Predicting future well performance for environmental remediation design using deep learning

Here in this study, we developed a deep learning (DL) framework with a multi-channel three-dimensional convolutional neural network (MC3D-CNN) to predict well performance and thereby assist future environmental remediation design. Such prediction of extraction well performance at designated locations is critical for configuring pump-and-treat (P&T) well network design and operation, setting reasonable target closure dates for overall remedying, and estimating remedy costs. The framework is developed with operational and monitoring data routinely collected during P&T remedy operations, including well extraction and injection rates as well as in situ contaminant concentrations. Traditionally, the collected data were rarely used for purposes other than assessing past well performance and the accuracy of the conceptual site model. However, recent advances in data-driven computational approaches enable better use of the large datasets to inform future well performance, enhance site characterization, and improve remediation planning. In this study, we established a DL framework to integrate transient three-dimensional contaminant plumes and multiple aquifer properties (e.g., hydraulic conductivity and hydrostratigraphic maps) to identify characteristic patterns controlling and representing extraction well mass recovery, aiming at providing future mass recovery estimates for existing wells and candidate wells at any proposed locations. We evaluated our framework by using a realistic synthetic dataset generated from a well-calibrated flow and transport model used in the 200 West Area of the U.S. Department of Energy’s Hanford Site in southeastern Washington state. The multi-channel feature in our framework allows integration of various types and temporal densities of training datasets for DL model development. Overall, we found that the trained DL model achieved an accuracy of over 90% in ranking extraction well performance in validation datasets, and over 80% in predicting high-performance-ranking well locations. This data-informed approach provides a flexible tool to support adaptive site management, streamline decision-making, and potentially reduce remediation time and costs. Our DL framework can be used as a filtering tool to improve the current P&T network optimization design by reducing the number of candidate well locations.

54 ENVIRONMENTAL SCIENCES↗

Integrated systems-based approach to monitoring environmental remediation

The U.S. Department of Energy is responsible for risk reduction and cleanup of its nuclear weapons complex. Remediation strategies for some of the contamination may include techniques that mitigate risk, but leave contaminants in place. Monitoring to verify remedy performance and long-term mitigation of risk is key to implementing these strategies and can be a large portion of the total cost of remedy implementation. Especially in these situations, there is a need for innovative monitoring approaches that move away from the cost- and labor-intensive point-source monitoring. In this paper, alternative approaches for monitoring are presented for vadose zone, groundwater, groundwater/surface water interface, and surface water. To illustrate integrated, systems-based monitoring, this paper focuses on vadose zone contaminant remediation to mitigate impact to groundwater. In this context, vadose zone contamination is a source, or potential source, to groundwater plumes. The monitoring design uses a systems-based approach focused on developing a conceptual site model that highlights key features that control contaminant flux to groundwater. These features are derived considering the unsaturated flow and contaminant transport processes in the vadose zone and the nature of the waste discharge. Diagnostic properties and/or parameters related to both short- and long-term contaminant flux to groundwater can be identified and targeted for monitoring. The resolution of monitoring data needed to correspond to a functionally useful indicator of flux to groundwater can be estimated using quantitative analyses and the associated unsaturated flow properties relevant to the targeted site and vadose zone features. This monitoring design approach follows the process of developing a quantitative conceptual model suitable for supporting projections of future flux to groundwater. Support for such projections is important because it is likely that, in many cases, remediation decisions for the vadose zone will need to be made based all or in part on projected impacts to groundwater, and monitoring will then be applied to verify that remedy goals are being met. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Remediation of uranium impacted sediments in a watercourse

In 2009, remediation was initiated for a non-operational fuel cycle facility previously used for government contract work located in Windsor, Connecticut, USA. Radiological contaminants consisted primarily of high enriched uranium (HEU). Other radionuclides encountered in relatively minor amounts in certain areas of the clean-up included Co-60, Cs- 137, Ra-226, Th-232 and low enriched uranium (LEU).Between 2009 and the spring of 2011, remediation efforts were focused on demolition of contaminated buildings and removal of contaminated soil. In the late spring of 2011, the last phase of remediation commenced involving the removal of contaminated sediments from portions of a 1,200 meter long gaining stream. Planning and preparation for remediation of the stream began in 2009 with submittal of permit applications to undertake construction activities in a wetland area. The permitting process was lengthy and involved securing permits from multiple agencies. However, early and frequent communication with stakeholders played an integral role in efficiently obtaining the permit approvals. Frequent communication with stakeholders throughout the planning and remediation process also proved to be a key factor in timely completion of the project. The remediation of the stream involved the use of temporary bladder berms to divert surface water flow, water diversion piping, a sediment vacuum removal system, excavation of sediments using small front-end loaders, sediment dewatering, and waste packaging, transportation and disposal. Many safeguards were employed to protect several species of concern in the work area, water management during project activities, challenges encountered during the project, methods of Final Status Survey, and stream restoration. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Gunnar uranium mine environmental remediation - Northern Saskatchewan

