Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Qualification”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

One NASA PEM qualification standard : comparison of JPL and GSFC standards

Although use of Plastic Encapsulated Microelectronics (PEMs) in space applications is discouraged, their use is mandatory for selected applications involving the need for advanced technology and small packages. Various space systems designers and manufacturers have developed methods to qualify and screen PEMs. In general, each procedure is different. The purpose of this fiscal year’s investigation is to initiate a process to coordinate the efforts at various NASA centers to eventually develop a One NASA method. Part of this activity includes sharing of test data and PEM qualification methodologies. Various experts in the NASA community were identified and contacted to support this effort. We were successful in finding such experts at GSFC, APL and the Constellation office (Orion and Ares). All these experts provided typical qualification program plans. Since funding was severely restricted, it was decided to concentrate on coordination activity with GSFC. GSFC is planning a new version of IEEE-INST-002 section applying to PEMs. The GSFC expert (Dr. Alexander Teverovsky) provided a detailed assessment of the differences between the planned new version of IEEE-INST-002 and the JPL-D-19426 (JPL guideline) as well as a summary rationale for the decisions within the IEEE-INST-002. It should be noted that GSFC’s assessment of IEEE-INST-002 in the area of PEMs is not finalized. JPL is also considering changes in PEM qualification methodologies based on test data from recent qualification testing for their newer Projects (MSL, Grail, Juno). A spreadsheet delineating the differences between the JPL standard and the GSFC standard is presented.

Cooper, Mark↗

Cathode & Electromagnet Qualification Status and Power Processing Unit Development Update for the Ascendant Sub-kW Transcelestial Electric Propulsion System

A review of the component-level flight qualification efforts and power processing unit development status of the Ascendant Sub-kW Transcelestial Electric Propulsion System (ASTRAEUS) program is presented. Component-level qualification efforts were undertaken for the system’s ultra-compact heaterless LaB6 hollow cathode and electromagnets, both of which employ designs bespoke to ASTRAEUS, as they represent the highest failure risks for the thruster. Through parallel long-duration wear and ignition tests, the ASTRAEUS cathode demonstrated invariant discharge performance over more than 5000 h of operation at its maximum operating current of 4 A and demonstrated more than 25,000 ignition cycles. The ASTRAEUS electromagnets completed their environmental qualification through a demonstration of more than 1200 deep thermal cycles with no indication of coil degradation (the test articles previously completed qualification-level vibration and shock testing). ASTRAEUS’s prototype power processing unit has demonstrated more than 92% total power conversion efficiency and class-leading power density & specific power density of 4.5 W/cm3 & 1670 W/kg, respectively. The various power converters found in the ASTRAEUS power processing unit are reviewed with a focus on the methods by which such high performance was achieved.

Conversano, Ryan W.↗

Summary of NASA Progress on the Development and Qualification of a 12-kW Hall-Effect, Solar Electric Propulsion Thruster

Beginning in 2014, the National Aeronautics and Space Administration (NASA) Space Technology Mission Directorate (STMD) began a project to increase the state of the art for the Hall-Effect Solar Electric Propulsion (SEP) technology. The Technology Demonstration Missions (TDM) Program Office provides programmatic oversight of SEP with the project being led by Glenn Research Center, supported by the Jet Propulsion Laboratory and development, qualification & flight hardware all provided by Aerojet Rocketdyne (AR). This technology was pursued as the propulsion system for the Asteroid Redirect and Robotic Mission (ARRM). While the concept was originally slated for ARRM, it was realigned to Gateway to support future Moon to Mars objectives. The Gateway lunar station was established and will play a key role in NASA’s Artemis Program which utilizes collaboration with the Canadian Space Agency (CSA), the European Space Agency (ESA) and the Japanese Space Agency (JAXA). The 12-kW hardware will be the primary propulsion for the Gateway element, Power & Propulsion Element (PPE), from Low Earth Orbit to a Near Rectilinear Halo Orbit around the Moon. Initial efforts began with utilizing Technology Development Units (TDU) built by NASA as the predecessor to the contract activity with AR. Over the past few years, AR has built Engineering Test Units (ETU), Engineering Development Units (EDU) and qualification & flight models (QM and FM, respectively). With requirement changes from the AARM mission to PPE, the joint team has modified the design and has started qualification activities for environment testing (shock, vibe) at multiple facilities in the US leading to eventual life testing. This paper will explore the various design changes, system modeling and the latest status for qualification testing.

