Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Power consistency”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

An Overview of Inverter-based Resource Interconnection Standards

For the past century, electric power systems have primarily been bulk power systems consisting of generation, transmission, and distribution networks. Now the rapid expansion of distributed renewable power sources (RESs) and the shift from large, conventional synchronous machine resources to smaller-sized resources with diverse generation characteristics become the most significant change in modern power systems. With the increasing penetration of RESs, which are inverter-based resources (IBRs), it is important to develop interconnection standards that define performance and capability criteria for these IBRs. This is necessary to ensure the stable and reliable operation of power systems. This report summarizes the standards for IBRs interconnection in North America.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Some Results of Multicriterial and Robust Optimization of Nuclear Power Systems Structure

The possibility of applying multicriterial and robust optimization methods as well as stochastic methods of determining the effect of uncertainties in the parameters of a system to structural optimization of nuclear power is discussed for the example of a hypothetical nuclear-power system consisting of thermal and fast reactors. It is shown that the optimal structures of nuclear power systems obtained by such methods are balanced in terms of conflicting criteria and technologically more diversified than those determined by single-criterion deterministic optimization. Cost-based innovative technologies, which can be adopted only by imposing additional external limitations in a single-criterion problem, appear in such structures. The examined methods make it possible to determine on a systematic basis the structures of nuclear power that are balanced in terms of a set of conflicting criteria, since factors having both positive and negative effects on the development of nuclear-power systems are included in the calculations, and to find economically efficient directions of structural changes in the system in order to improve stability and efficiency.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Design and Performance of Tropical Rainfall Measuring Mission (TRMM) Super NiCd Batteries

The Tropical Rainfall Measuring Mission (TRMM) is a joint mission between NASA and the National Space Development Agency (NASDA) of Japan. The observatory is designed to monitor and study tropical rainfall and the associated release of energy that helps to power the global atmospheric circulation shaping both weather and climate around the globe. The spacecraft was launched from Japan on November 27,1997 via the NASDA H-2 launch vehicle. The TRMM Power Subsystem is a Peak Power Tracking system that can support the maximum TRMM load of 815 watts at the end of its three year life. The Power Subsystem consists of two 50 Ampere Hour Super NiCd batteries, Gallium Arsenide Solar Array and the Power System Electronics. This paper describes the TRMM Power Subsystem, battery design, cell and battery ground test performance, and in-orbit battery operations and performance.

Ahmad, Anisa J.↗

Photovoltaic Power System and Power Distribution Demonstration for the Desert RATS Program

A stand alone, mobile photovoltaic power system along with a cable deployment system was designed and constructed to take part in the Desert Research And Technology Studies (RATS) lunar surface human interaction evaluation program at Cinder Lake, Arizona. The power system consisted of a photovoltaic array/battery system. It is capable of providing 1 kW of electrical power. The system outputs were 48 V DC, 110 V AC, and 220 V AC. A cable reel with 200 m of power cable was used to provide power from the trailer to a remote location. The cable reel was installed on a small trailer. The reel was powered to provide low to no tension deployment of the cable. The cable was connected to the 220 V AC output of the power system trailer. The power was then converted back to 110 V AC on the cable deployment trailer for use at the remote site. The Scout lunar rover demonstration vehicle was used to tow the cable trailer and deploy the power cable. This deployment was performed under a number of operational scenarios, manned operation, remote operation and tele-robotically. Once deployed, the cable was used to provide power, from the power system trailer, to run various operational tasks at the remote location.