The Gunnar Mine and mill site was the largest of some 38 now-abandoned uranium mines that were developed and operated in Northern Saskatchewan, Canada, during the Cold War years. During their operating lifetimes these mines produced large quantities of ore and tailings. The Gunnar mine (open pit and underground) produced over 5 million tonnes of uranium ore and nearly 4.4 million tonnes of mine tailings during its operations from 1955 through 1963. An estimated 2.2 to 2.7 million m{sup 3} of waste rock that was generated during the processing of the ore abuts the shores of Lake Athabasca, the 22. largest lake in the world. After closure in the 1960's, the Gunnar site was abandoned with little to no decommissioning being done. The Saskatchewan Research Council has been contracted to manage the clean-up of these abandoned northern uranium mine and mill sites. The Gunnar Mine, because of the magnitude of tailings and waste rock, is subject to an environmental site assessment process regulated by both provincial and federal governments. This process requires a detailed study of the environmental impacts that have resulted from the mining activities and an analysis of projected impacts from remediation efforts. The environmental assessment process, specific site studies, and public involvement initiatives are all now well underway. Due to the many uncertainties associated with an abandoned site, an adaptive remediation approach, utilizing a decision tree, presented within the environmental assessment documents will be used as part of the site regulatory licensing. A critical early task was dealing with major public safety hazards on the site. The site originally included many buildings that were remnants of a community of approximately 800 people who once occupied the site. These buildings, many of which contained high levels of asbestos, had to be appropriately abated and demolished. Similarly, the original mine head frame and mill site buildings, many of which still contained the original machinery and equipment, also had to be dismantled. Remediation options for the accumulated demolition debris have been assessed, as have remediation options for the waste rock and tailings, all of which form part of the environmental assessment. The regulatory requirements include the environmental assessment processes, a complex public involvement strategy, and licensing from the Canadian Nuclear Safety Commission (CNSC) with the long-term goal of releasing the property in a remediated and stable state to the Province of Saskatchewan. Prescribed environmental and land use endpoints will be determined based on the environmental assessment studies and remediation options analyzed and implemented. Ultimately, the site will be released into an institutional controls program that will allow long-term government management and monitoring. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Linking deposit morphology and clogging in subsurface remediation: Final Technical Report

Groundwater is a crucial resource for water supply, especially in arid and semiarid areas of the United States west of the 100th meridian. Accordingly, remediation of contaminated groundwater is an important application of science and technology, particularly for the U.S. Department of Energy (DOE), which oversees a number of groundwater remediation sites from Cold War era mining. Groundwater remediation is complex, because it depends on identifying, locating, and treating contaminants in the subsurface, where remediation reactions depend on interacting geological, hydrological, geochemical, and microbiological factors. Within this context, permeability is a fundamental concept, because it controls the rates and pathways of groundwater flow. Colloid science is intimately related to permeability, because when colloids are present (particles with equivalent diameters between 1 nanometer and 10 micrometers), changes in hydrological or geochemical conditions can trigger a detrimental reduction in permeability called clogging. Accordingly, clogging is a major concern in groundwater remediation. Several lines of evidence suggest that clogging by colloids depends on (1) colloid deposition, and (2) deposit morphology, that is, the structure of colloid deposits, which can be quantified as a fractal dimension. This report describes research, performed under a 2-year, exploratory grant from the DOE’s Subsurface Biogeochemical Research (SBR) program. This research employed a novel laboratory technique to simultaneously measure flow, colloid deposition, deposit morphology, and permeability in a flow cell, and also collected field samples from wells at the DOE’s Old Rifle remediation site. Field results indicate that suspended solids at the Old Rifle site have fractal structures. Laboratory results indicate that clogging is associated with colloid deposits with smaller fractal dimensions, in accordance with previous studies on initially clean granular media. Preliminary modeling has identified the deposit radius of gyration as a candidate variable to account for clogging as a function of (1) colloid accumulation and (2) deposit morphology.

