LESSONS LEARNED Biosurveillance Mobile App Development Intern Competition (Summer 2013)

The purpose of the lessons learned document for the BEOWulf Biosurveillance Mobile App Development Intern Competition is to capture the project’s lessons learned in a formal document for use by other project managers on similar future projects. This document may be used as part of new project planning for similar projects in order to determine what problems occurred and how those problems were handled and may be avoided in the future. Additionally, this document details what went well with the project and why, so that other project managers may capitalize on these actions. Project managers may also use this document to determine who the project team members were in order to solicit feedback for planning their projects in the future. This document will be formally communicated with the organization and will become a part of the organizational assets and archives.

97 MATHEMATICS AND COMPUTING↗

Procuring Stationary Fuel Cells For CHP: A Guide for Federal Facility Decision Makers

Federal agency leaders are expressing growing interest in using innovative fuel cell combined heat and power (CHP) technology at their sites, motivated by both executive branch sustainability targets and a desire to lead by example in the transition to a clean energy economy. Fuel cell CHP can deliver reliable electricity and heat with 70% to 85% efficiency. Implementing this technology can be a high efficiency, clean energy solution for agencies striving to meet ambitious sustainability requirements with limited budgets. Fuel cell CHP systems can use natural gas or renewable fuels, such as biogas. Procuring Stationary Fuel Cells for CHP: A Guide for Federal Facility Decision Makers presents an overview of the process for planning and implementing a fuel cell CHP project in a concise, step-by-step format. This guide is designed to help agency leaders turn their interest in fuel cell technology into successful installations. This guide concentrates on larger (100 kW and greater) fuel cell CHP systems and does not consider other fuel cell applications such as cars, forklifts, backup power supplies or small generators (<100 kW). Because fuel cell technologies are rapidly evolving and have high up front costs, their deployment poses unique challenges. The electrical and thermal output of the CHP system must be integrated with the building s energy systems. Innovative financing mechanisms allow agencies to make a make versus buy decision to maximize savings. This guide outlines methods that federal agencies may use to procure fuel cell CHP systems with little or no capital investment. Each agency and division, however, has its own set of procurement procedures. This guide was written as a starting point, and it defers to the reader s set of rules if differences exist. The fuel cell industry is maturing, and project developers are gaining experience in working with federal agencies. Technology improvements, cost reductions, and experienced project developers are making fuel cell projects easier to put into service. In this environment, federal decision makers can focus on being smart buyers of fuel cell energy instead of attempting to become experts in fuel cell technology. For agencies that want to pursue a fuel cell CHP this guide presents a four step process for a successful project. 1. Perform a preliminary screening of the energy needs energy costs and incentives. 2. Compare a detailed project plan. 3. Make a financing and contracting decision. 4. Execute the project plan including financing, installation, and operation. The simplest procurement method is designated funding for the outright purchase of the fuel cell CHP system, although this is usually not the most cost-effective option. This guide describes the following financing options: Power purchase agreement Energy savings performance contract Utility energy services contract Enhanced use lease Fuel cell CHP technology can help federal facility managers comply with agency objectives for reducing energy consumption and air pollution emissions. Fuel cells do not generate particulate pollutants, unburned hydrocarbons or the gases that produce acid rain. Fuel cells emit less carbon dioxide (CO 2 ) than other, less efficient technologies and use of renewable fuels can make them carbon neutral. Fuel cell CHP technology can deliver reliable electricity and heat with high efficiency (70% to 85%) in a small physical footprint with little noise, making it a cost-effective option for federal facilities.

03 NATURAL GAS↗

A comparison of two Stokes ice sheet models applied to the Marine Ice Sheet Model Intercomparison Project for plan view models (MISMIP3d)

