Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Pumped Hydro”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

A Comparison of the Environmental Effects of Open-Loop and Closed-Loop Pumped Storage Hydropower

Pumped storage hydropower (PSH) capabilities are generally characterized as either open-loop or closed-loop. The U.S. Department of Energy (DOE) defines open-loop PSH as “continuously connected to a naturally flowing water feature,” and closed-loop PSH as “not continuously connected to a naturally flowing water feature.” All the PSH projects constructed in the United States to date are open-loop, so the potential environmental effects of closed-loop systems are not as well documented as the effects of open-loop systems. To address this knowledge gap, the DOE Water Power Technologies Office, under its HydroWIRES Initiative, has prepared this report to: (1) compare the potential environmental effects of open-loop PSH projects with those of closed-loop PSH projects; (2) describe how these effects are being avoided, minimized, or mitigated at existing projects in other countries and proposed projects in the United States; and (3) discuss the relative significance of the environmental issues. The report begins with a brief introduction on the current status of PSH development in the United States. Next, the report describes the current Federal Energy Regulatory Commission (FERC) hydropower licensing process, emphasizing some recent regulatory changes that affect closed-loop PSH development. The report then provides a summary comparison of the environmental effects of constructing and operating open-loop and closed-loop PSH systems and discusses the relative significance of those issues. This comparison and discussion are based on the results of a literature review and a review of FERC licensing records. The literature review includes journal articles, technical reports, and presentations on the environmental effects of PSH systems. It includes literature from the United States as well as countries where closed-loop PSH projects have been constructed. The FERC records review examines the FERC licensing record (e.g., National Environmental Policy Act documents and license orders) to identify the environmental effects anticipated and mitigation measures proposed for six of the closed-loop PSH projects currently licensed or permitted in the United States. For comparison, the FERC records review also discusses the environmental effects and mitigation measures for four open-loop PSH projects proposed or currently operating in the United States. The comparison of effects between open-loop and closed-loop projects is relative; that is, it characterizes the impacts of each project type as generally lower or higher than another project type. The comparison reflects general trends among project types because there are sometimes exceptions to the examples cited. The comparison is based on both spatial (location) and temporal (duration) factors and reflects both the severity and likelihood of effects. The report concludes that the environmental effects of closed-loop PSH projects are generally lower (i.e., more localized and of shorter duration) than those of open-loop PSH projects because they are located “off-stream,” minimizing aquatic and terrestrial impacts, and often have greater siting flexibility than open-loop PSH projects. For certain closed-loop project designs, however, impacts to groundwater may be higher relative to open-loop projects and should be considered in any environmental review.

13 HYDRO ENERGY↗

FAST Equipment Lease with Liberty University, Inc. (Cooperative Research and Development Final Report)

Liberty University, Inc. (Participant) will receive government owned equipment from NREL to evaluate and perform fatigue testing of bladders in use for small scale pumped storage hydropower. NREL is providing technical support to advance Liberty University's pumped storage hydropower (PSH) concept towards commercialization. The concept creates modular upper and lower watertight enclosures (tanks or reservoirs) connected by a series of modular pipe lengths (penstock).

13 HYDRO ENERGY↗

Storage Effectiveness in Enabling Variable Generation and Avoiding Fossil Emissions

In this paper, we investigate the relationship between storage and variable generation (VG) and how they can be used to replace fossil-fired technologies and their associated emissions. Unlike fossil generation, VG relies on variable resources (wind, solar, etc.), and the timing of these resources does not always match system needs, creating challenges both in terms of when energy is delivered and the reliability of that delivery. These challenges are typically addressed in one of two ways: paring VG with storage to provide firmed, time-shiftable energy or by building additional VG throughout an interconnection so that adequate amounts of VG are always available. The choice of how much to build of each (storage and VG) is typically an economic one. In this work, we focus on the former case - investigating the role of storage in bringing renewables onto the grid.