54 ENVIRONMENTAL SCIENCES↗

Site Remediation Technology InfoBase: A Guide to Federal Programs, Information Resources, and Publications on Contaminated Site Cleanup Technologies. First Edition

Table of Contents: Federal Cleanup Programs; Federal Site Remediation Technology Development Assistance Programs; Federal Site Remediation Technology Development Electronic Data Bases; Federal Electronic Resources for Site Remediation Technology Information; Other Electronic Resources for Site Remediation Technology Information; Other Electronic Resources for Site Remediation Technology Information; Selected Bibliography: Federal Publication on Alternative and Innovative Site Remediation; and Appendix: Technology Program Contacts.

INFORMATION RESOURCES↗

25 Years Of Environmental Remediation In The General Separations Area Of The Savannah River Site: Lessons Learned About What Worked And What Did Not Work In Soil And Groundwater Cleanup

The Savannah River Site (SRS) is owned and administered by the US Department of Energy (DOE). SRS covers an area of approximately 900 square kilometers. The General Separation Area (GSA) is located roughly in the center of the SRS and includes: radioactive material chemical separations facilities, radioactive waste tank farms, a variety of radioactive seepage basins, and the radioactive waste burial grounds. Radioactive wastes were disposed in the GSA from the mid-1950s through the mid-1990s. Radioactive operations at the F Canyon began in 1954; radioactive operations at H Canyon began in 1955. Waste water disposition to the F and H Seepage Basins began soon after operations started in the canyons. The Old Radioactive Waste Burial Ground (ORWBG) began operations in 1952 to manage solid waste that could be radioactive from all the site operations, and ceased receiving waste in 1972. The Mixed Waste Management Facility (MWMF) and Low Level Radioactive Waste Disposal Facility (LLRWDF) received radioactive solid waste from 1969 until 1995. Environmental legislation enacted in the 1970s, 1980s, and 1990s led to changes in waste management and environmental cleanup practices at SRS. The US Congress passed the Clean Air Act in 1970, and the Clean Water Act in 1972; the Resource Conservation and Recovery Act (RCRA) was enacted in 1976; the Comprehensive Environmental Response Compensation, and Liability Act (CERCLA) was enacted by Congress in 1980; the Federal Facilities Compliance Act (FFCA) was signed into law in 1992. Environmental remediation at the SRS essentially began with a 1987 Settlement Agreement between the SRS and the State of South Carolina (under the South Carolina Department of Health and Environmental Control - SCDHEC), which recognized linkage between many SRS waste management facilities and RCRA. The SRS manages several of the larger groundwater remedial activities under RCRA for facilities recognized early on as environmental problems. All subsequent environmental remediation projects tend to be managed under tri-party agreement (DOE, Environmental Protection Agency, and SCDHEC) through the Federal Facilities Agreement. During 25 years of environmental remediation SRS has stabilized and capped seepage basins, and consolidated and capped waste units and burial grounds in the GSA. Groundwater activities include: pump and treat systems in the groundwater, installation of deep subsurface barrier systems to manage groundwater flow, in situ chemical treatments in the groundwater, and captured contaminated groundwater discharges at the surface for management in a forest irrigation system. Over the last 25 years concentrations of contaminants in the aquifers beneath the GSA and in surface water streams in the GSA have dropped significantly. Closure of 65 waste sites and 4 RCRA facilities has been successfully accomplished. Wastes have been successfully isolated in place beneath a variety of caps and cover systems. Environmental clean-up has progressed to the stage where most of the work involves monitoring, optimization, and maintenance of existing remedial systems. Many lessons have been learned in the process. Geotextile covers outperform low permeability clay caps, especially with respect to the amount of repairs required to upkeep the drainage layers as the caps age. Passive, enhanced natural processes to address groundwater contamination are much more cost effective than pump and treat systems. SRS operated two very large pump and treat systems at the F and H Seepage Basins to attempt to limit the release of tritium to Fourmile Branch, a tributary of the Savannah River. The systems were designed to extract contaminated acidic groundwater, remove all contamination except tritium (not possible to remove the tritium from the water), and inject the tritiated groundwater up-gradient of the source area and the plume. The concept was to increase the travel time of the injected water for radioactive decay of the tritium. The two systems were found to be non-effective and potentially mobilizing more contamination. SRS invested approximately $50 million in construction and approximately $100 million in 6 years of operation. The H Seepage Basin pump and treat system was replaced by a series of subsurface barriers that alters the groundwater velocity; the F Seepage Basin pump and treat system was replaced by subsurface barriers forming a funnel and gate augmented by chemical treatment within the gates. These replacement systems are mostly passive and cost approximately $13 million to construct, and have reduced the tritium flux to Fourmile Branch, in these plumes, by over 70%. SRS manages non-acidic tritiated groundwater releases to Fourmile Branch from the southwest plume of the MWMF with a forest irrigation system. Tritiated water is captured with a sheetpile dam below the springs that caused releases to Fourmile Branch. Water from the irrigation pond is pumped to a filter plant prior to irrigation of approximately 26 hectares of mixed forest and developing pine plantation. SRS has almost achieved a 70% reduction in tritium flux to the Branch from this plume. The system cost approximately $5 million to construct with operation cost of approximately $500K per year. In conclusion, many lessons have been learned in 25 years of relatively aggressive remedial activities in the GSA. Geotextile covers outperform low permeability clay caps, especially with respect to the amount of repairs required to upkeep the drainage layers as the caps age. Passive, enhanced natural processes to address groundwater contamination are much more cost effective than pump and treat systems. In water management situations with non-accumulative contaminants (tritium, VOCs, etc.) irrigation in a forest setting can be very effective.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

