Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Procurement”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

Charting the Emergence of Corporate Procurement of Utility-Scale PV

Through July 2017, corporate customers contracted for more than 2,300 MW of utility-scale solar. This paper examines the benefits, challenges, and outlooks for large-scale off-site solar purchasing through four pathways: PPAs, retail choice, utility partnerships (green tariffs and bilateral contracts with utilities), and by becoming a licensed wholesale seller of electricity. Each pathway differs based on where in the United States it is available, the value provided to a corporate off-taker, and the ease of implementation. The paper concludes with a discussion of future pathway comparison, noting that to deploy more corporate off-site solar, new procurement pathways are needed.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Charting the Emergence of Corporate Procurement of Utility-Scale PV

Corporations and other institutions have contracted for more than 2300 MW of off-site solar, using power purchase agreements, green tariffs, or bilateral deals with utilities. This paper examines the benefits, challenges, and outlooks for large-scale off-site solar purchasing in the United States. Pathways differ based on where they are available, the hedge value they can provide, and their ease of implementation. The paper features case studies of an aggregate PPA (Massachusetts Institute of Technology, Boston Medical Center, and Post Office Square), a corporation exiting their incumbent utility (MGM Resorts), a utility offering large scale renewables to corporate customers (Alabama Powers Renewable Procurement Program), and a company with approval to sell energy into wholesale markets (Google Energy Inc.).

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Designated Procurement Representative (DPR) Online Training

The purpose of this training is to provide you with an understanding of the duties, roles, and responsibilities of a Designated Procurement Representative (DPR) and the systems and tools associated with that position. The DPR plays an important role of the Laboratory's financial operations by helping the Laboratory be fiscally responsible and compliant with DOE and Federal financial rules and regulations, while helping Laboratory employees get the equipment, tools, materials, and services they need to perform their work.

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

Weekly Update - Flat Panel Detector Procurement

The Neutron Imaging (NI) project has procured a Flat Panel Detector (FPD), which will allow multimodal imaging and high-quality CT imaging of dense objects. The FPD will provide a test bed for new scintillator formulations as well as new imaging techniques designed to improve the spatial resolution with which dense objects can be imaged.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Coordinated Ramping Product and Regulation Reserve Procurements in CAISO and MISO using Multi-Scale Probabilistic Solar Power Forecasts (Pro2R)

How can probabilistic solar forecasts lower costs and improve reliability for independent system operator (ISO) markets? We tackle this question in three steps. First, we enhance an existing solar forecasting system to provide well-calibrated hours-ahead probabilistic forecasts. We then relate the degree of uncertainty in those forecasts to error distributions for net load ramps for the California ISO (CAISO) using statistical and machine learning methods. Projected net load errors conditioned on solar uncertainty are translated into flexible ramp requirements that therefore reflect real-time meteorological and solar conditions, improving on typical ISO procedures. Finally, a multi-period look-ahead production cost model quantifies how conditional ramp requirements can a) decrease operating costs by lowering requirements compared to often conservative unconditional methods, and b) reduce generation scarcity events and consequently improve reliability by increasing flexibility requirements at times when unconditional forecast-based requirements understate actual ramp uncertainty. In addition to the products just described (quantification of solar uncertainty, its translation into requirements for ramp capability product, and quantification of the benefits of more accurate ramp requirements), this project also developed a visualization system that alerts system operators of ramp and uncertainty conditions within the network based on solar forecasts. The system is called Resource Forecast and Ramp Visualization for Situational Awareness (RaVIS). These four products represent significant advances in the state-of-the-art of probabilistic solar forecasting, development of weather-informed reserve requirements, production costing methods for estimating the benefits of more accurate reserve requirements, and visualization of system status, respectively. Yet the products are also practical and can be immediately implemented, potentially enabling system operators to save millions of dollars in ramp product procurement costs per year.

14 SOLAR ENERGY↗

PTSFA QA Review of Container Procurements: Information Use Procedure

The purpose of this Packaging and Transportation Safety Functional Area (PTSFA) procedure is to describe the process in which the PTSFA Quality Assurance Engineer (QAE) or designee reviews and approves the documentation associated with the procurements of containers to be used for onsite transfer or off-site transportation of hazardous materials and waste.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Procurement Process Challenges, Issues, and Lessons Learned from IER 305 and IER 441 [Slides]

This presentation includes a IER 441 assembly overview and the difference between IER 305 AND IER 441 with central test region assembly and hex pitch. Next this presentation looks at IER 441 procurement issues and delays and new hardware. additionally conducted was a SPRF/CX: IER 441 hardware test fit (Success)). This presentation concludes with lessons learned and acknowledgements.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Procurement evaluation

Procurement process for evaluating logistics performance, and incentive features in support contracts

CONTRACTOR↗

Procurement specifications report. IMBLS phase B-4

Procurement specifications to provide vendors of space systems with supporting information to accurately price the selected major buy items are illustrated. In performing this task, rigid constraints on specifications and drawing details are avoided beyond those necessary to define basic requirements. Described are digital processing equipment, mass spectrometer, body mass measuring device, sensors, bio-belt power source, vision tester and instrumentation for a biochemical station.

Source record↗