Here, we present a comparison of the numerics and simulation results for two "full" Stokes ice sheet models, FELIX-S (Leng et al. 2012) and Elmer/Ice. The models are applied to the Marine Ice Sheet Model Intercomparison Project for plan view models (MISMIP3d). For the diagnostic experiment (P75D) the two models give similar results (< 2 % difference with respect to along-flow velocities) when using identical geometries and computational meshes, which we interpret as an indication of inherent consistencies and similarities between the two models. For the standard (Stnd), P75S, and P75R prognostic experiments, we find that FELIX-S (Elmer/Ice) grounding lines are relatively more retreated (advanced), results that are consistent with minor differences observed in the diagnostic experiment results and that we show to be due to different choices in the implementation of basal boundary conditions in the two models. While we are not able to argue for the relative favorability of either implementation, we do show that these differences decrease with increasing horizontal (i.e., both along- and across-flow) grid resolution and that grounding-line positions for FELIX-S and Elmer/Ice converge to within the estimated truncation error for Elmer/Ice. Stokes model solutions are often treated as an accuracy metric in model intercomparison experiments, but computational cost may not always allow for the use of model resolution within the regime of asymptotic convergence. In this case, we propose that an alternative estimate for the uncertainty in the grounding-line position is the span of grounding-line positions predicted by multiple Stokes models.

54 ENVIRONMENTAL SCIENCES↗

Compilation of PRF Canyon Floor Pan Sample Analysis Results

On September 28, 2015, debris collected from the PRF (236-Z) canyon floor, Pan J, was observed to exhibit chemical reaction. The material had been transferred from the floor pan to a collection tray inside the canyon the previous Friday. Work in the canyon was stopped to allow Industrial Hygiene to perform monitoring of the material reaction. Canyon floor debris that had been sealed out was sequestered at the facility, a recovery plan was developed, and drum inspections were initiated to verify no additional reactions had occurred. On October 13, in-process drums containing other Pan J material were inspected and showed some indication of chemical reaction, limited to discoloration and degradation of inner plastic bags. All Pan J material was sealed back into the canyon and returned to collection trays. Based on the high airborne levels in the canyon during physical debris removal, ETGS (Encapsulation Technology Glycerin Solution) was used as a fogging/lock-down agent. On October 15, subject matter experts confirmed a reaction had occurred between nitrates (both Plutonium Nitrate and Aluminum Nitrate Nonahydrate (ANN) are present) in the Pan J material and the ETGS fixative used to lower airborne radioactivity levels during debris removal. Management stopped the use of fogging/lock-down agents containing glycerin on bulk materials, declared a Management Concern, and initiated the Potential Inadequacy in the Safety Analysis determination process. Additional drum inspections and laboratory analysis of both reacted and unreacted material are planned. This report compiles the results of many different sample analyses conducted by the Pacific Northwest National Laboratory on samples collected from the Plutonium Reclamation Facility (PRF) floor pans by the CH2MHill’s Plateau Remediation Company (CHPRC). Revision 1 added Appendix G that reports the results of the Gas Generation Rate and methodology. The scope of analyses requested by CHPRC includes the determination of common anions, gamma spectrometry, metals, corrosivity, organics and alpha spectrometry (note: alpha spectrometry was cancelled during the performance of this work with concurrence from CHPRC). Results may help elucidate the components that led to the unexpected reaction in the canyon as well as inform the radiological and hazardous characteristics. The specific anions, gamma emitters, organics and metals requested by CHPRC are provided in the analytical reports sections. The individual analyses were conducted under the Plutonium Finishing Plant (PFP) Floor Pan Evaluation Project Quality Assurance Project Plan (PFP Floor Pan Evaluation QAPP, Revision 0.) developed by PNNL specifically for this project. The final reports for each analysis set are included in this compilation of the results. Each package was reviewed under the PFP Floor Pan Evaluation Project Quality Assurance Project Plan so no additional reviews were conducted in this compilation task. The Gas Generation Rates in Appendix G were conducted under the PNNL “How Do I…” quality assurance program and were NOT conducted under the Plutonium Finishing Plant (PFP) Floor Pan Evaluation Project Quality Assurance Project Plan (PFP Floor Pan Evaluation QAPP, Revision 0.).

36 MATERIALS SCIENCE↗

Update on Nuclear Energy Projects and Plans in Ukraine (Meeting Report)