In-Situ Radiological Surveys to Address Nuclear Criticality Safety Requirements During Remediation Activities at the Shallow Land Disposal Area, Armstrong County, Pennsylvania - 12268

Cabrera Services Inc. (CABRERA) is the remedial contractor for the Shallow Land Disposal Area (SLDA) Site in Armstrong County Pennsylvania, a United States (US) Army Corps of Engineers - Buffalo District (USACE) contract. The remediation is being completed under the USACE's Formerly Utilized Sites Remedial Action Program (FUSRAP) which was established to identify, investigate, and clean up or control sites previously used by the Atomic Energy Commission (AEC) and its predecessor, the Manhattan Engineer District (MED). As part of the management of the FUSRAP, the USACE is overseeing investigation and remediation of radiological contamination at the SLDA Site in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), 42 US Code (USC), Section 9601 et. seq, as amended and, the National Oil and Hazardous Substance Pollution Contingency Plan (NCP), Title 40 of the Code of Federal Regulations (CFR) Section 300.430(f) (2). The objective of this project is to clean up radioactive waste at SLDA. The radioactive waste contains special nuclear material (SNM), primarily U-235, in 10 burial trenches, Cabrera duties include processing, packaging and transporting the waste to an offsite disposal facility in accordance with the selected remedial alternative as defined in the Final Record of Decision (USACE, 2007). Of particular importance during the remediation is the need to address nuclear criticality safety (NCS) controls for the safe exhumation and management of waste containing fissile materials. The partnership between Cabrera Services, Inc. and Measutronics Corporation led to the development of a valuable survey tool and operating procedure that are essential components of the SLDA Criticality Safety and Material Control and Accountability programs. Using proven existing technologies in the design and manufacture of the Mobile Survey Cart, the continued deployment of the Cart will allow for an efficient and reliable methodology to allow for the safe exhumation of the Special Nuclear Material in existing SLDA trenches. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Environmental Remediation Activities in Japan Following the Fukushima Dai-ichi Reactor Incident - 12603

