Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “REMEDIAL ACTION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

The TRANSCEND University Consortium: Theme 2 - Site Decommissioning, Deconstruction and Remediation - 20329

This paper will discuss the aims, objectives and progress to-date under Theme 2 of the TRANSCEND consortium project: Site decommissioning, deconstruction and remediation. Decommissioning nuclear sites involves waste retrieval, decontamination, deconstruction and, where necessary, containment and/or remediation of the remaining structure and surrounding land. Critical to management of these processes is limiting radiation exposure for the workforce, restricting the spread of radionuclides in groundwater, surface water and airborne particulates, and minimising the volume of contaminated waste for disposal. The aim of Theme 2 research is to develop new technologies for monitoring, remediation and containment that serve to minimise the volume of radioactively contaminated waste for disposal, for application prior to, during and after retrieval, deconstruction and decontamination operations. Prior research, conducted under the previous DISTINCTIVE project, demonstrated that colloidal silica grout can penetrate low permeability materials (including cement) for hydraulic barrier formation, and improved sorption capacity. The silica grout can be injected at surface using extremely small (potentially gravity-driven) fluid pressures, without the need for borehole drilling. Current work is investigating the erodibility of silica-grouted soils for inhibition of airborne and water-borne particulates as well as enhancing the grout's sorption capacity by addition of other materials to provide a chemical, as well as hydraulic, barrier to subsurface migration. EK remediation uses low voltage DC current to control migration of contaminants in porous media as well as to remove or degrade them. Researchers in the consortium have already demonstrated that low-energy ex-situ EK techniques can be used to provide remediation and volume minimisation for AWE legacy wastes in the UK. Under the current project researchers are building EK test cells containing simulated site materials at laboratory and intermediate(m)-scales to: remove, focus or degrade contaminants (remediation or waste minimisation); and direct subsurface water, chemical and colloid flow (fencing/containment or forced migration). This lab-based research is being informed by numerical models of EK processes that can subsequently be used to design full-scale on-site applications by nuclear site holders. Research under theme 2 of TRANSCEND will ultimately combine novel non-invasive detection technologies with EK techniques and colloidal silica grout barriers, to optimise the containment of radionuclide contamination in soils. Thus, allowing us to detect in-situ contamination, mobilise it to a selected location and grout it in-situ, prior to the initiation of decommissioning and deconstruction operations. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

US EPA Superfund Radon Vapor Intrusion Screening Level (RVISL) Electronic Calculator - 20340

Currently, there is no U.S. Environmental Protection Agency (EPA) guidance on correlating soil or groundwater levels of radon with indoor radon concentrations at Superfund sites. EPA is developing the Radon Vapor Intrusion Level Calculator (RVISL) Calculator which is an online tool. The RVISL calculator: (1) lists three radon isotopes (Rn-219, Rn-220 and Rn-222) known to pose a potential cancer risk through the inhalation pathway; (2) provides generally recommended risk and Applicable or Relevant and Appropriate Requirements (ARAR) based preliminary remediation goals (PRG) for groundwater, soil gas (exterior to buildings and sub-slab) and indoor air for default target risk and ARAR based levels and exposure scenarios; and (3) allows calculation of site-specific PRGs based on user-defined target risk and ARAR based levels and exposure scenarios. EPA developed the RVISL calculator to help risk assessors, remedial project managers, and others involved with risk assessment and decision making at radioactively contaminated sites. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Evaluating Remediation Options for a Perched-Water Unit at the Hanford Site - 20378

