water diversion systems can drastically increase construction costs and contribute to environmental disruption, including modification of flow patterns and benthic habitats. Given the technical, economic, and environmental challenges associated with hydropower foundations, opportunities exist to improve the current state of practice and to develop new and innovative solutions to challenges frequently encountered with traditional approaches. With this understanding, it is critically important to understand and document the current state of practice for hydropower geotechnical foundations, identify key challenges, and define opportunities for innovative solutions. To this end, this report documents the current state of practice across the three main phases of geotechnical foundation development: (1) geotechnical site assessment, (2) design, and (3) construction for hydropower systems. It also describes the major challenges with conventional approaches and identifies opportunities for innovation to reduce hydropower foundations costs, timelines, and risks. Key takeaways from this report include the following: Approximately 80% of available low-head sites are expected to have foundations on soil beds rather than rock beds, suggesting that rockfill and earthfill dams may be the most cost-effective conventional dam type for new projects.; Geotechnical and geologic investigation activities are time-consuming and expensive but are essential to define the parameters and criteria needed for foundation design.; Certain riverbed soil and bedrock types present significant technical challenges or require expensive foundation construction, which can prove financially prohibitive for low-head project development.; Modular hydropower design and prefabricated modular foundations represent a promising but unproven paradigm for new hydropower development. Design and construction approaches using optimized and highly repeatable, reliable components would benefit project cost, time, and risk but require additional research and development.; Temporary construction features for foundations, including cofferdams, water diversion, and water control systems, can prove costly and have inherent construction risk.; For economically viable development, hydropower geotechnical foundations should be limited to 4 to 15% of the project’s total initial capital costs. Many proposed projects have experienced cost overruns attributable to foundation difficulties or surprises during construction. These overruns may have been due to inadequate investigations, lack of adequate engineering effort to tailor the structures to site geology and topography, and/or contractual terms, among other considerations.; Challenges for hydropower foundations and opportunities for innovative technology solutions are identified in the following areas (consistent with the three main phases of foundation development): Geotechnical site assessment, Foundation design and materials, Construction methods and technology. Ultimately, this report aims to provide information about geotechnical foundations for low-head hydropower and to motivate transformative technologies to support hydropower growth.

13 HYDRO ENERGY↗

An independent analysis of bias sources and variability in wind plant pre-construction energy yield estimation methods

The wind resource assessment community has long had the goal of reducing the bias between wind plant pre-construction energy yield assessment (EYA) and the observed annual energy production (AEP). This comparison is typically made between the 50% probability of exceedance (P50) value of the EYA and the long-term corrected operational AEP (hereafter OA P50), and is known as the P50 bias. The industry has critically lacked an independent analysis of bias reduction investigated across multiple consultants to identify the greatest sources of uncertainty and variance in the EYA process and the best opportunities for uncertainty reduction. The present study addresses this gap by benchmarking consultant methodologies against each other and against operational data at a scale not seen before in industry collaborations. We consider data from 10 wind plants and evaluate discrepancies between eight consultancies in the steps taken from estimates of gross to net energy. Consultants tend to overestimate the gross energy produced at the turbines and then compensate by further overestimating downstream losses, leading to a mean P50 bias near zero, still with significant variability among the individual wind plants. Within our data sample, we find that consultant estimates of all loss categories, except environmental losses, tend to reduce the project-to-project variability of the P50 bias. The disagreement between consultants, however, remains flat throughout the addition of losses. Finally, we find that differences in consultants’ estimates of project performance can lead to differences up to $10/MWh in the levelized cost of energy for a wind plant.

Todd, Austin C.↗

Mapping and Synthesis of International Biomass Supply Assessments

This report, Mapping and Synthesis of International Biomass Supply Assessments (or Global Biomass Resource Assessment) is the first step in a long-term process to assemble data from around the globe into a virtual repository that can be updated and provide user-friendly access to the data. The Clean Energy Ministerial (CEM) Biofuture Platform Initiative recommended that research be completed to “address the need for internationally accepted benchmarks quantifying sustainable biomass feedstock supplies.” To act upon the CEM Biofuture recommendation, in 2024, the U.S. Department of Energy (DOE) commissioned Oak Ridge National Laboratory (ORNL) to prepare this report as the primary deliverable for a one-year assignment to assemble data into a citable form that could help resolve the persistent question presented related to bioenergy policy, “Is there enough sustainable biomass?” In response to that query, this report includes information received by August 2024 from national CEM representatives, collaborators, and public sources on current and future sustainable biomass supplies in 62 nations,and subsequently documents (a) the approach used by ORNL to analyze and categorize the information received in a manner that enables aggregation and comparability; and (b) recommendations for next steps and guidelines to help others update and harmonize future assessments of global sustainable biomass supplies.