Joel Robinson↗

Summary of NASA Progress on the Development and Qualification of a 12 kW Hall Effect, Solar Electric Propulsion Thruster

Beginning in 2014, the National Aeronautics and Space Administration (NASA) Space Technology Mission Directorate (STMD) began a project to increase the state of the art for the Hall-Effect Solar Electric Propulsion (SEP) technology. The Technology Demonstration Missions (TDM) Program Office provides programmatic oversight of SEP with the project being led by Glenn Research Center, supported by the Jet Propulsion Laboratory and development, qualification & flight hardware all provided by Aerojet Rocketdyne (AR). This technology was pursued as the propulsion system for the Asteroid Redirect and Robotic Mission (ARRM). While the concept was originally slated for ARRM, it was realigned to Gateway to support future Moon to Mars objectives. The Gateway lunar station was established and will play a key role in NASA’s Artemis Program which utilizes collaboration with the Canadian Space Agency (CSA), the European Space Agency (ESA) and the Japanese Space Agency (JAXA). The 12-kW hardware will be the primary propulsion for the Gateway element, Power & Propulsion Element (PPE), from Low Earth Orbit to a Near Rectilinear Halo Orbit around the Moon. Initial efforts began with utilizing Technology Development Units (TDU) built by NASA as the predecessor to the contract activity with AR. Over the past few years, AR has built Engineering Test Units (ETU), Engineering Development Units (EDU) and qualification & flight models (QM and FM, respectively). With requirement changes from the AARM mission to PPE, the joint team has modified the design and has started qualification activities for environment testing (shock, vibe) at multiple facilities in the US leading to eventual life testing. This paper will explore the various design changes, system modeling and the latest status for qualification testing.