At the U.S. Department of Energy's Hanford Site, liquid-phase waste was discharged using surface disposal features such as ponds, trenches, and cribs. These practices distributed contaminants in the subsurface, some of which are currently in the vadose zone above the groundwater. At the 200-DV-1 operable unit (OU) at the Hanford Site, a key feature is a perched-water zone. This perched-water zone contains several million liters of water contaminated with high concentrations of uranium, technetium-99 (Tc-99), and nitrate that serves as a continuing source of contamination to the underlying aquifer. Currently, a pumping system is used to remove contaminant mass from the perched-water zone. However, water extraction will become more challenging as the perched unit dewaters. As a result, residual contaminants remaining after pumping is no longer effective needs to be addressed with post-extraction mitigation approaches, appropriate monitoring, and selection of suitable remediation endpoints. Thus, a remedy evaluation needs to include the unique conditions of this perched-water zone. As part of the initial evaluation, a set of technologies have been preliminarily identified as potentially applicable to the perched-water zone, including in situ remediation technologies to sequester uranium and Tc-99 and to degrade nitrate. While there is sufficient information available for direct consideration of some of the reviewed technologies in a feasibility study, five in situ remediation technologies were identified as needing additional information on their effectiveness under the geochemical and contaminant conditions of the perched-water zone. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Novel Remediation of Mercury-Contaminated Sediments Using Manganese Oxide and Activated Carbon Amendments - 20394

Mercury contamination in sediments poses a challenging remediation problem because of its ability to biogeochemically cycle and biomagnify in the food chain as methylmercury from low resident sediment and porewater concentrations. One mitigation approach is to lower the overall rate of net methylmercury production by creating conditions unfavorable for sulfate and iron reduction or methanogenesis, the primary pathways for methylation of inorganic mercury. Manganese oxides and other redox-active amendments are a promising and novel in situ amendment technology aimed at reducing net methylation of mercury though control of redox conditions in mercury-contaminated sediment-water systems. This paper reviews the thermodynamic and kinetic framework for this remediation technology, presents experimental and spectroscopic data illustrating the approach using solid manganese oxides, and discusses potential advantages, disadvantages, and applications. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Bayesian Approach to Estimation of Water Table Elevations Using Historical Rasters as Prior Information 2019 - 20430

In cases of complex but only partially known geology and a lack of spatial control in observation well locations, water table elevation estimation is very challenging. In some cases, auxiliary information, such as observations of the movement of tracers, operation of injection and extraction wells, and calibration of groundwater models against the historical elevation data, can be combined with expert judgement to estimate flow directions in areas of sparse data and to aid in the production of more reliable contour maps (and associated rasters) than could be produced by relying on sparse well elevation data alone. Given a historical sequence of these raster maps, the question arises how to automate, to the extent possible, the process of producing new raster maps to reflect data from previous times, the current data and the operation of expert judgement. One solution is to adopt a Bayesian point of view and to regard the historical well elevation data, auxiliary information and historical raster maps as prior information. The well elevations for water table wells, as well as those for injection/extraction wells and the data associated with other relevant variables, can be viewed as predictors for the raster surface. From this prior information, we can, conditional on the values of these predictors for a new time period, compute an expected value map and a standard deviation map for the new raster. These then can be taken to specify a prior predictive distribution for the pixels in the new raster map. Then we condition the pixels, corresponding to water level observation wells within the raster, on the observed values in those wells (which in general will differ from the regression estimate) for the new time period. Given the smoothness of the water table surface, we then smooth the surface of deviations from the mean surface, based on the variograms of the historical rasters, and add this smoothed surface to the regression mean surface. The error structure of the produced raster map is defined by the regression error structure and the error due to smoothing based on the estimated variograms. This methodology has been developed and is being further refined for groundwater monitoring and remediation at LANL. It is a very flexible method that can also be applied with a variety of other predictors applied to model the water level wells in the area of interest over the historical record. The smoothness of the spatial process and its possible evolution over time can then be estimated from the residuals from this regression. This can be augmented by expert hydrogeological opinion based on site topography and hydrogeology. (authors)

54 ENVIRONMENTAL SCIENCES↗

The Challenges of Air Monitoring at a Soil Remediation Project in a Suburban Setting - 20448

Air monitoring during soil excavation at a chemically and radiologically impacted site in a suburban setting presents unique challenges. Site activities were conducted in a manner that minimized the release of airborne particulates of concern, principally radionuclides of concern (ROC). Dust and air monitoring were performed to ensure the public was not being exposed to the soil contaminants. The project team collected representative air and dust data while being mindful to not impose on the lives of residents in the area. Due to the close proximity to the public, there was a high level of oversight from the client and regulatory agencies. The challenges involved with air sampling at this soil remediation site located in a suburban setting included the number of contaminants, the ranges of risks and hazards presented by the contaminants and the method of remediation, the concerns of the regulators and the public, and the perception of risk from the public. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Implications of End Points on Remediation - 20476

