Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Power system operational models”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

Introducing the 9500 Node Distribution Test System to Support Advanced Power Applications: An Operations-Focused Approach

The 9500 Node Test System is a representative section of distribution power system model developed as a part of the GridAPPS-D™ project, an effort funded by DOE as a part of the Grid Modernization Lab Consortium (GMLC) program. The test system was developed to fulfill a growing need to represent the rapidly evolving state of electric distribution systems by combining elements of legacy infrastructure systems, modern feeder topologies, and an anticipated future with smart grid technologies. It also provides a network model capable of supporting the simulation of operational scenarios such as the ones in a utility distribution control center. This test system allows the evaluation of the performance of advanced power applications in real-time, such as one that simulates the operations of an Advanced Distribution Management Systems (ADMS), Distributed Energy Resource Management Systems (DERMS), etc. in a Distribution control center. This model is an extension of the widely used IEEE 8500 Node Test Feeder and is currently being validated to become an IEEE test case to help increase adoption and widespread usage among both academia and industry. It is a full-size model representative of a section of a utility’s distribution system with multiple feeders fed from different substations. The model includes multiple distribution circuits, a sub-transmission system, multiple substations, behind the meter customer rooftop photovoltaics (PV), and multiple utility-scale distributed energy resources. To enable accurate simulations of operational scenarios, the 9500 Node Test System is designed to support procedure-based operations, with the ability to realistically demonstrate switching operations, feeder reconfiguration, adjustment of volt-var control equipment, dispatch of distributed generation, and response to planned and unplanned outages. The 9500 Node Test System includes three radial distribution feeders with 12.3 MVA of average load, consisting of both medium voltage and low voltage equipment each supplied by a different distribution substation. The three distribution feeders are connected to each other through Normally-Open switches which can be closed when needed to simulate restoration scenarios due to a fault. One feeder represents today’s grid with low penetration of customer-side renewables. The second represents a potential future grid with microgrids and 100% renewable penetration. The third has no customer generation resources, a district steam plant, and a utility-scale solar farm. The three diverse circuits were created to allow the simulation of both today’s situation as well as potential future scenarios. All three feeders have customers connected by low-voltage secondary triplex lines. This test system meets all requirements outlined in the report for creating a simulation environment that would enable discussion between key technical stakeholders as well as having the potential to accelerate operational application development and their subsequent testing and integration. The new model is a possible representation of what we believe the distribution grid may look like in the future: a high penetration of renewables, reconfigurable radial and mesh topology, numerous DERs, islanded microgrids, and significantly increased data and measurement density. The system supports both the solution of existing and newer algorithms but also enables the evaluation of applications in a realistic operational environment defined by task oriented procedural steps that represent the interaction between the control center operator and field personnel.

24 POWER TRANSMISSION AND DISTRIBUTION↗

An Open-Source Virtual Testbed for a Real Net-Zero Energy Community

Net zero energy communities (NZECs) are critical to ensure sustainability and resilience of modernized power systems. System modeling helps overcome technical challenges in designing and operating NZECs. In this paper, we present the modeling work based on a real NZEC. Two sets of models are developed: higher-fidelity physics-based models considering the interaction between subsystems of the studied NZEC and capturing fast-dynamics; and lower-fidelity data-driven models requiring less resource to establish and/or run. All models are validated against measurements from this real NZEC. In addition, we create a simulation framework which streamlines the processes for simulation and thus allows using developed models to form a virtual testbed. To demonstrate the usage of the virtual testbed, a case study is conducted where a building-to-grid integration control is evaluated via simulation. The evaluation results suggest that the tested control significantly smooths the power draw of the studied community and doesn’t sacrifice the thermal comfort to a great extent.