Joel W Robinson↗

AGR 5/6/7 Data Qualification Report for ATR Cycles 162B through 168A

This report provides the qualification status of experimental data for the Advanced Gas Reactor (AGR) 5/6/7 fuel irradiation. AGR-5/6/7 was conducted in the Advanced Test Reactor (ATR) at Idaho National Laboratory (INL) in support of development and qualification of tri-structural isotropic (TRISO) low-enriched fuel for use in high temperature gas-cooled reactors. The objectives of the AGR-5/6/7 experiments are to: (i) irradiate reference-design fuel particles to support fuel qualification, (ii) establish operating margins for the fuel beyond normal operating conditions, and (iii) provide irradiated-fuel performance data and irradiated-fuel samples for post-irradiation examination (PIE) and safety testing. The test train contains five separate capsules that were independently controlled and monitored. Each capsule contains multiple 12.51-mm-long compacts filled with low enriched uranium carbide/oxide (UCO) TRISO fuel particles. The primary objective of the AGR-5/6 test (Capsules 1, 2, 4, and 5) is to verify successful performance of the reference-design fuel under normal operating conditions. The AGR-7 test (Capsule 3) was designed to explore fuel performance at higher temperatures to demonstrate the capability of the fuel to withstand conditions beyond normal operating conditions in support of plant design and licensing. AGR 5/6/7 will also provide irradiated-fuel performance data on fission-gas release from failed particles during irradiation. The AGR-5/6/7 capsules were irradiated in the ATR northeast flux trap location. The experiment began on February 16, 2018 and ended on July 22, 2020, spanning nine ATR cycles over two and a half years. Thus, the AGR-5/6/7 fuel compacts were irradiated for a total of 360.9 effective full power days. The AGR 5/6/7 experiment was able to remain in the reactor core during all three Powered Axial Locator Mechanism (PALM) cycles (163A, 165A, and 167A) without overheating its fuel compacts. This report includes irradiation monitoring data from nine ATR Cycles: 162B, 163A, 164A, 164B, 165A, 166A, 166B, 167A, and 168A, as stored in the Nuclear Data Management and Analysis System (NDMAS). During irradiation, data records consisted of instantaneous measurements recorded every minute and provided by text files automatically every 2 hours. The AGR 5/6/7 data streams addressed in this report include thermocouple (TC) temperatures, sweep gas data (flow rates [capsule inlet, outlet, and downstream at detector], pressure, and moisture content), and Fission Product Monitoring System (FPMS) data (release rates and release to birth rate ratios [R/Bs]) for each of the five capsules. A total of 94,989,908 TC temperature and sweep gas data records were received and processed by NDMAS for AGR 5/6/7 irradiation. Of these records, 41,593,387 (or 43.7% of the total) met data collection and accuracy requirements and are labeled as Qualified. A total of 57,746,693 TC temperature readings were captured from 54 installed TCs. Among them, 10,034,676 TC temperature records (only 17.4%) were Qualified and 47,701,371 TC temperatures (or 82.6%) are Failed due to 48 TC failures (63.5%) and due to missing values (19.1%). To assess performance of the operational TCs, analysis of daily correlations between TCs found no evidence of virtual junction failure for any TCs. Analyses on control charts of TC temperature differences revealed trending in TC readings for TC2, 4, 5, and 13 in Capsule 3, but there is no conclusive indication of TC drift failure that caused those trends. Therefore, TC control charts are not used to disqualify TC data, but only for users’ consideration. For sweep gas flow rates, a total of 31,519,747 gas flow records (84.4%) are Qualified for use for AGR-5/6/7 experiment; 5,723,468 gas flow records (15.4%) are Failed due mostly to missing values; and 74,641 high sweep gas flow rates (0.2 %) are Trend. A large number of Failed missing TC temperature and gas flow values were caused by an error in the data output script that outputted a ‘NULL’ value when values were unchanged. This problem was fixed during the outage of Cycle 166B, which led to a substantially decreased number of missing values during the last three cycles. Nonetheless, a large amount of non-missing data remained because of the high data acquisition frequency (1-minute) and still provided sufficient data to effectively monitor the experiment as designed. For FPMS data, NDMAS received and processed fission product release and R/B data for nine ATR cycles, when ATR core reached full power during AGR 5/6/7 irradiation. These data consist of 110,388 release rate records and 110,388 R/B records for the twelve radionuclides (Kr 85m, Kr 87, Kr 88, Kr 89, Kr 90, Xe 131m, Xe 133, Xe 135, Xe 135m, Xe 137, Xe 138, and Xe 139) for each of the five capsules. Equivalent numbers of uncertainty records associated the release rates and R/B values were provided. To date, qualification status of the FPMS data stored in the NDMAS dat

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Sub-sized specimen testing and its relationship with Gen IV Materials Qualification

Renewed interest in advanced reactor technologies which can produce inherently safe, reliable, low carbon, low cost energy requires the development of new materials which can operate in the extreme environments proposed by Gen IV reactor designs. The primary focus of the Nuclear Materials Discovery and Qualification Initiative (NMDQi) is to accelerate the process by which new materials can make their way into commercial use, enabling new technologies and innovations within the nuclear sector. Due to limitations in the production of neutron irradiated material for testing and qualification, the use of specimens far smaller than those traditionally called for in regulatory codes becomes a necessity. While the use of these sub-sized specimens is necessary to achieve materials qualification on a realistic timeline and budget, literature showing the efficacy of these samples as an appropriate surrogate for ASME/ASTM defined samples is limited. This poster will detail historical efforts to compare the mechanical behavior of small geometry samples with bulk material behavior and the potential of sub-sized specimen testing at INL for future materials qualification efforts.