In March 2011, the Fukushima Dai-ichi reactor power plant was crippled by the Great Pacific earthquake and subsequent tsunami. Much of the focus in the news was on the reactor site itself as the utility company (TEPCO), the Japanese government, and experts from around the world worked to bring the damaged plants into a safe shutdown condition and stem the release of radioactivity to the environment. Most of the radioactivity released was carried out to sea with the prevailing winds. Still, as weather patterns changed and winds shifted, a significant plume of radioactive materials released from the plant deposited in the environment surrounding the plant, contaminating large land areas of the Fukushima Prefecture. The magnitude of the radiological impact to the surrounding environmental is so large that the Japanese government has had to reevaluate the meaning of 'acceptably clean'. In many respects, 'acceptably clean' cannot be a one-size-fits-all standard. The economics costs of such an approach would make impossible what is already an enormous and costly environmental response and remediation task. Thus, the Japanese government has embarked upon an approach that is both situation-specific and reasonably achievable. For example, the determination of acceptably clean for a nursery school or kindergarten play yard may be different from that for a parking lot. The acceptably clean level of residual radioactivity in the surface soil of a rice paddy is different from that in a forested area. The recognized exposure situation (scenario) thus plays a large role in the decision process. While sometimes complicated to grasp or implement, such an approach does prioritize national resources to address environment remediation based upon immediate and significant risks. In addition, the Japanese government is testing means and methods, including advanced or promising technologies, that could be proven to be effective in reducing the amount of radioactivity in the environment beyond a fixed, concentration based limit. Essentially, the definition of acceptably clean includes the concept of reasonably achievable, given the available technology, means and methods, and the cost to implement such. The Japanese government recently issued three technology demonstration contracts expressly designed to test and evaluate the available technologies, means, and methods, which, if implemented, might produce the greatest risk reduction from environmental contamination for the best value. One of the Japanese contract holders, Obayashi JV, has teamed with AMEC to demonstrate the applicability and capabilities of the Orion ScanPlot{sup SM} and ScanSort{sup SM} technologies in radiologically impacted towns both inside and immediately outside the 20 km restricted zone. This presentation provides some unique images and informative insight into the environmental radioactive impacts in and around the exclusion zone. It will provide a look at one element of the Japanese government?s efforts to achieve the greatest risk reduction that is reasonably achievable. The Orion ScanPlot{sup SM} and ScanSort{sup SM} are being used with success on the Japan Town Demonstration Project to assess pre-remedial action contamination levels, document the post-remedial action contamination levels and to precisely measure and segregate excavated soils based on their radioactive content and the prescribed segregation limits (DCS). Initial results suggest that these technologies could provide capabilities to the remedial action efforts that would result in considerable improvements in field data certainty and compliance with remedial objectives while reducing overall costs. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

25 years of environmental remediation in the general separations area of the Savannah river site: lessons learned about what worked and what did not work in soil and groundwater cleanup - 15270

The Savannah River Site, which is owned and administered by the US Department of Energy, covers approximately 900 square kilometers. The General Separation Area is located in the center of the site and includes: radioactive material chemical separations facilities, radioactive waste tank farms, radioactive seepage basins, and the radioactive waste burial grounds. Radioactive wastes were disposed in the General Separation Area from the mid-1950's through the mid-1990's. Operations at the F Canyon began in 1954 and at H Canyon began in 1955. Waste water disposition to the F and H Seepage Basins began soon after operations started in the canyons. The Old Radioactive Waste Burial Ground began operations in 1952 to manage solid waste that could be radioactive from all the site operations, and ceased receiving waste in 1972. The Mixed Waste Management Facility and Low Level Radioactive Waste Disposal Facility received radioactive solid waste from 1969 until 1995. Environmental legislation enacted in the 1970's through 1990's led to changes in waste management and environmental cleanup practices. The US Congress passed the Clean Air Act in 1970 and the Clean Water Act in 1972; the Resource Conservation and Recovery Act was enacted in 1976; the Comprehensive Environmental Response Compensation, and Liability Act was enacted by Congress in 1980; and the Federal Facilities Compliance Act was signed into law in 1992. Environmental remediation at the Savannah River Site essentially began with a 1987 Settlement Agreement between the Savannah River Site and the State of South Carolina. The site manages several of the larger groundwater remedial activities under the Resource Conservation and Recovery Act for facilities recognized early on as environmental problems. All subsequent remediation projects are managed under a tri-party agreement (Department of Energy, Environmental Protection Agency, and South Carolina Department of Health and Environmental Control) through the Federal Facilities Agreement. Environmental remediation activities during the past 25 years have stabilized and capped seepage basins as well as consolidated and capped waste units and burial grounds in the General Separation Area. Groundwater activities include: pump and treat systems in the groundwater, installation of deep subsurface barrier systems to manage groundwater flow, in situ chemical treatments in the groundwater, and captured contaminated groundwater discharges at the surface for management in a forest irrigation system. Concentrations of contaminants in the aquifers beneath the General Separation Area and in surface water streams in the General Separation Area have decreased over the past 25 years. Closure of 65 waste sites and 4 Resource Conservation and Recovery Act facilities has been successfully accomplished. Environmental clean-up has progressed to the stage where most of the work involves monitoring, optimization, and maintenance of existing remedial systems. Many lessons have been learned in the process of remediating the General Separations Area. Geo-textile covers outperform low permeability clay caps, especially with respect to the amount of repairs required to upkeep the drainage layers as the caps age. Passive and enhanced natural processes to address contamination are much more cost effective than pump and treat systems. Forest irrigation can be very effective in water management situations with non-accumulative contaminants such as tritium and volatile organic contaminants. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Challenges of mine remediation programmes in developing countries - a life cycle perspective - 15371