Colozza, Anthony↗

ACE3P Computations of Wakefield Coupling in the CLIC Two-Beam Accelerator

The Compact Linear Collider (CLIC) provides a path to a multi-TeV accelerator to explore the energy frontier of High Energy Physics. Its novel two-beam accelerator concept envisions rf power transfer to the accelerating structures from a separate high-current decelerator beam line consisting of power extraction and transfer structures (PETS). It is critical to numerically verify the fundamental and higher-order mode properties in and between the two beam lines with high accuracy and confidence. To solve these large-scale problems, SLAC's parallel finite element electromagnetic code suite ACE3P is employed. Using curvilinear conformal meshes and higher-order finite element vector basis functions, unprecedented accuracy and computational efficiency are achieved, enabling high-fidelity modeling of complex detuned structures such as the CLIC TD24 accelerating structure. In this paper, time-domain simulations of wakefield coupling effects in the combined system of PETS and the TD24 structures are presented. The results will help to identify potential issues and provide new insights on the design, leading to further improvements on the novel CLIC two-beam accelerator scheme.

43 PARTICLE ACCELERATORS↗

Power Lander for Support of Long-Term Lunar Presence

Emerging industrial base and the consequent sustained manned Lunar presence will require consistent high power capacities. This paper proposes a first iteration design of a flyable electric power platform which could serve as an enabler of Lunar Development and Exploration. It is intended to support a small facility solo or an emerging industrial base as part of a grid. Lunar Missions, Habitats and Facilities stand to benefit from an expected decade of non-stop operation, the economics of scale, Commercial Off-The-Shelf (COTS) availability, standardization of design, and logistical support for Lunar encampments provided by this architecture. The unattended and unmanned vehicle design is to be man- and robotics-serviceable after delivery by current and proposed heavy-lift boosters. Design continuity within a family of systems will improve reliability through "lessons learned'' in the field. Further, various configurations of the proposed scalable architecture will provide reference platforms for the indigenous construction of similar power plant facilities from in-situ Lunar resources (ISRU). The baseline design should be directed towards those materials available on the Moon and expected to be manufacturable on-site within the first decade of operation.

Joyner, Russ↗

Consistency of the Planck CMB data and ΛCDM cosmology

We test the consistency between Planck temperature and polarization power spectra and the concordance model of Λ Cold Dark Matter cosmology (ΛCDM) within the framework of Crossing statistics. We find that Planck TT best fit ΛCDM power spectrum is completely consistent with EE power spectrum data while EE best fit ΛCDM power spectrum is not consistent with TT data. However, this does not point to any systematic or model-data discrepancy since in the Planck EE data, uncertainties are much larger compared to the TT data. We also investigate the possibility of any deviation from ΛCDM model analyzing the Planck 2015 data. Results from TT, TE and EE data analysis indicate that no deviation is required beyond the flexibility of the concordance ΛCDM model. Our analysis thus rules out any strong evidence for beyond the concordance model in the Planck spectra data. We also report a mild amplitude difference comparing temperature and polarization data, where temperature data seems to have slightly lower amplitude than expected (consistently at all multiples), as we assume both temperature and polarization data are realizations of the same underlying cosmology.

79 ASTRONOMY AND ASTROPHYSICS↗

Cryogenically-Operable Electronics for Surviving the Lunar Night

Current solar-powered robotic lunar landers and rovers have not demonstrated survivability of the extreme cold temperatures seen during the 354-hour lunar night. To address this capability gap, we have been investigating the feasibility of a passive hibernation approach to enable low-cost solar- and battery-powered missions to operate over multiple lunar cycles. This strategy relies on isolating the batteries from the main bus during the lunar night and allowing cells to freeze as temperatures descend as low as 50K. The entire power architecture remains in a hibernation state with no electrical activity until lunar dawn. When the sun returns over the horizon, the now-illuminated solar arrays begin generating power. In order to manage the array power, architecture consisting of cryogenically-operable COTS electronics must be utilized. This architecture will distribute and control power to subsystems - importantly controlling heaters to bring the frozen lithium-ion battery cells to normal operating conditions. This alternative approach to lunar operations will enable low-cost commercial lunar landers and payloads to passively survive the night and continue to operate over multiple lunar cycles without a significant impact to cost or payload mass. Research last year focused on creating a power supply that was capable of operation at cryogenic temperatures. At the end of FY23, our team successfully designed and manufactured a Sequential Switching Shunt Regulator (S3R) that is operational in a cryogenic vacuum chamber. It is capable of full operation down to the coldest lunar night temperatures (~50K). Our presentation will provide an overview of the Lunar Hibernation strategy but will focus mainly on the technical details of this cryogenically-operable shunt regulator and test results.