The Port Hope Area Initiative (PHAI) is a federal environmental clean-up program. Its mandate is the remediation and local, long-term, safe management of approximately 1.7 million cubic metres of historic low-level radioactive waste in the adjacent communities of Port Hope and Port Granby in Southern Ontario, Canada. The PHAI is being undertaken by Canadian Nuclear Laboratories (CNL), on behalf of Atomic Energy of Canada Limited, a federal Crown corporation. It is currently one of the largest environmental remediation projects in Canada. The safety of workers, the public and the environment while delivering the PHAI compliantly, on time and within budget is CNL's number one priority. The PHAI is being implemented as two projects - the Port Hope Project and the Port Granby Project. The Port Hope Project is the larger of the two and includes the cleanup of approximately 1.2 million cubic metres of historic waste. The Port Hope Project includes a unique and important component - the remediation of approximately 1,200 private residences and businesses to include both interior and exterior verification of soil and surface-contaminated objects. Planning and consultation for the PHAI clean-up criteria and remediation verification standard operating procedures (RVSOP) were initiated in the early 2000's. The criteria were developed through a cooperative effort involving the PHAI, scientific specialists, federal and provincial government agencies, peer reviewers, the municipalities and members of the public. Subsequent verification procedures which detail the unique systematic methods to verify compliance with the clean-up criteria were developed by CNL in consultation with federal regulators and relevant stakeholders. Now, specifically with the Port Hope Small-Scale Sites project having been underway for a year and approximately 38 properties in some stage of remediation, it has become increasingly evident that the practical application of the clean-up criteria and RVSOP methodology is posing unique challenges that are having direct impact on project execution. The current RVSOP approach is based on discrete sample verification not allowing failure of any one sample. When implemented in the field, particularly at the Small-Scale Sites, it leads to a much more extensive excavation than what was accounted for in the original design, the implications of which are substantial delays in project progress and much more significant impact on the individual properties than originally anticipated. This paper will examine the evolution of PHAI clean-up criteria, subsequent RVSOP methodology and its impact on current project execution and the justification for exploring potential revisions to methods of remediation verification. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Stakeholder-Engaged Structured Decision Making for the Los Alamos Legacy Cleanup Mission - 20501