Huang, Sen↗

Power and Natural Gas Systems Interface Study

Power systems worldwide are becoming more reliant on energy from natural gas, wind, and solar, posing potential reliability and coordination challenges from the tighter coupling of these infrastructure systems. This paper proposes a framework for the market-based coordination of electricity and natural gas system operations. The proposed framework includes a power system model that accounts for flexibility in the commitment of power plants with short start-up and shut-down times, coupled with a dynamic gas model that simulates when gas cannot be delivered to generators. The capabilities of the framework are illustrated using real-world electric power and gas systems, including scenarios around wind and solar penetrations and the analysis of time-variant, “shaped flow” gas nominations. Our results indicate that coordination between power and gas systems improves total gas delivery and reduces out-of-merit order dispatch in the electricity system, and that shaped flows may reduce unserved gas in systems with high penetrations of wind and solar.

coordinated operation↗

Role of Renewable Energy, Storage, and Demand Response in Karnataka's Power Sector Future

Karnataka ranks fourth among Indian states in installed capacity of renewable energy, which accounts for over 50% of its resource mix. The state is positioned to play a leading role in India's energy transition and contribute to meeting national targets for renewable energy thanks, in part, to ambitious state goals to develop Karnataka's abundant zero carbon energy resources and plans to phase out new investments in thermal plants. Power system stakeholders in Karnataka are faced with the challenge of planning a generation portfolio that accounts for the variability of wind and solar resources, meets increasing and shifting electricity demand, and satisfies operational and reliability requirements. The objective of this study is to evaluate least-cost pathways for Karnataka's electric power system through 2050. The capacity expansion model developed for this study identifies power system investment and operational decisions for every year (2020-2050) for all of India, with detailed representation of the state of Karnataka. The study led to five high-level results and provides a framework for recurring planning studies to meet changing system conditions and needs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Field Validation of Thermoelectric Generation System at Holcim Cement Plant in Alpena, Michigan