Cryogenic↗

Measurements of B-mode polarization of the cosmic microwave background from 500 square degrees of SPTpol data

We report a B-mode power spectrum measurement from the cosmic microwave background (CMB) polarization anisotropy observations made using the SPTpol instrument on the South Pole Telescope. This work uses 500 deg 2 of SPTpol data, a five-fold increase over the last SPTpol B-mode release. As a result, the bandpower uncertainties have been reduced by more than a factor of two, and the measurement extends to lower multipoles: 52 < ` < 2301. Data from both 95 and 150 GHz are used, allowing for three cross-spectra: 95 GHz x 95 GHz, 95 GHz x 150 GHz, and 150 GHz x 150 GHz. B-mode power is detected at very high significance; we find P(BB < 0) = 5.8 × 10 -71 , corresponding to a 18.1 σ detection of power. With a prior on the galactic dust from Planck, WMAP and BICEP2/Keck observations, the SPTpol B-mode data can be used to set an upper limit on the tensor-to-scalar ratio, r < 0.44 at 95% confidence (the expected 1 σ constraint on r given the measurement uncertainties is 0.22). We find the measured B-mode power is consistent with the Planck best-fit ΛCDM model predictions. Scaling the predicted lensing B-mode power in this model by a factor A lens , the data prefer A lens = 1.17 ± 0.13. These data are currently the most precise measurements of B-mode power at ℓ > 320.

79 ASTRONOMY AND ASTROPHYSICS↗

Data Analytics for Electrical Distribution Systems with Micro PMUs (GMLC 1.4.9 Technical Report)

This report describes how electrical utilities with residential, industrial, commercial and government customers make decisions using Data Analytics (DA) applications and discusses how OpenFMB was leveraged to share that data among disparate types of devices for DA. OpenFMB is a data standard developed by utilities for distributed communication and control of power system assets. Here we explored how OpenFMB can be used for sharing analytics and what those analytics could be for a set of representative grid devices. A review of DA applications performed by electrical utilities and customers is presented. An overview of how the testbed we used was built and configured is summarized. Several experiments which were carried out to explore the capabilities of OpenFMB alongside other data sharing mechanisms for gathering sensor measurements and sharing analytics is also discussed. And finally a comparison of OpenFMB and LBNL’s SPARK framework is summarized. Today’s electrical utilities focus on monitoring the real-time customer consumptions, offering new real-time tariff models based on customer usage habits (rewards and punishments), providing energy peak during peak load times (plan energy generation and distribution), improving the load management for transformers and power lines, and controlling the energy and grid resources efficiently. On the other hand, the DA applications for residential customers are based on modifying the customer electricity usage habit to save money, making accurate and timely decisions for electrical billing. However, the DA applications for industrial, commercial and government customers focus on creating efficient programs to improve the environmental condition (reducing CO₂ emission), developing better load forecasting for industrial and/or commercial activities. In this project, a testbed was built to explore how the OpenFMB framework can be used to distribute data among various types of representative grid edge devices. Micro PMUs (Phasor Measurement Unit) were used to collect and transmit data to an OpenPDC server alongside relays with a framework configured with a system using OpenFMB to collect and transmit data. The testbed was composed of a physical asset based on a 60 Hz AC radial power system constructed using SI-GRID components. The power system consisted of a 3-phase 14 volts line-to-ground (24 volts line-to-line) power source, three 3-phase line emulators, a programmable resistive load bank, two smart relays, two micro PMUs, and a (SCADA) and Phasor Data Concentrator (PDC) computer. This testbed configuration allowed us to perform breaker operation tests collecting data from the micro PMUs and from the relays’ sensors. During the micro PMU breaker operation tests we collected the measured and estimated fundamental voltages, currents, frequency as well as the total true, reactive and apparent power. The displacement power factor from two micro PMUs located in parallel power lines was also used. The software steps for the implementation of the Synchrophasor system are explained in detail in this report. The setting (1-2-3) and data collection (4-5) phases were performed with a free download open source software. In the setting phase, the micro PMUs were set (1), the data stream for each micro PMU was validated, and the connection and configuration files were created (2). The PDC computer was set using the connection and configuration files of the micro PMUs (3). In the data collection phase, the binary data from the micro PMUs was collected (4), and the binary data files of the micro PMUs was converted to analyze the test results (5). OpenFMB was configured to use protocol translators to read Modbus and transform the reading into the OpenFMB data model to be read for DA applications.Our experiments showed that by leveraging the OpenFMB data model and the micro PMUs together we could obtain better situational awareness of network faults, which in some cases could lead to failures in the system and would be less perceivable otherwise. For example, in one experiment the fundamental RMS current angle, and the fundamental displacement power factor (estimated by the ratio between the measured real and apparent total power) had a disturbance at the micro PMU connected to the beginning of the parallel power line because the breaker was opened without the operators or SCADA system’s knowledge, and no current was available. Based on the breaker state scenarios and micro PMU locations, the DA applications using the current angle and displacement power factor from the micro PMUs should be studied in detail to avoid a non-desired measurement that could affect the decision from the DA. Also, the sample rates for PMU, Relay and micro PMU devices were compared. The DA application improved the control and operation between the electrical utilities and their customers (residential, industrial, transportation, commercial and government). The higher the sample rate, the better the quality of the measurement for DA estimations.