09 BIOMASS FUELS↗

Tidal Resource Gaps Analysis Technical Report

The tidal resource gaps project was created to address a growing body of evidence that models underpredict tidal current speeds compared to measurements at a number of the top-ranking tidal energy sites. In response, this project compared opportunistic tidal power density measurements from 16 tidal energy hot spot sites with estimates from resource assessment data to identify discrepancies. To improve the accuracy of resource estimates from model data, updated data from eight improved model simulations were obtained. Model improvements included grid refinement, domain coupling, and the use of unstructured or nested grids. New resource estimates were calculated from the updated models, and these data were used to update the tidal hot spots-a list of promising tidal energy sites around the United States.

16 TIDAL AND WAVE POWER↗

The Baseline Performance Reference for Irradiance in PV System Applications

This report proposes the definition of a new baseline performance reference (BPR). The definition goes beyond existing standards pertaining to photovoltaic (PV) reference cells and devices to define the response under all possible operating conditions in the field. Field evaluations using BPR devices will be more sensitive to performance anomalies than pyranometers because they track PV system power output more closely. At the same time, they will be able to detect a broader range of performance anomalies than traditional matched reference devices, which might have matching defects. The BPR definition also opens the door to new practices in resource assessment and yield prediction. Solar resource data can be collected or modeled and validated directly as BPR irradiance, and PV system simulations based on BPR irradiance need fewer assumptions and less processing to obtain the effective irradiance on modules. As a result, lower uncertainty in yield assessments can be expected.

14 SOLAR ENERGY↗

Wave resource characterization at regional and nearshore scales for the U.S. Alaska coast based on a 32-year high-resolution hindcast

A wave resource characterization was performed for the southern coast of Alaska based on a 32-year hindcast covering the period from 1979 to 2010. The characterization closely followed International Electrotechnical Commission (IEC) Technical Specifications. An unstructured-grid Simulating WAves Nearshore (SWAN) model, which had an approximate spatial resolution of 300 m within 30 km from the nearest shoreline, was developed. Additionally, extensive model validation and error characterization was performed. The model was found to perform well with an average absolute percent error of 8.6% in significant wave height, averaged over 18 buoys. Statistics for the six IEC wave resource parameters were calculated and aggregated at 20 km from shore to quantify the incident wave power and its variability at a regional scale. The southern coast of the Aleutian Archipelago was found to have the most available wave energy in the region. A nearshore resource assessment was performed by evaluating resource hotspots located 1 km from shore. More than 900 nearshore stations had an Optimum Hotspot Identifier value of 5 (kW/m) at diverse water depths, thereby positioning Alaska as a promising location for wave energy development.

54 ENVIRONMENTAL SCIENCES↗

Wind Plant Performance Prediction Benchmark Phase 1 (Technical Report)

Financial risk resulting from the uncertainty associated with developing, owning, and operating wind power plants remains a barrier to reducing the levelized cost of energy (LCOE). On average, modern wind power plants in the U.S. underperform their expected annual energy output by 3.5-4.5% , with many underperforming by over 10%. To compensate for this uncertainty, investors require a larger return on investment (ROI) and apply "knock-down" factors that mask much of the underlying sources of uncertainty. Wind energy projects thus have reduced access to low-cost capital. Furthermore, operating wind plants often take a simple approach to estimating operations & maintenance (O&M) costs (e.g. straight-line estimates based on similar plants), which can eat into profits. To overcome these issues, the wind industry must improve the models they use for estimating wind plant performance and operations. An industry consortium (IC) requested that the National Renewable Energy Laboratory (NREL) lead a Department of Energy (DOE) working group to benchmark the accuracy of wind power plant energy predictions against real operational data. The IC was also motivated by DOE and NREL's potential to characterize systematic energy underperformance, identify sources of uncertainty, and explore root causes. The Wind Plant Performance Prediction (WP3) project was created out of this request, and this report represents the successful completion of Phase 1 of the WP3 project. During the project, wind plant owners provided both pre-construction and operational data to NREL. The pre-construction data was provided to wind resource assessment (WRA) consultants so they could conduct energy yield assessments (EYA). NREL took all of the completed EYAs, along with the operational data, and conducted an operational assessment to benchmark the EYA results against actual operational data. Given the large amounts of sensitive data required for this effort, as well as historical opposition to sharing data within industry, successful completion of Phase 1 represents an unprecedented milestone for industry data sharing. To improve the accuracy and confidence of pre-construction EYAs, wind plant owners and investors need better, more certain, energy yield predictions. The WP3 Benchmark Project is an industry-driven response to this reality. For the first time, industry has taken the important step of working together at scale, sharing valuable operational data with DOE and NREL in order to investigate the sources of bias and uncertainty in these energy estimates. This IC provides wind plant preconstruction and operational data to NREL in an organized and documented fashion and provides guidance and feedback as needed. The IC also provides introspection of the design of experiment, key metrics of success, data challenges, analysis best practices, and quality of results.