Following the 1986 disastrous accident at Chernobyl, gaining independence following the fall of the former Soviet Union, two revolutions, and on-going Russian intervention, Ukrainea is seeking to expand its use of commercial nuclear energy and to further reduce its dependence on Russia for energy. Nuclear energy in Ukraine has made a significant contribution toward achieving sustainable development and social goals. Ukraine is very vulnerable to the effects of climate change and nuclear is a cornerstone of the country’s effort to combat the effects. With broad support from the U.S. government, Ukraine is cooperating with the U.S. on fresh nuclear fuel supply, civilian nuclear security, outage optimization, spent fuel storage, and future nuclear technology. And is looking to tap U.S. expertise on plant management, and electric grid operations and expansion. NEIc hosted this virtual event to provide an update on nuclear energy projects and plans in Ukraine. Featured speakers included Yaroslav Demchenkov, Deputy Minister of Energy, Taras Kachka, Deputy Minister – Trade Representative, Petro Kotin, CEO, Energoatom,d and Ann K. Ganzer, Senior Bureau Official, Bureau of International Security and Nonproliferation, U.S. Dept. of State. Maria Korsnick, NEI CEO, moderated the discussion. About forty individuals attended representing the Ukraine and U.S. governments, and U.S. suppliers.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

RIVER PROTECTION PROJECT SYSTEM PLAN

The U.S. Department of Energy (DOE), Office of River Protection (ORP) manages the River Protection Project (RPP). The RPP mission is to retrieve and treat Hanford's tank waste and close the tank farms to protect the Columbia River. As a result, ORP is responsible for the retrieval, treatment, and disposal of approximately 57 million gallons 1 of radioactive waste contained in the Hanford Site waste tanks and closure2 of all the tanks and associated facilities. The previous revision of the System Plan was issued in May 2008. ORP has made a number of changes to the tank waste treatment strategy and plans since the last revision of this document, and additional changes are under consideration. ORP has contracts in place to implement the strategy for completion of the mission and establish the capability to complete the overall mission. The current strategl involves a number of interrelated activities. ORP will reduce risk to the environment posed by tank wastes by the following: (1) Retrieving the waste from the single-shell tanks (SST) to double-shell tanks (DST) and delivering the waste to the Waste Treatment and Immobilization Plant (WTP). (2) Constructing and operating the WTP, which will safely treat all of the high-level waste (HLW) fraction contained in the tank farms. About one-third of the low-activity waste (LAW) fraction separated from the HLW fraction in the WTP will be immobilized in the WTP LAW Vitrification Facility. (3) Developing and deploying supplemental treatment capability assumed to be a second LAW vitrification facility that can safely treat about two-thirds of the LAW contained in the tank farms. (4) Developing and deploying supplemental pretreatment capability currently assumed to be an Aluminum Removal Facility (ARF) using a lithium hydrotalcite process to mitigate sodium management issues. (5) Developing and deploying treatment and packaging capability for contact-handled transuranic (CH-TRU) tank waste for possible shipment to and disposal at the Waste Isolation Pilot Plant (WIPP) in New Mexico. (6) Deploying interim storage capacity for the immobilized high-level waste (IHLW) pending determination of the final disposal pathway. (7) Closing the SST and DST tank farms, ancillary facilities, and all associated waste management and treatment facilities. (8) Optimizing the overall mission by resolution of technical and programmatic uncertainties, configuring the tank farms to provide a steady, well-balanced feed to the WTP, and performing trade-offs of the required amount and type of supplemental treatment and of the amount of HLW glass versus LAW glass. ORP has made and continues to make modifications to the WTP contract as needed to improve projected plant performance and address known or emerging risks. Key elements needed to implement the strategy described above are included within the scope of the Tank Operations Contract (TOC). Interim stabilization of the SSTs was completed in March 2004. As of April 2009, retrieval of seven SSTs has been completed and retrieval of four additional SSTs has been completed to the limits of technology. Demonstration of supplemental LAW treatment technologies has stopped temporarily pending revision of mission need requirements. Award of a new contract for tank operations (TOC), the ongoing tank waste retrieval experience, HLW disposal issues, and uncertainties in waste feed delivery and waste treatment led to the revision of the Performance Measurement Baseline (PM B), which is currently under review prior to approval. 6 This System Plan is aligned with the current WTP schedule, with hot commissioning beginning in 2018, and full operations beginning in late 2019. Major decisions regarding the use of supplemental treatment and the associated technology, the ultimate needed capacity, and its relationship to the WTP have not yet been finalized. This System Plan assumes that the outcome of these decisions will be to provide a second LAW vitrification facility. No final implementation decisions regarding supplemental technology can be made until the Tank Closure and Waste Management Environmental Impact Statement is completed and a Record of Decision is issued by DOE. Technical solutions are being developed to mitigate the impact from substantially increased estimates of sodium to be added during pretreatment of the tank waste solids. This may involve one or more of the following options: (1) refining or modifying the flowsheet to reduce the required amount of additional sodium, (2) increasing the overall LAW vitrification capacity, (3) increasing the incorporation of sodium into the LAW glass, (4) increasing the incorporation of aluminum in the HLW glass to reduce caustic leaching requirements, or (5) implementing other technical solutions. For planning purposes, the PMB assumes that option (5) above, in the form of an ARF, will be successful in reducing the sodium required to be added during pretreatment of the tank waste.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