This paper analyses some challenges of environmental rehabilitation (ER) projects in developing countries that the authors have encountered over the past two decades in many parts of the world, discusses the reasons and proposes ways to mitigate them. In the life cycle of an ER project, some stages that are particularly decisive for the lasting rehabilitation success are considered here: (1) site characterisation/baseline studies, (2) justification and development of remediation objectives, site end states and a remediation strategy, and (3) the after-care phase. This paper argues that the time available in many ER projects in developing countries using international funding is very often insufficient, and discusses the reasons for some of the most important bottlenecks: (1) time realistically required to produce thorough baseline data and obtain historic site information that are indispensable to develop a robust remediation design, (2) lack of an adequate legal and regulatory framework, overlapping and/or conflicting provisions of national standards and discrepancies with international best practice, (3) unmanaged stakeholder expectations regarding the actual health and environmental risks, justification and prioritisation of remedial actions, and the achievable remediation end state. Insufficient resources for after-care, monitoring and, if required, corrective action is another major issue that, in the experience of the authors, jeopardises the sustainability of remediation success. Consequently by applying the lessons learnt from previous ER projects in developing (and developed) countries and taking them on board during the programming phase of new ER projects, international funding agencies could greatly help to avoid these obstacles. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Remediation of a 3-Mile Hexavalent Chromium Plume in Hinkley, California - 18532

Pacific Gas and Electric Company (PG and E) is conducting assessment and cleanup of hexavalent chromium (Cr[VI]) in groundwater related to industrial activities from the 1950's and 1960's at the PG and E Hinkley Compressor Station near Barstow, California (the Site). The plume core undergoing remediation is approximately 4.8 kilometers long and 1.6 kilometers wide (3 miles long and one mile wide). In December 2015, a Cleanup and Abatement Order was issued which established cleanup requirements for the Site, including required cleanup time frames for the plume core undergoing remediation to reach 50 micrograms per liter (μg/L) across 90% of the plume by 2025 and to reach 10 μg/L across 80% of the plume by 2032. To reach the milestones at the scale of the site, remedy design includes a series of remedial system expansions and remedy implementation relies on an adaptive management scheme for continual performance evaluation and optimization. This presentation will detail the remedial approach, implementation and performance to date. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

An Information Template for Evaluating the Relative Priority of Remediation Projects that Pose a Risk to Receptors - 18674

The U.S. Department of Energy (DOE) has one of the largest remediation tasks in the world, in terms of the number of sites, the complexity of individual sites, the number of remediation projects at individual sites, and the full range of stakeholders involved. The question of how to decide what projects to initiate, at any point of time and how to prioritize the deployment of resources for these tasks, occurs both within and among sites. The Consortium for Risk Evaluation developed a Risk-informed Prioritization Framework for Oak Ridge Reservation. Our goal was to develop a risk-informed methodology for prioritizing remediation projects for the Department of Energy's Oak Ridge Reservation that can be adapted to other remediation projects elsewhere. The heart of the framework is a template that includes information about each site necessary to make prioritization decisions. The information in the template describes the environment (hazard, pathway, consequences), the receptors (workers, public, ecological) and the risk management considerations (cost, risk reduction effectiveness, capacity, efficiency and sequencing). The questions in the template provide a wide range of information that managers and regulators need to make decisions, and that Tribes and the public need to evaluate the efficacy of remediation decisions. Completing the template will also help identify data gaps, model parameters needed, and the agencies or individuals responsible for obtaining the information. The information presented in the Template will be useful for regulators (DOE, Environmental Protection Agency, states, Tribes), managers and workers at the sites, trustees of natural resources, site neighbors, and the general public, but more importantly, provides an example of information needed to rate the priority of remediation projects. DOE, other federal and state trustees, and regulators were included in all phases of the development, including the scope, overseeing its development, and evaluation of projects. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Environmental Remediation of Waste Management Areas at Chalk River Laboratories - 19130