The Los Alamos National Laboratory (LANL) environmental legacy cleanup program requires decisions to be made for environmental remediation, decommissioning and disposal or management of radioactive waste. This legacy cleanup program was established to address groundwater contamination, material disposal areas (MDAs) that have been used to dispose of radioactive and other waste material, and 'aggregate areas' that might produce radioactive or other chemical waste as a result of remediation activities. The LANL site is regulated for environmental concerns under the Resource Conservation and Recovery Act (RCRA). However, some parts of LANL, such as material disposal area G (MDA G), have disposed of radioactive waste under DOE Order 435.1, and are subject to other regulations. For example, decommissioning the remote-handled TRU material stored in 33 shafts at MDA G falls under EPA's 40 CFR 191. Collectively, the regulations are all aimed in the same direction of finding the best solution, either through constructs such as 'as low as reasonably achievable' (ALARA), considering balancing factors as opposed to only cost and human health risk, and, under EPA regulations such as RCRA and NEPA, evaluating impact from all chemicals and both human health and ecological endpoints. Despite the basic goals and objectives of the regulations or their guidance, the main challenge is in their implementation. Arguably perhaps, but really in principle, all of these (and similar) regulations are asking for a decision analysis to be performed. Implementation challenges encountered have included lack of understanding of decision analysis in the industry, lack of effective stakeholder engagement in the decision analysis process, and lack of appreciation of the need to separate value judgments from science, the latter leading to developing conservative, or protective, science-based models. Conservative models lead to poor solutions, lack of effective stakeholder engagement leads to long drawn out protracted approaches to finding a solution (which also might never be found with this approach), and lack of understanding of decision analysis and Bayesian statistics causes poor models to be built, which creates unfortunate situations of 'garbage in, garbage out' becoming the basis for decision making. Stakeholder-engaged structured decision making (SDM) is an approach to solving problems that relies on the theory of decision science to involve stakeholders in the decision-making process. This approach incorporates stakeholder values using a scientifically rigorous methodology that separates value judgments from science in a way that helps avoid the pitfalls of biased, protective, or conservative modeling. This approach has its foundation in Keeney's 1992 treatise on value-focused thinking [1]. Keeney advocated a paradigm shift in decision making based on the idea that the standard way of thinking about decisions is backwards. The standard approach of focusing first on identifying alternatives rather than on articulating values results in a reactive approach with the emphasis on mechanics and fixed choices instead of the core values that have meaning to stakeholders. This paradigm shift effectively engages all stakeholders in the decision-making process while using a values focused thinking approach that can lead to the identification of decision opportunities and the creation of better alternatives. The intent is to be proactive and generate solutions that are related directly to values and objectives as identified by stakeholders. There are, perhaps, two overarching reasons why SDM can be used to benefit LANL's environmental legacy cleanup. Some of LANL's remaining waste management and environmental management problems are challenging and complex (for example, the Cr and RDX plumes, and MDAs) and while the traditional approach has, arguably, worked well for relatively simple risk-based problems, it cannot, or should not, be applied to more complex problems if the most effective and efficient solutions are desired. The second reason is cost. This has perhaps become more critical since publication of the Government Accountability Office (GAO) reports that DoE's environmental liability is considered a high-risk concern for the nation [2]. The focus of SDM is on structuring solutions to decision risk problems by first addressing stakeholder and decision maker values and subsequently developing decision objectives and ways to measure those objectives, preference weighting across objectives, identifying decision alternatives that best achieve those values, and characterizing uncertainty in predictions of the measures. Because a complete decision model is created using SDM, it can be evaluated to find the main elements of the model that drive, or predict, the best solution. This approach creates complete decision models that are transparent, traceable, reproducible and technically defensible. The science behind SDM, or decision analysis, is well founded, yet it is not unusual to see ad hoc approaches to decision making implemented under various environmental regulations that are pertinent to the LANL site, including NEPA, RCRA and DOE Order 435.1. Such ad hoc approaches are often not transparent or traceable, and lack reproducibility and technical defensibility. The LANL legacy cleanup program has embarked on using SDM to address the complex problems that remain. Stakeholder meetings have been held, and a prototype version of the stakeholder value system has been developed. Further meetings are expected in the future to address specific project needs. This is a long-term endeavor considering the complex environmental problems faced by DOE EM in Los Alamos (EM-LA), and careful planning, consideration of stakeholder value systems, and engagement with stakeholders throughout the SDM process is expected to lead to a successful endpoint. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Lessons Learned from Demolition of Hanford's Plutonium Finishing Plant - 20507

U.S. Department of Energy (DOE) contractor CH2M Hill Plateau Remediation Company (CHPRC), a Jacobs owned company, is making significant progress demolishing the Plutonium Finishing Plant (PFP), which has long been known as one of the most hazardous buildings in the DOE Environmental Management Complex (DOE Complex). The facility is located on the Hanford Site and produced plutonium metal during the Cold War. Production was stopped in 1989, the facility was formally shut down in 1996, and material processing was completed in 2004. After approximately 25 years of demolition preparations, open-air demolition of the main portions of the Hazard Category II nuclear facility began in November 2016. To prepare the PFP for demolition, CHPRC employees performed some of the most hazardous work across the DOE Complex. In addition to extensive demolition preparations, including a wide-reaching communication strategy across the Hanford Site, CHPRC implemented robust controls and monitoring during demolition, and when necessary, adjusted demolition practices and sequence to maintain employee safety and project efficiency. Demolition of the main PFP building began in November 2016. The technical complexity, high hazards and radiological concerns have all led to a difficult demolition environment. Following a spread of contamination at the project site beyond the radiological boundaries in December 2017, work was halted and a recovery plan was generated to allow the demolition work to continue. After the implementation of additional controls and concurrence from regulatory agencies and DOE, the demolition was ready to resume work and reinitiated in August 2018. There are a number of lessons learned from the demolition activities and recovery plan process. This paper allows CHPRC and DoE's Richland Operations Office (RL) to share lessons learned and progress to date with other challenging and hazardous projects across the DOE Complex. Understanding the risk acceptance level is critical to execution of any open-air demolition project and is unique to each facility. Four key lessons learned from this project include: 1) plan execution issues, 2) stakeholder communication issues, 3) watching for summit fever and 4) minimizing exposed contaminated surfaces during demolition. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A Decade of Innovative Approaches to Treating and Dispositioning Radioactive Waste at the Savannah River Site - 20620