PMDT: AI-Enabled Predictive Maintenance Digital Twins for Advanced Nuclear Reactors

Our team made substantial technical progress on various fronts during the course of the program. Multiple milestones were geared towards demonstrating the feasibility of machine learning based predictive maintenance digital twins towards reducing O&M costs, whereas some other milestones actually focused on identifying technical gaps and developing technologies such as humble AI to provide necessary robustness to the ML-based models. We were able to demonstrate in many cases that Machine learning-based methods can be successfully adapted for Nuclear plant environments especially for remote monitoring applications. Detailed analyses were carried out with plant and full scope simulation data along with capabilities of enhanced analytics to assess and set realistic expectations on cost reductions in O&M. These assessments are paving the way for investments towards reactor design improvements as well project planning for SMR projects as they develop and mature in the next few years. Technology developed under this program got direct visibility to GE Hitachi and their utility customers and resulted in positive intents to deploy some of the elements from design phase. The project additionally resulted in several reports, publications, software and data generation that will be useful in deployment and O&M services for BWRX300 fleets.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Next-generation system analysis model for studying alternative Waste Management Systems - 15232

The U.S. Department of Energy's Office of Nuclear Energy (DOE-NE) is conducting planning activities within the Nuclear Fuels Storage and Transportation Planning Project (NFST). The plans involve (1) laying the groundwork for implementing interim storage (including dealing with any associated transportation that is needed) per the Administration's Strategy for the Management and Disposal of Used Nuclear Fuel and High-Level Radioactive Waste of January 2013 and (2) developing a foundation for a new nuclear waste management organization. An overarching goal is to develop options for designing an integrated system that will be considered by decision-makers. Based on the dynamic system analysis and software specification requirements that must be met, Argonne National Laboratory (Argonne) is leading the development of a consolidated waste management system tool known as the Next-Generation System Analysis Model (NGSAM). The development of NGSAM leverages the approaches and methods used previously to develop the Transportation Storage Logistics (TSL) and Total System Model (TSM) system analysis tools, but the new tool takes advantage of advanced computational capabilities. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Lessons Learned from the Clean Energy to Communities (C2C) Peer-Learning Cohort Incorporating Community Priorities into Electric Vehicle Plans and Projects

The National Renewable Energy Laboratory (NREL), with support from World Resources Institute (WRI), designed and led a six-month peer-learning cohort from January through July 2024 on "Enhancing Resilience at Critical Facilities through Solar, Storage, and Microgrids" as part of the U.S Department of Energy's Clean Energy to Communities (nrel.gov/c2c) (C2C) program. Representatives from 15 municipalities, municipal utilities, colleges, and Tribes from across the United States participated in monthly workshops covering best practices for planning and deploying local resilience projects. This document shares key takeaways, lessons learned, and resources from the cohort including key steps that can be taken to help entities design effective community engagement processes around clean mobility.

ADVANCED PROPULSION SYSTEMS,ENERGY PLANNING, POLIC↗

Mid-Atlantic U.S. Offshore Carbon Storage Resource Assessment Project (Final Technical Report)