42 ENGINEERING↗

Low-Cost, Easy-To-Integrate and Reliable Grid Energy Storage System with 2 nd Life Lithium Batteries

Batteries retired from electric vehicles have the potential to extend their service as low-cost stationary energy storage systems. However, disperse battery state of health (SOH) and nonuniform battery characters often lead to compromised battery performance and reliability, which greatly hinder their adoption. A Heterogenous Unifying Battery (HUB) system is proposed to stage 2 nd life battery bricks for a period, and enable them to attain improved SOH uniformity, performance, and reliability before being sold for 2 nd life applications, while simultaneously providing grid services. It may offer a technically and economically advantageous solution for the broad utilization of 2 nd use batteries. The goal of this project was to develop the hardware and software that enables the key functions of the HUB system. The first achievement of the project was the development of a 1kW scale proof-of-concept (POC) system, which comprises (i) a modular plug-n-play DC-DC power converter matrix with isolated series output connections to achieve fully independent control of energy flow to each of the connected battery units at low voltage; (ii) enhanced model based control that drives each batteries’ SOH towards uniformity while collectively providing grid energy storage services; and (iii) comprehensive procedures to perform battery diagnostics and prognostics. The second achievement was the development of a 100kW scale HUB system and demonstrated its performance of re-establishing battery SOH uniformity through a period of battery cycling operation. The final HUB system incorporates six DC-DC power converter matrices paired with six battery bricks. Hot swapping of a single battery brick while maintaining consistent system power was demonstrated and system operation was validated to be capable of implementing the approved grid duty cycle and of balancing and conditioning the battery bricks. Through the course of the project, the team optimized the building-block design, form-factors, and adjusted life balancing control. An up-sized 250kW Scale was developed and deployed in October 2022 with pack-level battery form factors, see photo in Figure 1 The third achievement of the project was to perform a techno-economic analysis in order to better understand the cost and revenue potentials in this new “recondition-then-resell" value proposition. The final TEA quantified the economics of new Li-ion batteries as well as second-life batteries processed via reconditioning and traditional binning. Results showed the reconditioned second-life batteries in this project to be economically favorable and viable in grid energy storage markets. The TEA results were published in the Applied Energy journal. The fourth achievement of the project was to deliver a tech-to-market plan for the HUB system that includes funding, IP, and manufacturing strategies. The final T2M plan outlines a business strategy in which the HUB provides a B2B service to EV companies as an alternative to battery recycling that can prepare batteries for 2nd life applications. A company named Smartville Inc. was founded to carry on the commercialization, funding, and technical IP licensing activities of the OPEN project.