This year marks the 70. anniversary of the U.S. Department of Energy's (DOE) Savannah River Site (SRS), located near Aiken, South Carolina. SRS is a key industrial complex responsible for environmental stewardship, environmental cleanup, waste management, and disposition of nuclear materials. SRS also continues to have a role in critical defense-related activities and the reprocessing of used reactor fuel. The SRS encompasses 803 square kilometers (310 square miles) in parts of Aiken, Barnwell, and Allendale counties. The Liquid Waste Mission starts with the safe receipt and storage of radioactive liquid waste in the waste tanks, which principally includes Cold War legacy waste, but also waste from support of National Aeronautics Space Administration missions, medical isotope production, and research activities. This 133,000 cubic meters (m{sup 3}) (35 million gallons [Mgal]) of high-level radioactive waste (HLW) is currently held in 43 large underground waste tanks. The capacity of each of these tanks range from 2,800 m{sup 3} to 5,000 m{sup 3} (0.75 to 1.33 Mgal) and were placed in operation between 1954 and 1986. In July 2009, the DOE awarded a stand-alone contract to execute the Liquid Waste Mission at SRS. The Liquid Waste Contractor selected was Savannah River Remediation LLC1 (SRR), which is responsible for receipt, storage, retrieval and treatment of all HLW, disposal of the decontaminated low-activity waste fraction, as well as operationally closing cleaned HLW tanks. Since July 2009, SRR has successfully grouted and operationally closed six large underground tanks, poured 1,476 canisters of vitrified HLW (a stable glass waste form), treated approximately 34,200 m{sup 3} (9.0 Mgal) of HLW, and dispositioned over 41,200 m{sup 3} (10.9 Mgal) of decontaminated salt solution as low-level waste (LLW) into the Saltstone Disposal Units (SDUs) being constructed by SRR on site. The innovative work performed by SRR in the LLW portion of its mission has earned it the Richard S. Hodes Award. The work conducted by SRR is the same work championed by the late Richard S. Hodes, a respected physician, statesmen, and Chairman of the Southeast Compact Commission for Low-Level Radioactive Waste Management. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Uranium Partitioning upon Ammonia Gas Treatment on Phyllosilicate Minerals

In the past, > 200,000 kg of U was released to the Hanford Site vadose zone from disposal and leakage of waste byproducts from plutonium production during World War II and the Cold War (Zachara et al., 2007). U is highly mobile due to the presence of carbonates and oxidizing conditions, with K{sub d} of 0.1 - 8 mL/g at the site (Zachara et al., 2007; Szecsody et al., 2013; Serne et al., 2008). NH{sub 3} (gas) injection is being investigated as a remediation technique as it is an in situ method that will not introduce additional liquid that could drive contaminants deeper into vadose zone towards groundwater. Objectives: To understand the impact of alkaline injection on geochemical processes in the Hanford Site vadose zone, including: 1)Long-term fate of uranium (U); 2)Dissolution and re-precipitation of secondary minerals. Apparent K{sub d}'s increase significantly with NH{sub 3} gas treatment, especially for six-month aging. - K{sub d} decreases after aeration, primarily due to U desorption at lower pH. U removal is still significantly greater than natural conditions (K{sub d} < 8 vs. > 100 mL/g). - Three-day aeration has higher loading than six-month after ammonia gas treatment and aeration. However, significantly greater desorption of U occurs with aeration in the six-month aged sample potentially due to transformation into different, more soluble solid phases with longer term aging. - U removal is primarily due to (1) co-precipitation of U with secondary minerals and (2) adsorption to minerals' surface, although further research is required to identify dominant mechanisms. Future experiments will focus on garnering a better understanding of the solid phase U speciation. Solids will be characterized using SEM-EDS, EMPA, XPS, XAFS, and TEM to better understand the effects of basic treatments on initial minerals and formation of secondary precipitates.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