Executive Summary Project Background The Industrial Technology Validation (ITV) program aims to identify and demonstrate the performance of new, emerging, and underutilized energy-saving technologies in the industrial sector to help inform decisions to help accelerate their commercialization and deployment, as well as to help make industries more competitive. This ITV demonstration evaluated a thermoelectric generation (TEG) technology at a cement plant, aiming to reduce energy demand in the cement industry. A median cement plant consumes 5.73 million British thermal units per ton of clinker production (resulting in 0.838 metric tons of carbon dioxide [CO₂] emissions per ton of clinker) (Boyd and Zhang 2011, EPA 2021), equivalent to approximately 6.9 trillion British thermal units (TBtu) per year in energy consumption at a cement plant producing 3,300 tons of clinker per day.¹ Collaborating with Holcim, Advanced Thermovoltaic Systems (ATS) developed and deployed a pilot-scale thermoelectric power system to efficiently capture and convert waste heat to electricity. The system leverages the Seebeck effect to convert temperature differences on two sides of semiconductor cartridges into electrical power (ScienceDirect, n.d.). This generation is realized with minimal moving parts compared to existing waste-heat-to-generation solutions and allows capture from heat sources with temperatures as low as 150°C. This project aimed to validate a scalable solution applicable for capturing medium-temperature waste heat, including ambient losses from other high-temperature processes, and high-temperature sources less suitable for other waste-heat-to-power solutions. By recovering this otherwise wasted heat, this project intends to validate improvements to overall process efficiency through reduction in purchased electricity, thereby reducing operational costs while enhancing resiliency and competitiveness. Description and Scope This study evaluated the performance of a TEG system from ATS as a solution to convert waste heat into useful power at a Holcim cement plant in Alpena, Michigan. This plant is a fully integrated cement plant that has been operating since 1907. The facility operates continuously (24/7/365) with approximately 250 employees and five long dry kilns, yielding a total production capacity of 7,852 tons of cement per day (EPA 2023). Currently, the Alpena plant uses waste heat boilers to convert waste heat from the exhaust of each kiln into steam, which drives steam turbine generators. The ATS TEG is being evaluated for its potential to supplement the steam turbines by capturing the remaining lower grade heat. This technology is also being considered for other Holcim plants where steam turbines are not a viable option. ATS installed a pilot-scale TEG unit with an array of 582 individual thermoelectric semiconductor cartridges, of which 573 were operational. The cartridges are sandwiched between 48 hot plates and 49 cold plates. Each cartridge is designed to generate 20 watts (W) of gross power at a hot-side temperature of 240°C and cold-side temperature of 20°C. As such, the total gross generation capacity of the installed system is 11.5 kilowatts (kW) at design conditions. The system configuration for the evaluation was designed to prioritize convenience of installation and minimize disruption to production at the site, while ensuring that the heat required can be obtained for evaluating the TEG system at various operational conditions. To accomplish this, a portion of the steam supplied to Alpena’s steam turbine generation system was diverted to be used as the heat source for the TEG system, while water was supplied to the cold side of the system from nearby Lake Huron. This configuration was designed for the evaluation of the pilot-scale system to assess the performance at different conditions. A commercial-scale system will likely vary from the pilot system depending on typical configurations, including both scale and application. Future commercial applications of the ATS system would involve integrating the system into the exhaust from kiln preheaters, clinker coolers, or radiant heat capture from kiln shells for the heat source. For the cold source, a range of cooling solutions can be considered, including a mechanical cooling system, depending on the location and the application. To increase the generation capacity for commercial applications, the technology provider is working toward developing a commercial-scale TEG system, which would combine multiple TEG units (each similar in design to the pilot system) together. The scope of this evaluation includes the pilot-scale TEG system and all impacted equipment including pumps, controllers, and power handling equipment. Study Objectives The evaluation's goal was to assess the potential of the ATS TEG system to generate useful electrical power by capturing waste heat from cement production kilns. The objectives of this study are to evaluate and verify the following claims made by ATS regarding the pilot-scale system installed at the Holcim Alpena plant. The following design parameters and claims are also outlined in Table ES- 1 and Table ES- 2: • Gross Power: The thermoelectric system converts heat into power to create gross power, the total measured power generated by the system. The 573 active cartridge pilot-scale system is expected to generate 11.5 kW of gross power at the designed hot-side temperature of 240°C and cold-side temperature of 20°C. Power production is dependent on the temperature difference between the heat source (ultimately from the waste heat) and cold temperature supply source. • Net Power: The net power is the total usable power provided to the site by the TEG system after deducting parasitic power loads from the gross generated power. Supplementary equipment is required to operate the TEG system including pumps, controllers, and, in certain anticipated applications, mechanical cooling, which introduce parasitic loads to system operation. After deducting the parasitic loads from the gross power generation, ATS anticipates achieving a net power generation of 7.5 kW from the pilot-scale system. • Thermal Efficiency: The thermal efficiency is the percent of the total heat transferred to the TEG system that is converted to gross power. Historically, TEGs have a thermal efficiency of 2%–5% (DOE 2008). Prior industrial-scale TEG systems, such as the E1 TEG offered by Alphabet Energy, operated at an efficiency of 2.5% (Lamonica, 2014). ATS anticipates achieving an average efficiency of 4.8% or higher in converting heat energy to usable electricity. • Cartridge Performance: The TEG system comprises 573 active individual semiconductor cartridges, each of which generates a portion of the total power. Cartridge optimization and selection is an important design consideration for potential future TEG system design performance. Therefore, understanding the distribution of gross power and efficiency within the pilot system is vital to understanding what is achievable. At a design hot-side temperature of 240°C and cold-side temperature of 20°C, ATS anticipates a cartridge performance of 20 W of gross power per cartridge at an efficiency of 4.8% per cartridge. In addition to evaluating the claimed performance of the TEG pilot-scale unit, the study estimated the potential annual impacts of a scaled-up commercial system used to capture kiln waste heat over annual operations. The evaluation estimated the gross and net annual electric generation achievable by capturing heat from the two proposed tap-in points: the kiln exhaust and the clinker cooler exhaust; see Section 2.1 for details. Two use cases were examined: • Holcim Alpena: The Holcim Alpena site consists of long dry kilns with superheater boilers, which differs from the rest of Holcim’s cement plant portfolio and results in lower waste heat temperatures. The study estimates