36 MATERIALS SCIENCE↗

Accelerating Nuclear Fuels and Materials Qualification by Multi-Level Irradiation Experiment Campaign

The advanced reactor technologies feature fuels, coolants, and materials that promise safer operating conditions under normal and accident scenarios. However, the nuclear fuels and materials qualifications require several decades (for example, new reactor fuel qualification from conceptualization requires about 20 years). Therefore, accelerating nuclear fuels and materials qualification is essential, and it can be achieved by combining high through-put materials irradiation and testing, advanced post-irradiation examinations, and Multiphysics modeling. This paper addressed the associated challenges in accelerating nuclear fuels and material qualification for new and advanced reactor designs, which differ based on fuel, coolant, operating conditions, and structural materials. These challenges vary for radiation level, operating conditions (e.g., temperature and pressure), and coolant type (e.g., corrosion environment). In addition, the challenges and limitations in modeling tools, experimental facilities, and licensing guidelines are also discussed, and a general solution path forward is recommended.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Presentation: Accelerating Nuclear Fuels and Materials Qualification by Multi-Level Irradiation Experiment Campaign

The advanced reactor technologies feature fuels, coolants, and materials that promise safer operating conditions under normal and accident scenarios. However, the nuclear fuels and materials qualifications require several decades (for example, new reactor fuel qualification from conceptualization requires about 20 years). Therefore, accelerating nuclear fuels and materials qualification is essential, and it can be achieved by combining high through-put materials irradiation and testing, advanced post-irradiation examinations, and Multiphysics modeling. This paper addressed the associated challenges in accelerating nuclear fuels and material qualification for new and advanced reactor designs, which differ based on fuel, coolant, operating conditions, and structural materials. These challenges vary for radiation level, operating conditions (e.g., temperature and pressure), and coolant type (e.g., corrosion environment). In addition, the challenges and limitations in modeling tools, experimental facilities, and licensing guidelines are also discussed, and a general solution path forward is recommended.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Methodology of Qualification of CCIM Vitrification Process Applied to the High- Level Liquid Waste from Reprocessed Oxide Fuels - 12438

The vitrification of high-level liquid waste from reprocessed oxide fuels (UOX fuels) by Cold Crucible Induction Melter is planed by AREVA in 2013 in a production line of the R7 facility at La Hague plant. Therefore, the switch of the vitrification technology from the Joule Heated Metal Melter required a complete process qualification study. It involves three specialties, namely the matrix formulation, the glass long-term behavior and the vitrification process development on full-scale pilot. A new glass frit has been elaborated in order to adapt the redox properties and the thermal conductivity of the glass suitable for being vitrified with the Cold Crucible Induction Melter. The role of cobalt oxide on the long term behavior of the glass has been described in the range of the tested concentrations. Concerning the process qualification, the nominal tests, the sensitivity tests and the study of the transient modes allowed to define the nominal operating conditions. Degraded operating conditions tests allowed to identify means of detecting incidents leading to these conditions and allowed to define the procedures to preserve the process equipments protection and the material quality. Finally, the endurance test validated the nominal operating conditions over an extended time period. This global study allowed to draft the package qualification file. The qualification file of the UOX package is currently under approval by the French Nuclear Safety Authority. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The CNSC's Inspector Training and Qualification Program and its Importance to the Nuclear Industry - 19370