13 HYDRO ENERGY↗

Large Power Transformer Supply Chain Gap Analysis and Domestic Content Strategies for Hydropower Rehabilitation: Supplemental Report

Large Power Transformers (LPTs) are indispensable to U.S. hydropower operations, serving as generator step-up (GSU) units that interconnect hydro facilities to the transmission grid. Yet the LPT supply chain faces mounting stress from aging infrastructure, limited domestic production, and long lead times. Currently, more than 80% of LPT demand is met through imports, with primary suppliers including Mexico, South Korea, Brazil, Austria, and Canada. Domestic manufacturers supply only about 20% of units, constrained by bottlenecks in high-grade Grain-Oriented Electrical Steel (GOES), copper conductors, bushings, and on-load tap changers (OLTCs). Hydropower rehabilitation projects in particular face additional challenges due to custom design requirements, remote siting, and regulatory needs around domestic content. Regional cost disparities, driven by transportation logistics, labor markets, and import price volatility, further exacerbate project risks. To address these vulnerabilities, coordinated action is required: strengthening domestic capacity for GOES and secondary components, developing near-site assembly hubs, and leveraging IRS domestic content safe harbors to incentivize U.S. manufacturing. This addendum refines the 2024 NREL Hydropower Supply Chain Gap Analysis by focusing specifically on critical issues related to LPT domestic manufacturing capacity and key considerations for hydropower developers and asset owners.

13 HYDRO ENERGY↗

Optimal pumping schedule with high-viscosity gel for uniform distribution of proppant in unconventional reservoirs

Hydrocarbon recovery from a hydraulic-fractured unconventional reservoir can be enhanced by replacing slickwater with non-Newtonian high-viscosity gel as a fracturing fluid. However, in the literature, the role of gel rheology on hydrocarbon production from a fractured reservoir is not very well understood. This lack of understanding makes it difficult for the industry to choose appropriate viscosity parameters of fracturing gels. Motivated by these limitations, first, we have developed a high-fidelity model of non-Newtonian fluid flow to simulate fracture propagation, fluid leak-off, and gel flowback processes to predict the oil production from a hydraulic fractured reservoir. Simulation results of the high-fidelity model show how fracture geometry, formation damage, and gel cleanup process varies with the fracturing fluid rheology. Therefore, the developed model is used to understand the effect of gel rheology on hydrocarbon production via a sensitivity analysis, which provides a set of rheological parameters that maximize the cumulative amount of oil production. Finally, utilizing this optimal high-viscosity gel, a model predictive controller is designed to obtain an optimal pumping schedule necessary for producing a target fracture geometry and proppant concentration. The closed-loop simulation results demonstrate that the obtained pumping schedule successfully achieved the desired fracture geometry and proppant concentration at the end of pumping, leading to the maximum oil production from an unconventional reservoir.

13 HYDRO ENERGY↗

Electrical Systems of Pumped Storage Hydropower Plants: Electrical Generation, Machines, Power Electronics, and Power Systems

Adjustable-speed (AS) pumped storage hydropower (PSH) technology has the potential to become a large, consistent contributor to grid stability enabling higher penetrations of wind and solar energy on the future U.S. power system. AS-PSH has high-value characteristics, such as fast response to provide ancillary services to the grid, because it is a power converter interface with the grid (like battery storage), but at the same time it has the energy content large enough to supply both short-term (seconds-to-minutes) and long-term (minutes-to-hours) of energy needs, like more conventional power plants. However, designs must be optimized to lower the capital expenditure (CapEx) and to provide a high-quality grid interface capability (e.g. power quality, ancillary service provider, fault-tolerant or fault ride-through capability), which is a primary factor in the acceptance of AS-PSH into a utility’s generation mix. This CapEx will be greatly affected by the cost savings associated with the civil structure, turbine design, power electronics, control systems, or unique generator designs. A holistic design must be considered to get a full picture of the benefits of the technology proposed. The AS-PSH can be controlled to reduce the impact of transient disturbance on a power system and at the same time can be controlled to minimized subsequent component fatigue and potential oscillation modes within the plant, with the overall impact in reducing the operational expenditures (OpEx).Generating clean power to meet standards such as Institute of Electrical and Electronics Engineers (IEEE) 519 and International Electrotechnical Commission (IEC) 1000-3-2 will be a continuing challenge. For many technology developers, however, improved AS-PSH technologies will become a key component of generator-storage systems of the future given the prospects of increased performance and decreasing costs, and the ever-increasing penetration of renewables (e.g wind power and solar power).