An Overview of Nanomaterials for Environmental Remediation Applications

The environmental remediation capabilities of nanoparticles were reviewed and evaluated. Nanoparticles (NPs) have been used to remediate various forms of environmental contamination. Various materials, morphologies, and conditions are required to remediate different contaminants. Nanoparticles may have benefits and/or limitations compared with traditional remediation methods. New techniques are being applied to mitigate the limitations of NPs. Nanomaterials are a promising technology for the environmental remediation. NPs have been used for the remediation of aqueous and atmospheric contaminants. Nanoparticles have been used to sequester contaminants toxic to human and environmental health. Various materials, morphologies, and conditions are necessary for the remediation of different contaminants. The remediation of heavy metals is of significant concern. Contaminants may be remediated by means of sorption or reduction. The remediation capability of nanoparticles is promising due to their high surface area and reactivity. Reaction kinetics are, therefore, notably fast. These characteristics make NPs attractive for environmental remediation. Various NPs have been used as sequestering agents for environmental contaminants. NPs have been used to remediate heavy metals as well as organic contaminants. Technical Objectives: Assess viability of nanoparticles (NPs) for environmental remediation; Review benefits and limitations of NPs; Design future experiments to test remediation capabilities of NPs. Future Plans: Create NP filters for remediation - Grow Au NPs on Stainless Steel Wool: Stainless steel wool has many defects and crevices allowing the Au NPs to grow on the surface; Stainless steel wool will not react with the heavy metal contaminants tested; NPs are embedded, so they do not have to be removed from solution. Test sorption capabilities with heavy metal contaminants in aqueous solution. Benefits of Gold NPs: Corrosion/oxidation resistant; Exhibit visible/near IR plasmon resonance; Can be synthesized by solution chemistry: cost efficient and easily scalable. Surfactants: Used to lower surface energy and prevent aggregation; Sodium citrate: anionic surfactant (-); Cetyltrimethylammonium bromide (CTAB): cationic surfactant (+); Ionic surfactants create charged NPs; Charged NPs can be used to sequester ionic contaminants (eg. heavy metals)

54 ENVIRONMENTAL SCIENCES↗

Synthesis and Characterization of Pd-based Nanomaterials

Bimetallic nanoparticles (BNPs) consist of two different types of metals or alloys that are bonded together. Unique properties such as optical, electronic, thermal, and catalytic effects differ for each type of BNP. Important BNPs range from Au-Pd, Ag- Pt, Au-Pt, and Ag-Ni. Pd bimetallic nanoparticles are of interest due to their many applications such as catalysis and sensing. Bimetallic catalysts have increase reaction rates and have improved catalyst stability through the geometry and ligand distribution. Pd nanoparticles are considered to be a strong catalyst due to their high activity at low temperatures and high tolerance to moisture. The catalytic properties of bimetallic nanoparticles depend on the structural properties such as size and shape. Core-shell, hollow structure, and multi-shell alloy are three possible structures nanoparticles can form as bimetallic catalysts. BNPs can be synthesized through different methods to control the size, shape, and structure. To obtain different morphologies, a variety of methods can be performed. Different methods can range from the usage of the glancing angle deposition (GLAD) to the galvanic replacement reaction, but the methods all depend on the properties of the metals. The galvanic displacement reaction was the method used to obtain Pd-based nanoparticles. This reaction is best know for obtaining hollow shaped NPs. To determine what redox process was preformed, the activity series of metals was used. From the activity series of metals, silver (Ag) was selected to preform Pd-based nanoparticles. Objectives: Synthesize Ag nanoparticles and Ag-Pd nanoparticles to understand the morphology. Characterize the synthesized nanoparticles using scanning electron microscopy (SEM), phase analysis light scattering (PALS), dynamic light scattering (DLS), energy dispersive X-ray spectroscopy (EDS), and UV-Vis spectroscopy. Results: In the UV-Vis spectrum, the Ag-Pd bimetallic NP's plasmon band decreased as the volume of palladium increased. The surface charge increases as the concentration of palladium increases. The Pd{sup 2+} ions interact with the sodium citrate surface, and decrease the negative charge. Conclusion: Ag-Pd nanoparticles were successfully created and stabilized with sodium citrate. The addition of Pd decreased the prominent plasmon band of the Ag nanoparticles. The SEM analysis showed that Ag nanoparticles had a well-defined structure, while the Ag-Pd nanoparticles showed hollow and rough structure. The EDX analysis confirmed the presence of silver and palladium. This material can be used in many industrial and research fields such as organic synthesis, fuel cells, and environmental sensing and remediation.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Functionalized Magnetic Nanoparticles for Technetium Sequestration from Groundwater