The Government of Canada's nuclear legacy liabilities have resulted from ∼70 years of nuclear research and development (R and D). The majority of these liabilities are located at the CRL Site and consist of shutdown research buildings (including prototype and research reactors), plus a wide variety of buried and stored wastes, and contaminated lands. The Environmental Remediation Projects (ERP) branch are assessing the waste inventory in the Chalk River Laboratories Waste Management Areas in order to make informed and risk based decisions on remediating affected lands. This paper provides examples of contaminated sites at CRL that require remediation as well as examples of remediation activities already complete. The environmental remediation process followed at CRL and the development of the CRL site cleanup plan are outlined. Until suitable disposal facilities are available ERP will continue to characterize and assess contaminated sites, monitoring and managing the risks in place while preparing for full-scale remediation activities. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Characterizing 5,000 Properties to Determine which Require Radiological Remediation - 19152

The Port Hope Area Initiative (PHAI) is a federal environmental clean-up program. Its mandate is the remediation and local, long-term, safe management of approximately 1.7 million cubic metres of historic low-level radioactive waste (hLLRW) in the adjacent communities of Port Hope and Port Granby in Southern Ontario, Canada. The PHAI is being undertaken by Canadian Nuclear Laboratories (CNL), on behalf of Atomic Energy of Canada Limited, a federal Crown corporation. It is currently one of the largest environmental remediation projects in Canada. Conducting work safely, while delivering the PHAI on time and within budget, is CNL's number one priority. The PHAI is being carried out as two projects - the Port Hope Project and the Port Granby Project. The Port Hope Project is the larger of the two and includes the cleanup of approximately 1.7 million cubic metres of hLLRW from various locations within the community. The Port Hope Project includes a unique and important component - the Property Radiological Survey. This survey involves the interior and exterior investigation of approximately 4,800 small-scale sites (SSS) - primarily residential - in the Municipality of Port Hope for the presence or absence of hLLRW. This paper provides an overview of the characterization, delineation and design for remediation of historic LLRW for the SSS, a grouping of sites within the municipality comprised of residential properties, municipal properties including municipal road allowances, private road allowances and temporary storage sites. Comprising over 4,800 parcels of land, a robust remedial process was designed to identify, characterize, delineate and remediate interior and exterior hLLRW contamination found in soils and building materials. The process adheres to the framework of the Port Hope Project Waste Nuclear Substance Licence (License) and its associated governance frameworks and regulatory requirements [1]. The overall goal is for CNL to be able to issue the owner of each parcel of land a Compliance Letter stating that the site meets the PHAI Clean-up Criteria, either after completion of characterization (if no hLLRW is identified) or after completion of remediation and verification. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Overview of the Long-Term Stewardship of the Remediated Uranium Mining and Milling Sites in Europe - 20079

Uranium mining in Europe began in the ' 40's for civil and military applications. The great majority of the uranium mines have now been closed and are going through the stages of decommissioning and/or rehabilitation. Today, the main uranium producers are outside the EU; only a few mines are still in operation inside the EU. In 2006, the situation of the uranium mines and mill tailings in Europe, identifying the tailings liabilities, their status, the plans for these sites and any associated hazards, was reported to the EC. The legacy of uranium mines and mill tailing disposals in the EU are located mainly in 12 Member States where, in total, 87 tailing objects were identified at 63 sites. The volume of each one of these tailings disposal varies from a few thousand to several tens of million m{sup 3}. The majority of these sites are no longer in operation. More than 40 tailing embankments have already been completely remediated. Approximately 20 are currently being remediated while for the remaining objects, remediation has yet to start. After ten years, and for a few cases where the respective projects have not yet been completed, it seems that most of Europe's uranium mines and milling legacies were remediated according to acceptable environmental standards. Nevertheless, Europe is about to face a new challenge that comes from the concluded remediation projects for which an effective set of measures for coordinated institutional control, known as 'long-term stewardship', is needed including, in most cases, continuous and active maintenance. Moreover, the uncertainty of what will happen to these sites if institutional control fails at some point in time is a major concern. This work presents a summary of the situation and current issues of the uranium mine and mill tailings in Europe and their remediation status. It addresses not only the management of existing uranium mine and mill legacies but also the methods and strategies that have been used to prevent the creation of new future legacy sites from uranium mines still in operation. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The TRANSCEND University Consortium: Theme 2 - Site Decommissioning, Deconstruction and Remediation - 20329