25 ENERGY STORAGE↗

X-57 Mod II Avionics Power Analysis

The X-57 Mod II Avionics Power Analysis was developed to provide the design requirements for the X-57 Avionics Power System. In the Mod II configuration, the two stock Tecnam P2006T Rotax engines are replaced with two electric motors. A high voltage traction battery (460 VDC nominal) supplies power for the motors. The Mod II avionics power design uses the stock Tecnam avionics power architecture as a baseline. The stock Tecnam power system utilizes three 12 VDC power sources, a battery and two alternators, to provided redundant avionics power. This redundancy was preserved in the X-57 avionics power architecture. A block diagram of the X-57 avionics system can be found in the “Mod II Architecture” worksheet of this documents. Since the X-57 electric motors do not have alternators or generators, two 13.8V DC Converters were added to replace the stock Tecnam alternators. Input power to these DC Converters is provide by the high voltage traction battery. The Tecnam stock lead acid battery was replaced with a Lithium Iron Phosphate (LiFePO4) battery. The Mod II Avionics Power Analysis provided the power requirements for the two 13.8V DC converters and the Lithium Iron Phosphate battery. Power requirement estimates for each subsystem used in this analysis were provided by manufacturer specifications, measured in the laboratory or provided by the subsystem design engineer. Typical power requirements and maximum power requirements were provided for each subsystem. The Mod II Avionics Power Systems consists of seven 13.8 VDC buses, two 28 VDC Buses and two 23 VDC buses. The avionics power requirements for Mod III configuration are the same as Mod II. The Mod III configuration replaces the stock Tecnam wing with a carbon fiber wing that is optimized for cruise conditions. The motors are located on the wingtips. The Mod IV Avionics Power Analysis is a separate analysis and is document number ANLYS-CEPT-032.

Keith Harris↗

Advanced Soldier Thermoelectric Power System for Power Generation from Battlefield Heat Sources

The U.S. military uses large amounts of fuel during deployments and battlefield operations. This project sought to develop a lightweight, small form-factor, soldier-portable advanced thermoelectric (TE) system prototype to recover and convert waste heat from various deployed military equipment (i.e., diesel generators/engines, incinerators, vehicles, and potentially mobile kitchens), with the ultimate purpose of producing power for soldier battery charging, advanced capacitor charging, and other battlefield power applications. The technical approach employed microchannel technology, a unique “power panel” approach to heat exchange/TE system integration, and newly-characterized LAST (lead-antimony-silver-telluride) and LASTT (lead-antimony-silver-tin-telluride) TE materials segmented with bismuth telluride TE materials in designing a segmented-element TE power module and system. This project researched never-before-addressed system integration challenges (thermal expansion, thermal diffusion, electrical interconnection, thermal and electrical interfaces) of designing thin “power panels” consisting of alternating layers of thin, microchannel heat exchangers (hot and cold) sandwiching thin, segmented-element TE power generators. The TE properties, structurally properties, and thermal fatigue behavior of LAST and LASTT materials were developed and characterized such that the first segmented-element TE modules using LAST / LASTT materials were fabricated and tested at hot-side temperatures = 400 °C and cold-side temperatures = 40 °C. LAST / LASTT materials were successfully segmented with bismuth telluride and electrically interconnected with diffusion barrier materials and copper strapping within the module electrical circuit. A TE system design was developed to produce 1.5-1.6 kW of electrical energy using these new TE modules from the exhaust waste heat of 60-kW Tactical Quiet Generators as demonstration vehicles.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Methane Mitigation Thermoelectric Generator (MMTEG) (Final Scientific/ Technical Report)