The greatest potential for carbon storage in the northeastern United States lies in the offshore geologic formations comprising the outer continental shelf (Monteverde et al., 2011). Offshore storage can be linked to large point-sources of carbon dioxide (CO 2 ) while avoiding many of the logistical difficulties and potential risks encountered when siting onshore projects, especially in densely populated areas of the East Coast. Offshore CO 2 storage assessment and research in the United States is underway to address uncertainty in potential storage resources, particularly in the mid- and north-Atlantic offshore area. Given the current knowledge base and access to publicly available data, the objectives of the Mid-Atlantic U.S. Offshore Carbon Storage Resource Assessment Project (MAOCSRAP) were fourfold: (1) complete a systematic carbon storage resource assessment of the mid-Atlantic offshore coastal region from the Georges Bank Basin (GBB) through the Long Island Platform (LIP) to the southern Baltimore Canyon Trough (BCT); (2) define key input parameters to reduce uncertainty for offshore storage resource and efficiency estimates; (3) perform a preliminary assessment of risk factors, uncertainties, and data gaps; and (4) engage industry and regulatory stakeholders through development of a Road Map to assist future project planning and implementation. The MAOCSRAP project has compiled, inventoried, and assimilated various publicly available data sets to provide a strong technical basis on which future carbon storage studies and applications can be built. The knowledge infrastructure necessary to support the development of full-scale offshore carbon storage include: Defining the geologic characteristics of candidate storage sites (Chapter 2). Using existing seismic data to better define the continuity of the storage zones and seals (Chapter 3). Cataloguing the hydrogeologic properties of mid-Atlantic offshore storage sites (Chapter 4). Calculating prospective CO 2 storage resources using net effective pore volumes and fluid displacement properties specific to offshore lithologies (Chapter 5). Examining risk factors related to offshore storage (Chapter 6). Communicating with industry and other stakeholders about the future prospects for offshore storage (Chapter 7). Ensuring technology transfer to industry and other stakeholders (Chapter 8). Led by Battelle, this project was conducted by public and private entities with expertise in offshore geology and resources for the study region, including state geological surveys of Delaware, Maryland, and Pennsylvania; United States Geological Survey-Woods Hole Coastal and Marine Science Center and Haifa University; Rutgers University; Harvard University; and Lamont-Doherty Earth Observatory (LDEO) at Columbia University. The storage resource assessment was completed for a broad region offshore of the U.S. East Coast, from Massachusetts to Virginia. The results include high-level storage resource estimates for areas not previously characterized and improved storage resource estimates for geographically expansive portions of offshore geologic units. Results of the project provide a foundation for developing CO 2 storage along offshore areas of the mid-Atlantic United States. A combination of information was used to provide confidence in project results. Key findings of the major project tasks are summarized as follows. Subsurface Data Analysis: Legacy seismic, well-log, core, and biostratigraphic data were digitized, reprocessed, and analyzed using modern techniques, augmenting previous characterization efforts. The sequence stratigraphic framework for the Cretaceous and Jurassic strata was developed by correlating well-log depositional sequences to seismic reflectors identified in the BCT, LIP, and GBB. The integration of well-log stratigraphy with seismic stratigraphy and petrophysical analysis helped to identify and map potential storage zones within sequences of the Logan Canyon (LC), Missisauga, and Mohawk formations, as well as the regionally extensive caprock comprised of the Dawson Canyon shale. Approximately 4,000 kilometers (km) of seismic data was reprocessed to create a structural framework that was used to tie together all available well data, constrain sequence stratigraphic interpretations, and make regional assessments of offshore carbon storage resources. Prospective storage resource estimates were 150 to 1136 megatons (Mt) for the combined storage zones. This suggests mid-Atlantic U.S. offshore formations can store decades of CO 2 from industrial sources in the region. Preliminary local reservoir simulations suggest that injection rates of 1 Mt CO 2 /year may be sustained for 30 years in single injection wells in the BCT. Advanced geologic modeling and new data acquisition are needed to address data gaps and advance carbon capture and storage (CCS) in key offshore areas selected for further investigation. Offshore Risk Factors: Offshore geologic risk factors include soft sediment deformation, unit continuity, sedimentological and structural features, seismicity and hydrates. CO 2 storage risks include inadequate seals, migration/leakage, and chemical interactions leading to decreased storage. Sensitive habitats, environmental impacts, disturbance to seafloor, and other risks need to be identified in advance of project activities and integrated into detailed mitigation plans for all project phases. Stakeholder Engagement: Input and participation from government, industry, and environmental groups provided input into the Road Map and address next steps needed for project deployment. Early engagement and ongoing communication, as well as policy framework development, is key to large-scale deployment of CCS. Next Steps: This project represents an important first step by completing a high-level CO 2 storage resource assessment and building the knowledge infrastructure necessary to improve quantitative storage resource estimates. The data sets that have been curated under this project provide an opportunity to conduct research and development (R&D) needed to address data gaps and reduce risk and uncertainty. Offshore characterization and validation strategies that are systematically designed to provide data and infrastructure that can be upscaled to meet commercial requirements could be developed off of this foundation.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Facility Utilization and Risk Analysis for Remediation of Legacy Transuranic Waste at the Savannah River Site - 13572