gross and net annual generation using the superheater boiler exhaust and clinker cooler exhaust, based on 2023 operational data. • Typical Installation: Common cement plants have preheater kilns with higher exhaust temperatures than Holcim Alpena across a range of production rates. The study estimates gross and net annual generation using the preheater exhaust and clinker cooler exhaust, with a sensitivity analysis to account for the typical range of preheater exhaust temperatures, clinker cooler exhaust temperatures, and clinker production rates. Methodology The evaluation methodology followed a measurement and verification (M&V) strategy based on the International Performance Measurement and Verification Protocol Option B through comprehensive measurements and analyses of the affected systems. Evaluation data was collected from March 9 to March 11, 2024, the test period of the pilot TEG system. During the test period, in coordination with the ITV team, the ATS team adjusted system operations to capture the range of variability expected for each of the variables pertinent to performance of the system. The methodology consisted of two parts: evaluating the performance of the pilot unit's TEG system and estimating the annual TEG impact in terms of gross and net power based on a given waste heat profile. First, the evaluation of the thermoelectric generation performance of the pilot unit relative to the claims was performed by analyzing the collected test data. Gross power of the pilot TEG system was directly measured. Net power was determined by deducting the measured parasitic power from the gross power. The gross power generation was compared to heat transferred to the system by the working fluid (which was heated by steam generated from the kiln waste heat) to calculate the thermal efficiency achieved by the system. Performance of individual semiconductor cartridges within the pilot array was also assessed in terms of measured gross cartridge power and calculated cartridge thermal efficiency. The second part of the evaluation estimated the annual TEG impacts in terms of gross power and net power (calculated from the difference between gross power and parasitic power). This analysis comprised development of mathematical regression models for gross power and parasitic power, with assessment of each model’s goodness-of-fit characteristics to ensure satisfaction of statistical requirements. The models predicted the gross power generation, the parasitic load based on the temperature difference between the hot working fluid and the cold-side fluid (cold water from Lake Huron) entering the system, the volumetric flow rate of the cold-side fluid at the inlet, and the volumetric flow rate of the hot working fluid at the inlet. The annual impact analysis considered a theoretical commercial-scale system sized to capture the available waste heat at a cement plant, consisting of linked pilot-scale units that receive heat from a theoretical gas-to-working-fluid heat exchanger. To estimate annual impacts at the Alpena plant, the gross power and parasitic power regression models were applied to the arrays in the theoretical commercial-scale system. The heat supplied to the unit was calculated based on the kiln run time, annual production, kiln exhaust waste heat, and clinker cooler waste heat derived from 2023 Holcim Alpena kiln operational data. Net power impacts were calculated by deducting the resulting parasitic power from the estimated gross power. Inputs for the model were generated from a combination of hourly data, assumed design considerations for TEG system scale-up from the pilot-scale unit, and assumptions regarding TEG system operations. This analysis was then used as the basis for estimating annual impacts of typical TEG installation at cement plants, by applying sensitivity analyses to key kiln operational characteristics including kiln preheater exhaust temperatures, cooler clinker exhaust temperatures, and plant daily production rates across a range of expected values. Project Results/Findings Table ES- 2 and Table ES- 2 provide a summary of the operating conditions and evaluation results compared to the stated claims from the technology provider. Key takeaways include: • Gross Power: The peak gross power achieved during the testing period was 10.0 kW, compared to the 11.5 kW expected for 573 active cartridges. The claimed gross power was associated with a target hot side of 240°C; however, the system only received a maximum hot-side mean plate temperature of 212°C during the testing period. • Net Power: The pilot-scale unit exceeded the claims for net power, achieving a peak of 7.7 kW net compared to a claim of 7.5 kW. One factor contributing to the higher achieved net power is the relatively high water pressure available through Lake Huron. The pilot TEG system did not require cold-side pumps during the test, whereas most installations would. This reduced the parasitic loads on the system, ultimately contributing to higher net power relative to the gross power. • Thermal Efficiency: The pilot-scale unit outperformed the claimed efficiency, achieving a peak system efficiency of 5.0% thermal efficiency compared to the stated 4.8%. • Cartridge Performance: To compare cartridge performance against claims, the study focused on the third day of testing, which aimed for conditions closest to the design specifications, with a hot side of 240°C and cold-side exit temperature of 6.4°–30°C. On this day, the mean gross power observed in the cartridges within the TEG array was 18.1 W/cartridge, and the peak performance was 34.7 W/cartridge. The estimated mean cartridge efficiency was 5.2%, and the estimated efficiency at peak gross cartridge power was 10%. The regression models developed for gross power generation and parasitic loads were used to estimate the generation impact for given heat input to the TEG from the working fluid (captured from the waste heat) and from the cold loop (Lake Huron) on an hourly basis for a year of operation. Based on this analysis, installation of a commercial-scale TEG system at the Holcim cement plant in Alpena, Michigan, with a waste heat exchanger of 0.85 effectiveness, would generate up to 391 kW of net power, translating to between 920,000 and 1,800,000 kilowatt-hours (kWh) in net electricity per year. Based on typical grid emissions for Alpena, this would avoid estimated net emissions by 752 metric tons of CO₂ annually.² The sensitivity analysis estimated that typical TEG system installations at cement plants could generate an average of 56–1,040 kW of net power, or between 488,000 and 9,110,000 kWh of net energy. This generation potential is most significantly affected by plant production rates and also influenced by preheater and clinker cooler exhaust temperatures. Applying the national average emission rate, typical commercial-scale installations at Holcim plants are projected to avoid between 182 and 3,401 metric tons of CO₂ annually per site. Table ES- 3 shows a summary of the estimated annual impacts.³ While parasitic loads are significant and vary by application, this analysis assumed the use of heating loop pumps and access to Lake Huron as a cold sink. This setup assumed no need for cooling loop pumps due to the available water pressure at the test site. Applications that require cooling towers or additional equipment are likely to experience higher parasitic loads. Therefore, the study’s estimates are most applicable to scenarios with similar parasitic load configurations—namely, access to a high-pressure cold sink. Applicability to other locations may be limited, as differing conditions could necessitate additional pumps and cooling systems, potentially impacting performance significantly.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Coordinated operation of electricity and natural gas systems from day-ahead to real-time markets