Trained, qualified, and designated staff at the Canadian Nuclear Safety Commission (CNSC) conduct inspections of licensed nuclear sites as a method of compliance verification. This paper will describe the unique and comprehensive qualification process for CNSC inspectors, known as the Inspector Training and Qualification Program (ITQP). The ITQP includes service-line-specific training that is unique to each inspection group within the CNSC, dependent on the facility/industry type. The training requirements specific to staff in the Wastes and Decommissioning Division and its impact on safety at waste management sites across Canada will be discussed. This paper will specifically identify the importance of CNSC inspector training and detail how the unique training program requirements enable the CNSC to better identify and encourage compliance among nuclear waste and decommissioning sites in Canada. CNSC inspectors are designated under section 29 of the Nuclear Safety and Control Act (NSCA), and the powers of inspectors are outlined in section 32 of the NSCA. Having trained, qualified, and designated inspectors is paramount for both the CNSC and the nuclear industry. For the CNSC, this ensures that staff in the field are aware of potential hazards and how to mitigate such hazards (if applicable), that staff understand the regulatory framework and how to measure compliance against it, and that staff consistently apply CNSC values across the nuclear industry. For the industry, this ensures that staff present at nuclear facilities are knowledgeable and professional, that inspections are conducted in a consistent manner, and that any compliance actions issued are measurable and defendable against the regulatory framework. The CNSC's ITQP incorporates both theoretical (in-class and online) and practical training, and is broken down into six categories: mandatory training for all new employees; core training; service-line-specific training; on-the-job training; CNSC regulations training; and, recommended additional training. This paper will discuss in detail the specific aspects of each of these categories, the importance of each category including the difference between knowledge and skills acquired in theoretical versus hands-on training, and how CNSC staff in designated inspector positions (inspectors-in-training) progress through the program. The complete list of core training and service-line-specific training for inspectors in the Wastes and Decommissioning Division, including re-qualification requirements, will be explored throughout the paper. It is further important that CNSC designated inspectors undergo continuous learning to ensure that their skills remain up to date, as well as to ensure that inspectors requalify at defined intervals to enable the maintenance of the core knowledge and skills with which the determination of the person's qualification was based. The steps involved in this requalification process, as well as the importance of continuous learning and the maintenance of skills and knowledge will be further discussed. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Sludge Washing And Demonstration Of The DWPF Flowsheet In The SRNL Shielded Cells For Sludge Batch 8 Qualification

The current Waste Solidification Engineering (WSE) practice is to prepare sludge batches in Tank 51 by transferring sludge from other tanks to Tank 51. Tank 51 sludge is washed and transferred to Tank 40, the current Defense Waste Processing Facility (DWPF) feed tank. Prior to transfer of Tank 51 to Tank 40, the Savannah River National Laboratory (SRNL) typically simulates the Tank Farm and DWPF processes using a Tank 51 sample (referred to as the qualification sample). WSE requested the SRNL to perform characterization on a Sludge Batch 8 (SB8) sample and demonstrate the DWPF flowsheet in the SRNL shielded cells for SB8 as the final qualification process required prior to SB8 transfer from Tank 51 to Tank 40. A 3-L sample from Tank 51 (the SB8 qualification sample; Tank Farm sample HTF-51-12-80) was received by SRNL on September 20, 2012. The as-received sample was characterized prior to being washed. The washed material was further characterized and used as the material for the DWPF process simulation including a Sludge Receipt and Adjustment Tank (SRAT) cycle, a Slurry Mix Evaporator (SME) cycle, and glass fabrication and chemical durability measurements.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

AGR-2 Data Qualification Report for ATR Cycle 154B

This report provides the data qualification status of Advanced Gas Reactor-2 (AGR-2) fuel irradiation experimental data from Advanced Test Reactor (ATR) Cycle 154B as recorded in the Nuclear Data Management and Analysis System (NDMAS). This is the last cycle of AGR-2 irradiation, as the test train was pulled from the ATR core during the outage portion of ATR Cycle 155A. The AGR-2 data streams addressed in this report include thermocouple (TC) temperatures, sweep gas data (flow rates including new Fission Product Monitoring (FPM) downstream flows from Fission Product Monitoring System (FPMS) detectors, pressure, and moisture content), and FPMS data (release rates and release-to-birth rate ratios [R/Bs]) for each of the six capsules in the AGR-2 experiment. The final data qualification status for these data streams is determined by a Data Review Committee (DRC) comprised of AGR technical leads, Sitewide Quality Assurance (QA), and NDMAS analysts. The Data Review Committee reviewed the data acquisition process, considered whether the data met the requirements for data collection as specified in QA-approved Very High Temperature Reactor (VHTR) data collection plans, examined the results of NDMAS data testing and statistical analyses, and confirmed the qualification status of the data as given in this report.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