Savannah River Nuclear Solutions (SRNS) completed the Accelerated TRU Project for remediating legacy waste at the Savannah River Site with significant cost and schedule efficiencies due to early identification of resources and utilization of risk matrices. Initial project planning included identification of existing facilities that could be modified to meet the technical requirements needed for repackaging and remediating the waste. The project schedule was then optimized by utilization of risk matrices that identified alternate strategies and parallel processing paths which drove the overall success of the project. Early completion of the Accelerated TRU Project allowed SRNS to pursue stretch goals associated with remediating very difficult TRU waste such as concrete casks from the hot cells in the Savannah River National Laboratory. Project planning for stretch goals also utilized existing facilities and the risk matrices. The Accelerated TRU project and stretch goals were funded under the American Recovery and Reinvestment Act (ARRA). (authors)

54 ENVIRONMENTAL SCIENCES↗

Confederated Tribes Umatilla Indian Reservation (CTUIR) Umatilla Anadromous Fisheries Habitat Project : A Columbia River Basin Fish Habitat Project : Annual Report Fiscal Year 2007.

The Umatilla Anadromous Fisheries Habitat Project (UAFHP) is an ongoing effort to protect, enhance, and restore riparian and instream habitat for the natural production of anadromous salmonids in the Umatilla River Basin, Northeast Oregon. Flow quantity, water temperature, passage, and lack of in-stream channel complexity have been identified as the key limiting factors in the basin. During the 2007 Fiscal Year (FY) reporting period (February 1, 2007-January 31, 2008) primary project activities focused on improving instream and riparian habitat complexity, migrational passage, and restoring natural channel morphology and floodplain function. Eight fisheries habitat enhancement projects were implemented on Meacham Creek, Camp Creek, Greasewood Creek, Birch Creek, West Birch Creek, and the Umatilla River. Specific restoration actions included: (1) rectifying five fish passage barriers on four creeks, (2) planting 1,275 saplings and seeding 130 pounds of native grasses, (3) constructing two miles of riparian fencing for livestock exclusion, (4) coordinating activities related to the installation of two off-channel, solar-powered watering areas for livestock, and (5) developing eight water gap access sites to reduce impacts from livestock. Baseline and ongoing monitoring and evaluation activities were also completed on major project areas such as conducting photo point monitoring strategies activities at the Meacham Creek Large Wood Implementation Project site (FY2006) and at all existing easements and planned project sites. Fish surveys and aquatic habitat inventories were conducted at project sites prior to implementation. Monitoring plans will continue throughout the life of each project to oversee progression and inspire timely managerial actions. Twenty-seven conservation easements were maintained with 23 landowners. Permitting applications for planned project activities and biological opinions were written and approved. Project activities were based on a variety of fisheries monitoring techniques and habitat assessments used to determine existing conditions and identify factors limiting anadromous salmonid abundance. Proper selection and implementation of the most effective site-specific habitat restoration plan, taking into consideration the unique characteristics of each project site, and conducted in cooperation with landowners and project partners, was of paramount importance to ensure each project's success.

13 HYDRO ENERGY↗

EIA and green procurement: Opportunities for strengthening their coordination

EIA plays an important role in enhancing the environmental performance of the construction sector. In recent years, the construction sector has been developing green procurement practices. Green procurement is a process that involves the incorporation of environmental requirements during the procurement of services and products. However, discussion on green procurement is rarely seen during the EIA phase. This paper addresses possible opportunities for improving the coordination between EIA and green procurement within the construction sector. The linking of EIA and green procurement has been postulated in the paper as an aid to strengthen the coordination between project planning and implementation. The paper is based on a literature review and is an outcome of an on-going research project concerning EIA and green procurement. This study indicated that it would be appropriate to introduce green procurement during the pre-decision phase of an EIA. In the present study, the opportunities for integrating green procurement at the stage of EIA are associated with the integration of project planning and EIA. Future research should investigate the mechanism through which the link can be established. - Highlights: Black-Right-Pointing-Pointer This paper identifies opportunities to link EIA and green procurement. Black-Right-Pointing-Pointer Pre-decision phase of EIA could be appropriate for planning green procurement. Black-Right-Pointing-Pointer Future research should investigate the mechanism for establishing the link.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Soft costs and EVSE – Knowledge gaps as a barrier to successful projects