17 WIND ENERGY↗

Impact of Siting Ordinances on Land Availability for Wind and Solar Development

In the United States, many siting regulations for wind and solar developments are created at the county or township level. Here we survey local zoning ordinances across the contiguous United States to understand the types and frequency of ordinances that might impact wind and solar development. We identify over 1,800 ordinances for wind and more than 800 ordinances for solar in 2022. To understand the impact of ordinances on anticipated land availability, we use spatial modelling on the setbacks specified in the ordinances. Extrapolating the setbacks throughout the country can reduce wind and solar resources by up to 87% and 38%, respectively, depending on the size of the setbacks applied. These results indicate the importance of capturing setback ordinances in resources assessments so as to not overstate resource potential, especially when considering highly decarbonized futures.

county↗

Impact of Siting Ordinances on Land Availability for Wind and Solar Development

In the United States, many siting regulations for wind and solar developments are created at the county or township level. Here we survey local zoning ordinances across the contiguous United States to understand the types and frequency of ordinances that might impact wind and solar development. We identify over 1,800 ordinances for wind and more than 800 ordinances for solar in 2022. To understand the impact of ordinances on anticipated land availability, we use spatial modelling on the setbacks specified in the ordinances. Extrapolating the setbacks throughout the country can reduce wind and solar resources by up to 87% and 38%, respectively, depending on the size of the setbacks applied. These results indicate the importance of capturing setback ordinances in resources assessments so as to not overstate resource potential.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Evaluation of a high-resolution regional climate simulation for surface and hub-height wind climatology over North America

Assessing the availability of key wind resources requires augmenting observations to support the implementation of wind energy infrastructure. However, observations are limited, necessitating the development of high-resolution, long-term gridded datasets. This study presents a robust, dynamically downscaled climatological dataset, offering 20 years of hourly wind data at a 4 km spatial resolution across North America, and evaluates its performance against observations, including meteorological towers and automated surface-observing system (ASOS) stations, as well as coarse-resolution reanalysis data (the European Centre for Medium-Range Weather Forecasts (ECMWF) reanalysis version 5 (ERA5)). Results demonstrate that the downscaled high-resolution wind data outperform ERA5 in regions of complex terrain and coastal areas, with improved overlap coefficients for wind data distributions and reduced root mean square errors (RMSEs) for hub-height and near-surface diurnal wind patterns. The downscaled simulation also captures the synoptic drivers of seasonal wind direction patterns reasonably well, indicated by high wind rose similarity indices. This study also provides an analysis of interannual variability, utilizing the dataset's full 20-year period, and model uncertainty, generated by varying model initial conditions and physics parameterizations across 1-year ensemble members, which are key considerations for wind resource assessment in wind farm development.

17 WIND ENERGY↗

Massachusetts and New England SAF Study [Slides]

The Massachusetts Port Authority established a project to assess feedstock availability to produce SAF near 10 New England airports. A techno-economic analysis was conducted to determine renewable fuels and SAF that could be produced from these feedstocks. The resource assessment found municipal solid waste, woody biomass, and food waste were most abundant. The techno-economic analysis found that potential fuel production varied widely based on location, feedstock, and technology production pathway. An assessment of infrastructure readiness to handle SAF was conducted. It was determined that SAF produced outside of New England should be blended in other regions with more capacity and flexibility and delivered to New England as Jet A is today. For SAF produced in New England, there are terminals that have existing infrastructure to receive, blend, and distribute SAF/Jet A blends.

33 ADVANCED PROPULSION SYSTEMS↗

Offshore Wind Technology: Above the Water

WINDExchange will produce an Offshore Wind Technology: Above the Water Webinar. The webinar will explore the technology involved in offshore wind above the water including wind farm technology, turbine technology, and wind resource assessments and modeling to provide foundational technical information to communities and interested stakeholders.

above the water↗