13 HYDRO ENERGY↗

Furthering Advancements to Shorten the Time (FAST) to Commissioning for Pumped Storage Hydropower (PSH) Prize (CRADA Final Report)

NREL initiated a prize with support from Argonne National Laboratory (ANL), Oak Ridge National Laboratory (ORNL), and Pacific Northwest National Laboratory (PNNL), and sponsored by the U.S. Department of Energy Water Power Technologies Office (DOE WPTO) to encourage ideas to reduce the time to commissioning for PSH projects. As a result, Southwest Research Institute (SWRI) was chosen as one of nine finalists to develop their concept in advance of the FAST Prize Pitch Contest held on October 27, 2021. The National Labs provided technical and business advisement to SWRI in preparation for this Pitch Contest.

13 HYDRO ENERGY↗

Furthering Advancements to Shorten the Time (FAST) to Commissioning for Pumped Storage Hydropower (PSH) Prize: Cooperative Research and Development, CRADA Number CRD-19-00837 (Final Report)

The National Renewable Energy Laboratory (NREL) initiated a Prize with support from Argonne National Laboratory (ANL), Oak Ridge National Laboratory (ORNL), and Pacific Northwest National Laboratory (PNNL), and sponsored by the U.S. Department of Energy Water Power Technologies Office (DOE WPTO) to encourage ideas to reduce the time to commissioning for PSH projects. As a result, nine finalists have been chosen to develop their concepts in advance of the FAST Prize Pitch Contest to be held on October 7, 2019. The national labs will provide technical and business advisement to the noted FAST Prize finalists in preparation for this Pitch Contest.

13 HYDRO ENERGY↗

Methods for Assessing Opportunities for Ring Dam Pumped Storage Hydropower

There is growing interest in new pumped storage hydropower (PSH) deployment to provide a range of grid flexibility, reliability, and resiliency services under an evolving and uncertain future power sector. The National Laboratory of the Rockies develops open PSH resource assessment and cost modeling tools to help evaluate PSH deployment opportunities, and this report describes expansions to those tools to consider an additional PSH system configuration - ring-dam reservoirs built on flat topographical features that are constructed from roller-compacted concrete material. This reservoir type is common among current PSH proposals and requires new methods to identify sites with this reservoir geometry throughout the United States and characterize the associated dam cost. Cost characterization for ring dam reservoirs required collecting historical dam cost data for earthen, rockfill, and roller-compacted concrete dams and regressing equations that relate costs between alternative materials. The ring dam site identification algorithm follows a 5-step procedure to identify circular geometry reservoirs. Once ring dam reservoirs are identified, they are then paired with potential dry-gully reservoirs, and the full set of potential paired reservoirs is cost-optimized to produce a least-cost set of potential PSH sites with no overlapping reservoirs. The resulting analysis found 1,663 ring-dam to dry-gully systems in the contiguous United States that are lower cost than any overlapping dry-gully to dry-gully systems, 29 in Alaska, and none in Hawaii or Puerto Rico. These systems constitute 1.5 TW of capacity in the contiguous United States and nearly 29 GW in Alaska, demonstrating that under suitable topography and head, ring-dam systems can provide cost-effective PSH opportunities. The greatest density of these opportunities are found in the intermountain west where there are mesas and flat land at bases of mountain ranges, but continued work could incorporate additional site characteristics or consider more complex reservoir shapes to find additional PSH deployment opportunities.

13 HYDRO ENERGY↗

NPD Hydro

This tool, the Non-Powered Dam Hydropower Development and Ranking Opportunity Tool (NPD HYDRO), allows users to prioritize or rank NPD sites for future development based on user-defined priorities. Benefits can be evaluated in several categories: the grid, community, industry, and environment (represented by the GCIE impact scores in the tool. In addition, the tool provides the user with a qualitative measure for the feasibility of adding energy storage during NPD conversion, specifically battery, hydrogen electrolysis, and pumped-storage hydropower (PSH). By taking a holistic approach to the potential range of benefits provided by NPD conversions with results tailored to the user’s priorities, NPD HYDRO provides the opportunity for national-level screening and enables users to focus on the sites that are most closely aligned with their interests.