WTP Waste Feed Qualification: Hydrogen Generation Rate Measurement Apparatus Testing Report

The generation rate of hydrogen gas in the Hanford tank waste will be measured during the qualification of the staged tank waste for processing in the Hanford Tank Waste Treatment and Immobilization Plant. Based on a review of past practices in measurement of the hydrogen generation, an apparatus to perform this measurement has been designed and tested for use during waste feed qualification. The hydrogen generation rate measurement apparatus (HGRMA) described in this document utilized a 100 milliliter sample in a continuously-purged, continuously-stirred vessel, with measurement of hydrogen concentration in the vent gas. The vessel and lid had a combined 220 milliliters of headspace. The vent gas system included a small condenser to prevent excessive evaporative losses from the sample during the test, as well as a demister and filter to prevent particle migration from the sample to the gas chromatography system. The gas chromatograph was an on line automated instrument with a large-volume sample-injection system to allow measurement of very low hydrogen concentrations. This instrument automatically sampled the vent gas from the hydrogen generation rate measurement apparatus every five minutes and performed data regression in real time. The fabrication of the hydrogen generation rate measurement apparatus was in accordance with twenty three (23) design requirements documented in the conceptual design package, as well as seven (7) required developmental activities documented in the task plan associated with this work scope. The HGRMA was initially tested for proof of concept with physical simulants, and a remote demonstration of the system was performed in the Savannah River National Laboratory Shielded Cells Mockup Facility. Final verification testing was performed using non-radioactive simulants of the Hanford tank waste. Three different simulants were tested to bound the expected rheological properties expected during waste feed qualification testing. These simulants were tested at different temperatures using purge gas spiked with varying amounts of hydrogen to provide verification that the system could accurately measure the hydrogen in the vent gas at steady state.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Silicon Carbide Composite Cladding Qualification

This report examines the process to qualify a new fuel-cladding type focusing on the data requirements and types of irradiation testing necessary to meet the regulatory burden and related guidance applicable to fuel qualification of accident-tolerant fuel. The report considers the use of accelerated fuel qualification techniques and lead-test specimen programs that may shorten the timeline for qualifying fuel for use in a nuclear reactor at the desired burnup. The assessment framework particularly emphasizes the identification of key fuel manufacturing parameters, the specification of a fuel performance envelope to inform testing requirements, the use of evaluation models in the fuel qualification process, and the assessment of the experimental data used to develop and validate the empirical models and empirical safety criteria.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Qualification of Bonding Process of Temperature Sensors to Extreme Temperature Deep Space Missions

A process has been explored based on the state-of-the-art technology to bond the platinum resistance thermometer (PRT) on to potential aerospace material such as a flat aluminum surface and a flexible copper tube to simulate coaxial cable for the flight applications. Primarily, PRTs were inserted into a metal plated copper braid to avoid stresses on the sensor while attaching the sensor with braid to the base material for long duration deep space missions. Appropriate pretreatment has been implemented in this study to enhance the adhesion of the PRTs to the base material. NuSil product has been chosen in this research to attach PRT to the base materials. The resistance (approx.1.1 k(Omega)) of PRTs has been electrically monitored continuously during the qualification thermal cycling testing from -150 C to +120 C and -100 C to -35 C. The test hardware has been thermal cycled three times the mission life per JPL design principles for JUNO project. No PRT failures were observed during and after the PRT thermal cycling qualification test for extreme temperature environments. However, there were some failures associated with staking of the PRT pig tails as a result of thermal cycling qualification test.