Gas Technology Institute (GTI) has completed a $1.815M (plus $500K cost share), 54-month Co-operative agreement with the Department of Energy’s National Energy Technology Laboratory to develop a Methane Mitigation Thermoelectric Generator (MMTEG) system for gas field applications. This novel system uses fugitive gas to produce electrical power and consists of Thermoelectric Generators (TEG) driven by a linear burner, an air compressor, an accumulator, valves, batteries, and power electronics. The electrical power generated by the system is used to compress air and, in turn, the air is used to operate the pneumatic valves at the well site instead of using natural gas (NG) which would then be vented. The team completed the project objectives which included (1) Design, fabricate and test an integrated 6We nominal MMTEG prototype system, (2) Design a “retrofit kit” MMTEG system capable of being field tested at a gas well production site, and (3) build and test the field MMTEG system in a laboratory environment. Multiple system options were developed prior to selecting a “Passive” system which meets cost, NG savings, and greenhouse gas (GHG) reduction targets although not as efficient as initially planned. The MMTEG system is built primarily from commercial off-the-shelf parts (in some cases re-purposed) including the heat exchanger, heat rejection, electronic components, and also the TEGs. The team developed and implemented a novel system including the control system developed by Morrison Applied Sciences (MAS). The team completed incremental demonstrations of the hardware prior to the MMTEG system demonstration. A one-year simulation of the air delivery and battery charging subsystems was completed prior to the integration into the MMTEG system. In addition, the team simulated two-years of thermal cycles for integrated Burner/TEG/heat rejection subsystem. Finally, the entire MMTEG system was assembled, and troubleshooting was completed over a two-week period. Next, the MMTEG system was tested to simulate over 15 weeks of entire system operation over approximately four weeks in an accelerated test fashion with minimal intervention (such as changing fuel tanks). The MMTEG system met the key goals of a unit cost of under $1500 while saving 97% of NG expended today (including leakage) on average by pneumatic systems venting to the atmosphere. The MMTEG system reduced GHG emissions by 1000X (using the methane intensification factor of 28 relative to CO2). GTI is currently pursuing a field test of the MMTEG system. Interfacing with producers has provided additional insight into system improvements. Planned improvements include additional weather protection and control system improvements including the implementation of a long- range radio capability to notify operators if there is a fault.

03 NATURAL GAS↗

Measurements of B-mode Polarization of the Cosmic Microwave Background from 500 Square Degrees of SPTpol Data

We report a B-mode power spectrum measurement from the cosmic microwave background (CMB) polarization anisotropy observations made using the SPTpol instrument on the South Pole Telescope. This work uses 500 deg$^2$ of SPTpol data, a five-fold increase over the last SPTpol B-mode release. As a result, the bandpower uncertainties have been reduced by more than a factor of two, and the measurement extends to lower multipoles: $52 < \ell < 2301$. Data from both 95 and 150 GHz are used, allowing for three cross-spectra: 95 GHz x 95 GHz, 95 GHz x 150 GHz, and 150 GHz x 150 GHz. B-mode power is detected at very high significance; we find $P(BB < 0) = 5.8 \times 10^{-71}$, corresponding to a $18.1 \sigma$ detection of power. An upper limit is set on the tensor-to-scalar ratio, $r < 0.44$ at 95% confidence (the expected $1 \sigma$ constraint on $r$ given the measurement uncertainties is 0.22). We find the measured B-mode power is consistent with the Planck best-fit $\Lambda$CDM model predictions. Scaling the predicted lensing B-mode power in this model by a factor Alens, the data prefer Alens = $1.17 \pm 0.13$. These data are currently the most precise measurements of B-mode power at $\ell > 320$.