Woodruff, Nathan↗

Non-Powered Dam Hydropower Development and Ranking Opportunity Tool

In pursuit of a net-zero-carbon emissions economy in the United States, non-powered dams (NPDs) represent a large opportunity to develop hydropower while leveraging existing infrastructure. With almost 600 NPD sites in the United States identified as having over 1 megawatt (MW) of potential capacity, only a small portion of the total potential capacity at these sites has been developed in recent years. , Conventional NPD retrofit feasibility analysis primarily focuses on the developer’s perspective but fails to consider the broader impacts of developing a dam, including on the neighboring communities. This tool, the Non-Powered Dam Hydropower Development and Ranking Opportunity Tool (NPD HYDRO), allows users to prioritize or rank NPD sites for future development based on user-defined priorities. Benefits can be evaluated in several categories: the grid, community, industry, and environment (referred to as the four impact scores in the tool as discussed in Section 2.2). In addition, the tool provides the user with a qualitative measure for the feasibility of adding energy storage during NPD conversion, specifically battery, hydrogen electrolysis, and pumped-storage hydropower (PSH). By taking a holistic approach to the potential range of benefits provided by NPD conversions with results tailored to the user’s priorities, NPD HYDRO provides the opportunity for national-level screening and enables users to focus on the sites that are most closely aligned with their interests.

13 HYDRO ENERGY↗

Closed-Loop Pumped Storage Hydropower Resource Assessment for the United States. Final Report on HydroWIRES Project D1: Improving Hydropower and PSH Representations in Capacity Expansion Models

Pumped storage hydropower represents the bulk of the United States' current energy storage capacity: 23 gigawatts (GW) of the 24-GW national total (Denholm et al. 2021). This capacity was largely built between 1960 and 1990. PSH is a mature and proven method of energy storage with competitive round-trip efficiency and long life spans. These qualities make PSH a very attractive potential solution to energy storage needs, particularly for longer-duration storage (8 hours or more); such storage will be crucial to bridge gaps in electricity production as variable wind and solar production continue to comprise an ever-larger portion of the United States' energy portfolio (Cole et al. 2021; Frazier et al. 2021). However, it is unclear how much potential the United States has for the development of new PSH. No new large PSH has been constructed in the United States since the 1990s, and attempts to quantify technical potential capacity from PSH project applications to the Federal Energy Regulatory Commission (FERC) suffer from inconsistent site and cost evaluation methodologies and likely are not representative of all PSH opportunities. This study seeks to better under understand the technical potential for PSH development in the United States by developing a national-scale resource assessment for closed-loop PSH. Individual sites are not modeled in sufficient detail for project-level development, but they do provide valuable insights into potential resource areas across the United States, including the ability to provide estimates for a range of long-term development scenarios.

13 HYDRO ENERGY↗

Hybridization Assessment of Trybrid Pumped Storage Hydropower System—Part 1: A Case Study of Corral Summit

This report is a part of the deliverables for technical assistance provided to Cat Creek Energy for the Coral Summit Trybrid (Triple Hybrid-Pumped Storage Hydropower, Battery Energy Storage System, and photovoltaic solar energy) energy project. This report explores the operational benefits and challenges of hybridizing an open loop PSH (200MW) located at Mackay, Custer County, Idaho with solar PV (Ground mount 300MW and floating 40MW) and battery (720MWhr). This document reports two activities performed as a part of the hybridization assessment task 1) optimal resource allocation and energy management strategy, and 2) power quality and reliability assessment. From optimal resource allocation and energy management strategy (activity 1), the following key findings can be observed: • Conventional PSH (CPSH) with two reversible pump turbines and separate penstocks can provide required flexibility equivalent to that from two ternary PSH with separate penstock. With single unit CPSH, upper reservoir head cannot be maintained accurately, the variation of water level is rapid and pump mode flexibility is not available. These disadvantages can be overcome by single unit TPSH. However, using two CPSH units with separate penstocks also overcome these disadvantages with the formation of the hydraulic short circuit between two conventional units. • Flooding of the lower reservoir is a severe concern when considering continuous operation for black start. This limits the duration of continuous operation from PSH alone to around 50 hours. Due to the complementary PV and battery action, the duration of continuous operation and smooth power output can be extended. • An optimization problem is framed that maximizes the power output on an hourly basis while minimizing constraint violations and respecting seasonal variations of solar PV and load profiles . Two value streams, arbitrage and baseload generation are served by this profile. It was uncovered that for smooth power output during regular operation, PV curtailment will be required, or the battery capacity needs to be increased above 90MW to accommodate additional PV. From power quality and reliability assessment (activity 2) the following takeaway points can be observed: • The Trybrid, when integrated at the Lost River bus, and limited to 250MW in generation mode and -150MW in the pump mode, causes no violation of voltage or flow.

13 - HYDRO ENERGY↗