There has been a recent push to increase access to electric vehicle (EV) charging infrastructure. The National Electric Vehicle Infrastructure (NEVI) program, part of the Bipartisan Infrastructure Law (BIL) has made significant funding available for major charging infrastructure projects along state thruways, and many state and local incentives exist for EV owners to install chargers in their homes. However, deployment of these chargers has not kept up with demand, primarily due to issues in project planning, permitting processes, and unforeseen delays. This paper serves as a review of the current understanding of these and other non-hardware costs in EV charging infrastructure projects (collectively known as “soft costs”). We found that soft costs in EV charging infrastructure projects are not well understood. Specifically, there is little agreement on how soft costs should be categorized and tracked, and less agreement still on best practices for controlling these costs and lowering barriers to infrastructure deployment. A broader review of EV charging infrastructure cost analyses shows that these costs can have significant impacts on project outcomes. EV charging infrastructure projects may be able to examine the success of the solar industry in lowering soft costs, and a similar effort may lower project costs significantly. Further work on standardizing and collecting data on EV charging infrastructure costs is required to begin addressing and controlling these costs.

32 - ENERGY CONSERVATION, CONSUMPTION, AND UTILIZA↗

Overview of the DESI Legacy Imaging Surveys

The DESI Legacy Imaging Surveys (http://legacysurvey.org/) are a combination of three public projects (the Dark Energy Camera Legacy Survey, the Beijing–Arizona Sky Survey, and the Mayall z-band Legacy Survey) that will jointly image ≈14,000 deg{sup 2} of the extragalactic sky visible from the northern hemisphere in three optical bands (g, r, and z) using telescopes at the Kitt Peak National Observatory and the Cerro Tololo Inter-American Observatory. The combined survey footprint is split into two contiguous areas by the Galactic plane. The optical imaging is conducted using a unique strategy of dynamically adjusting the exposure times and pointing selection during observing that results in a survey of nearly uniform depth. In addition to calibrated images, the project is delivering a catalog, constructed by using a probabilistic inference-based approach to estimate source shapes and brightnesses. The catalog includes photometry from the grz optical bands and from four mid-infrared bands (at 3.4, 4.6, 12, and 22 μm) observed by the Wide-field Infrared Survey Explorer satellite during its full operational lifetime. The project plans two public data releases each year. All the software used to generate the catalogs is also released with the data. This paper provides an overview of the Legacy Surveys project.

79 ASTRONOMY AND ASTROPHYSICS↗

NSUF CoMET Project, Implementation Plan FY2019

The Combined Materials and Experiment Toolkit (CoMET) is an NSUF information management resource designed to give users access to the information and tools necessary for designing meaningful experiments and writing clear, structured proposals. NSUF has a milestone to deploy an experiment design expert system to the NSUF website to support applications for the FY2020 CINR, due on August 30, 2019. To meet this milestone, the CoMET project work for FY2019 focuses on three main objectives: 1.) Integrate the three NSUF web applications by linking data fields in one application with the data found in the others. The NSUF web applications are: The Rapid Turnaround Experiment (RTE) Proposal Solicitation system, the Nuclear Fuels and Materials Library (NFML) and the Nuclear Energy Infrastructure Database (NEID) and the researcher and technical staff account and profile management systems. 2.) Build an Experiment Design Wizard (expert system) that will guide users through the process of writing a statement of work for a CINR or RTE experiment. 3.) Build an Irradiation Effects Calculator to help a PI choose the best neutron irradiation facility for their needs, estimate the time needed to achieve their goals, and estimate the resulting radioactivity of their samples, post-irradiation. These objectives are designed to support the mission of the NSUF and optimize the experiment design portion of the proposal processes. The new researcher database will make finding collaborators easier. The wizard will provide the PI with early NSUF expertise so that their proposed experiments, at the “Letter of Intent” and “Pre-Application” stages are better designed to work within the available NSUF facilities. Utilization of these tools should reduce the proportion of proposals that are judged to be infeasible or “not ready” for NSUF access. It should also improve the efficiency of the NSUF technical leads since the PI will be starting with a better statement of work for the project. The tools will also provide resources for NSUF staff to more efficiently screen and score incoming proposals. This implementation plan will layout the work breakdown structure, activities, resources required, and plan for completion of the activities for CoMET in FY2019.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