79 ASTRONOMY AND ASTROPHYSICS↗

A measurement of the cosmic microwave background B-mode polarization power spectrum at sub-degree scales with POLARBEAR

We report a measurement of the B-mode polarization power spectrum in the cosmic microwave background (CMB) using the POLARBEAR experiment in Chile. The faint B-mode polarization signature carries information about the universe's entire history of gravitational structure formation, and the cosmic inflation that may have occurred in the very early universe. Our measurement covers the angular multipole range 500 < ℓ < 2100 and is based on observations of an effective sky area of 25 deg{sup 2} with 3.'5 resolution at 150 GHz. On these angular scales, gravitational lensing of the CMB by intervening structure in the universe is expected to be the dominant source of B-mode polarization. Including both systematic and statistical uncertainties, the hypothesis of no B-mode polarization power from gravitational lensing is rejected at 97.2% confidence. The band powers are consistent with the standard cosmological model. Fitting a single lensing amplitude parameter A{sub BB} to the measured band powers, A{sub BB}=1.12±0.61(stat){sub −0.12}{sup +0.04}(sys)±0.07(multi), where A{sub BB} = 1 is the fiducial WMAP-9 ΛCDM value. In this expression, 'stat' refers to the statistical uncertainty, 'sys' to the systematic uncertainty associated with possible biases from the instrument and astrophysical foregrounds, and 'multi' to the calibration uncertainties that have a multiplicative effect on the measured amplitude A{sub BB}.

79 ASTRONOMY AND ASTROPHYSICS↗

Constraints on single-field inflation with WMAP, SPT and ACT data — a last-minute stand before Planck

We constrain models of single field inflation with the pre-Planck CMB data. The data used here is the 9-year Wilkinson Microwave Anisotropy Probe (WMAP) data, South Pole Telescope (SPT) data and Atacama Cosmology Telescope (ACT) data. By adding in running of spectral index parameter, we find that the χ{sup 2} is improved by a factor of Δχ{sup 2} = 8.44, which strongly indicates the preference of this parameter from current data. In addition, we find that the running of spectral index α{sub s} does not change very much even if we switch to different pivot scales, which suggests that the power law expansion of power spectrum is accurate enough till the 1st order term. Furthermore, we find that the joint constraints on r−n{sub s} give very tight constraints on single-field inflation models, and the models with power law potential φ{sup p} can only survive if 0.9∼<p∼<2.1, so a large class of inflation models have already been ruled out before Planck data. Finally, we use the f{sub NL} data to constrain the non-trivial sound speed c{sub s}. We find that the current constraint is dominated by the power spectrum constraints which have some inconsistency with the constraints from f{sub NL}. This poses important questions of consistency between power spectrum and bispectrum of WMAP data.

79 ASTRONOMY AND ASTROPHYSICS↗

Nuclear Power's Future Role in a Decarbonized U.S. Electricity System

This study explores the potential future role of nuclear energy in a decarbonized U.S. electricity system through a multi-model comparison approach. We employ four state-of-the-art CEMs with native and harmonized input assumptions, layered with different policy and technology trajectories. Comparing outputs across models, technology assumptions, and policy scenarios informs model understanding, interpretation, and development decisions. Under current policies, models differ in their projections for nuclear retirements, but nuclear power plants consistently run with high capacity factors and new builds only occur in scenarios with very low nuclear costs. String power sector carbon policies drive models to align in keeping existing nuclear capacity and employing nuclear plant flexibility, but they may not be enough to bring new nuclear capacity online in the absence of significant cost declines. Therefore, significant economic deployment of new nuclear capacity requires both a stringent electric sector CO2 policy and very low cost assumptions for new nuclear. While these scenarios should not be interpreted as predictions, they are informative for understanding differing model assessments of the relative competitiveness of nuclear energy under a range of policy and technology conditions.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