Power systems worldwide are becoming more reliant on energy from natural gas, wind, and solar, posing possible reliability and coordination challenges from the tighter coupling of these infrastructure systems. This paper proposes a framework for the market-based coordination of electricity and natural gas system operations. The proposed framework includes a power system model that accounts for flexibility in the commitment of power plants with short start-up and shut-down times, coupled with a dynamic gas model that simulates when gas cannot be delivered to generators. The capabilities of the framework are illustrated using real-world electric power and gas systems, including scenarios around wind and solar penetrations and the analysis of time-variant, “shaped flow” gas nominations. Our results indicate that coordination between power and gas systems improves total gas delivery and reduces out-of-merit order dispatch in the electricity system, and that shaped flows may reduce unserved gas in systems with high penetrations of wind and solar. Coordination can have mixed effects on carbon-dioxide emissions, with emissions increasing with coordination for current systems during high load weeks but decreasing for systems with high renewable penetrations, particularly during periods of high variability.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Analysis of Distributed Energy Storage as a Core Grid Infrastructure via Production Cost Modeling

Energy storage plays a pivotal role in enabling power system operation with more flexibility and resilience. Unlike current practice that considers energy storages as attached ancillary devices, this paper focuses on storages as a core infrastructure by looking at their spatial distribution in the system. A sensitivity analysis based on production cost modeling is conducted to demonstrate the benefits of distributed energy storages. First, the modeling of energy storages in production cost modeling is presented. Second, potential optimal locations of distributed energy storages in a power system are discussed. Finally, multiple scenarios with various numbers and locations of additional distributed energy storages in the WECC 2030 model are created. The production cost modeling results of these scenarios show that distributed energy storages have higher utilization compared to the centralized ES units and therefore provide significantly more benefits in terms of reduction in generation cost, emission cost, and volatility of location marginal prices. A saturation effect is observed suggesting the selection of optimal locations will further improve the benefits.

Nguyen, Quan H.↗

Substation-Level Grid Topology Optimization Using Bus Splitting: Preprint

Operations of substation circuit breakers are of high significance for performing system maintenance and topology optimization. Bus splitting is one type of topology changes where the two bus-bars at a substation become electrically disconnected after certain actions of circuit breakers. As these events involve detailed substation modeling, they are not typically considered in power system routine operation and control. In this paper, an improved substation-level topology optimization is developed by expanding traditional line switching with breaker-level bus splitting, which can further reduce grid congestion and generation costs. A tight McCormick relaxation is proposed to reformulate the bi-linear terms in the resultant topology optimization model. Thus, a tractable mixed-integer linear program formulation is presented which can be efficiently solved for real-time control. Numerical studies on the IEEE 14-bus and 118-bus systems demonstrate the performance and economic benefits of the proposed topology optimization approach.

bus split↗

Dynamic Parameter Estimation with Physics-based Neural Ordinary Differential Equations