Technetium 99 (Tc) is among the most common environmental contaminants at DOE sites and one of the most common risk drivers in low- and high-level waste disposal sites. The majority of Tc is generated from anthropogenic sources, such as nuclear power plants, global weapons, nuclear storage facilities and medical applications. Through these sources, Tc contamination has been unintentionally introduced in to the environment. The most common chemical form of Tc is Tc(VII)O{sub 4}{sup -}. Due to its high solubility and mobility, Tc can enter the food chain and cause adverse health effects to humans. Currently, ion exchange resins and reduction processes are the most common approaches for Tc immobilization. Although these techniques have shown to be effective, they also possess major drawbacks, such as high cost, low adsorption capacity, and complex creation and maintenance. Therefore, development of more efficient and simple technologies for the remediation of Tc-contaminated systems are needed. Functionalized magnetic nanoparticles have been used to remove organic and inorganic contaminants from water resources. These nanoparticles have attracted extensive attention as an adsorbent material due to their large surface area, high efficiency, low-cost, easy functionalization and separation with a magnet. This study seek to develop functionalized magnetic iron oxide nanoparticles for the efficient removal of Tc and other heavy metal contaminants from water resources under ambient conditions. Objectives: Synthesize magnetic iron oxide nanoparticles and functionalize their surface with Cetyltrimethylammonium Bromide (CTAB) and tetraethyl-orthosilicate (TEOS). Characterize the synthesized nanoparticles using scanning electron microscopy (SEM) coupled with energy dispersive X-ray spectroscopy (EDS), Dynamic Light Scattering (DLS) and Zeta PALS. Perform adsorption studies to evaluate their adsorption behavior and capacity for (a) Technetium using Rhenium (ReO{sub 4}{sup -}) as a surrogate and (b) heavy metals, e.g. Cu{sup 2+}. Conclusions: Magnetic iron oxide nanoparticles were successfully functionalized with CTAB and TEOS. The functionalization of the iron oxide nanoparticles affects their surface charge and their hydrodynamic diameter. The addition of CTAB or TEOS decreased the hydrodynamic diameter of the nanoparticles due to repulsive and steric forces. The SEM micrographs show spherical nanoparticles of different sizes. The EDX analysis shows the presence of iron and oxygen from the iron oxide crystalline structure, and the different constituents of the CTAB and TEOS molecules. Proof-of-concept shows the successful adsorption of rhenium (ReO{sub 4}{sup -}) and copper Cu{sup 2+}) onto CTAB-Fe{sub 2}O{sub 3} and TEOS-Fe{sub 2}O{sub 3} respectively.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Panel Session 129: Perspectives (US and Non-US) on the Use of Risk and Dose Assessment Tools (R9.3)