This paper will discuss the aims, objectives and progress to-date under Theme 2 of the TRANSCEND consortium project: Site decommissioning, deconstruction and remediation. Decommissioning nuclear sites involves waste retrieval, decontamination, deconstruction and, where necessary, containment and/or remediation of the remaining structure and surrounding land. Critical to management of these processes is limiting radiation exposure for the workforce, restricting the spread of radionuclides in groundwater, surface water and airborne particulates, and minimising the volume of contaminated waste for disposal. The aim of Theme 2 research is to develop new technologies for monitoring, remediation and containment that serve to minimise the volume of radioactively contaminated waste for disposal, for application prior to, during and after retrieval, deconstruction and decontamination operations. Prior research, conducted under the previous DISTINCTIVE project, demonstrated that colloidal silica grout can penetrate low permeability materials (including cement) for hydraulic barrier formation, and improved sorption capacity. The silica grout can be injected at surface using extremely small (potentially gravity-driven) fluid pressures, without the need for borehole drilling. Current work is investigating the erodibility of silica-grouted soils for inhibition of airborne and water-borne particulates as well as enhancing the grout's sorption capacity by addition of other materials to provide a chemical, as well as hydraulic, barrier to subsurface migration. EK remediation uses low voltage DC current to control migration of contaminants in porous media as well as to remove or degrade them. Researchers in the consortium have already demonstrated that low-energy ex-situ EK techniques can be used to provide remediation and volume minimisation for AWE legacy wastes in the UK. Under the current project researchers are building EK test cells containing simulated site materials at laboratory and intermediate(m)-scales to: remove, focus or degrade contaminants (remediation or waste minimisation); and direct subsurface water, chemical and colloid flow (fencing/containment or forced migration). This lab-based research is being informed by numerical models of EK processes that can subsequently be used to design full-scale on-site applications by nuclear site holders. Research under theme 2 of TRANSCEND will ultimately combine novel non-invasive detection technologies with EK techniques and colloidal silica grout barriers, to optimise the containment of radionuclide contamination in soils. Thus, allowing us to detect in-situ contamination, mobilise it to a selected location and grout it in-situ, prior to the initiation of decommissioning and deconstruction operations. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Implications of End Points on Remediation - 20476

The Port Hope Area Initiative (PHAI) is a federal environmental clean-up program. Its mandate is the remediation and local, long-term, safe management of approximately 1.7 million cubic metres of historic low-level radioactive waste in the adjacent communities of Port Hope and Port Granby in Southern Ontario, Canada. The PHAI is being undertaken by Canadian Nuclear Laboratories (CNL), on behalf of Atomic Energy of Canada Limited, a federal Crown corporation. It is currently one of the largest environmental remediation projects in Canada. The safety of workers, the public and the environment while delivering the PHAI compliantly, on time and within budget is CNL's number one priority. The PHAI is being implemented as two projects - the Port Hope Project and the Port Granby Project. The Port Hope Project is the larger of the two and includes the cleanup of approximately 1.2 million cubic metres of historic waste. The Port Hope Project includes a unique and important component - the remediation of approximately 1,200 private residences and businesses to include both interior and exterior verification of soil and surface-contaminated objects. Planning and consultation for the PHAI clean-up criteria and remediation verification standard operating procedures (RVSOP) were initiated in the early 2000's. The criteria were developed through a cooperative effort involving the PHAI, scientific specialists, federal and provincial government agencies, peer reviewers, the municipalities and members of the public. Subsequent verification procedures which detail the unique systematic methods to verify compliance with the clean-up criteria were developed by CNL in consultation with federal regulators and relevant stakeholders. Now, specifically with the Port Hope Small-Scale Sites project having been underway for a year and approximately 38 properties in some stage of remediation, it has become increasingly evident that the practical application of the clean-up criteria and RVSOP methodology is posing unique challenges that are having direct impact on project execution. The current RVSOP approach is based on discrete sample verification not allowing failure of any one sample. When implemented in the field, particularly at the Small-Scale Sites, it leads to a much more extensive excavation than what was accounted for in the original design, the implications of which are substantial delays in project progress and much more significant impact on the individual properties than originally anticipated. This paper will examine the evolution of PHAI clean-up criteria, subsequent RVSOP methodology and its impact on current project execution and the justification for exploring potential revisions to methods of remediation verification. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