Accurate estimation of dynamic parameters of gen-erators is crucial to building a reliable model for dynamical studies and reliable operation of the power system. This paper develops a physics-based neural ordinary differential equations (ODE) approach to learn the parameters of generator dynamic model using phasor measurement units (PMU) data. We design a physics-based neural network to represent the swing equations of the power system dynamics. A loss function is defined as the difference between dynamic simulation results from the physics-based neural networks and pseudo PMU measurements. The parameters of generator dynamic model are iteratively updated using the neural ODEs and the adjoint method. By exploiting the mini-batch scheme in neural ODE training, the parameter estimation performance is significantly improved. Numerical study results on a 3-machine 9-bus system show that the proposed algorithm outperforms state-of-the-art baseline method in both computation time and dynamic parameter estimation accuracy.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Understanding the Capabilities and Limitations of the Controls and Operations of High Voltage Direct Current (HVdc) Converters in Interconnected Electric Power Systems

This project will seek to build a fundamental understanding, and capability, to model and simulate the controls and operations of high voltage direct current (HVdc) converter stations in an electromagnetic simulation environment. While HVdc stations have been operated in the United States for over 50 years, these are typically simple two terminal point-to-point systems. Recently multi-terminal systems have begun to be deployed. The challenge with these new multi-terminal systems is that they often use different control schemes on the different terminals. The interactions of existing and new controls, and the fact that HVdc systems are rates in the 1,000’s of MWs means that small control instabilities can have dramatic impacts to bulk power systems. Despite these challenges, the operational capabilities of HVdc make them an attractive option for the transfer of the large amounts of renewable electricity that will be necessary for decarbonization of the nation’s electrical infrastructure and other sectors.

42 ENGINEERING↗

Analysis of Multi-Output Hybrid Energy Systems Interacting with the Grid: Application of Improved Price-Taker and Price-Maker Approaches to Nuclear-Hydrogen Systems

The growing recognition of the value of hydrogen as an energy intermediate in supporting future power systems with high shares of variable renewable energy has prompted many studies to quantify the economic potential of multi-output hybrid systems, which are one type of integrated energy systems (IES). Because of the complexity of modeling multiple sectors, these studies typically use simplified modeling approaches to capture the interactions between sectors. In this study, we explore the implications of alternative modeling approaches for nuclear-hydrogen IES focusing on a power system in the Midwest United States. We combine highly resolved capacity expansion and production cost modeling tools of the power system with a detailed hydrogen system optimization tool to determine the optimal electrolyzer and storage sizing and optimal operations of the nuclear-hydrogen hybrid resource across three future study years. We compare economic and operational outcomes across a spectrum of modeling approaches, including a non-hybridized base approach; a traditional price-taker approach that does not include the impact of hydrogen production on the electricity system; a power-system-focused price-maker approach that does not account for temporal hydrogen constraints; and two improved price-taker and price-maker approaches that each address the impact of revenue-optimal levels of electricity production on the resulting power system and temporal hydrogen constraints on the overall feasible solution. Results show how a traditional price-taker approach can overestimate the economic benefits of multi-output nuclear-hydrogen IES compared to our two improved approaches that estimate both hydrogen system constraints and power system interaction. We find that hydrogen output requirements and storage size limits are key drivers to overall operations and some economic outcomes. Under our assumed constant hydrogen output requirement, storage costs, test system, and modeling approaches, our results indicate that hybridization can provide a net benefit, but results are sensitive to the treatment of hydrogen revenues and electricity prices as impacted by the power system evolution.

capacity expansion modeling↗

Turbine-based Power System Tool

Advanced research tools are essential to illustrate the effects of turbine-based power system operations on the electric grid network. This paper presents the development of an open-source tool to visualize the operation of turbine-based electricity generation. The tool exposes power system models, control parameters, and corresponding values of the turbine model and its electrical system, allowing them to customize the simulation according to their needs. The developed tool enables users to simulate power profiles for different turbinebased energy generation such as wind, tidal, and gas turbines. It allows users to investigate the details of the generated profiles of various types of turbine systems at various scales. It can provide valuable insights into model development and facilitate the analysis of integrated power systems. By enabling access to turbine-based operations visualization, the tool aims to bridge the gap between advanced research tools and users, facilitating broader adoption of renewable energy technologies and aiding in developing sustainable power systems.