This panel focused on various dose and risk assessment tools for assessments, Deactivation and Decommissioning, remediation, and closure of sites of chemical and radioactive wastes. Representatives from the US government agencies, non-US countries and their representative regulatory bodies or authorities, as well as performance/risk assessment practitioners compared and contrasted the various guidance from regulatory agencies and authorities on how tools such as the Preliminary Remediation Goals (PRG) calculator, the Dose Compliance Concentrations (DCC) calculator, and Residual Radioactivity (RESRAD) should be used in support of analyses and decisions for environmental cleanup activities. Panelists with presentations: Cumulative Impact Evaluation: Innovative Tools for Evaluation of Groundwater Protection (Alaa Aly); Superfund Evaluation Process for Alternative Risk and Dose Models (with Focus on EPA and DOE Tools) (Stuart Walker); NRC Staff Perspective on Risk-Informed Approach and Reasonable Safety Assurance in D and D and LLW (Rateb (Boby) Abu Eid)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Panel Session 132: Risk-Informed Approach for Decision Making in WM, D and D and SNF Management: Reasonable Assurance for Safety

Mr. Larry Camper organized a panel of experts to discuss approaches to better make risk-informed decisions in waste management, decommissioning, and the management of Spent Nuclear Fuel (SNF). The audience heard the perspectives from four panelists that addressed issues ranging from the technical basis used to make risk-informed decisions to for developing cleanup criteria and promulgating regulations and safety standards both domestically and abroad. A summary of each of the presentations given by the panelists is provided herein. This WMS BOD featured panel focused on the Risk-Informed Approach for Decision Making in WM, D and D and SNF Management and the Reasonable Assurance for Safety. The panelists addressed and discussed with the audience different approaches used for decision-making, summarizing ongoing probabilistic vs. deterministic approaches, including IAEA graded approach, and discussed policies/approaches to achieve reasonable assurance for safety rather than using absolute assurance. Panelists with presentations: Risk-Informed Decision Making - More than a Motto? (Paul Black); NRC Staff Perspective on Risk-Informed Approach and Reasonable Safety Assurance in D and D and LLW (Rateb (Boby) Abu Eid); Risk-Informed Decision-Making and Illustrative National Academies Studies (Charles Ferguson); IAEA's Revised Safety Guidance on Remediation (Michelle Roberts); NDA Radioactive Waste Strategy - A Risk Informed Approach (James McKinney)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Session 077 - Panel: Wednesday US DOE Featured Site: Lexington, KY Office (Portsmouth and Paducah Sites) (R1.14)

This panel featured the DoE's Portsmouth Paducah Project Office (PPPO), which is responsible for the management and cleanup of at the Portsmouth, Ohio and Paducah, Kentucky former Gaseous Diffusion Plant sites. Portsmouth is primed for the first major skyline change at the site the upcoming demolition of the X-326 process building and initial operations of the Onsite Waste Disposal Facility. The Paducah site is working on the C-400 city block initiative allowing DOE to tackle the main source of groundwater contamination at the site, in conjunction with deactivation and demolition of the C-400 Cleaning Building. PPPO's DUF6 conversion plants have 7 lines in continuous operation at both sites providing the opportunity to ramp up cylinder processing. Panelists with presentations: DOE PPO Update (Robert Edwards, Joel Bradburne); Portsmouth/Paducah Project Office (PPPO) (Joel Bradburne, Robert Edwards); PADUCAH (Jennifer Woodard, Myrna Espinosa Redfield); Depleted Uranium Hexafluoride Conversion Project (Reinhard Knerr, Zack Smith); Paducah Deactivation and Remediation Project (Myrna Espinosa Redfield); Mid-America Conversion Services - Seven Lines One Project (Zack Smith)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Panel Session 88: Waste Management from Remediation of Legacy Sites or Unplanned Releases

This panel focused on the progression of cleanup on the Hanford Site, Washington, USA, from establishing the regulatory framework necessary for cleanup, to understanding the risks and addressing near-term hazards, to moving to 24/7 operations as cleanup focuses on tank waste treatment and co-located risk reduction efforts as the active cleanup footprint shrinks. Panelists with presentations: Hanford: Past, Present, Future (Brian Vance); Protecting the River (L. Ty Blackford); Hanford Tank Farms (John Eschenberg Jr.); The Hanford Site (Robert Wilkinson); The Hanford Site (Valerie McCain)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