Extreme temperatures↗

Risk-Informed Safety Margin Characterization Case Study: Selection of Electrical Equipment to Be Subjected to Environmental Qualification

The Risk-Informed Safety Margin Characterization (RISMC) pathway of the DOE’s Light Water Reactor Sustainability (LWRS) program focuses on advancing the state of the art in safety analysis and risk assessment to support decision-making on nuclear power plant operation well beyond the originally designed lifetime of the plants (i.e., beyond 60 years). Among the issues being addressed in RISMC is the significance of SSC aging and how confident we are about our understanding of its impact on the margin between the loads SSCs are expected to see during normal operation and accident conditions, and the SSC capacities (their ability to resist those loads) as the SSCs age. In this paper, a summary is provided of a case study that examines SSC aging from an environmental qualification (EQ) perspective. The case study illustrates how the state of knowledge regarding SSC margin can be characterized given the overall integrated plant design, and was developed to demonstrate a method for deciding on which cables to focus, which cables are not so important from an environmental qualification margin standpoint, and what plant design features or operating characteristics determine the role that environmental qualification plays in establishing a safety case on which decisions regarding margin can be made. The selection of cables for which demonstration of margin with respect to aging and environmental challenges uses a technique known as Prevention Analysis. Prevention Analysis is a Boolean method for optimal selection of SSCs (that is, those combinations of SSCs both necessary and sufficient to meet a predetermined selection criterion) in a manner that allows demonstration that plant-level safety can be demonstrated by the collection of selected SSCs alone. Choosing the set of SSCs that is necessary and sufficient to satisfy the safety objectives, and demonstrating that the safety objectives can be met effectively, determines where resources are best allocated to assure SSC performance margin. The paper describes the resulting component types that were selected by Prevention Analysis and identifies the accident sequence characteristics that cause these component types to be important from an EQ and aging perspective (and, hence, worthwhile evaluating the extent of safety margin). In addition, component types not selected as needing significant margin from an EQ and aging perspective are discussed and an engineering rationale is developed justifying the lack of need to apply resources to demonstrating margin for these component types. This rationale is in terms of design features of the plant and operating characteristics that make these component types less important from an EQ and aging perspective. While the case study focuses on EQ and aging of equipment and cables located inside the containment of this PWR, the prevention analysis method is demonstrated to be an effective technique for identification of minimal collections of components that would be effective in managing safety for a variety of issues associated with aging and long-term operation of the fleet of plants.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Qualification of data obtained during a severe accident. Illustrative examples from TMI-2 evaluations

The accidents at the Three Mile Island Unit 2 (TMI-2) Pressurized Water Reactor (PWR) and the Daiichi Units 1, 2, and 3 Boiling Water Reactors (BWRs) provide unique opportunities to evaluate instrumentation exposed to severe accident conditions. Conditions associated with the release of coolant and the hydrogen burn that occurred during the TMI-2 accident exposed instrumentation to harsh conditions, including direct radiation, radioactive contamination, and high humidity with elevated temperatures and pressures. Post-TMI-2 instrumentation evaluation programs focused on data required by TMI-2 operators to assess the condition of the reactor and containment and the effect of mitigating actions taken by these operators. Prior efforts also focused on sensors providing data required for subsequent forensic evaluations and accident simulations. This paper provides additional details related to the formal process used to develop a qualified TMI-2 data base and presents data qualification details for three parameters: reactor coolant system (RCS) pressure; containment building temperature; and containment pressure. These selected examples illustrate the types of activities completed in the TMI-2 data qualification process and the importance of such a qualification effort. These details are described to facilitate implementation of a similar process using data and examinations at the Daiichi Units 1, 2, and 3 reactors so that BWR-specific benefits can be obtained.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