Kini, Roshan L.↗

A two-level structure for advanced space power system automation

The tasks to be carried out during the three-year project period are: (1) performing extensive simulation using existing mathematical models to build a specific knowledge base of the operating characteristics of space power systems; (2) carrying out the necessary basic research on hierarchical control structures, real-time quantitative algorithms, and decision-theoretic procedures; (3) developing a two-level automation scheme for fault detection and diagnosis, maintenance and restoration scheduling, and load management; and (4) testing and demonstration. The outlines of the proposed system structure that served as a master plan for this project, work accomplished, concluding remarks, and ideas for future work are also addressed.

Loparo, Kenneth A.↗

A Nonlinear Regression Method for Composite Protection Modeling of Induction Motor Loads

Protection equipment are used to prevent damages to induction motor loads by isolating those from the power network in the event of severe faults. Modeling the response of induction motor loads and their protection is vital for power system planning and operation, especially in understanding system's response moments after a fault has occurred. This article proposes an optimization based framework to generate composite protection models for commercial building motor loads. Introducing a mathematical abstraction, the task of finding a suitable (simplified) model of the composite protection scheme is formulated as a nonlinear regression problem. Numerical examples are provided to illustrate the application of the framework.

Kundu, Soumya↗

Low-Power Operation and Plasma Characterization of a Qualification Model SPT-140 Hall Thruster for NASA Science Missions

Hall thruster systems based on commercial product lines can potentially lead to lower cost electric propulsion (EP) systems for deep space science missions. A 4.5-kW SPT-140 Hall thruster presently under qualification testing by SSL leverages the substantial heritage of the SPT-100 being flown on Russian and US commercial satellites. The Jet Propulsion Laboratory is exploring the use of commercial EP systems, including the SPT-140, for deep space science missions, and initiated a program to evaluate the SPT-140 in the areas of low power operation and thruster operating life. A qualification model SPT-140 designated QM002 was evaluated for operation and plasma properties along channel centerline, from 4.5 kW to 0.8 kW. Additional testing was performed on a development model SPT-140 designated DM4 to evaluate operation with a Moog proportional flow control valve (PFCV). The PFCV was commanded by an SSL engineering model PPU-140 Power Processing Unit (PPU). Performance measurements on QM002 at 0.8 kW discharge power were 50 mN of thrust at a total specific impulse of 1250 s, a total thruster efficiency of 0.38, and discharge current oscillations of under 3% of the mean current. Steady-state operation at 0.8 kW was demonstrated during a 27 h firing. The SPT-140 DM4 was operated in closed-loop control of the discharge current with the PFCV and PPU over discharge power levels of 0.8-4.5 kW. QM002 and DM4 test data indicate that the SPT-140 design is a viable candidate for NASA missions requiring power throttling down to low thruster input power.

Garner, Charles E.↗

Visual Style Elements in Human–System Interface Design for Nuclear Power Operations: Does Style Affect Performance and Preference?

As the world increasingly adopts renewable and sustainable energy systems, transitionary solutions include nuclear power, which currently provides 20% of the United States’ electricity and is the largest single source of carbon-free electricity generation. Advanced reactors are a critical component of a carbon-free mixed energy portfolio that require careful design of first-of-a-kind control rooms. The application of Human Factors Engineering (HFE) is essential for scientific and iterative testing of novel human–system interface (HSI) concepts to ensure effective, efficient, and safe plant operations. Microworlds are simulators that use simplified physics models and control systems to distill nuclear power operations into essential functions. HFE scientists used the Rancor Microworld Simulator to obtain preference and performance metrics for novel and traditional static HSI design styles. Participants comprised advanced reactor company employees and nuclear industry consultants. A mixture of quantitative and qualitative data was captured. There was a preference for the basic graphical style that included high contrast and traditional color scheme elements. No single HSI design outperformed the others, and the participants did not perform better using their preferred HSI style. We report this experiment is the first in a series of HFE testing for HSIs in advanced reactor control room development. Clear user preferences emerged for elements within static displays. The cutting-edge neumorphic style was the least preferred. Future directions include tests of dynamic displays. HFE is used in evaluating and designing HSI devices that will improve the efficiency and safety of advanced nuclear power operations.

99 GENERAL AND MISCELLANEOUS↗